Case Study
Utility-Owned Smart Grid Smart Grid, Smart Cities
Trial 1 March – 31 May 2012
11 July 2012
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page ii
Background
The Australian Government has chosen Ausgrid to lead a $100 million initiative across five sites in
Newcastle, Sydney and the Upper Hunter regions (see Figure 1). Smart Grid, Smart City creates a
testing ground for new energy supply technologies. At least 30,000 households will participate in
the project over three years.
The demonstration project gathers information about the benefits and costs of different smart grid
technologies in an Australian setting. Building a smart grid involves transforming the traditional
electricity network by adding a chain of new, smart technology. It includes smart sensors, new back-
end IT systems, smart meters and a communications network.
RedFlow has won the bid to supply 61 energy storage systems (ESS) to Ausgrid for installation in
Newcastle, Scone and Newington in Sydney. 40 of these were installed in Newcastle in late 2011
and early 2012, with the other 20 ESS installed in Scone in April 2012. One ESS has also been
operational in Newington since 2010 as part of the ongoing Smart Home sub-project. The 40
systems in Newcastle have been operating since February 2012 and have been feeding into the grid
during peak demand periods. The 20 systems in Scone have been operational since mid-May 2012.
Figure 1: The locations and highlights of the Smart Grid, Smart City Trial [1]
RedFlow’s ESS are based on its core zinc bromide module (ZBM) flow battery technology. Each ESS
contains one ZBM, battery management system (BMS), remote terminal unit (RTU), inverter and 3G
modem for communications. All components are housed in a metal enclosure installed near
customer houses on private property.
40 RedFlow ESS
20 RedFlow ESS
1 RedFlow ESS
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page iii
Summary
Increases in both general and peak electricity demand, the integration of intermittent and
distributed generation, and developments in communications technology have all enabled, as well
as necessitated a more advanced electricity network. This moves away from the traditional uni-
directional grid, with central generation and one-way communications. As such, utilities have seen
Smart Grids as an answer to the need for greater grid capacity, as well as allowing transmission and
distribution infrastructure upgrade deferral. According to the Electric Power Research Institute
(EPRI), a Smart Grid “integrates and enhances other necessary elements including traditional
upgrades and new grid technologies with renewable generation, storage, increased consumer
participation, sensors, communications and computational ability” [2].
The use of energy storage in Smart Grids can provide utilities with many benefits, including
improved operational efficiency and increased value of distributed generation, thereby improving
customer satisfaction [3]. This is done through the time-shifting of electricity from low demand, as
well as times of high distributed generation output, to high demand times.
However, despite the many benefits of energy storage, existing proven technologies are either
inappropriate for Smart Grid applications (in the case of lead acid batteries), or are physically
impossible to implement on a large scale in a variety of areas (in the case of pumped hydro or
compressed air energy storage (CAES)). As such, new and advanced technologies are emerging to
satisfy this new market. These must be trialed and tested to ensure that they are both reliable and
align with the needs of utilities.
As such, the Australian Government has initiated, and is currently funding the Smart Grid, Smart
Cities (SGSC) Trial. It aims to test several hypotheses about many types of Smart Grid technology. In
particular, the Trial aims to quantify the following seven benefits of energy storage:
1. Reduction in peak demand – energy storage as a cost-effective and reliable alternative to
network capacity expansion
2. Improvement in network reliability/voltage/power factor/power quality – cost-
effectiveness and value of energy storage
3. Energy supply during peak price events – net benefit to retail sector
4. Minimisation of customers’ energy bills – with innovative tariffs e.g. time of use together
with energy storage.
5. Combined benefit between consumer, retail and network sectors
6. Investigation of large capacity (~1MVA) storage – extra cost and other benefits compared
to smaller capacity storage
7. Intermittent generation support – optimisation of renewable energy sources value
RedFlow has been selected as one of several advanced energy storage companies to supply energy
storage systems (ESS) for the trial to test these seven benefits of energy storage to Smart Grids. The
ESS supplied for the Trial by RedFlow are the zinc-bromide module (ZBM)-based R510 model (see
Appendix B – R510 Product Brochure). These systems are rated at 5kW, 10kWh, and comprise one
ZBM, inverter, 3G modem for communications, battery management system (BMS), remote terminal
unit (RTU) and other power electronics housed in a metal enclosure (see Figure 8).
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page iv
Figure 2: Components of RedFlow's R510 ESS
61 R510 ESS have been installed and commissioned on separate residential properties as part of the
SGSC Trial. The ESS have been staggered in their installations, with all systems operational since
mid-May 2012. The operational results and benefits of RedFlow’s ZBM-based ESS were analysed,
and the lessons learnt presented. This produced the following key conclusions:
Over the period between 1 March and 31 May 2012, the R510 ESS installed for the SGSC trial
have outputted a total of 14.334MWh to the grid at an average efficiency of 58.03%. This is
shown in the graph below in Figure 12.
Figure 3: Total grid import and export over the trial period with average monthly efficiency
0
20
40
60
80
100
0
2000
4000
6000
8000
10000
March April May
%
kWh
SGSC ESS Grid Interaction
Grid Import (kWh) Grid Export (kWh) Efficiency (%)
ZBM
Inverter
SMA Sunny Backup
Enclosure
1850 H x 971 L x 567 W
Power Electronics
Including BMS, RTU,
3G Modem
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page v
The use of RedFlow’s ESS reduces the traditional peak seen by the grid by 10-15% when used
in a ratio of approximately 1 ESS for 16 customers during cooler months (see Figure 4).
