Page 1: CASE STUDY: The Adelaide to Darwin Rail Link

1 Genesee & Wyoming Inc.

Genesee & Wyoming Australia

October 2012

AusIntermodal 2012

Page 2: CASE STUDY: The Adelaide to Darwin Rail Link

2 Genesee & Wyoming Inc.

Discussion

• Overview of GWI

• GWA & Business

• Intermodal Business

• Investment

• Future Opportunities

Page 3: CASE STUDY: The Adelaide to Darwin Rail Link

3 Genesee & Wyoming Inc.

Genesee & Wyoming Inc

Page 4: CASE STUDY: The Adelaide to Darwin Rail Link

4 Genesee & Wyoming Inc. 4 Genesee & Wyoming Inc.

Genesee & Wyoming Inc Overview

• Listed on New York Stock Exchange with market cap of ~$2.9 billion (pre Rail America)

• Own 66 railroads and employ ~2,600 people

• Operate over ~ 9,000 track miles with ~600 locomotives

• Over 850 Customers

• Provide rail service in the United States, Canada, Australia, the Netherlands and Belgium

Page 5: CASE STUDY: The Adelaide to Darwin Rail Link

5 Genesee & Wyoming Inc.

Outstanding Safety Performance 2012 Injury Frequency Rate per 200,000 man-hours. Through August

3.10 3.00

2.28

1.03 1.0

0.07

0.67 0.53 0.48 0.49

0 0 0 0 0

Page 6: CASE STUDY: The Adelaide to Darwin Rail Link

6 Genesee & Wyoming Inc.

Genesee & Wyoming 2012

Page 7: CASE STUDY: The Adelaide to Darwin Rail Link

7 Genesee & Wyoming Inc.

Genesee & Wyoming 2012 (Rail America)

Page 8: CASE STUDY: The Adelaide to Darwin Rail Link

8 Genesee & Wyoming Inc.

Our Core Purpose

To be the safest and most respected rail service provider in the world.

Page 9: CASE STUDY: The Adelaide to Darwin Rail Link

9 Genesee & Wyoming Inc.

Industry Leading Customer Satisfaction

Page 10: CASE STUDY: The Adelaide to Darwin Rail Link

Genesee & Wyoming Australia

Page 11: CASE STUDY: The Adelaide to Darwin Rail Link

11 Genesee & Wyoming Inc.

Genesee & Wyoming (GWI) History in Australia

1996 • GWI privatises Australia National’s SA business

1999 • Start-up of intra-facility contract to serve OneSteel Whyalla

2000 • Formation of Australian Railroad Group (ARG) with partner Wesfarmers • ARG buys Westrail, owns and manages above and below rail services

2001 • GWI invests in FreightLink - begins operating construction trains • GWI crews operate first FreightLink train (2004)

2006 • QR and Babcock & Brown make unsolicited offer and purchase certain ARG assets • GWI retains original SA business, names it Genesee & Wyoming Australia (GWA)

2010 • GWA purchases FreightLink, expanding presence in Australia

Page 12: CASE STUDY: The Adelaide to Darwin Rail Link

12 Genesee & Wyoming Inc. 12 Genesee & Wyoming Inc.

Genesee & Wyoming Australia Pty Ltd

• 0.67 reportable injury rate YTD 2012 (2 injuries) – Currently 222 days injury free at 23 October 2012

• 400+ employees – located in Adelaide, Alice Springs, Darwin, Ceduna, Port Lincoln, Whyalla, Port Augusta, Tailem Bend and Parkes (NSW)

• 85+ locomotives and 950 wagons – 19 new high-horsepower locos

• 3,500+ km of owned track

• Accredited rail operator in six states (all but Tasmania)

Page 13: CASE STUDY: The Adelaide to Darwin Rail Link

13 Genesee & Wyoming Inc.

GWA Safety

Genesee & Wyoming Australia

Injury Frequency Rate per 200,000 Employee Hours as at September 30, 2012

0.48 0.81 0.55 0.53 0.27

0.67 0.50 0.0

1.0

2.0

3.0

2006 2007 2008 2009 2010 2011 2012 YTD 2012Goal

GWA

Page 14: CASE STUDY: The Adelaide to Darwin Rail Link

14 Genesee & Wyoming Inc.

Customer Base - SA • Arrium (6.8mtpa of iron ore exports and intra-facility

shunting in Whyalla NG, 3.8mtpa Wirrida to Whyalla ST)

• Viterra/Glencore (3mtpa of grain in South Australia)

• Bulk Minerals • GRA (1.8mtpa of gypsum)

• Penrice (0.5mtpa of marble)

• Crewing Services • SCT services

• Parkes-Pt Augusta – 1 service per week

• Melbourne-Perth 4 services per week

Page 15: CASE STUDY: The Adelaide to Darwin Rail Link

15 Genesee & Wyoming Inc.

OZ Minerals • Up to 250,000 tonnes of copper-gold concentrate

ore per annum

• Rail haulage to Port Adelaide

• 116 kilometre haul road to Wirrida rail siding

• Direct loading of 20’ half height containers road to rail at Wirrida

• Two dedicated rail services per week between Wirrida and Port Adelaide

• Two new 3000hp locomotives and over 44 flat wagons

Adelaide

Bigrlyi Uranium

Nolans Bore Molyhil Tungsten

Tarcoola

Darwin

Alice Springs

Tennant Creek

Prominent Hill Wirrida

Page 16: CASE STUDY: The Adelaide to Darwin Rail Link

16 Genesee & Wyoming Inc.

OM Manganese • 900,000 tonnes of manganese ore per annum • Rail haulage over 800 kilometres Muckaty to

