case study: energy efficiency and cdm project in lao...
TRANSCRIPT
ODA-UNESCO Project:
” Promotion of Energy Science Education for Sustainable Development in Laos:”
Prepared by: Assoc. Prof. Sengratry KYTHAVONE
Department of Mechanical Engineering, Faculty of Engineering
National University of Laos
Case Study:
Energy Efficiency and CDM Project
in Lao Brewery Co.Ltd,.
Production Energy Efficiency in Lao Brewery Co.,Ltd.
ISO 9001:2008
ISO 14001:2004
Electrical Energy Consumption: 14million kWh
Fuel Oil Consumption: 2.8 million Tons
Production: 160 million liters
(Year 2009)
Process Diagram
The proposed project aims at improving energy efficiency and will be
implemented at a single industrial facility, i.e., the LB’s beer brewery in
Vientiane. The project consists of two components as follows:
☆Project Component #1: Installation of Vapour Re-Compression
(VRC) system in brewhouse and heat-pump system in pasteurizing
process
☆ Project Component #2: Installation of biogas boiler
The VRC system and heat-pump system in the pasteurizing system
would reduce fuel consumption by recycling waste heat with advanced
technology. On the other hand, the biogas boiler that utilizes biogas
(methane) coming from the wastewater treatment system displaces fuel
consumption of the existing boilers.
Energy Efficiency Project in Lao Brewery Co.,Ltd.
Energy Utility Equipments
Transformer : 6,900 kVA
Cooling system plant : 2,768,700 kcal /hr. 3,220 kW
Boiler plant : 26 ton /hr. (9 ton/hr Stand by) 192 kW
Air compressor plant : 1960 Nm3/hr. 223 kW
CO2 plant : 905 kg /hr 138 kW
Air conditioning system : 3,071,000 Btu/hr
Diesel Generator : 1,000 kVA
Water treatment : 172 m3/hr 155 kW
Waste water plant : 3200 m3/day 315 kW
Brew house : 350*2 hl/brew 188 kW
Filtration plant : 300 hl/hr 101 kW
Packaging line 1 : 20.000 bph 320 kW
Packaging line 2 : 24.000 bph 424 kW
Packaging line 3 : 24.000 bph 1,038 kW
Drinking Water : 24.000 bph 886 kW
Energy Saving System : VRC , Heat pump, Biogas 250 kW
Energy Efficiency Facilities Installation in Lao
Brewery Co., Ltd.
8
Vapor Recompression System
Project activity :
Saving steam by reusing the discharged steam
※ This system was developed for energy saving with the aid from Japanese Government
Boiler steam Drain
HL:Heat Loss
Exhaust steam
Steam compressor
1/10~1/15
COP=10~15
Vapor Re-Compression system
Drain
Conventional heat recovery system VRC system
WP WP
Exhaust steam
HL:Heat Loss
Heat Recovery
Baseline: Discharging the Exhaust Steam
9
VRC System
M
ST ST EAM
40 40 ℃ ℃
Hot water
recovery from
vapor drainage
Wort Kettle
Vapor
76 C 95 C
99 C
80 C
Wort supply
25 C
85 C Waste Vapor
from Wort kettle
Vapor scrubber wash
the vapor and
recover heat for Wort
Pre-heater
Hot water
storage Tank at
99C
100 C
Waste Vapor is
recompressed by
Steam compressor.
Energy Input is
1/10~1/20
Pre-heater
10
VRC System
VRC
11
Heat Pump Efficient Pasteurising System
Hot Water
P P P P P P P P P
No.1 No.2 No.3 No.4 No.5 No.6 No.7 No.8 No.9
Heat Pump System
Flow of Hot Water
Project activity : Saving steam by heat pump system for Pasteuriser
12
Efficient Pasteurising System
14
Biogas Plant system
Gas Holder
Bio-gas
Boiler 2 ton
Anaerobic Waste Water
Treatment System
Project activity :
Saving Fuel oil usage by Biogas Boiler
Baseline :
Flaring the biogas
15
Biogas Boiler system
Biogas Plant
16
Synergies in treatment
ANAEROBIC
PRE-TREATMENTBREWERY
AEROBIC
POST-TREATMENT
DISCHARGE
PIPE
MUNICIPAL
WASTE WATER
TREATMENT PLANTCITY
BIOGAS
UTILISATION
RIVER
Biogas Plant
1. Average fuel consumption before energy saving system was installed :
3.13 kg – oil / hl ( average Jan – Oct / 2006 )
2. Expected consumption rate in year 2007
2.39 kg – Oil / hl ( average Jan – May / 2007 )
3.Prouction volume in year 2007 : 1,300,000 hl / year
4.Fuel saving : 1,300,000 hl *( 3.13 – 2.39 )kg –oil / hl = 962,000 kg – oil/year
a) Fuel Cost Saving : 962,000 / 0.99 * 4,700 /10,600 = US $ 430,856
b) Running Cost : USD 2.572 ( average Jan – May)*12M *0.9( 90% ) = US $ 27,778
( 70 % Power factor )
c) Broken bottle saved : US $ 21.083 ( average Jan – May ) *12 M * 0.9( 90% ) = US $ 227,696
d) Water Saving : US$ 1.648 ( average Jan – May ) * 12 M * 0.9( 90% ) = US $ 17,798
Annual saving : a) + c) + d) – b) = US $ 648,572 / year
Payback period : US $ 1,829,600 ( total investment ) / US $ 648,572 = 2.8 year
Production volume and Estimated Energy Saving System.
18
0
20000
40000
60000
80000
100000
120000
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
1,800,000
2,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Pro
fit(
US
D)
Pa
yb
ack P
erio
d(U
SD
)
Graph 1 ESS Year 2007 Report
Payback Period $
VRC+BIOGAS +Heating Pump(Saving cost) $
Profit $
0
1000
2000
3000
4000
5000
6000
7000
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
1,800,000
2,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Opera
ting R
unnin
g S
yste
m C
ost (U
SD
) / F
uel cost (k
ip/little)
Payb
ack P
eriod (
US
D)
Graph 2 ESS Year 2007 Report
Payback Period $
Operating Running System Cost $
Fuel cost kip/liters
Payback Period of Three Facilities of Saving Energy
19
0
20000
40000
60000
80000
100000
120000
140000
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Pro
fit(
US
D)
Pa
yb
ack P
erio
d(U
SD
)
Graph 1 ESS. Year 2008 Report
Payback Period $
VRC+BIOGAS +Heating Pump(Saving cost) $
Profit $
0
1000
2000
3000
4000
5000
6000
7000
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Op
era
tin
g R
un
nin
g S
yste
m C
ost
(US
D)
/ F
ue
l co
st (k
ip/little
)
Pa
yb
ack P
erio
d (
US
D)
Graph 2 ESS. Year 2008 Report
Payback Period $
Operating Running System Cost $
Fuel cost kip/liters
Payback Period of Three Facilities of Saving Energy
20
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
1 2 3 4 5 6 7 8 9 10 11 12
kW
h/h
l
monthly
Energy Consumption Yearly 2008 Report
Energy year 2007
Energy year 2008
Target Year
2008
27 kwh/hl
-7% -2%
2%
-1%
Monthly energy consumption before and after installation
energy saving facilities
21
Target
Year 2007
27 kWh/hl
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
1 2 3 4 5 6 7 8 9 10 11 12
kW
h/h
l
monthly
Energy Consumption Yearly 2008 Report
Energy year 2007
Energy year 2008
-7% -2% 2%
-1%