Figure 4: Results from the Melinda Avenue feeder in Newcastle show a reduction in peak demand of over 15% with the
use of RedFlow's ESS during traditional peal times
The use of RedFlow’s ESS transforms the traditional evening peak seen by the grid to a
trough when used in a ratio of approximately 1 ESS for 1 customer during cooler months
(see Figure 5).
Figure 5: Results from the Scone feeder in mid-June show a transformation from peak to trough with the use of
RedFlow's ESS during traditional peak times
Research and Development already undertaken by RedFlow shows that its kW-scale ESS can
be scaled up to MW-scale systems (see Figure 6).
0
10
20
30
40
50
60
70
80
90
100
12:00 AM 3:00 AM 6:00 AM 9:00 AM 12:00 PM 3:00 PM 6:00 PM 9:00 PM 12:00 AM
Po
we
r (k
VA
)
Power on Miranee Road Recloser Energy Storage in Use
Grid-Feed
Period 45kW
Grid Charge Period 28kW
0
10
20
30
40
50
60
70
80
90
3:40PM
4:10PM
4:40PM
5:10PM
5:40PM
6:10PM
6:40PM
7:10PM
7:40PM
8:10PM
8:40PM
9:10PM
9:40PM
10:10PM
Gri
d P
ow
er (
kW)
Grid-Feed Period – Monday 9 April 2012
Real Power (kW) with Storage Real Power (kW) without Storage
Peak Reduction
15.19%
65 Residential Customers 4 R510 ESS
Grid Charge Period 12kW
13 Residential Customers
15 R510 ESS
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page vi
Figure 6: RedFlow's M90 90kW, 180kWh ESS was installed at the University of Queensland in late May 2012
RedFlow’s ESS perform well when integrated with intermittent solar generation, as well as
more reliable fuel cell distributed generation
Figure 7: The SGSC trial in Newcastle has integrated a total of 200kW of solar and 50kW of Blue Gen fuel cell generation
with 40 RedFlow ESS
3 Solar
12 Solar
2 Solar
15 Solar
5 Solar
3 Solar
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page vii
Contents
Background ............................................................................................................................................. ii
Summary ................................................................................................................................................ iii
Contents ................................................................................................................................................ vii
List of Figures ....................................................................................................................................... viii
1 Introduction .................................................................................................................................... 1
2 Operation ........................................................................................................................................ 5
2.1 Newcastle ................................................................................................................................ 5
2.2 Scone ....................................................................................................................................... 5
2.3 Newington ............................................................................................................................... 5
3 Results ............................................................................................................................................. 6
3.1 Newcastle ................................................................................................................................ 6
3.1.1 Peak Demand Reduction ................................................................................................. 6
3.1.2 Reliability ......................................................................................................................... 8
3.2 Scone ....................................................................................................................................... 9
3.2.1 Peak Demand Reduction ................................................................................................. 9
3.2.2 Reliability ....................................................................................................................... 10
3.3 Newington ............................................................................................................................. 10
3.3.1 Load Following .............................................................................................................. 10
3.3.2 Reliability ....................................................................................................................... 11
4 Lessons Learnt ............................................................................................................................... 12
4.1 Newcastle .............................................................................................................................. 12
4.2 Scone ..................................................................................................................................... 12
4.3 Newington ............................................................................................................................. 13
5 Conclusions ................................................................................................................................... 14
6 References .................................................................................................................................... 15
Appendix A – List of Abbreviations ....................................................................................................... 16
Appendix B – R510 Product Brochure ................................................................................................... 17
Appendix C– List of Trial Sites ............................................................................................................... 20
Appendix C1 – List of Newcastle Sites .............................................................................................. 21
Appendix C2 – List of Scone Sites ..................................................................................................... 23
