Owner
Tanjung Bin Energy Issuer Bhd.
Client
Mudajaya Corporation Berhad
Chimney EPC Contractor
Zelan BEC Consortium
Lining System
Pennguard Borosilicate Block Lining System
Project
Participants
Challenges • Significantly tapered external windshield design with off-centered single flue. • Constructed on reclaimed land. • Large 10.5m ID internal steel flue.
Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including pile cap, slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works and Pennguard borosilicate block protection lining system to the inside face of the flue. But the steel structural were fabricated by Zelan and installed by BEC.
Tanjung Bin 4 Project Tanjung Bin Energy Issuer Berhad has a proposed 1 x 1000-megawatt (MW) coal-fired power plant for construction in Negeri Johor Darul Takzim, The new 1000 MW base load power facility will provide a reliable power source to the Malaysia community.
.
Tanjung Bin Energy Issuer Berhad was constructing a 1000-megawatt coal-fired power plant in Negeri Johor Darul Takzim , Malaysia. Mudajaya Corporation Berhad was the main EPC contractor for this project.
TA
NJU
NG
BIN
4 P
RO
JE
CT
CASE STUDY TANJUNG BIN 4
PROJECT
BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966
Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]
Chimney Data
Height 200m
No. of internal steel flue 1
No. of internal platforms 3
Diameter of internal flue 10.5m
External concrete diameter 24.2m
Piles 56 Nos. x 1200 dia
Pile Cap 33.0dia x 2.9m deep
Tanjung Bin 4 stack elevation
Slip forming in progress
Painting in progress
Installation of the 10.5m ID flue
Pennguard Borosilicate Block Protection Lining System