Darwin • 60 kilometre haul road to Muckaty rail siding

from mine • Stockpile to bulk rail wagon loading at Muckaty

siding • Four dedicated trains per week to Darwin • Bottom discharge from rail wagons to stockpile

at Port of Darwin

Bigrlyi Uranium

Nolans Bore Molyhil Tungsten

Darwin

Bootu Creek

Tennant Creek

Alice Springs

Muckaty

Page 17: CASE STUDY: The Adelaide to Darwin Rail Link

17 Genesee & Wyoming Inc.

Territory Resources • Task 1.5 million tpa of haematite iron ore

• Rail haulage 210 kilometres to Darwin

• 15 kilometre haul road to Union Reef rail siding

• Stockpile to bulk rail wagon loading at Union Reef

• Eight dedicated trains per week between Union Reef and Darwin

• Bottom discharge from rail wagons to stockpile at Port of Darwin

Bigrlyi Uranium

Nolans Bore Molyhil Tungsten

Darwin

Francis Creek

Tennant Creek

Alice Springs

Union Reef

Page 18: CASE STUDY: The Adelaide to Darwin Rail Link

18 Genesee & Wyoming Inc.

GWA Intermodal - Northbound • 6 services per week • Trains 1800 m long • Average 4000 tonnes • Journey to Darwin – 2 days • Crews work relay working – state of art

resting facilities • New high horse power locomotives

Adelaide

Bigrlyi Uranium

Nolans Bore Molyhil Tungsten

Tarcoola

Darwin

Alice Springs

Katherine

Tennant Creek

2000 kms

Page 19: CASE STUDY: The Adelaide to Darwin Rail Link

19 Genesee & Wyoming Inc.

GWA Intermodal

• Terminals – Adelaide - services provided under contract by PN – Alice Springs – GWA owned & operated – Tennant Creek – GWA owned & services provided

under contract by Linfox – Katherine – GWA owned & services provided

under contract by Linfox – Darwin – GWA owned & operated

Page 20: CASE STUDY: The Adelaide to Darwin Rail Link

20 Genesee & Wyoming Inc.

GWA Intermodal • Locations Serviced

– Adelaide – Alice Springs – Tennant Creek – Katherine – Darwin

• Container Types – 6.1m (20’), 12.2m (40’), 13.7m (45’),

14.6m (48’) and 16.15m (54’) – Refrigerated (diesel powered) – Insulated / Ventilated – General Purpose – Tautliners – Transi-flats /Flat Racks

Page 21: CASE STUDY: The Adelaide to Darwin Rail Link

21 Genesee & Wyoming Inc.

GWA Intermodal • Major Customers

– Scott Group (NTFS) – Toll Group (Toll Express, NQX,

Automotive, Ipec) – Woolworths – Northline – Linfox

• Major Commodities – Fresh Fruit and Vegetables – Fast Moving Consumer Goods – Motor Vehicles – Cement – Commercial Furniture – Mail – Whitegoods – Personal Effects

Page 22: CASE STUDY: The Adelaide to Darwin Rail Link

22 Genesee & Wyoming Inc.

Freight Availability

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Freight Availability - Northbound

2010

2011

2012

Page 23: CASE STUDY: The Adelaide to Darwin Rail Link

23 Genesee & Wyoming Inc.

Freight Availability

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Freight Availability - Southbound

2010

2011

2012

Page 24: CASE STUDY: The Adelaide to Darwin Rail Link

24 Genesee & Wyoming Inc.

Intermodal Traffic

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Total Intermodal Containers

2010 2011 2012

Jan, Feb, Mar 2012 includes containers terminated Katherine due Edith River Bridge

Page 25: CASE STUDY: The Adelaide to Darwin Rail Link

25 Genesee & Wyoming Inc.

Investment • Locomotives

– 9 x 4300 AC Locomotives – for Intermodal & Other Business were delivered June 2012 and are in service on the corridor.

• Crew Vans – Overhaul of existing 4 Crew Vans – 4 are completed.

• Lifting Equipment – Purchase of new lifting equipment for Alice Springs & Darwin

• 2 Darwin • 1 Alice Springs

• In-line fuelling – Purchase of equipment for In-Line fuelling (intermodal) – five

systems commissioned and in service.

• Terminal Acquisition – Purchase of Alice Springs Terminal

Page 26: CASE STUDY: The Adelaide to Darwin Rail Link

26 Genesee & Wyoming Inc.

Infrastructure Investment • McKinlay River bridge scour protection -

completed

• Place at various locations - additional inventory (rail, sleepers, ballast) for emergency recovery - completed

• Earth bund at Bridge Creek to mitigate

• Investment in weather monitoring and advance weather warning services

• Rail defect removal program Tarcoola-Alice Springs

August 2011

December 2011

Page 27: CASE STUDY: The Adelaide to Darwin Rail Link

27 Genesee & Wyoming Inc.

Organic Growth Opportunities

-

Adelaide

Darwin

Tarcoola

Developing Natural Resources Projects in South Australia and Northern Territory:

• Iron Ore • Rare Earths • Phosphates • Manganese • Nickel • Coal • Copper/Gold/Uranium

Katherine

Alice Springs

Roxby Downs

Page 28: CASE STUDY: The Adelaide to Darwin Rail Link

28 Genesee & Wyoming Inc.