  • Gujarat RefineryIndian Oil Corporation Limited

    Catalytic Reforming UnitDate Time 11/1/2015 5:51Overall DesignOnstream Days No. -Reformer T'put MTPD 983Reformate Yield % 88.31Octane Tonne T/P * Yield * RON 76407

    Quality ControlReformate R/DReformate RON No. 92.0Reformate Density gm/cc at 15 0C 0.786Reformate Benzene %

  • Furnace21-F-01

    - 214- 273

    780 756438 373

    - -390 557

    - 4.7Waste Heat BoilerSteam Pressure Kg/cm2gSteam Flow MT/hrSteam Temp.

    Equipments Under MaintenanceEquipment No. Service

    22FC13 C2 to K2 flow22P11B BFW cir

    Area of Concern21-F-01/02 running at very very high stack temp./Arch temp.RGC Oil mist separator not working properly.RGC main sealing system is passing and lube oil is leaking outside from turbine as well as from compressor side.

    Note:1. All Blue coloured figures are design/Test run Figures.2. All process data are day average data.3. Cetane improver dosing stopped (vessel level:47.2%)

    CIT, 0CCOT, 0CArch Temp., 0CSkin Temp., 0CBrid Wall Temp., 0CStack Temp., 0CO2 %

    0C

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:360

    0.51

    1.52

    2.53

    3.54

    CRU Offgas to FG, Kg/hr

  • 0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:360

    0.51

    1.52

    2.53

    3.54

    CRU Offgas to FG, Kg/hr

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:360

    500

    1000

    1500

    2000

    2500E-1 gas away to FG, Kg/hr

  • Gujarat RefineryIndian Oil Corporation Limited

    Catalytic Reforming Unit

    Feed/Products188 Feed Unit

    1050.0 Naphtha to Unit MTPH83.46 Feed Sources79750 AU - 1 K9 btm to CRU MTPH

    Hy Nap. from HCU MTPH- MTPH- MTPH

    91.0 31-Oct-15 - MTPH0.7813 31-Oct-15 Total Feed receipt MTPH

    1.82 27-Oct-15 Total Feed to Unit MTPH

    83 31-Oct-15 Products Unit0.26 31-Oct-15 Reformate MTPH45 17-Oct-15 Drag Stream MTPH

    0.50 23-Oct-15 PTN(Surplus) MTPH

  • 22-C-03 Pressure Kg/cm2g -22-K-02 Top temp. -22-K-02 Bottom temp. -22-K-02 Pressure Kg/cm2g -22-K-02 Reflux Flow -

    21-F-02 P-1A(Conv. + Rad - 2) P-1A (Rad - 1)- 242 354 452- 241 452 498

    829 810 - -360 285 478 532

    - - 928 933371 452 - -

    - 7 - -Fuel Gas

    12.50 Pressure Kg/cm2g 1.724.04 Flare CV Opening % 0.00

    193.2 Fuel gas consu. in CRU Kg/hr 1193

    Equipments Under MaintenanceAction by Date of outage Maintenance Status

    I/M 27/04/15 It's orifice tapping is chockedM/M 1/9/15 Casing leak

    Area of Concern21-F-01/02 running at very very high stack temp./Arch temp.RGC Oil mist separator not working properly.RGC main sealing system is passing and lube oil is leaking outside from turbine as well as from compressor side.

    3. Cetane improver dosing stopped (vessel level:47.2%)

    0C0C

    M3/hr

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:360

    0.51

    1.52

    2.53

    3.54

    CRU Offgas to FG, Kg/hr

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:365900595060006050610061506200625063006350

    CRU Offgas to MSQU, M3/hr

  • 0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:360

    0.51

    1.52

    2.53

    3.54

    CRU Offgas to FG, Kg/hr

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:365900595060006050610061506200625063006350

    CRU Offgas to MSQU, M3/hr

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:360

    500

    1000

    1500

    2000

    2500E-1 gas away to FG, Kg/hr

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:360

    0.10.20.30.40.50.60.70.80.9

    1FG to flare CV ope., %

  • Gujarat RefineryIndian Oil Corporation Limited

    Catalytic Reforming Unit

    Quantity Stock, m3 (+/-)45 43.750 MSQU Feed

    -528.00 CRU Feed10.00 101

    - - Total Feed- - 96- - - 43.750

    Quantity To38.684 36.516 Blending Needs to be crosschecked with OMS tank dip.1.059 1.213 AU - 20.000 0.000 Tk - 5540.200 0.003 FG Network0.228 0.372 FG Network1.118 0.003 FG Network1.297 1.611 To MSQU1.324 1.710 FG Network0.140 0.140 To Pretreater43.910 41.426

    56.221991

    5.60.50

    Delta P, Kg/cm275.0 0.9428.0 0.6610.9 0.7017.8 0.89

    117.3 2.40

    Delta T, 0C

  • 15.564.6

    180.112.318.9

    P-1B (Rad - 3) 22-F-01472 - 424488 - 498

    - 857 744501 600 546891 - -

    - 240 210- - 4.9

    Equipments Under MaintenanceRemarks

    C2 to K2 Feed flow inter lock is by passed.Under replacement

    Area of Concern21-F-01/02 running at very very high stack temp./Arch temp.RGC Oil mist separator not working properly.RGC main sealing system is passing and lube oil is leaking outside from turbine as well as from compressor side.

    3. Cetane improver dosing stopped (vessel level:47.2%)

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:365900595060006050610061506200625063006350

    CRU Offgas to MSQU, M3/hr

  • 0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:365900595060006050610061506200625063006350

    CRU Offgas to MSQU, M3/hr

    0:00 4:48 9:36 14:24 19:12 0:00 4:48 9:360

    0.10.20.30.40.50.60.70.80.9

    1FG to flare CV ope., %

  • Needs to be crosschecked with OMS tank dip.

    4

  • Sheet2