case study | ibm · customer: cbre / ibm case study | ibm ibm hursley, a research and development...

1
Site Wide BMS Upgrade www.syscombms.com [email protected] 01784 435 125 TIME FRAME: 4 months PROJECT VALUE: £1.2m COMPLETION DATE: 2018 CUSTOMER: CBRE / IBM Case Study | IBM IBM Hursley, a research and development laboratory belonging to IBM, has been associated with Hursley Park in Hampshire in some form since the 1950s. From working within Hursley House itself, IBM has gone on to purchase land and develop an office complex used for testing, development and executive briefings. BMS System – Tridium Product: Tridium Controls, Niagara N4 Upgrade of 27 Control Panels, 7 No Cooling Towers, Chillers and 490 FCU/VAV/CAV From 2016 to 2018, Syscom were engaged to carry out a site-wide BMS upgrade of Hursley Park, including IBM Head Office and Development Centre with Data Centre and Critical Building Services Equipment, works valued at £1.2 million. Existing Johnson Controls, Robert Shaw and Siemens equipment was upgraded to the open network Tridium Niagara N4 platform, allowing IBM Hursley to take full advantage of the Internet of Things. This involved the upgrade of 27 control panels, 7 Cooling towers, Chillers and 490 FCUs/VAVs/CAVs. As an added challenge, the upgrade of all controls equipment had to be carried out while maintaining full operability of all plant and services to a fully occupied establishment with critical Data Centre infrastructure. Network: Client Corporate Ethernet network with remote server hosted Head End Supervisor Upgrade existing Johnson Controls, Robert Shaw and Siemens equipment to Tridium Niagara N4 Controls SUMMARY SyscomCaseStudyibm.indd 1 01/11/2018 16:54

Upload: others

Post on 15-Mar-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study | IBM · CUSTOMER: CBRE / IBM Case Study | IBM IBM Hursley, a research and development laboratory belonging to IBM, has been associated with Hursley Park in Hampshire in

Site Wide BMS Upgrade

www.syscombms.com [email protected] 01784 435 125

TIME FRAME: 4 months PROJECT VALUE: £1.2m

COMPLETION DATE: 2018CUSTOMER: CBRE / IBM

Case Study | IBM

IBM Hursley, a research and development laboratory belonging to IBM, has been associated with Hursley Park in Hampshire in some form since

the 1950s. From working within Hursley House itself, IBM has gone on to purchase land and develop an office complex used for testing, development and

executive briefings.

• BMS System – Tridium• Product: Tridium Controls, Niagara N4• Upgrade of 27 Control Panels, 7 No Cooling

Towers, Chillers and 490 FCU/VAV/CAV

From 2016 to 2018, Syscom were engaged to carry out a site-wide BMS upgrade of Hursley Park, including IBM Head Office and Development Centre with Data Centre and Critical Building Services Equipment, works valued at £1.2 million.Existing Johnson Controls, Robert Shaw and Siemens equipment was upgraded to the open network Tridium Niagara N4platform, allowing IBM Hursley to take full advantage of the Internet of Things. This involved the upgrade of 27 control panels, 7 Cooling towers, Chillers and 490 FCUs/VAVs/CAVs.

As an added challenge, the upgrade of all controls equipment had to be carried out while maintaining full operability of all plant and services to a fully occupied establishment with critical Data Centre infrastructure.

• Network: Client Corporate Ethernet network with remote server hosted Head End Supervisor

• Upgrade existing Johnson Controls, Robert Shaw and Siemens equipment to Tridium Niagara N4 Controls

SUMMARY

SyscomCaseStudyibm.indd 1 01/11/2018 16:54