Appendix D – Cycle Profiles .................................................................................................................. 24
Appendix E – Newcastle Reduction in Peak Demand ........................................................................... 25
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page viii
List of Figures
FIGURE 1: THE LOCATIONS AND HIGHLIGHTS OF THE SMART GRID, SMART CITY TRIAL [1] II
FIGURE 2: COMPONENTS OF REDFLOW'S R510 ESS IV
FIGURE 3: TOTAL GRID IMPORT AND EXPORT OVER THE TRIAL PERIOD WITH AVERAGE MONTHLY EFFICIENCY IV
FIGURE 4: RESULTS FROM THE MELINDA AVENUE FEEDER IN NEWCASTLE SHOW A REDUCTION IN PEAK
DEMAND OF OVER 15% WITH THE USE OF REDFLOW'S ESS DURING TRADITIONAL PEAL TIMES V
FIGURE 5: RESULTS FROM THE SCONE FEEDER IN MID-JUNE SHOW A TRANSFORMATION FROM PEAK TO
TROUGH WITH THE USE OF REDFLOW'S ESS DURING TRADITIONAL PEAK TIMES V
FIGURE 6: REDFLOW'S M90 90KW, 180KWH ESS WAS INSTALLED AT THE UNIVERSITY OF QUEENSLAND IN LATE
MAY 2012 VI
FIGURE 7: THE SGSC TRIAL IN NEWCASTLE HAS INTEGRATED A TOTAL OF 200KW OF SOLAR AND 50KW OF
BLUE GEN FUEL CELL GENERATION WITH 40 REDFLOW ESS VI
FIGURE 8: COMPONENTS OF REDFLOW'S R510 ESS 2
FIGURE 9: INSTALLATION OF AN ESS IN NEWCASTLE 2
FIGURE 10: THE LOCATIONS OF THE REDFLOW ESS IN NEWCASTLE, WITH THE FUEL CELL GENERATION
CONNECTED TO EACH FEEDER 3
FIGURE 11: THE R510 ESS INSTALLED AT THE SMART HOME IN NEWINGTON, SYDNEY 4
FIGURE 12: TOTAL GRID IMPORT AND EXPORT OVER THE TRIAL PERIOD WITH AVERAGE MONTHLY EFFICIENCY
6
FIGURE 13: A TYPICAL FEED-IN CURVE FOR THE 4 ESS ON THE MELINDA AVENUE FEEDER 6
FIGURE 14: THE REDUCTION IN PEAK DEMAND SEEN BY THE GRID (4PM-10PM) IN MAY ON THE MELINDA
AVENUE FEEDER 7
FIGURE 15: REDUCTION IN PEAK DEMAND SEEN BY THE MELINDA AVENUE FEEDER DURING TRADITIONAL
PEAK TIMES 7
FIGURE 16: THE PEAKS CAUSED BY AUTOMATIC HOT WATER SYSTEMS ON THE MELINDA AVENUE FEEDER 8
FIGURE 17: AVAILABILITY OF ZBMS AND ESS IN NEWCASTLE 8
FIGURE 18: AVERAGE POWER ON THE SCONE RECLOSER 14 TO 18 MAY (BEFORE REDFLOW ESS COMMENCED
FULL OPERATION) 9
FIGURE 19: AVERAGE POWER ON THE SCONE RECLOSER 18 TO 22 JUNE (WITH REDFLOW ESS OPERATIONAL) 9
FIGURE 20: AVAILABILITY OF ZBMS AND ESS IN SCONE 10
FIGURE 21: THE ESS CAN DYNAMICALLY FOLLOW THE LOAD, AND ANY SUDDEN CHANGES TO GENERATION 10
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 1
1 Introduction
Increases in both general and peak electricity demand, the integration of intermittent and
distributed generation, and developments in communications technology have all enabled, as well
as necessitated a more advanced electricity network. This moves away from the traditional uni-
directional grid, with central generation and one-way communications. As such, utilities have seen
Smart Grids as an answer to the need for greater grid capacity, as well as allowing transmission and
distribution infrastructure upgrade deferral. According to the Electric Power Research Institute
(EPRI), a Smart Grid “integrates and enhances other necessary elements including traditional
upgrades and new grid technologies with renewable generation, storage, increased consumer
participation, sensors, communications and computational ability” [2].
The use of energy storage in Smart Grids can provide utilities with many benefits, including
improved operational efficiency and increased value of distributed generation, thereby improving
customer satisfaction [3]. This is done through the time-shifting of electricity from low demand, as
well as times of high distributed generation output, to high demand times.
However, despite the many benefits of energy storage, existing proven technologies are either
inappropriate for Smart Grid applications (in the case of lead acid batteries), or are physically
impossible to implement on a large scale in a variety of areas (in the case of pumped hydro or
compressed air energy storage (CAES)). As such, new and advanced technologies are emerging to
satisfy this new market. These must be trialed and tested to ensure that they are both reliable and
align with the needs of utilities.
As such, the Australian Government has initiated, and is currently funding the Smart Grid, Smart
Cities (SGSC) Trial. It aims to test several hypotheses about many types of Smart Grid technology. In
particular, the Trial aims to quantify the following seven benefits of energy storage:
8. Reduction in peak demand – energy storage as a cost-effective and reliable alternative to
network capacity expansion
9. Improvement in network reliability/voltage/power factor/power quality – cost-
effectiveness and value of energy storage
10. Energy supply during peak price events – net benefit to retail sector
11. Minimisation of customers’ energy bills – with innovative tariffs e.g. time of use together
with energy storage.
12. Combined benefit between consumer, retail and network sectors
13. Investigation of large capacity (~1MVA) storage – extra cost and other benefits compared
to smaller capacity storage
14. Intermittent generation support – optimisation of renewable energy sources value
RedFlow has been selected as one of several advanced energy storage companies to supply energy
storage systems (ESS) for the trial to test these seven benefits of energy storage to Smart Grids. The
ESS supplied for the Trial by RedFlow are the zinc-bromide module (ZBM)-based R510 model (see
Appendix B – R510 Product Brochure). These systems are rated at 5kW, 10kWh output, and
comprise one ZBM, inverter, 3G modem for communications, battery management system (BMS),
remote terminal unit (RTU) and other power electronics housed in a metal enclosure (see Figure 8).
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 2
Figure 8: Components of RedFlow's R510 ESS
61 R510 ESS have been installed (see Figure 9) and commissioned on separate residential properties
as part of the SGSC Trial. This includes 40 systems in Newcastle (see Figure 10), which were installed
throughout late 2011 and early 2012. All systems were operational by February 2012, and operate
on four different charge/discharge cycles with the aim of reducing the peak load seen by the grid in
these suburban areas. They are also integrated with solar and fuel cell distributed generation.
