castle. if you have any questions orneed further

30
April 04, 2014 Jeremy Henson Crown Castle 12725 Morris Road Extension Suite 400 Alpharetta, GA 30004 (678)366-1240 Subject: Carrier Designation: Crown Castle Designation: Structural Analysis Report Sprint PCS Co-Locate Carrier Site Number: Carrier Site Name: Crown Castle BU Number: Crown Castle Site Name: Crown Castle JDE Job Number: Crown Castle Work Order Number: Crown Castle Application Number: B+T Group Project Number: B+T GRP B+T Group 1717 S. Boulder, Suite 300 Tulsa, OK 74119 (918)587-4630 [email protected] Scenario B JA27XC018 Pelican Bay 877737 Pelican Bay 260689 720611 216378 Rev. 1 81117.007.01a Engineering Firm Designation: Site Data: Dear Jeremy Henson, 2050 Beville Rd, Daytona Beach, Volusia County, FL Latitude 29° 9'49.3", Longitude -81° 3'34.2" 118 Foot - Monopole Tower B+T Group is pleased to submit this "Structural Analysis Report" to determine the structural integrity of the above mentioned tower. This analysis has been performed in accordance with the Crown Castle Structural 'Statement of Work' and the terms of Crown Castle Purchase Order Number 623082, in accordance with application 216378, revision 1. The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have determined the tower stress level for the structure and foundation, under the following load case, to be: LC5: Existing + Proposed Equipment Note: See Table 1 and Table 2 for the proposed and existing loading, respectively. Sufficient Capacity This analysis has been performed in accordance with the 2010 Florida BuildingCode based upon an ultimate 3- second gust wind speed of 140 mph converted to a nominal 3-second gust wind speed of 108 mph per section 1609.3.1 as required for use in the TIA-222-G Standard per Exception #5 of Section 1609.1.1. Exposure Category C and Risk Category II were used in this analysis. All equipment proposed in this report shall be installed in accordance with the attached drawings for the determined available structural capacity to be effective. We at B+T Group appreciate the opportunity of providing our continuing professional services to you and Crown Castle. If you have any questions or need further assistance on this or any other projects please give us a call. v\\^ ""/// Respectfully submitted by: B+T Engineering, Inc. Kristin Mears, E.I. Project Engineer tnxTower Report - version 6.1.4.1 John W. Kelly, P.E., S.E. \ Vice President : COA: 27496 Expires: 02/28/2015 6619>

Upload: others

Post on 24-Dec-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Castle. If you have any questions orneed further

April 04, 2014

Jeremy HensonCrown Castle

12725 Morris Road Extension Suite 400

Alpharetta, GA 30004(678)366-1240

Subject:

Carrier Designation:

Crown Castle Designation:

Structural Analysis Report

Sprint PCS Co-LocateCarrier Site Number:

Carrier Site Name:

Crown Castle BU Number:

Crown Castle Site Name:

Crown Castle JDE Job Number:

Crown Castle Work Order Number:

Crown Castle Application Number:

B+T Group Project Number:

B+T GRP

B+T Group1717 S. Boulder, Suite 300Tulsa, OK 74119(918)[email protected]

Scenario B

JA27XC018

Pelican Bay

877737

Pelican Bay260689

720611

216378 Rev. 1

81117.007.01aEngineering Firm Designation:

Site Data:

Dear Jeremy Henson,

2050 Beville Rd, Daytona Beach, Volusia County, FLLatitude 29° 9'49.3", Longitude -81° 3'34.2"118 Foot - Monopole Tower

B+T Group is pleased to submit this "Structural Analysis Report" to determine the structural integrity of theabove mentioned tower. This analysis has been performed in accordance with the Crown Castle Structural'Statement of Work' and the terms of Crown Castle Purchase Order Number 623082, in accordance withapplication 216378, revision 1.

The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis wehave determined the tower stress level for the structure and foundation, under the following load case, to be:

LC5: Existing + Proposed EquipmentNote: See Table 1 and Table 2 for the proposed and existing loading, respectively.

Sufficient Capacity

This analysis has been performed in accordance with the 2010 Florida BuildingCode based upon an ultimate 3-second gust wind speed of 140 mph converted to a nominal 3-second gust wind speed of 108 mph per section1609.3.1 as required for use in the TIA-222-G Standard per Exception #5 of Section 1609.1.1. ExposureCategory C and Risk Category II were used in this analysis.

All equipment proposed in this report shall be installed in accordance with the attached drawings for thedetermined available structural capacity to be effective.

We at B+T Group appreciate the opportunity of providing our continuing professional services to you and CrownCastle. If you have any questions orneed further assistance on this orany other projects please give us a call.

v\\^ ""///Respectfully submitted by:B+T Engineering, Inc.

Kristin Mears, E.I.Project Engineer

tnxTower Report - version 6.1.4.1

John W. Kelly, P.E., S.E. \Vice President :COA: 27496 Expires: 02/28/2015

6619>

Page 2: Castle. If you have any questions orneed further

April 04, 2014118 Ft Monopole Tower StructuralAnalysis Report CCIBU No. 877737Project Number 81117.007.01a, Application 216378, Revision 1 Page 2

TABLE OF CONTENTS

1) INTRODUCTION

2) ANALYSIS CRITERIATable 1 - Proposed Antenna and Cable InformationTable 2 - Existing Antenna and Cable InformationTable 3 - Design Antenna and Cable Information

3) ANALYSIS PROCEDURETable 4 - Documents Provided

3.1) Analysis Method3.2) Assumptions

4) ANALYSIS RESULTSTable 5 - Section Capacity (Summary)Table 6 - Tower Components vs. Capacity4.1) Recommendations

5) APPENDIX AtnxTower Output

6) APPENDIX BBase Level Drawing

7) APPENDIX CAdditional Calculations

tnxTower Report - version 6.1.4.1

Page 3: Castle. If you have any questions orneed further

118 Ft Monopole Tower Structural Analysis ReportProject Number 81117.007.01a, Application 216378, Revision 1

April 04, 2014CCIBU No. 877737

Page 3

1) INTRODUCTION

This tower is a 118 ft. monopole tower designed by Summit in May of 2001. The tower was originally designedfor a wind speed of 105 mph per TIA/EIA-222-F. Modifications designed by IETS and Sabre in February 2010are included in this analysis.

2) ANALYSIS CRITERIA

The structural analysis was performed for this tower in accordance with the requirements of TIA-222-GStructural Standards for Steel Antenna Towers and Antenna Supporting Structures using a 3-second gust windspeed of 108 mph with no ice and 60 mph under service loads, exposure category C with topographic category1 and crest height of 0 feet.

Table 1 - Proposed Antenna and Cable Information

MountingLevel (ft)

Center

Line

Elevation

(ft)

Number

of

Antennas

Antenna

ManufacturerAntenna Model

Number

of Feed

Lines

Feed

Line

Size (in)Note

120.0 120.0

3 Ericsson RRUS 31 B25

3 Nokia FZHJ-RRH

3 Nokia RADAR FILTER

3 Tongyu TYDA-252718DER4-65P

5/8

Table 2 - Existing and Reserved Antenna and Cable Information

MountingLevel (ft)

Center

Line

Elevation

(ft)

Number

of

Antennas

Antenna

ManufacturerAntenna Model

Number

of Feed

Lines

Feed

Line

Size (in)Note

120.0

113.0

100.0

93.0

121.0

120.0

114.0

113.0

106.0

103.0

100.0

94.0

tnxTower Report - version 6.1.4.1

6 Decibel DB948F65E-M

6 Rfs Celwave IBC1900HG-1

3 Ericsson RRUS A2 MODULE

9 Ericsson RRUS-11 1900MHz

3 Ericsson 800MHZ SMR FILTER

3 Ericsson RRUS-11 800MHz

9 Rfs Celwave ACU-A20-N

3 Rfs Celwave APXVERR18-C

1 ~ T-Arm Mount [TA 602-3]

3 Antel BXA-185063/12CFx2

3 Antel BXA-70063/6CFx2

1 ~ T-Arm Mount [TA 602-3]

1 Andrew VHLP2-11-2WH

1 Andrew VHLP2-18-1WH

1 Andrew VHLP2.5-11

3 Dragonwave Horizon DUO

3 Kathrein 84010054

3 Motorola DAP Vx RF

1 - Side Arm Mount [SO 102-3]

3 Andrew ETW200VS12UB

12

13

1 5/8

1 3/16

1 5/8

1/2

5/16

1 1/4

Page 4: Castle. If you have any questions orneed further

118 Ft Monopole Tower StructuralAnalysis ReportProject Number 81117.007.01a, Application 216378, Revision 1

April04, 2014CCI BU No. 877737

Page 4

MountingLevel (ft)

Center

Line

Elevation

(ft)

Number

of

Antennas

Antenna

ManufacturerAntenna Model

Number

of Feed

Lines

Feed

Line

Size (in)Note

3 Andrew TMBX-6517-R2M

6 Andrew TMBXX-6517-A2M

93.0 1

3 Nokia

T-Arm Mount [TA 602-3]

TME-FRIG

.0 91.02 Nokia TME-FXFB

1 Raycap TME-ASU9338TYP01

1

Notes:

