CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Building (C)BLDC
PERMITTYPEPREFIX
Air Barrier Behind TubOther Inspector CommentsRed Card Items
Air BarriersOther Inspector CommentsRed Card Items
Brick Lintelsmake sure any lintel over 10 feet you have eng. DOther Inspector CommentsRed Card Items
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed
Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing
Demolition InspectionOther Inspector Comments
Drain/Damp Proofinginstalled approved alternate designinstalled per codeminimum 2" stone below drain / 6" on topnote location of termination point of pipeOther Inspector CommentsRed Card Itemswaterproofing installed
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Fire Damperinstalled per manufacturers instructionsmatch up UL designs with plansOther Inspector CommentsRed Card Items
Fire Wall Separationall designs must match with plans that were approOther Inspector CommentsRed Card Items
Fixturing and FurnitureOther Inspector CommentsRed Card Items
Floor System Onlycheck for center third bearing for girderscorrect lumber sizes for spansjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Found., Floor Sysm & Dampanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for center third bearing for girderscorrect lumber sizes for spansengineered plans for retaining walls greater thanfoundation vents installedget elevation certificate if requiredinstalled approved alternate designinstalled per approved designinstalled per codejoist blocked at endsminimum 2" stone below drain / 6" on topminimum access of 18" x 24"note location of termination point of pipeOther Inspector CommentsRed Card Itemssealed crawlspacetruss sheets on sitewaterproofing installed
rinspectionchecklists1 11/10/2016 11:06 Page 1 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Building (C)BLDC
PERMITTYPEPREFIX
Foundationanchor bolts installed per code or approved desigcheck any fireplace footings for proper projectioengineered plans for retaining walls greater thanfoundation vents installedinstalled per approved designminimum access of 18" x 24"Other Inspector CommentsRed Card Itemssealed crawlspace
Foundation & Drain Proofanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for proper projection of footingsfoundation vents installedget elevation certificate if requiredOther Inspector CommentsRed Card ItemsVerify location of pier footings with approved pl
Foundation & Floor Systemcheck anchor bolts to insure wrench tightcheck for center third bearing for girderscorrect lumber sizes for spansget elevation certificate if requiredjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site
Framing Above Ceilingdraftstopping installedOther Inspector CommentsRed Card Itemstruss sheets on site
GPS Data CaptureDrawn in and sent to supervisorIf not captured for any reason note why and reschOther Inspector CommentsSend to GIS
Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required
Marriage WallOther Inspector CommentsRed Card Itemsspacing and size of bolts used per mfg. setup man
Masonry Fireplace
check for proper projection of footingsminimum 1" clearance from combustibles at chimneyminimum 2" clearance from combustiblesOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Progress Check of Const.Other Inspector Commentsscheduled follow up inspection if needed
Roof Leaders/Drain TestOther Inspector Commentsverify size with approved engineered plans
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
rinspectionchecklists1 11/10/2016 11:06 Page 2 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Building (C)BLDC
PERMITTYPEPREFIX
Safety BuildingOther Inspector CommentsRed Card Items
Safety ElectricalOther Inspector CommentsRed Card Items
Safety MechanicalOther Inspector CommentsRed Card Items
Safety PlumbingOther Inspector CommentsRed Card Items
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Temp CO (Expired)Other Inspector CommentsRed Card Items
Temp Electrical RenewalOther Inspector CommentsRed Card Items
Temp Gas ConnectionOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Heat on BuildingOther Inspector CommentsRed Card Items
Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments
Temp Power Agreement ExpiredOther Inspector Comments
Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items
Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card Items
Temporary Mech. RenewalOther Inspector CommentsRed Card Items
Vertical Steel in FootingMinimum clearance from earth 3"
Other Inspector CommentsSize rebar and spacing per approved plans
Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing
Building (R)BLDR
PERMITTYPEPREFIX
Air Barrier Behind TubOther Inspector CommentsRed Card Items
Air BarriersOther Inspector CommentsRed Card Items
Brick Lintelsmake sure any lintel over 10 feet you have eng. DOther Inspector CommentsRed Card Items
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
ChimneyOther Inspector CommentsRed Card Items
Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed
Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing
Demolition InspectionOther Inspector Comments
rinspectionchecklists1 11/10/2016 11:06 Page 3 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Building (R)BLDR
PERMITTYPEPREFIX
Drain/Damp Proofinginstalled approved alternate designinstalled per codeminimum 2" stone below drain / 6" on topnote location of termination point of pipeOther Inspector CommentsRed Card Itemswaterproofing installed
Elevation Certificate InspectionOther Inspector Comments
Fire Wall Separationall designs must match with plans that were approOther Inspector CommentsRed Card Items