Figure 9: Installation of an ESS in Newcastle
ZBM
Inverter
SMA Sunny Backup
Enclosure
1850 H x 971 L x 567 W
Power Electronics
Including BMS, RTU,
3G Modem
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 3
Figure 10: The locations of the RedFlow ESS in Newcastle, with the fuel cell generation connected to each feeder
Twenty systems were installed in Scone (a map cannot be given for privacy reasons) in early 2012,
and were operational by May 2012. These systems are located at fringe-of-grid areas, and are being
used to test islanding aspects of a Smart Grid, as well as integration with wind turbines.
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 4
One R510 ESS (see Figure 11) has also been in operation since October 2011 in Ausgrid’s Smart
Home, located in the suburb of Newington in Western Sydney. It was installed as an upgrade to an
existing RedFlow lead-acid system that was installed in mid-2010, with a ZBM installed in late 2010
to augment the lead acid storage. This ESS originally operated on a daily charge/discharge cycle,
which was followed by a zero import/export from the grid mode with the installation of the R510.
This has recently been modified to a hybrid cycle including both forced charge/discharge, as well as
dynamic load following.
Figure 11: The R510 ESS installed at the Smart Home in Newington, Sydney
This Case Study provides an overview and analysis of the performance of RedFlow’s R510 ESS in their
Smart Grid applications. It will cover the period of 1 March to 21 May 2012. It has been divided into
the sections of Operation, Results and Lessons Learnt. Each section addresses the three locations of
Newcastle, Scone and Newington separately.
Appendix A contains a list of abbreviations used in this Case Study.
Appendix B contains a Product Brochure for RedFlow’s R10, outlining key specifications of the ESS.
Appendix C contains a list of all sites testing energy storage in the SGSC trial (see Appendix D for an
explanation of schedule profiles).
Appendix D contains a list of charge and discharge schedule profiles.
Appendix E contains a large graph of peak reduction data from Newcastle.
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 5
2 Operation
2.1 Newcastle The 40 R510 ESS installed in Newcastle were located in suburban areas, which generally experiences
a very high standard of power quality. However, in relation to the installation of further embedded
generation (e.g. fuel cells and extra solar panels), the value and capabilities of energy storage in
meeting these non-traditional challenges to the grid were tested.
As such, the ESS were set to charge from and discharge into the grid at set times every weekday.
The ESS did not operate at all (apart from discharging in the early hours of each Saturday) on
weekends. This time schedule was varied between four different profiles: Profile A, Profile B, Profile
C and Profile D (see Appendix D). 10 ESS operated on each profile (see Appendix C1).
The efficiency and reliability of the R510 ESS in reducing the peak demand seen by the grid was
tested. The results of this are presented in Section 3.1.
2.2 Scone The 20 R510 ESS installed in Scone were located in fringe of grid areas, which generally experiences a
lesser standard of power quality than those areas in Newcastle. As such, the islanding abilities of the
ESS were tested, as well as their ability to limit peaks seen by the grid.
The ESS did not operate at all (apart from discharging in the early hours of each Saturday) on
weekends. This time schedule was varied between two different profiles: Profile E and Profile F, (see
Appendix D). 6 ESS operated on Profile E, and 14 ESS operated on Profile F (see Appendix C1).
2.3 Newington The R510 ESS installed in Newington is located in a suburban area, which generally experiences a
very high standard of power quality. While the ESS at Newington has operated under several types
of cycles, it is currently operating under Profile G (see Appendix D). When it is in the load following
mode, the ESS discharges power to the household load if the generation from the solar panels and
the fuel cell in insufficient, and charges from any excess generation that exceeds the household load.
The efficiency and reliability of the R510 ESS in reducing the peak demand of the Smart Home seen
by the grid was tested. The results of this are presented in Section 3.3.
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 6
3 Results Over the period between 1 March and 31 May 2012, the R510 ESS installed for the SGSC trial have
outputted a total of 14.334MWh to the grid at an average efficiency of 58.03%. This is shown in the
graph below in Figure 12.
Figure 12: Total grid import and export over the trial period with average monthly efficiency
3.1 Newcastle
3.1.1 Peak Demand Reduction The ESS installed in Newcastle have had significant impact on the peak demand seen by the grid.
Analysis has shown that during the cooler Autumn months, a ratio of 4 ESS to 65 residential
customers produced reductions of peak demand seen by the grid during the traditional peak period
(between the hours of 4pm and 10pm on weeknights) by an average of 5.39% in May. This is with 4
ESS operational for most of the month (1 ESS recommenced operation on 10 May after being out of
service since the start of the month), and therefore a ratio of approximately 1 ESS for 16 customers.
A typical output curve of the cumulative ESS is shown in Figure 13.
Figure 13: A typical feed-in curve for the 4 ESS on the Melinda Avenue feeder
0
20
40
60
80
100
0
2000
4000
6000
8000
10000
March April May
%
kWh
SGSC ESS Grid Interaction
Grid Import (kWh) Grid Export (kWh) Efficiency (%)
0
1
2
3
4
5
6
7
8
9
10
4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM
Gri
d F
eed
Po
wer
(kW
)
Power Fed into the Grid by 4 ESS
3 ESS on Profile A
feed in 9kW total 1 ESS on Profile B
feeds in 3kW
3 ESS on Profile A
are almost flat
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 7
However, the irregularity of this curve results in only very small peak reductions when peaks occur
around 7pm, or after 9pm. The variability in peak reduction can be seen in Figure 14.
Figure 14: The reduction in peak demand seen by the grid (4pm-10pm) in May on the Melinda Avenue feeder
Despite this, the ESS have been capable of achieving peak reduction of about 15% (see Figure 15). A
grid peak demand graph for the week of Monday 9 April 2012, showing similar results, is given in
Appendix E.
