CASE STUDY

CLIENT General ElectricPROJECT Tsugaru Wind Farm JapanSCOPE Mechanical Completion Punch List Closure

[email protected] FPT-CS002

Page 2: CASE STUDY - FPT Global · FPT-CS002. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque imperdiet ut neque ut rhoncus. Vestibulum viverra rhoncus arcu non efficitur

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque imperdiet ut neque ut rhoncus. Vestibulum viverra rhoncus arcu non efficitur. Vestibulum commodo interdum lacus, a egestas nunc bibendum nec. Morbi sodales felis odio, ut ornare tellus accumsan non.

HEADLINE

20182019

The multinational conglomerate General Electric employed FPT Global to supply experienced electrical and mechanical technicians for their 38 unit wind farm located in Aomori, Japan. The main scope of work consisted of clearing punch lists and assisting in accelerating the current rate of mechanical completion handover(s) by pre-inspecting the wind turbine towers.

A key focus on this project was placed on torquing, repairing/replacing damaged components and overall quality assurance work. FPT Global directly coordinated with General Electric to ensure compliance and verification on all items to ensure they met or exceeded the required criteria.

As an additional service, FPT Global worked directly with the clients' installation contractor to identify and recommend areas for improvement, providing classroom presentations and hands-on coaching sessions. Ronald Johnson Senior Director of the FPT Global renewable division was also requested to assist in facilitating the current schedule and provide leadership experience at the installation site.