Floor System Onlycheck for center third bearing for girderscorrect lumber sizes for spansjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Found., Floor Sysm & Dampanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for center third bearing for girderscorrect lumber sizes for spansengineered plans for retaining walls greater thanfoundation vents installedget elevation certificate if requiredinstalled approved alternate designinstalled per approved designinstalled per codejoist blocked at endsminimum 2" stone below drain / 6" on topminimum access of 18" x 24"note location of termination point of pipeOther Inspector CommentsRed Card Itemssealed crawlspacetruss sheets on site
waterproofing installedFoundation
anchor bolts installed per code or approved desigcheck any fireplace footings for proper projectioengineered plans for retaining walls greater thanfoundation vents installedinstalled per approved designminimum access of 18" x 24"Other Inspector CommentsRed Card Itemssealed crawlspace
Foundation & Drain Proofanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for proper projection of footingsfoundation vents installedget elevation certificate if requiredOther Inspector CommentsRed Card ItemsVerify location of pier footings with approved pl
Foundation & Floor Systemcheck anchor bolts to insure wrench tightcheck for center third bearing for girderscorrect lumber sizes for spansget elevation certificate if requiredjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site
Framing Above Ceilingdraftstopping installedOther Inspector CommentsRed Card Itemstruss sheets on site
GPS Data CaptureDrawn in and sent to supervisorIf not captured for any reason note why and reschOther Inspector CommentsSend to GIS
Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required
Masonry Fireplacecheck for proper projection of footingsminimum 1" clearance from combustibles at chimneyminimum 2" clearance from combustiblesOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 4 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Building (R)BLDR
PERMITTYPEPREFIX
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Modular Marriage WallOther Inspector CommentsRed Card Items
Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Perm. Power Main Servicemake note of any section not allowed to be turnedOther Inspector Commentspermanent plaques required for more than one servRed Card Items
Power Conn./Temp PoleOther Inspector CommentsRed Card Items
Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Quality Control BuildingOther Inspector Comments
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
Site Code InspectionOther Inspector Comments
Stucco Material Installationmfg installation instructions must be on sitenon drainable systems not allowedOther Inspector CommentsRed Card Items
Temp CO (Expired)Other Inspector CommentsRed Card Items
Temp Electrical RenewalOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments
Temp Power Agreement ExpiredOther Inspector Comments
Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items
Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card ItemsOther Inspector Comments
Temporary Mech. RenewalOther Inspector CommentsRed Card Items
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing
Building (Wireless Comm)WRLS
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
rinspectionchecklists1 11/10/2016 11:06 Page 5 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Building (Wireless Comm)WRLS
PERMITTYPEPREFIX
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far eno
Other Inspector CommentsSchool Inspection
Other Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Building Pool (C)SWMC
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed
Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company
Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing
Building Pool (R)SWMR
PERMITTYPEPREFIX
rinspectionchecklists1 11/10/2016 11:06 Page 6 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Building Pool (R)SWMR
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed
Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing
Building Sign (C)SGNC
PERMITTYPEPREFIX
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Sign FinalOther Inspector CommentsRed Card Items
Building Sign (R)SGNR
PERMITTYPEPREFIX
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Sign FinalOther Inspector CommentsRed Card Items
Catawba Residential Zoning PermitCAZR
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
rinspectionchecklists1 11/10/2016 11:06 Page 7 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Catawba Residential Zoning PermitCAZR
PERMITTYPEPREFIX
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far eno
Other Inspector CommentsSchool Inspection
Other Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Claremont Residential Zoning PermitCLZR
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
rinspectionchecklists1 11/10/2016 11:06 Page 8 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Claremont Residential Zoning PermitCLZR
PERMITTYPEPREFIX
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
County Facility BuildingsCOFA
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footing
installed per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
County SchoolsSCH
PERMITTYPEPREFIX
rinspectionchecklists1 11/10/2016 11:06 Page 9 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
County SchoolsSCH
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor required
engineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Electrical (C)ELEC
PERMITTYPEPREFIX
Electric Under SlabOther Inspector Commentsraceways or cables meet minimum burial depthRed Card Items
Electrical Above Ceilingjunction box covers installedluminaries secured to ceiling gridOther Inspector Commentsraceways supported per code
Electrical Finalbond all available electrodesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector Commentspermanent labels on all disconnectsRed Card Items
Electrical Line UndergroundOther Inspector Commentsraceways or cables meet minimum burial depth
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Fixturing and FurnitureOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 10 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Electrical (C)ELEC
PERMITTYPEPREFIX
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Meeting w/ Elec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Pool Bonding3 foot bonding grid installednote items that were bonded (rwg)Other Inspector CommentsRed Card Items
Quality Control ElectricalOther Inspector Comments
Safety ElectricalOther Inspector CommentsRed Card Items
Service Changebond all available electrodesbond to water line(rwg)minimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Temp Electrical RenewalOther Inspector CommentsRed Card Items
Temp Gas ConnectionOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Heat on BuildingOther Inspector CommentsRed Card Items
Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments
Temp Power Agreement ExpiredOther Inspector Comments
Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items
Temp Saw Pole Connectioncheck for in use coversOther Inspector Comments
Red Card ItemsOther Inspector Comments
Temporary Mech. RenewalOther Inspector CommentsRed Card Items
Wire Mech UnitGFCI outlet within 25 feetOther Inspector CommentsRed Card Itemsworking clearance at disconnect
Electrical (R)ELER
PERMITTYPEPREFIX
Electric Under SlabOther Inspector Commentsraceways or cables meet minimum burial depthRed Card Items
Electrical Above Ceilingjunction box covers installedluminaries secured to ceiling gridOther Inspector Commentsraceways supported per code
Electrical Finalbond all available electrodesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector Commentspermanent labels on all disconnectsRed Card Items
Electrical Line UndergroundOther Inspector Commentsraceways or cables meet minimum burial depth
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Meeting w/ Elec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Pool Bonding3 foot bonding grid installednote items that were bonded (rwg)Other Inspector CommentsRed Card Items
Quality Control ElectricalOther Inspector Comments
rinspectionchecklists1 11/10/2016 11:06 Page 11 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Electrical (R)ELER
PERMITTYPEPREFIX
Relocate Existing Servicebond all available electrodesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items
Relocate Serv. for Const.bond all available electrodesbond between halvesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items
Safety ElectricalOther Inspector CommentsRed Card Items
Service Changebond all available electrodesbond to water line(rwg)minimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items
Temp Electrical RenewalOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Heat on BuildingOther Inspector CommentsRed Card Items
Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments
Temp Power Agreement ExpiredOther Inspector Comments
Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items
Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card ItemsOther Inspector Comments
Under Mobile Home Elec.Other Inspector Comments
Wire Mech UnitGFCI outlet within 25 feetOther Inspector Comments
Red Card Itemsworking clearance at disconnect
ExemptEXEM
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 12 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
ExemptEXEM
PERMITTYPEPREFIX
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Explosives PermitEXPL
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs marked
Verify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Fire ConstructionFCP
PERMITTYPEPREFIX
rinspectionchecklists1 11/10/2016 11:06 Page 13 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Fire ConstructionFCP
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor required
engineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Fire UseFIR
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 14 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Fire UseFIR
PERMITTYPEPREFIX
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Floodplain DevelopmentFLD
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Rough
electrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
rinspectionchecklists1 11/10/2016 11:06 Page 15 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Floodplain DevelopmentFLD
PERMITTYPEPREFIX
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Food & Lodging InstitutionsFLI
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Rough
firestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Hickory Fire ConstructionHFCP
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 16 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Hickory Fire ConstructionHFCP
PERMITTYPEPREFIX
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
ImprovementIMPV
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 17 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
ImprovementIMPV
PERMITTYPEPREFIX