Figure 15: Reduction in peak demand seen by the Melinda Avenue feeder during traditional peak times
However, in this particular area of Newcastle, many homes are fitted with automatic hot water
systems that are set to charge at 11pm. As can be seen in Figure 16, this causes a much larger peak
than that seen during traditional peak periods, when the ESS are discharging into the grid.
Therefore, while the ESS are effectively reducing the traditional evening peak, they are not
addressing the actual peaks see by the grid.
0
2
4
6
8
10
12
Re
du
ctio
n in
Pe
ak D
em
and
(%
) Reduction in Peak Demand (4pm to 10pm) in May
0
10
20
30
40
50
60
70
80
90
3:40PM
4:10PM
4:40PM
5:10PM
5:40PM
6:10PM
6:40PM
7:10PM
7:40PM
8:10PM
8:40PM
9:10PM
9:40PM
10:10PM
Gri
d P
ow
er (
kW)
Grid-Feed Period – Monday 9 April 2012
Real Power (kW) with Storage Real Power (kW) without Storage
Peak Reduction
15.19%
65 Residential Customers
4 R510 ESS
Peak occurs at
times of low ESS
feed-in power
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 8
Figure 16: The peaks caused by automatic hot water systems on the Melinda Avenue feeder
This highlights the importance of thorough load profiling prior to setting charge/discharge profiles
for residential ESS aimed at reducing peaks in demand seen by the grid. In the case of the Newcastle
ESS involved in the SGSC trial, this would have raised two main issues. Firstly, the ESS should be
discharging between about 11pm and 2am to reduce the true peak caused by the hot water systems.
Furthermore, the discharge profiles should be more appropriately staggered to achieve a smoother
collective output curve, that discharges more power during times when the load curve is normally
highest. These measures would aid in reducing the peak demand seen by the grid even more than
the significant reductions already provided by the ESS.
3.1.2 Reliability As the ZBM is still an emerging technology, the reliability of the R510 is an important aspect of
evaluating its value in Smart Grid applications of energy storage. As can be seen in Figure 17, the
vast majority of ZBMs were available for operation throughout the study period, showing that ZBM
failure is not the main cause for making ESS unavailable.
Figure 17: Availability of ZBMs and ESS in Newcastle
0
20
40
60
80
100
1-Mar 13-Mar 25-Mar 6-Apr 18-Apr 30-Apr 12-May 24-May
%
Percentage of Newcastle ZBM and ESS Available
Newcastle ZBM Available Newcastle ESS Available
0
20
40
60
80
100
120
140
12:00 AM 6:00 AM 12:00 PM 6:00 PM 12:00 AM 6:00 AM 12:00 PM 6:00 PM 12:00 AM
kW
Effect of Hot Water Systems
Real Power (kW) with Storage Real Power (kW) without Storage
Peak Reduction shown in Figure 15
65 Residential Customers
4 R510 ESS
43.29% increase of traditional
evening peak
Monday 9 April Tuesday 10 April
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 9
3.2 Scone
3.2.1 Peak Demand Reduction The ESS installed in Scone have had significant impact on the peak demand seen by the grid. This is
due in part to the high ratio of ESS to customers (just over 1 ESS per customer) in this semi-rural
area. Analysis has shown that during the cooler Autumn and Winter months, the usual evening peak
seen by the grid (see Figure 18) is transformed into a noticeable trough with the use of RedFlow’s
ESS (see Figure 19).
Figure 18: Average power on the Scone recloser 14 to 18 May (before RedFlow ESS commenced full operation)
Figure 19: Average power on the Scone recloser 18 to 22 June (with RedFlow ESS operational)
However, it can also be seen that peaks occur very late at night, and in the early morning due to
automatic off-peak hot water systems turning on. However, these hot water system peaks are not
significantly larger in magnitude than the traditional morning and evening peaks.
0
10
20
30
40
50
60
70
80
90
100
12:00 AM 3:00 AM 6:00 AM 9:00 AM 12:00 PM 3:00 PM 6:00 PM 9:00 PM 12:00 AM
Po
we
r (k
VA
)
Power on Miranee Road Recloser No Energy Storage in Use
0
10
20
30
40
50
60
70
80
90
100
12:00 AM 3:00 AM 6:00 AM 9:00 AM 12:00 PM 3:00 PM 6:00 PM 9:00 PM 12:00 AM
Po
we
r (k
VA
)
Power on Miranee Road Recloser Energy Storage in Use
Grid-Feed
Period 45kW
Grid Charge Period 28kW
Grid Charge Period 12kW
13 Residential Customers
15 R510 ESS
13 Residential Customers
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 10
3.2.2 Reliability As the ZBM is still an emerging technology, the reliability of the R510 is an important aspect of
evaluating its value in Smart Grid and islanding applications of energy storage. As can be seen in
Figure 20, the vast majority of ZBMs were available for operation throughout the study period,
showing that ZBM failure is not the main cause for making ESS unavailable.
Figure 20: Availability of ZBMs and ESS in Scone
3.3 Newington
3.3.1 Load Following Results, such as those presented in Figure 21, show that the R510 ESS can charge and discharge
according to the needs of the load, as well as discharge when interruptions to normal generation
occur. This is known as load following.