1) Existing Equipment2) Equipment To Be Removed

Pipe Mount [PM 601-3]

Table 3 - Design Antenna and Cable Information

MountingLevel (ft)

Center

Line

Elevation

(ft)

Number

of

Antennas

Antenna

ManufacturerAntenna Model

Number

of Feed

Lines

Feed

Line

Size (in)

118 118

100 100

80 80

3 Generic T-Arm

9 Decibel DB948F65E-M

1 Generic LP Clamp Platform

12 Dapa 48000

1 Generic LP Clamp Platform

12 Dapa 48000

3) ANALYSIS PROCEDURE

Table 4 - Documents Provided

Document Remarks Reference Source

Online Application

Tower Manufacturer Drawing

Tower Modification Drawings

Post Modification Inspection

Foundation Drawing

Geotech Report

Antenna Configuration

3.1) Analysis Method

Sprint Co-Locate Revision # 1

Summit Manufacturing, Inc.Dwg No. 14075-D1

lETS.Dwg. No. 2010-70019

IETS, Project. No. 2010-70191

Summit Manufacturing, Inc.Job No. 29201-0509

UES, Project No. 45291-001-01

Crown CAD Package

216378 CCI Sites

1548523 CCI Sites

2592390 CCI Sites

2699677 CCI Sites

1474641 CCI Sites

1549663 CCI Sites

Date:03/03/2014 CCI Sites

tnxTower (version 6.1.4.1), a commercially available analysis software package, was used to create athree-dimensional model of the tower and calculate member stresses for various loading cases.Selected output from the analysis is included in Appendix A.

tnxTower Report - version 6.1.4.1

Page 5: Castle. If you have any questions orneed further

118 Ft Monopole Tower Structural Analysis ReportProject Number 81117.007.01a, Application 216378, Revision 1

April04, 2014CCI BU No. 877737

Page 5

3.2) Assumptions

1) Tower and structures were built in accordance with the manufacturer's specifications.2) The tower and structures have been maintained in accordance with the manufacturer's

specification.3) The configuration of antennas, transmission cables, mounts and other appurtenances are as

specified in Tables 1 and 2 and the referenced drawings.4) Mount areas and weights are assumed based on photographs provided.

This analysis may be affected if any assumptions are not valid or have been made in error. B+TGroup should be notified to determine the effect on the structural integrity of the tower.

4) ANALYSIS RESULTS

Table 5 - Section Capacity (Summary)

Section

No.Elevation (ft)

ComponentTypo

SizeCritical

ElementP(K)

SPP allow

(K)%

CapacityPass / Fail

L1 118-76.75 Pole TP29.63x22x0.219 1 -8.166 1367.510 63.0 Pass

L2 76.75 - 40.5 Pole TP35.9x28.498x0.25 2 -13.826 1850.790 96.7 Pass

L3 40.5-18 Pole TP39.561x34.567x0.313 3 -19.904 2707.090 90.3 Pass

L4 18-0 Pole TP42.89x39.561x0.458 4 -25.148 2824.100

Pole (L4)

RATING =

98.3

Summary

98.3

98.3

Pass

Pass

Pass

Table 6 - Tower Component Stresses vs. Capacity - LC5

Notes Component Elevation (ft)

1 Anchor Rods Base

1 Base Plate Base

1 Base Foundation Base

Structure Rating (max from all components) =

% Capacity

79.7

79.1

77.6

Pass / Fail

Pass

Pass

Pass

98.3%

Notes:

1) See additional documentation in "Appendix C - Additional Calculations" for calculations supporting the % capacityconsumed.

2) Capacities up to 105% are considered acceptable based on analysis methods used.

4.1) Recommendations

The tower and its foundation have sufficient capacity to carry the existing and proposed loads. Nomodifications are required at this time.

tnxTower Report - version 6.1.4.1

Page 6: Castle. If you have any questions orneed further

o

DE

SIG

NE

DA

PP

UR

TE

NA

NC

EL

OA

DIN

G

TY

PE

EL

EV

AT

ION

TY

PE

EL

EV

AT

ION

L;

!-.•:•rv

jR:

;l3

4",

3'|E

:1

23

BX

A-70063/6C

Fx2

w/M

ountPipe

(E)

iit

••-;>>

:>.E

RR

-R-C

.-.M

ountP

ipe

E1

20

AP

XV

ER

R1

B-C

w/

Mo

un

tP

ipe

(E)

12

06'

x2"

Mo

un

tP

ipe

(E)

113

AP

XV

ER

R16-C

w/

Mount

Pip

e(E

)1

20

6'x

2"M

ou

nt

Pip

e(E

)1

13

800MH

2SM

RFIL

TE

R(E

)1

20

6'x

2"M

ou

nt

Pip

e(E

)1

13

80

0M

HZ

SM

RFIL

TE

R(E

)1

20

T-A

rmM

ount[T

A602-3]

(E)

11

3

80

0M

H2

SM

RFIL

TE

R(E

)1

20

84010054

.•.M

ountP

ipe

[E]

10

0

(3)AC

U-A

20-N(E

)1

20

(2)8

40

10

05

4w

/M

ou

nt

Pip

e(E

)1

00

(3)AC

U-A

20-N(E

)1

20

DA

PV

xR

F(E

)1

00

(3)AC

U-A

20-N(E

)1

20

(2)D

AP

Vx

RF

(E)

10

!)

RR

US-11

800MH

z(E

)1

20

Horizon

DU

O(E

)1

00

RR

US

-118

00

MH

z(E

)1

20

Horizon

DU

O(E

)1

00

RR

US

-118

00

MH

z(E

)1

20

Horizon

DU

O(E

)1

00

TY

DA

-25

27

18

DE

R4

-65

Pw

/M

ountPipe

(P)1

20

6'x2"

Mount

Pipe(E

)1

00

SideA

rmM

ount(SO

102-3)(E

)1

00

TY

DA

-25

27

18

DE

R4

-65

Pw

/

Mo

un

tP

ipe

(P)1

20

VH

LP

2-1

1-2

WH

(E)

10

0

VH

LP

2-1

8-1

WH

(E)

10

0

TY

DA

-25

27

1B

DE

R4

-65

Pw

/

Mount

Pipe(P)

12

0V

HL

P2

5-1

1(E

)1

00

ET

W2

00

VS

12

UB

1E

)9

3R

RU

S31

32

5;P

12

0E

TW

200VS

12UB

(E)

93

RR

US

31B

25

\P,

12

3E

TW

20

0V

S1

2U

B(E

)3

3

RR

US

31

B2

5(P

)12

0(2)

TM

BX

X-6517-A

2Mw

/M

ou

nt

P.p

e(E

)9

3

FZ

HJ-R

RH

(P)1

20

FZ

HJ-R

RH

(P)1

20

(21T

MB

XX

-65

17

-A2

M«.•'

Mc.in

tP

ipe

(E)

93

FZ

HJ-R

RH

(P)1

23

RA

DA

RFIL

TE

R(P

)1

20

(2)T

MB

XX

-6517-A2M

w/

Mo

un

tP

ipe

(E)

93

R/O

AR

r_

;er,p

12

0

RA

DA

RFIL

TE

R(P)

12

0T

-Arm

Mount

[TA

602-3](E

)9

3

T-A

rmM

ount[T

A602-3]

(E)

12

0T

MB

X-6

51

7-R

2M

w/

Mo

un

tP

ipe

(E)

93

(2)6'

i?

Mount

Pipe(E

)1

23

TM

BX

-6517-R2M

w/M

ountPipe

(E)

93

(2)6

'x?

Mount

Pipe(E

)1

20

(2)6'

x2"M

ountPipe

(E)

12

0T

MB

X-6517-R

2Mw

/M

ountPipe

(E)

93

BX

A-1

85

06

3/1

2C

Fx

2w

/M

ou

nt

Pip

e(E

)1

13

TM

E-F

XF

B(E

)91

BX

A-1

85

06

3/1

2C

Fx

2w

/M

ou

nt

Pip

e(E

)1

13

TM

E-F

XF

B(E

)91

TM

E-A

SU

9338TY

P01

(E)

91B

XA

-18

50

63

/12

CF

x2

w/

Mo

un

t

Pip

e(E)

11

3

PipeM

ount[PM

601-3)(E

)9

1

BX

A-70063/6C

Fx2

w/

Mount

Pipe<E>

11

3T

ME

-FR

IG(E

)9

1

TM

E-rR

ic-

:E:

91

BX

A-70063/6C

Fx2

w/

Mount

Pipe(E

)1

13

TM

E-F

RIG

(E)

9!

MA

TE

RIA

LS

TR

EN

GT

H

GR

AD

EF

yF

uG

RA

DE

Fy

Fu

A5

/2-6

36:3

-.%i

SOksi

40

07

61

06

ksi

40

ksi

55

•••

TO

WE

RD

ES

IGN

NO

TE

S

1.T

ower

islocated

inV

olusiaC

ounty,F

lorida.2.

Tow

erd

esign

edfor

Ex

po

sure

Cto

the

TIA

-222-GS

tand

ard.