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
LandfillLAN
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs marked
Verify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Long View Residential Zoning PermitLVZR
PERMITTYPEPREFIX
rinspectionchecklists1 11/10/2016 11:06 Page 18 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Long View Residential Zoning PermitLVZR
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor required
engineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Maiden Residential Zoning PermitMDZR
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 19 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Maiden Residential Zoning PermitMDZR
PERMITTYPEPREFIX
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Manufactured HomeMOH
PERMITTYPEPREFIX
Air Barrier Behind TubOther Inspector CommentsRed Card Items
Brick Lintelsmake sure any lintel over 10 feet you have eng. DOther Inspector CommentsRed Card Items
Building Final911 numbers
flashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
ChimneyOther Inspector CommentsRed Card Items
Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed
Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing
Drain/Damp Proofinginstalled approved alternate designinstalled per codeminimum 2" stone below drain / 6" on topnote location of termination point of pipeOther Inspector CommentsRed Card Itemswaterproofing installed
Elevation Certificate InspectionOther Inspector Comments
Fire Wall Separationall designs must match with plans that were approOther Inspector CommentsRed Card Items
Floor System Onlycheck for center third bearing for girderscorrect lumber sizes for spansjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
rinspectionchecklists1 11/10/2016 11:06 Page 20 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Manufactured HomeMOH
PERMITTYPEPREFIX
Foundationanchor bolts installed per code or approved desigcheck any fireplace footings for proper projectioengineered plans for retaining walls greater thanfoundation vents installedinstalled per approved designminimum access of 18" x 24"Other Inspector CommentsRed Card Itemssealed crawlspace
Framing Above Ceilingdraftstopping installedOther Inspector CommentsRed Card Itemstruss sheets on site
GPS Data CaptureDrawn in and sent to supervisorIf not captured for any reason note why and reschOther Inspector CommentsSend to GIS
Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required
Marriage WallOther Inspector CommentsRed Card Itemsspacing and size of bolts used per mfg. setup man
Masonry Fireplacecheck for proper projection of footingsminimum 1" clearance from combustibles at chimneyminimum 2" clearance from combustiblesOther Inspector CommentsRed Card Items
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company
Outside RoughFlashing is installed in all locations required bOther Inspector Comments
Red Card Itemsvapor retarder seams taped and installed per manu
Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Quality Control BuildingOther Inspector Comments
Quality Control Mobile HomeOther Inspector Comments
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Site Code InspectionOther Inspector Comments
Stucco Material Installationmfg installation instructions must be on sitenon drainable systems not allowedOther Inspector CommentsRed Card Items
Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card Items
Under Mobile Home BldgOther Inspector Comments
Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing
Mechanical (C)MECC
PERMITTYPEPREFIX
Boiler/Hot Water Systeminstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Chilled Water Pipingbackflow preventer installedOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 21 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Mechanical (C)MECC
PERMITTYPEPREFIX
Duct Joint SealantOther Inspector CommentsRed Card Items
Duct Smoke Detector TestOther Inspector CommentsRed Card Items
Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in
Fixturing and FurnitureOther Inspector CommentsRed Card Items
Gas Applianceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Gas Line (In & Out)CSST bonded if usedif nonmetallic piping look for tracer wireOther Inspector CommentsRed Card Items
Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Line (Outside)CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Gas PACinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Grease Hood Duct Testclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Hoodclearance to combustibles
installed per manufacturers instructionsOther Inspector CommentsRed Card Items
Hood Exhaust Ductclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Hood System/Fire Suppress.Other Inspector CommentsRed Card Items
Hot Water/Steam Piping Sys.Other Inspector CommentsRed Card Items
Mechanical Above CeilingOther Inspector CommentsRed Card Items
Mechanical FinalOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Mechanical Under SlabOther Inspector CommentsRed Card Items
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Meeting w/ Elec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Meeting w/ Mec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Meeting w/ Plbg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Quality Control MechanicalOther Inspector Comments
Refrig. Lines/Press Testnote pressure test o.k.Other Inspector Comments
rinspectionchecklists1 11/10/2016 11:06 Page 22 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Mechanical (C)MECC
PERMITTYPEPREFIX
Safety MechanicalOther Inspector CommentsRed Card Items