Figure 21: The ESS can dynamically follow the load, and any sudden changes to generation
0
20
40
60
80
100
4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May
%
Percentage of Scone ZBM and ESS Available
Scone ZBM Available Scone ESS Available
-3
-2
-1
0
1
2
3
4
5
6
12:00AM
2:00AM
4:00AM
6:00AM
8:00AM
10:00AM
12:00PM
2:00PM
4:00PM
6:00PM
8:00PM
10:00PM
Po
we
r (k
W)
Blue Gen Fuel Cell Outage Performance
InvPwrAt [kW] Blue Gen Power Total Usage
Fuel cell
outage
ZBM discharges
to satisfy load
ZBM discharges in preparation to strip
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 11
3.3.2 Reliability The R510 at Newington was installed on 5 October 2011. It engaged in daily operation until 20
December, when it was shut down because its ZBM’s health was deteriorating and a fault was
expected to soon occur. Soon after, the resident family moved out of the Smart Home and Ausgrid
suspended the operation of most of the Smart Home’s elements while it underwent upgrades and
maintenance. The R510 ESS was kept shut down until late March when the ZBM was replaced. After
a series of calibration and test cycles, the ESS was shut down again until the new resident family
moved into the Smart Home on 28 April, at which point the ESS recommenced operation. It has not
experienced a fault since this time.
At the end of May 2012, the new ZBM installed at the Smart Home had undertaken 48 cycles (of less
than 100% depth of discharge due to the shortage of excess generation from the Smart Home to
charge the ZBM), and outputted 87.23kWh.
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 12
4 Lessons Learnt
4.1 Newcastle The 40 systems in Newcastle were the first R510s to be installed on a large scale for RedFlow. As a
result of this, and early operation, the following important points were observed for future work in
the area.
The use of specialist installers, O’Donnell Griffin (ODG), has been highly beneficial in the roll-
out of ESS to Newcastle. This brought expertise to the project that RedFlow did not have,
and will be used in future large-scale trials. Small issues with Newcastle installations shaped
changes to the process during Scone installations.
RedFlow needs to have unlimited access to data sent from each ESS. In the case of the SGSC
project, Ausgrid kept data on their machines, which made it highly difficult and time-
consuming for RedFlow to acquire and analyse data from systems for both monitoring and
improvement purposes.
An average of 76.14% of the ESS installed for the SGSC Trial were available for operation
over this study period. While this can be improved, the average of 96.65% availability of
ZBMs over the same time period means that most ESS faults were not due to ZBM failures.
Instead, it was elements of the ESS, and in particular the analogue looms that caused most
ESS faults.
This shows the reliability of the core ZBM product, as well as the need for specialist system
integrators to be involved in the design and manufacturing of future ESS.
It is important to carry out appropriate load and distributed generation analyses prior to
project commencement. In the case of Newcastle, this would have shown the large peaks
caused by the automatic hot water systems. In response to this, and in addressing the true
peaks in the Newcastle area, the discharge period of the ESS should be shifted, or hot water
systems should begin charging at staggered times.
The ESS have been installed at suitable ratios (1 ESS for every 16 customers) to the number
of customers in respective areas to achieve reductions in peak demand seen by the grid by
about 5-10%. However, reductions could be improved with different discharge profiles.
Regardless, the number of ESS may need to be increased to see the same peak reduction
results during the summer months.
4.2 Scone The following lessons were also noted for the installation and operation of the 20 ESS in Scone.
The use of specialist installers, O’Donnell Griffin (ODG), has also been highly beneficial in the
roll-out of ESS to Scone.
RedFlow needs to have unlimited access to data sent from each ESS. In the case of the SGSC
project, Ausgrid kept data on their machines, which made it highly difficult and time-
consuming for RedFlow to acquire and analyse data from systems for both monitoring and
improvement purposes.
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 13
An average of 79.57% of the ESS installed for the SGSC Trial were available for operation
over this study period. While this can be improved, the average of 92.24% availability of
ZBMs over the same time period means that most ESS faults were not due to ZBM failures.
This shows the reliability of the core ZBM product, as well as the need for specialist system
integrators to be involved in the design and manufacturing of future ESS.
4.3 Newington The R510 ESS, as well as previous ESS, installed at the Newington Smart Home have produced the
following lessons learnt from installation and operation.
The 5kW, 10kWh rating of the R510 ESS is appropriate for the needs of the Smart Home
household load (approximately 15kWh/day), and would still be suitable for slightly higher
loads.
Large and continuous loads, such as the EV, are often too large for the ESS to sustain without
requiring power from the grid.
There is a need for a fuel cell or other similar reliable form of embedded generation to back-
up solar generation in off-grid or minimum grid import Smart Grid applications.
The effectiveness of the R510 in conjunction with embedded generation to load follow and
greatly reduce grid import to below 8% of the time.
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 14
5 Conclusions
Overall, this project has shown that ZBMs in R510 ESS are a suitable type of energy storage to use in
Smart Grid applications. The ZBM is reliable and effective in reducing peak demand seen by the grid,
as well as in islanding applications.
Overall, RedFlow has learnt many valuable lessons over the course of the SGSC Trial, and will use
these to improve upon their technology and installation procedures for future Smart Grid ESS
designs. These have included:
The benefits of using specialist installers to carry out large-scale installations of ESS.
The importance of complete access to trial data for monitoring and analysis.
The ZBM is a reliable product, and was by far not the main cause of ESS failures.
The subsequent need for specialist system integrators to be involved in the design and
manufacturing of future ESS.
