cbn sep8 brownfields workshop final

18
Implementing Brownfields Lisa Prime Director Environment and Innovation

Upload: oneia

Post on 10-Jun-2015

141 views

Category:

Environment


0 download

DESCRIPTION

September 9, 2014. ONEIA Excess Soil Session - Presentation Lisa Prime Waterfront Toronto

TRANSCRIPT

Page 1: Cbn sep8 brownfields workshop final

Implementing Brownfields

Lisa Prime Director Environment and Innovation

Page 2: Cbn sep8 brownfields workshop final

We’re engaged in one of the most significant city building projects in the world.

Page 3: Cbn sep8 brownfields workshop final

Our business model

Page 4: Cbn sep8 brownfields workshop final

Master planner and developer

Page 5: Cbn sep8 brownfields workshop final

Creating quality of place

Page 6: Cbn sep8 brownfields workshop final

Responsible revitalization

Page 7: Cbn sep8 brownfields workshop final

Innovative Integrated Systems

Design Excellence

Green Buildings

Sustainable Transport

Intelligent Communities

Parks and Habitat

Creation

Infrastructure

Moving Beyond Principles to Performance

Page 8: Cbn sep8 brownfields workshop final
Page 9: Cbn sep8 brownfields workshop final

Minimum Green Building Requirements and Tracking System Version 1 2006, Version 2 February 2014 Minimum performance measures for development: energy, water, waste, transportation, materials, design + progress tracking including soil management plan activities for contaminated soils

Page 10: Cbn sep8 brownfields workshop final

•  LEED Gold certified buildings

•  building targeting LEED Gold certification awaiting review with the Canada Green Building Council

•  buildings under construction targeting LEED Gold certification

•  buildings under design targeting LEED Gold certification

LEED certified buildings

2

1

10

4

Page 11: Cbn sep8 brownfields workshop final

Waste Diversion

65

89

97

97

99

100

West Don Lands

George Brown College

York Quay

Sherbourne Common

Queen's Quay

Bayside

Waste&Diversion&Rates&(construc1on,&demoli1on,&and&excava1on)&in&%&

Page 12: Cbn sep8 brownfields workshop final

Revitalizing brownfields

•  40,000$new$residences,$$•  40,000$new$jobs,$and$$•  300$hectares$of$public$parks$

Page 13: Cbn sep8 brownfields workshop final

Land risk assessed,

43.5

Land assessed but not yet

implemented 17.3$

Land not yet assessed,

9.8$

Land assessed and met property specific

standards (remediation

not required),

Brownfield approvals (ha)

Page 14: Cbn sep8 brownfields workshop final

Soil Recycling Facility Established in July 2010 Use technology to treat contaminated soil and turn it in to a resource

Cost Benefit Analysis Completed

Technology Research Sharing, others such as Kingston, Cambridge Model for brownfields stakeholders

Page 15: Cbn sep8 brownfields workshop final

Building future-ready infrastructure

Page 16: Cbn sep8 brownfields workshop final

The Port Lands

Page 17: Cbn sep8 brownfields workshop final

Port Lands Future Communities

Page 18: Cbn sep8 brownfields workshop final

Lisa Prime Director Environment and Innovation

www.waterfrontoronto.ca

Follow us on Twitter: @WaterfrontTO