case study

24
GROUP MEMBERS: NAMRATHA R SUKRITI SHARMA SAMPOORNA SARKAR PRIYAM SINGH MANEESH BHATIA BENIHANA OF TOKYO 1

Upload: bhupesh-sharma

Post on 11-Jun-2015

4.096 views

Category:

Real Estate


1 download

TRANSCRIPT

Page 1: Case study

1

GROUP MEMBERS: NAMRATHA RSUKRITI SHARMA

SAMPOORNA SARKARPRIYAM SINGH

MANEESH BHATIA

BENIHANA OF TOKYO

Page 2: Case study

2

P R O C E S S FLOW D I A G RA M

Customer enters

restaurant

Customer orders for drink

Customer enters dining

area

Customer orders for food

Customer waits for the chef

Chef arrives and starts cooking

Customer enjoys the food

Customer pays and leaves

Page 3: Case study

3

inputs

LABOUR

MATERIAL

ENERGY CAPITAL

INPUTS

Page 4: Case study

4

LA B O U R

CHEF

WAITRESS

MANAGER

ASSISTANT MANAGER

FRONT MEN

Page 5: Case study

5

M AT E R I A L

FOOD Biggest purchase : meat

BEVERAGE

Page 6: Case study

6

EN E R GY

LIGHTING

COOKING

Page 7: Case study

7

cap i t a l

REAL ESTATE

EQUIPMENTFURNITURE

Page 8: Case study

8

OUTputs

SERVICE

FOOD

Page 9: Case study

9

Ta s k s , f l o w s & s t o r a g e

1. TAKING ORDER2. COOKING

TASKS

FLOWS

STORAGE

1. FLOW OF GOODS• FOOD• BEVERAGE

2. FLOW OF INFORMATION• ORDER OF FOOD

RAW MATERIAL1. FOOD – cooked or

uncooked state2. BEVERAGE

Page 10: Case study

10

OTHE R PA RAMETERS

CYCLE TIME

Min time: 45 minutesMax time: 90 minutes

Average = 60 minutes

CYCLE TIME

THROUGHPUT TIME

Page 11: Case study

11

BATCH SIZE =

CAPACITY DEPENDS

ON SEATING CAPACITY

Each table accomodates 8 people.If there are 5 tables, then capacity will be 5x8=40

Page 12: Case study

12

IDLE TIME

Between lunch and dinner

Efficiency UtilizationSetup time Run time

OTHERS

Page 13: Case study

Key Elements Of Focus

13

Optimum Space Utilization

Hibachi Table arrangement

Waste Management and StorageHistorical authenticity

Location Advantage

The restaurants are built with materials imported from Japan along with the help of a Japanese crew. The chefs too are formally educated Japanese chefs

Elements Benihana Focus

The restaurants have about 8% more than average productive dinning space.

This unique feature not only adds to the showmanship of the restaurant's culinary offerings, but also reduces labour cost and takes away any apprehensions regarding exotic fare.

The Benihana restaurants cut food costs substantially just by smartly serving the most wanted entrees and thereby cutting on storage costs and this also helps in avoiding waste.

The restaurants are located in heavily populated areas so as to attract clientele for lunch and dinner.

Page 14: Case study

14

Cost-Structure: Profit Making ModelIn

frastr

uctu

re

The infrastructure was built by

the materials gathered From

old houses

disassembled carefully in Japan

and was built by the

two crews of Japanese carpenters.

Served MenuBy reducing the menu to only

three simple Middle American entrees: steak, chicken and shrimp they cut the food

costs to between 30% and 35%

and this also lead to reduce wastage.

Non-Conventional KitchenThey eliminated the conventional

kitchen with the hibachi table arrangement thereby reducing the

labour cost and the additional cost of kitchen space.

Page 15: Case study

15

Cost-Structure: Profit Making Model(Chicago Branch)

4%Management

5%Rent

30%Food

10%Labour

10%Ads

69 % Savings

Page 16: Case study

16

Making Operations EfficientElimination Of Kitchen Space

1. It builds an amount of trust among the customers which was lacking before.

2. There is an effective reduction in space for kitchen and the same space can be used as the productive dining area.

3. It also gives an opportunity to attract customers by exhibiting the culinary skills of the chefs in an innovative manner.

4. This also reduces the labour costs low.

Page 17: Case study

17

Making Operations Efficient

Simple Menu

By keeping the menu

simple and limited only

to three entrees, there

is reduction in food

waste which in turn

reduces food costs.

Page 18: Case study

18

Making Operations Efficient

Authentic ambience: Every entity inside the restaurant was made authentic. Even building materials were shipped from Japan directly. This helped in attracting customersBetter Layout: This increased the productive area by about 8% effectively compared to competitors.

Page 19: Case study

19

Balance-Sheet-It’s all about Money(Given)

Share of Food and Beverages

Food

Beverages

Cost per share

FoodLabourAdvertisingRentManagement

Assumptions: •Labor costs include Payroll, Employee benefits, and Employee meals.•The costs are assumed on the higher end of the range

Page 20: Case study

20

Balance-Sheet-It’s all about Money(Solution)

Sales 100%  

Food 70%  

Beverage 30%  

     

Cost of sales    

Food 21% 30% of 70

Beverage 9% 30% of 30

Total cost of sales 30%  

     

Gross Profit 70% 100-30

***Assuming sales to be 100%

Page 21: Case study

21

Balance-Sheet-It’s all about Money(Solution)Operating costs  Labour 10%Advertising 10%Management 4%Laundry, linen, uniforms 2%Replacements 1%Supplies 1.50%Menu 0.50%Music 1%Utilities 2%Administrative expenses 2%Repairs 2%Rent 5%Taxes 1.50%Insurance 1%Interest 1%Depreciation 4%Total 51%Net Profit before tax 19%

Page 22: Case study

22

Balance-Sheet-It’s all about Money(Conclusion)

•The sales is equal to $1.3million.•According to the above figure, net profit

before tax = 19% of $1.3million = $247000

Page 23: Case study

23

Time Calculation(Sum)

To Determine: The maximum throughput time is the time

that elapses from the time a person enters the bar to the time

he/she leaves the restaurant.

Given information: The dining area is five times the

capacity Of the bar.

Assumptions:Seating capacity of bar is 1 and that of

dining area is 5(for ease in calculation). The average turnover at the teppanyaki table is one

hour. The first 5 people who enter the bar will get seating

inside the dining area.The sixth person who enters the bar

will have to wait until one table inside the dining area becomes

vacant.

Solution:Considering all the possibilities, a person who

enters after 1 minute of the dining area becoming busy will

have to wait for 59 minutes, a person who enters after 2 mins

will have to wait for 58 minutes. The maximum waiting time for

person will be 60 minutes. Therefore the average waiting time = (1+2+3+.....+58+59+60)/60 = 30.5

minutes

Page 24: Case study

24Thank

You