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 15
6 References
[1] Ausgrid. (2011) “Program Trial Areas,” Ausgrid. [Online]. Available: http://www.smartgridsmartcity.com.au/About-Smart-Grid-Smart-City/~/media/Microsites/SGSC/Files/PDFs/Smart%20Grid%20Smart%20City%20project%20trial%20map.pdf
[2] Electrical Power Research Institute (EPRI), “Estimating the Costs and Benefits of the Smart Grid: A Preliminary Estimate of the Investment Requirements and the Resultant Benefits of a Fully Functioning Smart Grid,” EPRI, Palo Alto, CA, Final Report 1022519, Mar. 2011.
[3] M. Dean. (2012, Jun. 20). Smart Grid growth to spur demand for energy storage [Online]. Available: http://www.pennenergy.com/index/power/display/3319716882/articles/pennenergy/power/grid/2012/june/-smart_grid_growth.html
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 16
Appendix A – List of Abbreviations
BMS - Battery Management System
CAES - Compressed Air Energy Storage
EPRI - Electric Power Research Institute
ESS - Energy Storage System
RTU - Remote Terminal Unit
SGSC - Smart Grid, Smart Cities
ZBM - Zinc Bromide Module
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 17
Appendix B – R510 Product Brochure
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 18
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 19
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 20
Appendix C– List of Trial Sites
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 21
Appendix C1 – List of Newcastle Sites Site
Number ZBM # (Class)
Cabinet ID Date of
Commissioning Schedule Status Comments
159 195 R510-A1-DE13-159 17 November 2011 Profile A Operational Leak 1 Trip
160 184 R510-A1-DE14-160 17 November 2011 Profile A Operational
161 319(A+) R510-A1-DE15-161 17 November 2011 Profile A Operational 2 ZBM Replacements
162 194 R510-A1-DE22-162 17 November 2011 Profile A Not Operational
163 318 (A+) R510-A1-DE17-163 17 November 2011 Profile A Operational ZBM Replacement
164 339 (A+) R510-A1-DE18-164 17 November 2011 Profile A Operational ZBM Replacement Previous SMA Fault
165 346 (A+) R510-A1-DE19-165 17 November 2011 Profile A Unknown Fault ZBM Replacement
Q4 Switching
166 304 (A+) R510-A1-DE20-166 17 November 2011 Profile A Not Operational System Noise
ZBM Replacement
167 300 (A+) R510-A1-DE21-167 17 November 2011 Profile A Operational ZBM Replacement
168 311 (A+) R510-A1-DE22-168 17 November 2011 Profile A Operational Analog Loom Fixed ZBM Replacement
169 341 (A+) R510-A1-DE23-169 17 November 2011 Profile B Not Operational System Noise
ZBM Replacement
170 301 (A+) R510-A1-DE24-170 17 November 2011 Profile B Operational ZBM Replacement
171 297 (A+) R510-A1-DE25-171 17 November 2011 Profile B Not Operational ZBM replacement
172 309 (A+) R510-A1-DE26-172 17 November 2011 Profile B Operational ZBM Replacement
173 307 (A+) R510-A1-DE27-173 17 November 2011 Profile B Operational ZBM Replacement
174 226 (B) R510-A1-DF01-174 21 December 2011 Profile B Operational
175 317 (A+) R510-A1-DF02-175 21 December 2011 Profile B Operational ZBM Replacement
176 238 (A) R510-A1-DF03-176 21 December 2011 Profile B Operational Leak1 Trip and Battery Voltage Fail
177 240 (A) R510-A1-DF04-177 12 December 2011 Profile B Not Operational BC Firmware Upgrade Required
178 233 (A) R510-A1-DF05-178 12 December 2011 Profile B Operational Incorrect Installation
179 329 (A+) R510-A1-DF06-179 12 December 2011 Profile C Not Operational Previous RTU Fault ZBM Replacement
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 22
Site Number
ZBM # (Class)
Cabinet ID Date of
Commissioning Schedule Status Comments
180 235 (A) R510-A1-DF07-180 21 December 2011 Profile C Not Operational System Noise
181 244 (A) R510-A1-DE08-181 12 December 2011 Profile C Operational Previous Analog Loom Failure
182 237 (A) R510-A1-DF09-182 12 December 2011 Profile C Operational Incorrect Installation
183 234 (A) R510-A1-DF10-183 12 December 2011 Profile C Not Operational
184 295 (A+) R510-A1-DF11-184 21 December 2011 Profile C Operational Incorrect Installation
ZBM Replacement Previous Analog Loom Fault
185 186 (A) R510-A1-DF12-185 12 December 2011 Profile C ZBM Fault RTU Lost Comms with BC
186 305 (A+) R510-A1-DE13-186 12 December 2011 Profile C Operational ZBM Replacement
187 239 (A) R510-A1-DF14-187 21 December 2011 Profile C Operational