3.T

ower

designedfor

a108

mph

basicw

indin

accord

ance

with

theT

IA-222-G

Sta

nd

ard

.

4.D

eflectionsare

based

upona

60m

ph

wind.

5.

To

wer

Stru

ctu

reC

lass

II.

6.T

opographicC

atego

ry1

with

Crest

Height

of0

.00

0ft

7.

Mo

del

Inclu

des

Pre

vio

us

Mo

dific

atio

ns

8.T

OW

ER

RA

TIN

G=

98

.3%

AL

LR

EA

CT

ION

S

AR

EF

AC

TO

RE

D

MO

ME

NT

24

54

kip-It

TO

RQ

UE

1kip-It

RE

AC

TIO

NS

-1

08

mp

hW

IND

,=r

B+

TG

rou

pp3

1717S.Boulder,Suite

300T

ulsa

,O

K7

41

19

Ph

on

e:(9

18

)58

7-4

63

0FA

X.{918)295-0205

81117.007.01a-

Pelican

Bay,

FL

(BU

#87773

Project

CliemC

rown

Castle

DK

.M

ears

TIA

-22

2-G

04

/04

/14

NT

SD

wg

Nop

i

Page 7: Castle. If you have any questions orneed further

Vx Vz

TIA-222-G -108 mph Exposure C Maximum Values

Mx - Mz

Global Mast Shear (K)c

118 00O

so

76750

Elevation(ft)s

18000

i i I

4i i l

O.OOO 1 i

Global Mast Moment (kip-ft)

B+T • •••

B+T Group1717 S. Boulder, Suite 300

Tulsa, OK 74119Phone: (918)587-4630

FAX: (918)295-0265

,ob 81117.007.01a - Pelican Bay, FL (BU# 87773Project

c:ienl Crown Castle |Dravy,lby K. Mears App'd

Cod0 TIA-222-G iDate 04/04/14 Scale NTS

Path Dwg No r i

Page 8: Castle. If you have any questions orneed further

c

_o'•+-"CO>

LU

TIA-222-G - Service - 60 mph Maximum Values

Deflection (in)0 5 10 15 20 0

Tilt (deg) Twist (deg)

LL1J.

J-LJ.1--J-LJ.J...L.LJ.L. I I L _ 7675°

—I -/ )—I- I - -4-L--1-L.- —-I—I—-I—I—

r- B+T Group•^j^ 1717 S. Boulder, Suite 300b+t,.. • Tulsa, OK 74119

Phone:(918)587-4630FAX: (918)295-0265

ob 81117.007.01a - Pelican Bay, FL (BLW 87773\Project

Clien' Crown Castle DrawnbyK Megrs App'd

Code T|A.222-G Da,e 04/04/14 Scale NTS

Path Dwg No pr.j

Page 9: Castle. If you have any questions orneed further

co

+-"

CO>o

LU

Feed Line Distribution Chart

0'-118'___ Ap;i in r.icu ^^^^ App Out Face Truss Leg

118 000Face A Face B Face C

118 000

ll 3.000 113000 L i

100 000 100 000

j i [

f.__L_.

1 1__J _L_ 93 000 93 000 i i

76 750 __L __i___J_„ 76 750

° I •-1

40 500

51

^ 1U J

if |

5 1 ?? 1

l! l!

c " 5 "T I c 1

=1 " 1s; £;

u. I O

1 * 1

r T"

5 I•; '3;-1

o 1

• I

T

ui •

•-.

u '>- •

."' 11

'•:•' •

— 1

< •O 1

^ 1

Q ' _

1 <

...

•r

a

:•£<

40 500

L__ i i 20 000 20 000 418000

r r t18 000

2f2 J

I' a. a

0 000 0000

r- B+T Group^JT* 1717 S. Boulder, Suite 300wow' Tulsa, OK 74119

Phone: (918)587-4630FAX: (918)295-0265

°" 81117.007.01a - Pelican Bay, FL (BU# 87773:Projecl

Clienl Crown Castle Drawn by K Mears App'd

code T|A.222-G Dal8 04/04/14 Scale NTS

Path Dwg No £_j

Page 10: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder, Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630

FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

1 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Tower Input Data

There is a pole section.This tower is designed using the TIA-222-G standard.The following design criteria apply:

Tower is located in Volusia County, Florida.Basic wind speed of 108 mph.Structure Class II.

Exposure Category C.Topographic Category 1.Crest Height 0.000 ft.Deflections calculated using a wind speed of 60 mph.Model Includes Previous Modifications.

TOWER RATING = 98.3%.

A non-linear (P-delta) analysis was used.Pressures are calculated at each section.

Stress ratio used in pole design is 1.Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are notconsidered.

Consider Moments - LegsConsider Moments - HorizontalsConsider Moments - DiagonalsUse Moment Magnification

V Use Code Stress RatiosV Use Code Safety Factors - Guys

Escalate Ice

Always Use Max KzUse Special Wind ProfileInclude Bolts In Member CapacityLeg Bolts Are At Top Of SectionSecondary Horizontal Braces LegUse Diamond Inner Bracing (4 Sided)Add iBC .6D+W Combination

Options

Distribute Leg Loads As UniformAssume Legs Pinned

V Assume Rigid Index PlateV UseClearSpansFor Wind Area

Use Clear Spans For KL rRctcnsion Guys To Initial Tension

V Bypass Mast Stability ChecksV Use Azimuth Dish CoefficientsV Project Wind Area of Appurt.

Autocalc Torque Ann AreasSR Members Have Cut Ends

Sort Capacity Reports By ComponentTriangulate Diamond Inner BracingUse TIA-222-G Tension Splice CapacityExemption

Treat Feedline Bundles As CylinderUse ASCE 10 X-Brace Ly RulesCalculate Redundant Bracing ForcesIgnore Redundant Members in FEASR Leg Bolts Resist CompressionAll Leg Panels Have Same AllowableOffset Girt At Foundation

Consider Feedline TorqueInclude Angle Block Shear Cheek

Poles

Include Shear-Torsion Interaction

Always Use Sub-Critical PlowUse Top Mounted Sockets

Tapered Pole Section Geometry

Section Elevation Section Splice Number Top Bottom Wall Bend Pole Grade

Length Length of Diameter Diameter Thickness Radius

fi ft41.250

ft Sides in3.750 18 22.000

in

29.630

in

0.219

in

0.876LI 118.000-76.750 A572-65

(65 ksi)

L2 76.750-40.500 40.000 4.500 18 28.498 35.900 0.250 1.000 A572-65

(65 ksi)

L3 40.500-18.000 27.000 0.000 18 34.567 39.561 0.313 1.250 A572-65

(65 ksi)

L4 18.000-0.000 18.000 18 39.561 42.890 0.458 1.831 40.076 l()6ksi

Page 11: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a-Pelican Bay, FL (BU# 877737)

Page

2 Of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Section Elevation

f>

Section

Lengthfi

Splice NumberLength of

ft Sides

TopDiameter

in

Bottom

Diameter

in

Wall

Thickness

Tapered Pole Properties

Bend

Radius

in

Pole Grade

(40 ksi)

Section TipDiet. Area 1 r C 1/C ./ It/Q w w/l

in in in1 in in in In4 in' m

LI 22.339 15.140 907.448 7.732 11.176 81.196 1816.091 7.571 3.487 15.92

30.087 20.444 2234.178 10.441 15.052 148.430 4471.297 10.224 4.829 22.052

L2 29.643 22.415 2259.770 10.028 14.477 156.092 4522.514 11.210 4.576 18.30336.454 28.288 4542.166 12.656 18.237 249.060 9090.308 14.147 5.878 23.514

L3 35.946 33.976 5036.853 12.160 17.560 286.834 10080.334 16.991 5.534 17.708

40.171 38.930 7576.369 13.933 20.097 376.991 15162.708 19.468 6.413 20.521

L4 40.171 56.815 10975.525 13.882 20.097 546.129 21965.492 28.413 6.157 13.45

43.552 61.652 14024.179 15.063 21.788 643.662 28066.811 30.832 6.743 14.73

Tower Gusset Gusset Gusset Grade Adjust. Factor Adjust. Weight Mult. Double Angle Double AngleElevation Area Thickness Aj Factor Stitch Bolt Stitch Bolt

(per/ace) A, Spat ing Sp icingDiagonals Horzontals

fi fr in ii in

LI 1 1 1

118.000-76.75

L2 1 1 1

76.750-40.500

L3 1 1 1

40.500-18.000

L4 1 1 0.977705

18.000-0.000

Feed Line/Linear Appurtenances - Entered As Round Or Flat

Description Sector t onipoiiciit Placement Total A umber Start/End n lath or Perimeter WeightType

ftNumber Pe • Row Position Diameter

in in klf*♦//**

LDF6-50A( 1-1/4") c Surface Ar 93.000 - 0.000 12 4 -0.500 1.550 0.001

(E) (CaAa) 0.400

3X4AWGO 1/4) C Surface Ar 93.000 - 0.000 1 1 0.400 1.300 0.001

(E) (CaAa) 0.500

»*//»*

**//**

1" Plate C Surface Af 20.000 - 0.000 1 1 -0.100 6,000 14.000 0.000

(Mod) (CaAa) 0.100

1" Plate A Surface Af 20.000 - 0.000 1 1 -0.100 6.000 14.000 0.000

(Mod) (CaAa) 0.100

1" Plate B Surface Af 20.000 - 0.000 1 1 -0.100 6.000 14.000 0.000

(Mod) (CaAa) 0.100

**//*♦

Page 12: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder. Suite 300

Tulsa, OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

3 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Feed Line/Linear Appurtenances - Entered As Area

