ccycle
TRANSCRIPT
-
8/18/2019 CCycle
1/4
-
8/18/2019 CCycle
2/4
-
8/18/2019 CCycle
3/4
I agree with the observations of the Peer Team as mentioned in this
report.
Signature of
the Head of the Institution
-
8/18/2019 CCycle
4/4
Seal of Institution
Signature of the Peer Team Member
Place: Shillong Date: 1th
!ul"# $1%