case study overview lc 2012
TRANSCRIPT
www.vpodsolutions.com
Case Study Compilation
www.vpodsolutions.com
www.vpodsolutions.com
Introduction
Since Vpod launched its products and services to the global market in January 2010, following 18 months of R&D, they have built up an enviable global customer base. Vpod’s customers straddle broad swathes of global industry and vertical markets, but they all have some common goals:-
a desire to collaborate, to work efficiently, to deploy efficiency swiftly, to reduce their carbon footprint and to embrace video technology.
Vpod help their customers to realise these goals through the deployment of their products and services. The following document gives an insight into how they are achieving this with a selection of their clients.
www.vpodsolutions.com
BP plc - Energy
Deployment Location(s) Houston, USA Cairo, Egypt Basra, Iraq (deployment pending) Helsinki, Finland (deployment pending)
Product Vpod V6 with Cisco CTS3010 Challenge Need to deploy TP technology swiftly
Desire for consistent environment in extremely variable buildings and geographies
Results Consistent environments successfully deployed
Fully functioning Telepresence suites installed in 5 days TP usage running at 85% Further deployments planned for 2012
www.vpodsolutions.com
BP – Images
Houston, USA Cairo, Egypt
www.vpodsolutions.com
Barclays plc – Finance
Deployment Location(s) Vilnius, Lithuania Cheshire, UK Singapore (deployment pending) London, UK (deployment pending) Mumbai, India (deployment pending)
Product Vpod V6 with Cisco CTS3010 Challenge Need to deploy TP technology swiftly
Desire for consistent environment in extremely variable buildings and geographies
Results Consistent environments successfully deployed
Fully functioning Telepresence suites installed in 5 days Further deployments planned for 2012
www.vpodsolutions.com
Barclays – Images
www.vpodsolutions.com
Progress Rail - Manufacturing
Deployment Location(s) Alabama, USA
Product Vpod V6 with Cisco CTS3010 Challenge Need to deploy TP technology effectively to
manufacturing plants Buildings not conducive to traditional room build Aggressive deployment timescales
Results Consistent environments successfully deployed in 2
manufacturing facilities Fully functioning Telepresence suites installed in 5 days
www.vpodsolutions.com
Progress Rail - images
Albertville, USA LaGrange, USA
www.vpodsolutions.com
Major Global Bank - Finance
Deployment Location(s) Leicester, UK London, UK
Product Vpod V1 with Cisco EX90 Challenge Desire to trial delivery of service via video to branch
network Video contact centre environment requiring strong brand aesthetic together with perfect VC environment Limited budget and challenging success metrics
Results Business conversion rates rose from less than 20% to
over 80% using video as the transaction vehicle Pilot trial extended indefinitely Further business areas preparing for trial to wider branch network
www.vpodsolutions.com
Major Global Bank - Images
www.vpodsolutions.com
Google - Media
Deployment Location(s) London, UK Oslo, Norway Paris, France (deployment pending)
Product Vpod V1 Challenge Desire to implement personal video space within new
office architecture Required on brand product to compliment revolutionary and inspirational interior design
Results Following initial London implementation, further implementations followed in London, Oslo and Paris V1’s form striking landmark within the workspace and become part of the interior architecture blueprint
www.vpodsolutions.com
Google - Images
www.vpodsolutions.com
Clients
www.vpodsolutions.com
www.vpodsolutions.com