Description Face

or

Allow

Shield

ComponentType

Placement Total

NumberC,AA Weight

Leg fi118.000 - 0.000

fi:/fi klfTSZ 999 C No Inside Pole 3 No Ice 0.000 0.001

067/xxxM-8AWG(

1-3/16")(E)

FIBER ONLY CABLE C No Inside Pole 118.000-0.000 1 No Ice 0.000 0.000

16(5/8")

(P)**//**

LDF7-50A( 1-5/8") c No Inside Pole 113.000-0.000 12 No Ice- 0.000 0.001

(E)**//»*

2" Rigid Conduit A No Inside Pole 100.000-0.000 1 No Ice- 0.000 0.003

(E)LDF4-50A(l/2") A No Inside Pole 100.000-0.000 3 No Ice 0.000 0.000

(E-Inside Conduit)

RG-11(5/16") A No Inside Pole 100.000-0.000 6 No Ice 0.000 0.000

(E-Inside Conduit)**/ *"

Feed Line/Linear Appurtenances Section Areas

Tower Tower Face Ar Af CAAt C,A, WeightSection Elevation In Face Out Face

fi ft fr fr fr K

LI 118.000-76.750 A 0.000 0.000 0.000 0.000 0.088

B 0.000 0.000 0.000 0.000 0.000

C 0.000 0.000 12.188 0.000 0.642

L2 76.750-40.500 A 0.000 0.000 0.000 0.000 0.137

B 0.000 0.000 0.000 0.000 0.000

C 0.000 0.000 27.188 0.000 0.801

L3 40.500-18.000 A 0.000 0.000 2.000 0.000 0.085

B 0.000 0.000 2.000 0.000 0.000

C 0.000 0.000 18.875 0.000 0.497

1 I 18.000-0.000 A 0.000 0.000 18.000 0.000 0.068

B 0.000 0.000 18.000 0.000 0.000

C 0.000 0.000 31.500 0.000 0.398

Feed Line Center of Pressure

Section Elevation CPX CP,_ CPsIce Ice

fi in in in

-0.018

in

LI 118.000-76.750 -0.018 0.458 0.458

L2 76.750-40.500 -0.039 0.932 -0.039 0.932

L3 40.500-18.000 -0.038 0.882 -0.038 0.882

L4 18.000-0.000 -0.025 0.555 -0.025 0.555

Page 13: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S.Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

4 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Shielding Factor Ka

Tower Feed Line Description Feed Line K.: KaSection Record No. Segment Elev. No he Ice

LI 11 LDF6-50A( 1-1/4") 76.75 - 93.00 1.0000 1.0000

LI 12 3X4AWG(I 1/4) 76.75 - 93.00 1.0000 1.0000

L2 11 LDF6-50A(l-l/4") 40.50 - 76.75 1.0000 1.0000

L2 12 3X4AWG(I 1/4) 40.50 - 76.75 1.0000 1.0000

L2 18 1" Plate 40.50 - 20.00 1.0000 1.0000

L2 19 1" Plate 40.50 - 20.00 1.0000 1.0000

L2 20 1" Plate 40.50 - 20.00 1.0000 1.0000

L4 11 LDF6-50A( 1-1/4") 0.00- 18.00 1.0000 1.0000

L4 12 3X4AWG(1 1/4) 0.00- 18.00 1.0000 1.0000

L4 18 1" Plate 0.00- 18.00 1.0000 1.0000

L4 19 1" Plate 0.00- 18.00 1.0000 1.0000

L4 20 1" Plate 0.00 - 18.00 1.0000 1.0000

Description

Lightning Rod 3/4" x 3'(E)

**//**

APXVERRI8-Cw/Mount

Pipe(E)

APXVERRI8-Cw/ Mount

Pipe(E)

APXVERR18-C w/ Mount

Pipe(E)

800MHZ SMR FILTER

(E)

S00MHZ SMR FILTER

(E)

800MHZSMR FILTER

(E)

(3) ACU-A20-N(E)

(3) ACU-A20-N(E)

(3) ACU-A20-N

(E)

Face Offsetor Type

U-g

None

From Leu

From Leg

From Leu

:rom Leg

From Leu

C From Leu

From Leu

:rom Leu

C From Leg

Discrete Tower Loads

Offsets: Azimuth PlacementIlorz Adjustment

Lateral

Vert

fi ° ftftft

0.000 123.000 No Ice

4.000

0.000

0.000

4.000

0.000

0.000

4.000

0.000

0.000

4.000

0.000

0.000

4.000

0.000

0.000

4.000

0.000

0.000

4.000

0.000

0.000

4.000

0.000

0.000

4.000

0.000

0.000

0.000

0.000

0.(1(10

0.000

(1.(1(10

0.000

0.000

0.000

0.000

120.000

120.000

120.000

120.000

120.000

120.000

120.000

120.000

120.000

No Ice

No Ice

No lee

No Ice

No Ice

No lee

No Ice

No Ice

No Ice

CaAaFront

fr

0.225

8.498

8498

8.498

0.758

0.758

0.758

0.078

0.078

0.078

CMaSide

fr

0.225

6.946

6,946

6.946

0.254

0.254

0.254

0.136

0.136

0.136

Weight

0.030

0.076

0.076

0.076

0.009

0.009

0.009

0.001

0.001

0.001

Page 14: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

5 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Description Face Offset Offsets: Azimuth Placement C,,l, G/f, Weightor Type Hon Adjustment Front Side

Leg Lateral

Vert

fi ° fi fr fr K

fift

RRUS-ll 800MHz A From Leg 4.000 0.000 120.000 No Ice 2.942 1.521 0.054

(E) 0.000

0.000

RRUS-11 800MHz B From Leg 4.000 0.000 120.000 No lee 2.942 1.521 0.054

(E) 0.000

0.000

RRUS-I l 800MHz C From Leg 4.000 0.000 120.000 No lee 2.942 1.521 0.054

(E) 0.000

0.000

TYDA-2527I8DER4-65P w/ A From Leg 4.000 0.000 120.000 No lee 8.301 5.492 0.077

Mount Pipe 0.000

(P) 0.000

TYDA-252718DER4-65P\v.' B From Leg 4.000 0.000 120.000 No Ice 8.301 5.492 0.077

Mount Pipe 0.000

(P) 0.000

TYDA-252718DER4-65P w/ c From Leg 4.000 0.000 120.000 No lee 8.301 5.492 0.077

Mount Pipe 0.000

(P) 0.000

RRUS 31 B25 A From Leg 4.000 0.000 120.000 No Ice 1.893 1.492 0.056

(P) 0.000

0.000

RRUS 31 B25 B From Leg 4.000 0.000 120.000 No lec 1.893 1.492 0.056

(P) 0.000

0.000

RRUS 31 B25 C From Leg 4.000 0.000 120.000 No Ice 1.893 1.492 0.056

(P) 0.000

0.000

FZHJ-RRH A From Leg 4.000 0.000 120.000 No Ice 1.472 1.184 0.055

(P) 0.000

0.000

FZHJ-RRH B From Leg 4.000 0.000 120.000 No Ice 1.472 1.184 0.055

(P) 0.000

0.000

FZHJ-RRH C From Leg 4.000 0.000 120.000 No Ice 1.472 1.184 0.055

(P) 0.000

0.000

RADAR FILTER A From Leg 4.000 0.000 120.000 No Ice 1.143 0.314 0.022

(P) 0.000

0.000

RADAR FILTER B From Leg 4.000 0.000 120.000 No lee 1.143 0,314 0.022

(P) 0.000

0.000

RADAR FILTER c From Leg 4.000 0.000 120.000 No Ice 1.143 0.314 0.022

(P) 0.000

0.000

T-Arm Mount [TA 602-3] C None 0.000 120.000 No Ice- 11.590 11.590 0.774

(E)(2) 6' x 2' Mount Pipe A From Leg 4.000 0.000 120.000 No Ice- 1.425 1.425 0.022

(E) 0.000

0.000

(2) 6' x 2' Mount Pipe B From Leg 4.000 0.000 120.000 No Ice- 1.425 1.425 0.022

(E) 0.000

0.000

(2) 6' x T Mount Pipe C From Leg 4.000 0.000 120.000 No Ice 1.425 1.425 0.022

(E) 0.000

0.000

Page 15: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

6 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Description Face Offset Offsets: Azimuth Placement CaAa G.-f, Weightor Type Horz Adjustment Front Side