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Heat on BuildingOther Inspector CommentsRed Card Items
Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items
Temporary Mech. RenewalOther Inspector CommentsRed Card Items
Und. Crossover/Dryer VentOther Inspector Comments
Under Mobile Home Mech.Other Inspector Comments
Unit Heatersinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Mechanical (R)MECR
PERMITTYPEPREFIX
Air Barrier Behind TubOther Inspector CommentsRed Card Items
Air BarriersOther Inspector CommentsRed Card Items
Boiler/Hot Water Systeminstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Chilled Water Pipingbackflow preventer installedOther Inspector Comments
Red Card ItemsDuct Joint Sealant
Other Inspector CommentsRed Card Items
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Line (Outside)CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required
rinspectionchecklists1 11/10/2016 11:06 Page 23 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Mechanical (R)MECR
PERMITTYPEPREFIX
Mechanical Above CeilingOther Inspector CommentsRed Card Items
Mechanical FinalOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Mechanical Under SlabOther Inspector CommentsRed Card Items
Meeting w/ Mec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Perm. Gas ConnectionOther Inspector CommentsRed Card Items
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Quality Control MechanicalOther Inspector Comments
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Piping
make sure of two main drains and that are far enoOther Inspector Comments
Safety MechanicalOther Inspector CommentsRed Card Items
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Temp Gas ConnectionOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Heat on BuildingOther Inspector CommentsRed Card Items
Temporary Mech. RenewalOther Inspector CommentsRed Card Items
Und. Crossover/Dryer VentOther Inspector Comments
Under Mobile Home Mech.Other Inspector Comments
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Wire Mech UnitGFCI outlet within 25 feetOther Inspector CommentsRed Card Itemsworking clearance at disconnect
MiscellaneousMISC
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
rinspectionchecklists1 11/10/2016 11:06 Page 24 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
MiscellaneousMISC
PERMITTYPEPREFIX
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far eno
Other Inspector CommentsSchool Inspection
Other Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Mobile ClassroomsMBCL
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
rinspectionchecklists1 11/10/2016 11:06 Page 25 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Mobile ClassroomsMBCL
PERMITTYPEPREFIX
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Plumbing (C)PLMC
PERMITTYPEPREFIX
Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in
Fixturing and FurnitureOther Inspector CommentsRed Card Items
Gas Line (In & Out)CSST bonded if usedif nonmetallic piping look for tracer wireOther Inspector CommentsRed Card Items
Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Line (Outside)CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Grease Hood Duct Testclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Grease Trap Interceptorclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Meeting w/ Plbg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Plumbing Above Ceilingminimum 6.5 insulation on waterlinesnote any cleanout locationsOther Inspector Comments
Plumbing Finalescutcheon rings installedOther Inspector CommentsRed Card Itemstoilets & sinks caulked
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Plumbing Under SlabOther Inspector Comments
Quality Control PlumbingOther Inspector Comments
Roof Leaders/Drain TestOther Inspector Commentsverify size with approved engineered plans
Sewer Line InspectionOther Inspector CommentsRed Card Itemsverify if backwater valve is needed (rwg)
rinspectionchecklists1 11/10/2016 11:06 Page 26 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
Plumbing (C)PLMC
PERMITTYPEPREFIX
Shower PanOther Inspector CommentsRed Card Items
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Water & Sewer LineOther Inspector CommentsRed Card Itemsseal foundation walls
Water LineOther Inspector CommentsRed Card Itemsseal foundation walls
Plumbing (R)PLMR
PERMITTYPEPREFIX
Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in
Gas Line (In & Out)CSST bonded if usedif nonmetallic piping look for tracer wireOther Inspector CommentsRed Card Items
Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Line (Outside)CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Meeting w/ Plbg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Plumbing Above Ceilingminimum 6.5 insulation on waterlinesnote any cleanout locations
Other Inspector CommentsPlumbing Final
escutcheon rings installedOther Inspector CommentsRed Card Itemstoilets & sinks caulked
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Plumbing Under SlabOther Inspector Comments
Quality Control PlumbingOther Inspector Comments
Roof Leaders/Drain TestOther Inspector Commentsverify size with approved engineered plans
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
Sewer Line InspectionOther Inspector CommentsRed Card Itemsverify if backwater valve is needed (rwg)
Shower PanOther Inspector CommentsRed Card Items
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Under Mobile Home Plbg.main cleanoutOther Inspector Comments
Water & Sewer LineOther Inspector CommentsRed Card Itemsseal foundation walls
