Session : s_m_GRA_LOAD_TL_WBS_ELEMENT was wrong for long time than expected,so we aborted it
Then as per the workflow flow,we kickstarted required session one after the other
s_m_GRA_LOAD_TL_WBS_ELEMENT
s_m_GRA_LOAD_B_IDP_PMO
s_m_GRA_LOAD_B_RESPONSIBLE_UNIT
s_m_GRA_LOAD_B_COST_CENTER
s_m_GRA_LOAD_B_ACTUAL_PLAN
CMD_Create_Trigger_NoN_Forecast_File2(This will Trigger Dimension.after that the flow will go on)
(but by mistake i kickstarted CMD_Create_Trigger_NoN_Forecast_File1,as a result a parameter file with extension .txt will be created which will hamper our next run so to consume that file we need to run evt_wait_NoN_Forecast_File_1)
Then we need to run s_m_GRA_LOAD_TL_F_PMO_FORECASTS(If we miss this one then all the PMO_FORECAST data will be wrong,Which I missed)
Above all within this time non-forecast got completed as usual,and forecast got started as s_m_GRA_LOAD_TL_F_PMO_FORECASTS we missed so we aborted the PMO_FORECAST and will restart Once s_m_GRA_LOAD_TL_F_PMO_FORECASTS get succeed.
Now again when we restart s_m_GRA_LOAD_TL_F_PMO_FORECASTS,it failed with error