Leg Lateral

Vert

fifift

0

fi fr fr K

BXA-185063/12CFx2w/ A From Leg 4.000 0.000 113.000 No lee 5.009 4.735 0.041

Mount Pipe 0.000

(E) 1.000

BXA-185063/l2CFx2w/ B From Leg 4.000 0.000 113.000 No Ice- 5.009 4.735 0.041

Mount Pipe 0.000

(E) 1.000

BXA-185063/l2CFx2w/ C From Leg 4.000 0.000 113.000 No Ice- 5.009 4.735 0.041

Mount Pipe 0.000

(E) 1.000

BXA-70063/6CFx2 w/ Mount A From Leg 4.000 0.000 113.000 No Ice 7.969 5.398 0.042

Pipe 0.000

(E) 1.000

BXA-70063/6CFx2 w/ Mount B From Leg 4.000 0.000 113.000 No Ice 7.969 5.398 0.042

Pipe 0.000

(E) 1.000

BXA-70063/6CFx2 w/ Mount C From Leg 4.000 0.000 113.000 No Ice- 7.969 5.398 0.042

Pipe 0.000

(E) 1.000

6' x 2" Mount Pipe A From Leg 4.000 0.000 113.000 No Ice 1.425 1.425 0.022

(E) 0.000

0.000

6' x 2" Mount Pipe B From Leg 4.000 0.000 113.000 No Ice- 1.425 1.425 0.022

(E) 0.000

0.000

6' x 2" Mount Pipe C From Leg 4.000 0.000 113.000 No Ice 1.425 1.425 0.022

(E) 0.000

0.000

T-Arm Mount [TA 602-3] c None 0.000 113.000 No Ice 11.590 11.590 0.774

(E)**//**

840 10054 vv/Mount Pipe A From Leg 1.000 0.000 100.000 No Ice 5.413 2.385 0.051

(E) 0.000

(2) 840 10054 w/ Mount Pipe B(E)

DAP Vx RI

(E)

(2) DAP Vx RF

(E)

Horizon DUO

(E)

Horizon DUO

(E)

Horizon DUO

(E)

6' x 2" Mount Pipe(E)

Side Arm Mount [SO 102-3] C(E)

**//**

3.000

From Leg 1.000 0.0000.000

3.000

A From Leg 1.000 0.0000.000

3.000

B From Leg 1.000 0.0000.000

3.000

A From Leg 1.000 0.0000.000

6.000

B From Leu 1.000 0.000

0.000

6.000

C From Leg 1.000 0.0000.000

6.000

C From Leg 1.000 0.0000.000

0.000

None 0.000

100.000 No Ice 5.413 2.385 0.051

100.000 No Ice 2.275 2.275 0.026

100.000 No Ice 2.275 2.275 0.026

100.000 No Ice 0.547 0.343 0.007

100.000 No Ice 0.547 0.343 0.007

100.000 No Ice 0.547 0.343 0.007

100.000 No Ice 1.425 .425 0.022

100.000 No Ice 3.000 3.000 0.081

Page 16: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)Page

7 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Description Face Offset Offsets: Azimuth Placement C',l: (";,!: Weightor Type Horz Adjustment Front Side

Leg Lateral

Vert

ft 0 fi fr fr K

fift

TMBX-6517-R2M w/ Mount A From Leg 4.000 0.000 93.000 No Ice 6.261 5.678 0.044Pipe 0.000

(E) 1.000

TMBX-65l7-R2Mvv/Mount B From Leg 4.000 0.000 93.000 No Ice 6.261 5.678 0.044Pipe 0.000

(E) 1.000

TMBX-65I7-R2Mw/Mount c From Leg 4.000 0.000 93.000 No Ice 6.261 5.678 0.044Pipe 0.000

(E) 1.000

ETW200VSI2UB A From Leg 4.000 0.000 93.000 No Ice 0.184 0.472 0.011

(E) 0.000

1.000

ETW20OVS12UB B From Leg 4.000 0.000 93.000 No Ice 0.184 0.472 0.011

(E) 0.000

1.000

ETW200VSI2UB C From Leg 4.000 0.000 93.000 No Ice 0.184 0.472 0.011

(E) 0.000

1.000

(2)TMBXX-65l7-A2Mw/ A From Leg 4.000 0.000 93.000 No Ice 8.976 6.963 0.071

Mount Pipe 0.000

(E) 1.000

(2)TMBXX-65l7-A2M\v/ B From Leg 4.000 0.000 93.000 No Ice 8.976 6.963 0.071

Mount Pipe 0.000

(E) 1.000

(2)TMBXX-65I7-A2Mw' c From Leg 4.000 0.000 93.000 No Ice- 8.976 6.963 0.071Mount Pipe 0.000

(E) 1.000

T-Arm Mount [TA 602-3] C None 0.000 93.000 No Ice 11.590 11.590 0.774

(E)**//**

TME-FRIG A From Leg 2.000 0.000 91.000 No Ice 2.804 1.103 0.057

(E) 0.000

0.000

TME-FRIG B From Leg 2.000 0.000 91.000 No Ice- 2.804 1.103 0.057

(E) 0.000

0.000

TME-FRIG c From Leg 2.000 0.000 91.000 No Ice 2.804 1.103 0.057

(E) 0.000

0.000

TME-FXFB A From Leg 4.000 0.000 91.000 No Ice 4.128 1.123 0.055

(E) 0.000

0.000

TME-FXFB B From Leg 4.000 0.000 91.000 No Ice- 4.128 1.123 0.055

(E) 0.000

0.000

TME-ASU9338TYP0I c From Leg 4.000 0.000 91.000 No Ice 3.737 1.155 0.019

(E) 0.000

0.000

Pipe Mount [PM 601-3] c None 0.000 91.000 No Ice 4.390 4.390 0.195

('-)

**//**

Page 17: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S.Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)Page

8 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Dishes

Description Face Dish Offset Offsets: Azimuth 3dB Elevation Outside Aperture Weightor Type Type Horz Adjustment Beam Diameter Area

Leg Lateral

Vert

Width

fi 0o

fi fi fr K

**//**

VHLP2-1I-2WH A Paraboloid From 1.000 -15.000 100.000 2.175 No Ice 3.715 0.031

(E) w/Radomc Leg 0.000

6.000

VHLP2-18-IWH A Paraboloid From 1.000 46.000 100.000 2.175 No Ice 3.715 0.031

(E) w/Radomc Leg 0.000

6.000

VHLP2.5-U B Paraboloid From 1.000 19.000 100.000 2.917 No Ice 6.681 0.048

(E) w/Radomc Leg 0.000

6.000

**//**

Comb.

No.

1

2

3

4

5

6

7

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

Dead Only1.2 Dead+1.6 Wind 0 deg - No Ice0.9 Dead *1.6 Wind 0 deg - No Ice1.2 Dcad+1.6 Wind 30 deg - No Ice0.9 Dead-1.6 Wind 30 deg - No Ice1.2 Dead 11.6 Wind 60 deg - No Ice0.9 Dead-1.6 Wind 60 deg - No lee1.2 Dead-1.6 Wind 90 deg - No Ice0.9 Dead -1.6 Wind 90 deg - No Ice1.2 Dead-1.6 Wind 120 deg - No Ice0.9 Dead-1.6 Wind 120 deg - No Ice1.2 Dead +1.6 Wind 150 deg - No Ice0.9 Dead-' 1.6 Wind 150 deg - No Ice1.2 Dcad^ 1.6 Wind 180 deg - No Ice0.9 Dcad-r 1.6 Wind 180 deg - No Ice1.2 Dead-11.6 Wind 210 deg - No Ice0.9 Dead+1.6 Wind 210 deg - No Ice1.2 DcadJ-1.6 Wind 240 deg - No Ice0.9 Dead-1.6 Wind 240 deg - No Ice1.2 Dead* 1.6 Wind 270 deg - No Ice0.9 Dcad^1.6 Wind 270 deg - No Ice1.2 Dead-1.6 Wind 300 deg - No Ice0.9 Dead-1.6 Wind 300 deg - No Ice1.2 Dead-1.6 Wind 330 deg - No Ice0.9 Dead-1.6 Wind 330 deg - No IceDead+Wind 0 deg - ServiceDcad^Wind 30 deg - ServiceDead+Wind 60 deg - ServiceDead -Wind 90 deg - ServiceDead-Wind 120 deg - ServiceDead-Wind 150 deg - ServiceDead •Wind 180 deg - ServiceDcad-Wind 210 deg - Service-Dead -Wind 240 deg - ServiceDead+Wind 270 deg - ServiceDcad-Wind 300 deg - Service

Load Combinations

Description

Page 18: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S.Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

9 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Comb.

No.

Description

37 Dead- Wind 330 deg - Service

Section

No.