Water LineOther Inspector CommentsRed Card Itemsseal foundation walls
REHAB CODEREHA
PERMITTYPEPREFIX
Brick Lintelsmake sure any lintel over 10 feet you have eng. DOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 27 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
REHAB CODEREHA
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed
Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing
Fire Wall Separationall designs must match with plans that were approOther Inspector CommentsRed Card Items
Fixturing and FurnitureOther Inspector CommentsRed Card Items
Floor System Onlycheck for center third bearing for girderscorrect lumber sizes for spansjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Found., Floor Sysm & Dampanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for center third bearing for girderscorrect lumber sizes for spans
engineered plans for retaining walls greater thanfoundation vents installedget elevation certificate if requiredinstalled approved alternate designinstalled per approved designinstalled per codejoist blocked at endsminimum 2" stone below drain / 6" on topminimum access of 18" x 24"note location of termination point of pipeOther Inspector CommentsRed Card Itemssealed crawlspacetruss sheets on sitewaterproofing installed
Foundationanchor bolts installed per code or approved desigcheck any fireplace footings for proper projectioengineered plans for retaining walls greater thanfoundation vents installedinstalled per approved designminimum access of 18" x 24"Other Inspector CommentsRed Card Itemssealed crawlspace
Foundation & Floor Systemcheck anchor bolts to insure wrench tightcheck for center third bearing for girderscorrect lumber sizes for spansget elevation certificate if requiredjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site
Framing Above Ceilingdraftstopping installedOther Inspector CommentsRed Card Itemstruss sheets on site
Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required
Masonry Fireplacecheck for proper projection of footingsminimum 1" clearance from combustibles at chimneyminimum 2" clearance from combustiblesOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 28 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
REHAB CODEREHA
PERMITTYPEPREFIX
Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Temp Electrical RenewalOther Inspector CommentsRed Card Items
Temp Gas ConnectionOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Heat on BuildingOther Inspector CommentsRed Card Items
Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments
Temp Power Agreement ExpiredOther Inspector Comments
Temp Power Main Serv.electrical room secured per policyOther Inspector Comments
Red Card ItemsTemp Saw Pole Connection
check for in use coversOther Inspector CommentsRed Card Items
Temporary Mech. RenewalOther Inspector CommentsRed Card Items
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing
REHAB ElectricalRELE
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electric Under SlabOther Inspector Commentsraceways or cables meet minimum burial depthRed Card Items
Electrical Above Ceilingjunction box covers installedluminaries secured to ceiling gridOther Inspector Commentsraceways supported per code
Electrical Finalbond all available electrodesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector Commentspermanent labels on all disconnectsRed Card Items
Electrical Line UndergroundOther Inspector Commentsraceways or cables meet minimum burial depth
rinspectionchecklists1 11/10/2016 11:06 Page 29 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
REHAB ElectricalRELE
PERMITTYPEPREFIX
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Fixturing and FurnitureOther Inspector CommentsRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Meeting w/ Elec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Pool Bonding3 foot bonding grid installednote items that were bonded (rwg)Other Inspector CommentsRed Card Items
Quality Control ElectricalOther Inspector Comments
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
Safety ElectricalOther Inspector CommentsRed Card Items
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Service Changebond all available electrodesbond to water line(rwg)minimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Temp Electrical RenewalOther Inspector CommentsRed Card Items
Temp Gas ConnectionOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Heat on BuildingOther Inspector CommentsRed Card Items
Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments
Temp Power Agreement ExpiredOther Inspector Comments
Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 30 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
REHAB ElectricalRELE
PERMITTYPEPREFIX
Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card ItemsOther Inspector Comments
Temporary Mech. RenewalOther Inspector CommentsRed Card Items
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Wire Mech UnitGFCI outlet within 25 feetOther Inspector CommentsRed Card Itemsworking clearance at disconnect
REHAB MechanicalRMEC
PERMITTYPEPREFIX
Boiler/Hot Water Systeminstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Chilled Water Pipingbackflow preventer installedOther Inspector CommentsRed Card Items
Duct Joint SealantOther Inspector CommentsRed Card Items
Duct Smoke Detector TestOther Inspector CommentsRed Card Items
Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in
Fixturing and FurnitureOther Inspector CommentsRed Card Items
Gas Applianceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damage