188 245 (B) R510-A1-DF15-188 12 December 2011 Profile C Operational Previous Analogue Loom Fault
189 257 (A) R510-A1-DG01-189 21 December 2011 Profile D Not Operational
190 349 (A+) R510-A1-DG01-190 21 December 2011 Profile D Operational ZBM Replacement
191 264 (A) R510-A1-DG01-191 21 December 2011 Profile D Operational
192 350 (A+) R510-A1-DG01-192 21 December 2011 Profile D Not Operational ZBM Replacement
193 249 (A) R510-A1-DG01-193 21 December 2011 Profile D Unknown Fault Mains Fail, Needs AS Board
Replacement
194 248 (A) R510-A1-DG01-194 21 December 2011 Profile D Operational
195 303 (A+) R510-A1-DG01-195 21 December 2011 Profile D Operational ZBM Replacement
196 330 (A+) R510-A1-DG01-196 21 December 2011 Profile D Battery Controller
Fault Amp Lockout Failure ZBM Replacement
197 263 (A) R510-A1-DG01-197 21 December 2011 Profile D Operational
198 331 (A+) R510-A1-DG01-198 21 December 2011 Profile D Operational ZBM Replacement
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 23
Appendix C2 – List of Scone Sites Site
Number ZBM # (Class)
Cabinet ID Date of Commissioning Schedule Status Comments
199 261 (A+) R510-A1-DG01-199 29 March 2012 Profile F Operational
200 262 (A+) R510-A1-DG01-200 29 March 2012 Profile E Operational ZBM Replacement
201 348 (A+) R510-A1-DG01-201 29 March 2012 Profile F Operational ZBM Replacement
202 265 (A+) R510-A1-DG01-202 4 April 2012 Profile F Operational
203 343 (A+) R510-A1-DH01-203 28 March 2012 Profile F Operational ZBM Replacement
204 271 (A+) R510-A1-DH01-204 29 March 2012 Profile E Operational
205 258 (A+) R510-A1-DH01-205 4 April 2012 Profile F Operational
206 272 (A) R510-A1-DH01-206 4 April 2012 Profile F Operational Previous Analog Loom Fault
207 342 (A+) R510-A1-DH01-207 29 March 2012 Profile E Operational ZBM Replacement
208 267 (A+) R510-A1-DH01-208 4 April 2012 Profile F Operational
209 340 (A+) R510-A1-DH01-209 29 March 2012 Profile E Operational ZBM Replacement
210 185 (A) R510-A1-DH01-210 30 March 2012 Profile F Operational Previous ZBM Fault
211 344 (A+) R510-A1-DH01-211 28 March 2012 Profile F Operational ZBM Replacement
212 282 (A) R510-A1-DH01-212 28 March 2012 Profile F Operational Previous Battery Controller Fault
213 313 (A+) R510-A1-DH01-213 28 March 2012 Profile F Operational ZBM Replacement
214 284 (A) R510-A1-DH01-214 29 March 2012 Profile E Operational
215 347 (A+) R510-A1-DH01-215 28 March 2012 Profile F Not Operational ZBM Replacement
Grid Fault
216 281 (A) R510-A1-DH01-216 28 March 2012 Profile F Operational Previous Battery Controller Fault
217 278 (A) R510-A1-DH01-217 29 March 2012 Profile E Operational
218 276 (A) R510-A1-DH01-218 30 March 2012 Profile F Operational
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 24
Appendix D – Cycle Profiles
Profile Days of the Week Active Time Power
Profile A Charge
Monday to Friday 2am to 8am 2kW
Discharge 4pm to 2am 3kW
Profile B Charge
Monday to Friday 2am to 8am 2kW
Discharge 7pm to 2am 3kW
Profile C Charge
Monday to Friday 2am to 8am 2kW
Discharge 5pm to 2am 5kW
Profile D Charge
Monday to Friday 2am to 8am 2kW
Discharge 7pm to 2am 5kW
Profile E Charge
Monday to Friday 8am to 2pm 2kW
Discharge 5pm to 2am 3kW
Profile F Charge
Monday to Friday 1am to 7am 2kW
Discharge 6pm to 1am 3kW
Profile G
Charge Monday, Wednesday, Friday,
Sunday
2am to 7am 2kW
Load Follow 7am to 11pm Load Following
Discharge 11pm to 2am 4.5kW
REDFLOW LTD. – Smart Grid, Smart Cities Trial Case Study 11/10/2012 Page 25
Appendix E – Newcastle Reduction in Peak Demand
0
20
40
60
80
100
120
140
12:0
0 A
M
4:00
AM
8:00
AM
12
:00
PM
4:00
PM
8:00
PM
12:0
0 A
M
4:00
AM
8:00
AM
12
:00
PM
4:00
PM
8:00
PM
12:0
0 A
M
4:00
AM
8:00
AM
12
:00
PM
4:00
PM
8:00
PM
12:0
0 A
M
4:00
AM
8:00
AM
12
:00
PM
4:00
PM
8:00
PM
12:0
0 A
M
4:00
AM
8:00
AM
12
:00
PM
4:00
PM
8:00
PM
12:0
0 A
M
4:00
AM
8:00
AM
12
:00
PM
4:00
PM
8:00
PM
12:0
0 A
M
4:00
AM
8:00
AM
12
:00
PM
4:00
PM
8:00
PM
12:0
0 A
M
4:00
AM
8:00
AM
Gri
d P
ow
er
(kW
)
Effect of Storage on Peak Reduction - April 2012
Real Power (kW) with Storage Real Power (kW) without Storage
Friday 6 April
Peak Reduction 17.78%
Peak Reduction 15.19%
Peak Reduction 14.78%
Peak Reduction 14.85%
Peak Reduction 14.13%
Saturday
7 April
Sunday
8 April
Monday
9 April
Tuesday
10 April
Wednesday
11 April
Thursday
12 April
Friday
13 April
65 Residential Customers
4 R510 ESS Operating