LI

Elevation

fi

118 - 76.75

Maximum Member Forces

76.75-40.5

Component Condition Gov. Axial Major Axis Minor Axis

Type Load Moment Moment

Comb. K kip-ft kip-ftPole- Max Tension 1 0.000 0.000 0.000

Max. Compression 1 -8.310 -0.483 -0.027

Max. Mx 20 -8.199 499.880 3.119

Max. My 2 -8.214 3.057 500.638

Max. Vy 20 -19.348 499.880 3.119

Max. Vx 2 -19.362 3.057 500.638

Max. Torque- 24 -1.243

Pole Max Tension 1 0.000 0.000 0.000

Max. Compression 2 -13.907 8.738 1248.469

Max. Mx 20 -13.858 1258.359 7.750

Max. My 14 -13.907 -8.898 -1249.155

Max. Vy 20 -23.413 1258.359 7.750

Max. Vx i -22.748 8.738 1248.469

Max.Torque 24 -1.224

Pole- Max Tension 1 0.000 0.000 0.000

Max. Compression 2 -19.946 13.031 1894.918

Max. Mx 20 -19.919 1929.508 11.143

Max. My 14 -19.945 -12.774 -1896.366

Max. Vy 20 -26.223 1929.508 11.143

Max. Vx 2 -25.116 13.031 1894.918

Max. Torque- 24 -1.217

Pole Max Tension 1 0.000 0.000 0.000

Max. Compression 2 -25.149 15.853 2359.206

Max. Mx 20 -25.148 2416.726 13.327

Max. My 14 -25.149 -15.307 -2361.225

Max. Vy 20 -27.942 2416.726 13.327

Max. Vx •> -26.536 15.853 2359.206

Max. Torque 24 -1.215

L3 40.5- 18

L4 I8-0

Location

Pole

Maximum Reactions

C audition Gov. Vertical Horizontal. X Horizontal. 7.

Load K K K

Comb.

25.160Max. Vert 20 27.932 0.140

Max. H, 20 25.160 27.932 0.140

Max. H7 2 25.160 0.156 26.526

Max. M. 2 2359.206 0.156 26.526

Max. M, 8 2398.116 -27.749 -0.179

Max. Torsion 14 1.172 -0.139 -26.518

Min. Vert 11 18.870 -24.290 -14.147

Min. Hx 8 25.160 -27.749 -0.179

Min. FL 14 25.160 -0.139 -26.518

Min. M, 14 -2361.225 -0.139 -26.518

Min. M, 20 -2416.726 27.932 0.140

Min. Torsion 24 -1.215 14.370 24.705

Page 19: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

10 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Tower Mast Reaction Summary

Load Vertical Shear, Shear. Overturning Overturning TorqueCombination Moment. M, Moment. M.

K K K kip-ft kip-ft-0.509

kip-ftDead Only 20.967 0.000 0.000 1.156 0.000

1.2 Dead-1.6 Wind 0 deg - NoIce

0.9 Dead-1.6 Wind 0 deg - NoIce

1.2Dcad-1.6Wind30dcg-NoIce

0.9 Dead-1.6 Wind 30 deg - NoIce

1.2 Dcad+1.6 Wind 60 deg - NoIce

0.9 Dead-1.6 Wind 60 deg - NoIce

1.2 DcadH .6 Wind 90 deg-NoIce0.9 Dcad+1.6 Wind 90 deg - NoIce

1.2 Dead- 1.6 Wind 120 deg -

25.160 -0.156 -26.526 -2359.206 15.853 1.213

18.870 -0.156 -26.526 -2340.791 15.882 1.211

25.160 13.728 -24.067 -2078.930 -1183.807 0.876

18.870 13.728 -24.067 -2062.938 -1174.349 0.874

25.160 23.818 -13.693 -1184.786 -2065.797 0.411

18.870 23.818 -13.693 -1175.824 -2049.394 0.410

25.160 27.749 0.1 79 20.412 -2398.116 -0.142

18.870 27.749 0.179 19.893 -2379.111 -0.141

25.160 24.290 14.147 1227.831 -2102.249 -0.742

No Ice

0.9 Dead-1.6 Wind 120deg - 18.870 24.290 14.147 1217.835 -2085.585 -0.741

No Ice

1.2 Dead-1.6 Wind 150 deg - 25.160 14.303 24.736 2124.304 -1228.460 -1.152

No Ice

0.9 Dead-1.6 Wind 150 deg - 18.870 14.303 24.736 2107.315 -1218.679 -1.150

No Ice

1.2 Dead-1.6 Wind 180 deg - 25.160 0.139 26.518 2361.225 -15.307 -1.172

No Ice

0.9 Dcad^ 1.6 Wind 180 deg - 18.870 0.139 26.518 2342.097 -15.021 -1.170

No Ice

1.2 Dead-1.6 Wind 210 deg - 25.160 -13.828 24.076 2082.716 1193.537 -0.790

No Ice

0.9 Dcad^l.6 Wind 210 deg- 18.870 -13.828 24.076 2065.996 1184.319 -0.788

No Ice

1.2 Dead-1.6 Wind 240 deg-No Ice

0.9 Dead-1.6 Wind 240 deg-

25.160 -23.947 13.716 1190.148 2078.582 -0.310

18.870 -23.947 13.716 1180.442 2062.396 -0.309

No Ice

1.2 Dead-1.6 Wind 270 deg - 25.160 -27.932 -0.140 -13.327 2416.726 0.323

No Ice

0.9 Dead- 1.6 Wind 270 deg- 18.870 -27.932 -0.140 -13.568 2397.888 0.322

No Ice

1.2 Dead-1.6 Wind 300 deg - 25.160 -24.365 -14.124 -1222.476 2109.190 0.948

No Ice

0.9 Dead-1.6 Wind 300 deg - 18.870 -24.365 -14.124 -1213.226 2092.788 0.947

No Ice

1.2 Dead-1.6 Wind 330 deg - 25.160 -14.370 -24.705 -2118.072 1234.499 1.215

No Ice

0.9 Dead-1.6 Wind 330 deg -No Ice-

Dead -Wind 0 deg - Service

18.870 -14.370 -24.705 -2101.835 1224.985 1.213

20.967 -0.027 -4.578 -404.919 2.302 0.213

Dead+Wind 30 deg - Service 20.967 2.369 -4.154 -356.711 -204.080 0.153

Dead-Wind 60 deg - Service 20.967 4.Ill -2.363 -202.SS4 -355.804 0.071

Dead -Wind 90 deg - Service- 20.967 4.789 0.031 4.446 -412.985 -0.025

Dead-Wind 120 deg - Service 20.967 4.192 2.442 212.178 -362.107 -0.130

Dead-Wind 150 deg - Service 20.967 2.469 4.269 366.423 -211.781 -0.201

Dead -Wind 180 deg - Scrvice 20.967 0.024 4.577 407.138 -3.057 -0.204

Page 20: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S.Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Pago

11 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Load Vertical Shear, Shear. Overturning Overturning TorqueCombination Moment. M, Moment. M:

K K K kip-ft kip-ft kip-ftDcad-Wind 210 deg - Service 20.967 -2.387 4.155 359.239 204.908 -0.138

Dead-Wind 240 deg - Service 20.967 -4.133 2.367 205.683 357.165 -0.054

Dead-Wind 270 deg - Service 20.967 -4.821 -0.024 -1.357 415.354 0.056

Dcad-Wind 300 deg - Service 20.967 -4.205 -2.438 -209.389 362.456 0.165

Dcad-Wind 330 deg - Service 20.967 -2.480 -4.264 -363.480 211.971 0.213

Solution Summary

Sunt ofApplied Forces Sum of ReactionsLoad PX PY PZ PX PY PZ % Error

Comb. K K K K K K

1 0.000 -20.967 0.000 0.000 20.967 0.000 0.000%

2 -0.156 -25.160 -26.526 0.156 25.160 26.526 0.000%

3 -0.156 -18.870 -26.526 0.156 18.870 26.526 0.000%

4 13.728 -25.160 -24.067 -13.728 25.160 24.067 0.000%

5 13.728 -18.870 -24.067 -13.728 18.870 24.067 0.000%

6 23.818 -25.160 -13.693 -23.818 25.160 13.693 0.000%

7 23.818 -18.870 -13.693 -23.818 18.870 13.693 0.000%

8 27.749 -25.160 0.179 -27.749 25.160 -0.179 0.000".,

9 27.749 -18.870 0.179 -27.749 18.870 -0.179 0.000%

10 24.290 -25.160 14.147 -24.290 25.160 -14.147 0.000",,

II 24.290 -18.870 14.147 -24.290 18.870 -14.147 0.000%

12 14.303 -25.160 24.736 -14.303 25.160 -24.736 0.000%

13 14.303 -18.870 24.736 -14.303 18.870 -24.736 0.000%

14 0.139 -25.160 26.518 -0.139 25.160 -26.518 0.000%

15 0.139 -18.870 26.518 -0.139 18.870 -26.518 0.000" „

16 -13.828 -25.160 24.076 13.828 25.160 -24.076 0.000%

17 -13.828 -18.870 24.076 13.828 18.870 -24.076 0.000%

18 -23.947 -25.160 13.716 23.947 25.160 -13.716 0.000%

19 -23.947 -18.870 13.716 23.947 18.870 -13.716 0.000%

20 -27.932 -25.160 -0.140 27.932 25.160 0.140 0.000%

21 -27.932 -18.870 -0.140 27.932 18.870 0.140 0.000%

22 -24.365 -25.160 -14.124 24.365 25.160 14.124 0.000%

23 -24.365 -18.870 -14.124 24.365 18.870 14.124 0.000%

24 -14.370 -25.160 -24.705 14.370 25.160 24.705 0.000%

25 -14.370 -18.870 -24.705 14.370 18.870 24.705 0.000%

26 -0.027 -20.967 -4.578 0.027 20.967 4.578 0.000%

27 2.369 -20.967 -4.154 -2.369 20.967 4.154 0.000%

28 4.111 -20.967 -2.363 -4.1 II 20.967 2.363 0.000%

29 4.789 -20.967 0.031 -4.789 20.967 -0.031 0.000%

30 4.192 -20.967 2.442 -4.192 20.967 -2.442 0.000%

31 2.469 -20.967 4.269 -2.469 20.967 -4.269 0.000%

32 0.024 -20.967 4.577 -0.024 20.967 -4.577 0.000%

33 -2.387 -20.967 4.155 2.387 20.967 -4.155 0.000%

34 -4.133 -20.967 2.367 4.133 20.967 -2.367 0.000%

35 -4.821 -20.967 -0.024 4.821 20.967 0.024 0.000%

36 -4.205 -20.967 -2.438 4.205 20.967 2.438 0.000%

37 -2.480 -20.967 -4.264 2.4SH 20.967 4.264 0.000%

Load

Combination

Converged?