Red Card ItemsGas Line (Outside)
CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Grease Hood Duct Testclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Hoodclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Hood Exhaust Ductclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Hood System/Fire Suppress.Other Inspector CommentsRed Card Items
Hot Water/Steam Piping Sys.Other Inspector CommentsRed Card Items
Mechanical Above CeilingOther Inspector CommentsRed Card Items
Mechanical FinalOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Mechanical Under SlabOther Inspector CommentsRed Card Items
Meeting w/ Mec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 31 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
REHAB MechanicalRMEC
PERMITTYPEPREFIX
Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Quality Control MechanicalOther Inspector Comments
Safety MechanicalOther Inspector CommentsRed Card Items
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Temp Heat Agreement ExpiredOther Inspector Comments
Temp Heat on BuildingOther Inspector CommentsRed Card Items
Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items
Temporary Mech. RenewalOther Inspector CommentsRed Card Items
Und. Crossover/Dryer VentOther Inspector Comments
Unit Heatersinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
REHAB PlumbingRPLM
PERMITTYPEPREFIX
Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in
Fixturing and FurnitureOther Inspector CommentsRed Card Items
Gas Line (In & Out)CSST bonded if usedif nonmetallic piping look for tracer wireOther Inspector CommentsRed Card Items
Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damage
Red Card ItemsGas Line (Outside)
CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items
Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items
Meeting w/ Plbg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items
Plumbing Above Ceilingminimum 6.5 insulation on waterlinesnote any cleanout locationsOther Inspector Comments
Plumbing Finalescutcheon rings installedOther Inspector CommentsRed Card Itemstoilets & sinks caulked
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Plumbing Under SlabOther Inspector Comments
Quality Control PlumbingOther Inspector Comments
Roof Leaders/Drain TestOther Inspector Commentsverify size with approved engineered plans
Sewer Line InspectionOther Inspector CommentsRed Card Itemsverify if backwater valve is needed (rwg)
Shower PanOther Inspector CommentsRed Card Items
Stocking and MerchandiseOther Inspector CommentsRed Card Items
Water & Sewer LineOther Inspector CommentsRed Card Itemsseal foundation walls
rinspectionchecklists1 11/10/2016 11:06 Page 32 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
REHAB PlumbingRPLM
PERMITTYPEPREFIX
Water LineOther Inspector CommentsRed Card Itemsseal foundation walls
SafetySAFE
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Safety BuildingOther Inspector CommentsRed Card Items
Safety ElectricalOther Inspector CommentsRed Card Items
Safety MechanicalOther Inspector CommentsRed Card Items
Safety PlumbingOther Inspector CommentsRed Card Items
Septic Pumper TruckSPT
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector Comments
Property line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
ShorelineSHR
PERMITTYPEPREFIX
rinspectionchecklists1 11/10/2016 11:06 Page 33 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
ShorelineSHR
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor required
engineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
SubdivisionSUB
PERMITTYPEPREFIX
Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure
Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items
Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans
Footing, Light Pole BaseOther Inspector CommentsRed Card Items
rinspectionchecklists1 11/10/2016 11:06 Page 34 of 35
CATAWBA COUNTYINSPECTION CHECKLIST REPORT
BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER
SubdivisionSUB
PERMITTYPEPREFIX
Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items
Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu
Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items
Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site
Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments
School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.
Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans
Third Party InspectionTPI
PERMITTYPEPREFIX
TPI-Final CaseOther Inspector Comments
TPI-Final Concrete Construction ReporOther Inspector Comments
TPI-Final EIFS System ReportOther Inspector Comments
TPI-Final Fabricators ReportOther Inspector Comments
TPI-Final Masonry Report
Other Inspector CommentsTPI-Final Pier Foundation Report
Other Inspector CommentsTPI-Final Pile Foundation Report
Other Inspector CommentsTPI-Final Seismic Resis Report
Other Inspector CommentsTPI-Final Smoke Control Report
Other Inspector CommentsTPI-Final Soil Eval Report
Other Inspector CommentsTPI-Final Special Case Report
Other Inspector CommentsTPI-Final Sprayed Fire Resistance
Other Inspector CommentsTPI-Final Steel Construction Steel Rep
Other Inspector CommentsTPI-Final Structural Observation
Other Inspector CommentsTPI-Final Wall Panel-Ven Report
Other Inspector CommentsTPI-Final Wood Construction Report
Other Inspector CommentsTPI-Interim Inspection Report
Other Inspector Comments
Zoning Authorization (NR)ZONC
PERMITTYPEPREFIX
Site Code InspectionOther Inspector Comments
Zoning Authorization (R)ZONR
PERMITTYPEPREFIX
Site Code InspectionOther Inspector Comments