Non-Linear Convergence Results

Number

ofCyclesDisplacement

Tolerance

Force

Tolerance

Page 21: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

12 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

1 Yes •1 0.00000001 0.00000001

2 Yes 4 0.00000001 0.00040599

3 Yes 4 0.00000001 0.00022441

4 Yes 5 0.00000001 0.00046342

5 Yes 5 0.00000001 0.00017318

6 Yes 5 0.00000001 0.00044825

7 Yes 5 0.00000001 0.00016680

8 Yes 4 0.00000001 0.00028833

9 Yes 4 0.00000001 0.00014599

10 Yes 5 0.00000001 0.00045772

11 Yes 5 0.00000001 0.00016764

12 Yes 5 0.00000001 0.00047858

13 Yes 5 0.00000001 0.00017655

14 Yes 4 0.00000001 0.00086102

15 Yes 4 0.00000001 0.00048601

16 Yes 5 0.00000001 0.00044789

17 Yes 5 0.00000001 0.00016568

18 Yes 5 0.00000001 0.00045874

19 Yes 5 0.00000001 0.00017076

20 Yes •1 0.00000001 0.00041137

21 Yes •1 0.00000001 0.00022636

22 Yes 5 0.00000001 0.00047551

23 Yes 5 0.00000001 0.00017568

24 Yes 5 0.00000001 0.00045326

25 Yes 5 0.00000001 0.00016528

26 Yes 4 0.00000001 0.00004170

27 Yes 4 0.00000001 0.00015401

28 Yes 4 0.00000001 0.00013748

29 Yes 4 0.00000001 0.00003039

30 Yes 1 0.00000001 0.00014501

31 Yes 4 0.00000001 0.00016864

32 Yes 4 0.00000001 0.00004386

33 Yes 4 0.00000001 0.00013646

34 Yes 4 0.00000001 0.00014724

35 Yes 1 0.00000001 0.00003188

36 Yes 4 0.00000001 0.00016202

37 Yes 4 0.00000001 0.00014050

Section

No.

1 I

L2

L3

L4

Maximum Tower Deflections - Service Wind

Elevation

f'118-76.75

80.5 - 40.5

45- 18

18-0

Horz. Gov. Tilt

Deflection Load

in Comb. °

15.932 31 1.163

7.461 31 0.923

2.130 31 0.471

0.293 31 0.156

Twist

0,002

0.001

0.000

0.000

Critical Deflections and Radius of Curvature - Service Wind

Elevation Appurtenance Gov.

Load

/ Reflection Til! 7u7.v/ Radius ofCurvature

fi Comb. in ° ° f123.000 Liizhtning Rod 3/4" x 3' 31 15.932 1.163 0.002 36565

120.000 APXVERRI8-C w/ Mount Pipe 31 15.932 1.163 0.002 36565

113.000 BXA-185063/!2CFx2 w/ Mount 31 14.727 1.139 0.(1(12 36565

Page 22: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S. Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a-Pelican Bay, FL (BU# 877737)Page

13 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Elevation

fi

Appurtenance Gov.

Load

Comb.

Deflection Tilt Twist Radius ofCurvature

fiPipe

106.000 VHLP2-1I-2WH 31 13.055 1.105 0.002 15235100.000 840 10054 w/ Mount Pipe 31 11.653 1.072 0.002 1015793.000 TMBX-6517-R2M w/ Mount Pipe 31 10.071 1.028 0.002 731291.000 TME-FRIG 31 9.632 1.013 0.002 6771

Section

No.

LI

L2

L3

L4

Maximum Tower Deflections - Design Wind

Elevation

fi18-76.75

50.5 - 40.5

45-18

18-0

Horz. Gov.

Deflection Load

in Comb.

92.193 12

43.226 12

12.351 12

1.702 12

Till

6.743

5.356

2.731

0.906

Twist

0.013

0.007

0.002

0.001

Critical Deflections and Radius of Curvature - Design Wind

Elevation

ft

Appurtenance Gov.

Load

Comb.

Deflection

in

Till Twist

o

Radius ofCurvature

ft123.000

120.000

113.000

106.000

100.000

93.000

91.000

Lightning Rod 3/4" x 3'APXVERR18-C w/ Mount PipeBXA-185063/12CFx2 w/ Mount

PipeVHLP2-I1-2WH

840 10054 w/ Mount PipeTMBX-6517-R2M w/ Mount Pipe

TME-FRIG

12

12

12

12

12

12

12

92.193

92.193

85.230

75.571

67.463

58.320

55.787

6.743

6.743

6.608

6.410

6.220

5.962

5.879

0.013

0.013

0.012

0.011

0.010

0.009

0.009

6486

6486

6486

2701

1799

1293

1197

Compression Checks

Pole Design Data

Section Elevation Size L La Kir A Pu <!>/>„ Ratio

No.

ft ft ft

0.0

in

19.962

K

-8.166

K

1367.510

!',.

0/',

LI 118-76.75(1) TP29.63x22x0.219 41.250 0.000 0.006

L2 76.75 - 40.5 (2) TP35.9x28.498x0.25 40.000 0.000 0.0 27.628 -13.826 1850.790 0.007

L3 40.5- 18(3) TP39.561x34.567x0.313 27.000 0.000 0.0 38.930 -19.904 2707.090 0.007

L4 18-0(4) TP42.89x39.561x0.458

4.8.2(1.01 CR)-418.000 0.000 0.0 61.652 -25.148 2824.100 0.009

Page 23: Castle. If you have any questions orneed further

tnxTower

B+T Group1717 S.Boulder. Suite 300

Tulsa. OK 74119

Phone: (918) 587-4630FAX: (918) 295-0265

Job

81117.007.01a - Pelican Bay, FL (BU# 877737)

Page

14 of 14

Project Date

08:18:57 04/04/14

Client

Crown CastleDesigned by

K. Mears

Pole Bending Design Data

Section Elevation Size A/„ 03 A. Ratio Mm OA/. RatioNo.

fi kip-ft kip-ftM.,

kip-ft kip-ftM.

<?A/,„ OA/

LI 118-76.75(1) TP29.63x22x0.2I9 503.885 807.734 0.624 0.000 807.734 0.000

I 2 76.75-40.5(2) TP35.9x28.498x0.25 1271.608 1325.983 0.959 0.000 1325.983 0.000

L3 40.5- 18(3) TP39.561x34.567x0.313 1955.700 2184.608 0.895 0.000 2184.608 0.000

L4 18-0(4) TP42.89x39.561x0.458 2453.933 2457.017 0.999 0.000 2457.017 0.000

Pole Shear Design Data

Section

No.

Elevation

ft

Size Actual

v„K

<J>K„

K

Ratio

v„

Actual

Tukip-ft

o/'.

kip-ft

Ratio

Tu

0! WnLI

L2

L3

L4

118-76.75(1)

76.75-40.5(2)40.5- 18(3)

18-0(4)

TP29.63x22x0.2l9

TP35.9x28.498x0.25

TP39.561x34.567x0.313

TP42.89x39.561x0.458

19.494

23.788

26.770

28.585

683.756

925.393

1353.540

1412.050

0.029

0.026

0.020

0.020

1.162

1.155

1.153

1.152

1617.442

2655.200

4374.550

4920.042

0.001

0.000

0.000

0.000

Pole Interaction Design Data

Section

No.

Elevation

ft

Ratio

P

Ratio

A/,.,

Ratio

A/„,

Ratio

v„

Ratio

T.

Comb.

Stress

Ratio

Alio::.

Stress

Ratio

Criteria

OP. #/,„ (J>A/,„ ♦K, 07-,,

LI 118-76.75(1) 0.006 0.624 0.000 0.029 0.001 0.631

•0.967

1.000 4.8.2 l/

L2 76.75 - 40.5 (2) 0.007 0.959 0.000 0.026 0.000 1.000 4.8.2 l/

48i j/L3 40.5- 18(3) 0.007 0.895 0.000 0.020 0.000 0.903 1.000

L4 18-0(4) 0.009 0.999 0.000 0.020 0.000

•1.008 X 1.000 4.8.2 X

Section Capacity Table

Section ElevationNo.

ComponentType

Size Critical

Element

P

K

oPalhmK Capacity

Pass

Fail

LI

L2

L3

L4

118-76.75

76.75 - 40.5

40.5- 18

18-0

PolePole-

Pole

Pole

TP29.63x22x0.219

TP35.9x28.498x0.25

TP39.561x34.567x0.313

TP42.89x39.561x0.458

1

3

4

-8.166

-13.826

-19.904

-25.148

**

**

**

Pole(L4)RATING =

63.0

96.7

90.3

98.3

Summary98.3

98.3

Pass

Pass

Pass

Pass

Pass

Pass

**See Aerosoft output for detailed capacitieS

Program Version 6.1.4.1 - 12/17/2013 File: 877737 PELICAN BAY.eri

Page 24: Castle. If you have any questions orneed further

r " -•

APPENDIX B

BASE LEVEL DRAWING

Page 25: Castle. If you have any questions orneed further

(INSTALLED-BUNDLED IN A 2" CONDUIT)(3) 1/2" TO 100 FT LEVEL(6) 5/16" TO 100 FT LEVEfc

(PROPOSED)(1) 3/8" TO 120 FT LEVEL(INSTALLED-TO BE REMOVED)(6) 1-5/8" TO 120 FT LEVEL(INSTALLED)(3) 1-3/16" TO 120 FT LEVEL -(SPRINT PCS)

(INSTALLED)(13) 1-1/4" TO 93 FT LEVEL.

BUSINESS UNIT: 877737

(INSTALLED)(12) 1-5/8" TO 113 FT LEVEL

Page 26: Castle. If you have any questions orneed further

«• ' *

APPENDIX C

ADDITIONAL CALCULATIONS

Page 27: Castle. If you have any questions orneed further

Rei

nfo

rcem

ent

Cap

acit

y

Dim

en

sio

n!

.in

dP

rop

ert

ies

Wei

gh

t

Cb

/(t)

On

tro

id

Cen

tred

Iro

mB

olt

Web

Mom

ent

otM

omen

tol

from

Mat

ing

Hol

eC

ente

rT

hick

ness

Are

a|in'

|In

ertia

[in')

Iner

tia(in

*)td

ge'in

)(in

)|in

)0

.5n

60

00

50

S.\

f'(0

;rcr

ilC

rrjw

nCos

t/.'\

8in;

_s;7

737_

('.';

iio/

iflU

)'\r

n8ir

irer

,naW

7lS

llJ/

,0()

/_01

ri_<

lrro

Col

iuto

rmm

lRe,

n/or

<rm

.-nr

Cop

oci(

y

flan

ge

Wii

ith

dn

l

Fla

ng

e

Th

ick

ness

Ho

le

Dia

met

erY

ield

Str

ait

Ult

imat

e

I'")

!">

')st

ress

Iks,

!-n

r- 1

0/3

Co

mp

rrss

.on

Un

braced

!;"

M"'

l

Sle

nd

er

Rati

oU

nb

raced

Cue

lliL

ient

len

gth

[in)

All

ow

ab

le

Aai

alw

/

All

owab

lein

crea

seG

over

ning

Aai

al(k

ip)

<hi

p)A

xial

18

75

2S

0.0

Ru

ptu

4

Des

ign

Axi

al

Str

en

gth

Go

ver

nin

g

l«ip

lA

.ial

Aero

So

luti

on

sll

ci|

....

....

....

.-.„

.

Bo

uld

er.

tOB

01

O1

11

0U

M&

S8

2

4/4

/10

14

K.0

7A

M

Page 28: Castle. If you have any questions orneed further

Su u u o o

ill

si

I ti

n

-f

1*

3 C

5 r *

* s -E 5

II

»iilsi

g c

g££g

Page 29: Castle. If you have any questions orneed further

Square, Stiffened / Unstiffened Base Plate, Any Rod Material - Rev. F /(Assumptions: 1) Rod groups at corners. Total # rods divisible by 4. Maximum total # of rods = 48 (12 per Corner).

2) Rod Spacing = Straight Center-to-Center distance between any (2) adjacent rods (same corner)3) Clear space between bottom of leveling nut and top of concrete not exceeding (1)*(Rod Diameter)

Site Data

BU#: 877737

Site Name:

App#:PELICAN BAY

216378 Revision # 1

Anchor Rod Data

Eta Factor, q 0.5 TIA G (Fig. 4-4)

Qty:Diam:

Rod Material:

Yield, Fy:Strength, Fu:

Bolt Circle:

12

in

ksi

ksi

in

2.25

A615-J

75

100

49

Anchor Spacing 6 in

Plate Data

W=Side:

Thick:

Grade:

Clip Distance:

48 in

in

ksi

in

2.5

55

6

Stiffener Data (Welding at both sides)

Configuration:Weld Type:

Groove Depth:Groove Angle:Fillet H.Weld:

Fillet V.Weld:

Width:

Height:Thick:

Notch:

Grade:

Weld str.:

Unstiffened

in **

degrees<- Disregardin

in

in

in

in

ksi

ksi

Pole Data

Diam:

Thick:

Grade:

# of Sides:

42.89 in

in

ksi

"0" IF Round

0.3125

65

18

Base Reactions

TIA Revision:

Factored Moment, Mu:

Factored Axial, Pu:

Factored Shear, Vu:

G

ft-kipskipskips

2453.93225

25.1475

28.584601

Anchor Rod Results

TIA G --> Max Rod (Cu+ Vu/q):Axial Design Strength, 0*Fu*Anet:Anchor Rod Stress Ratio:

Base Plate Results

Base Plate Stress:

PL Design Bending Strength, (p*Fy:Base Plate Stress Ratio:

N/A - Unstiffened

Stiffener Results

Horizontal Weld :

Vertical Weld:

Plate Flex+Shear, fb/Fb+(fv/Fv)A2:

Plate Tension+Shear, ft/Ft+(fv/Fv)A2:

Plate Comp. (AISC Bracket):Pole Results

Pole Punching Shear Check:

207.2 Kips260.0 Kips

79.7% Pass

Flexural Check

39.2 ksi

49.5 ksi

79.1% Pass

N/A

N/A

N/A

N/A

N/A

N/A

ear spaceol BC 'or SingleAnchor Case

" Note: forcomplete jointpenetration groove welds the groove depth must be exactly 1/2 the stiffenerthickness forcalculation purposes

CCIplate 1.5 - Square Base F-G 1.2, Effective March 19, 2012 Analysis date: 4/4/2014

Page 30: Castle. If you have any questions orneed further

CCIFoundation Tool Suite - Monopole Pier - Beta Release

CCI Foundation Tool Suite - vl.O Date: 4/4/2014

BU: 877737

Site Name. PELICAN BAY, FL

App Number: 216378 Rev:l

Work Order: 720611 WfPMonopole Drilled Pier

Input

Criteria

TIA Revision: G

ACI 318 Revision: 2008

Seismic Category: B

Forces

Compression 25 kips

Shear 29 kips

Moment 24S4 k-ft

Swelling Force 0 kips

Foundation Dimensions

Pier Diameter: 6 ft

Ext. above grade: 0.5 ft

Depth below grade: 24.5 ft

Material Properties

Number of Rebar: 16

Rebar Size: 11

Tie Size 5

Rebar tensile strength: 60 ksi

Concrete Strength: 3000 psi

Ultimate Concrete Strain 0.003 in/in

Clear Cover to Ties: 4 in

Soil Profile: Soil

Ultimate Ultimate Ultimate

Friction Uplift Skin Comp. Skin Bearing

Thickness From To Unit Weight Cohesion Angle Friction Friction Capacity SPT'N'

Layer (ft) (ft) (ft) (pcf) (psf) (deg) (ksf) (ksf) (ksf) Counts

1 3 0 3 110 0 0 0 0 0

2 1.3 3 4.3 110 30 0.2 0.2 0

3 4.7 4.3 9 50 30 0.2 0.2 0

4 3 9 12 50 29 0.3 0.3 0

5 11 12 23 50 28 0 1 Q I 0

6 1.5 23 24.5 r,0 30 0.4 0.4 7

85 Tie Size

(16)-«11

Analysis Results

Soil Lateral Capacity

Depth to Zero Shear: 5.09 ft

Max Moment, Mu: 2562.66 k-ft

Soil Safety Factor: 1.83

Safety Factor Req'd: 1.33

RATING: 72.6%

Soil Axial Capacity

Skin Friction (k): 53.72 kips

End Bearing (k): 148.44 kips

Comp. Capacity (k), <pCn: 202.16 kips

Comp. (k), Cu: 25.00 kips

RATING: 12.4%

Concrete/Steel Check

Mu (from soil analysis) 2562.66 k-ft

ct>Mn 3300.85 k-ft

RATING: 77.6%

rho provided 0.61

rho required 0.33 OK

Rebar Spacing 10.63

Spacing required 22.56 OK

Dev. Length required 19.08

Dev. Length provided 61.78 OK

Overall Foundation Rating: 77.6% |

E