Case Study #2 Background. You have selected your sub-contractors using your criteria in Case Study #1 and work will now begin The land has to be cleared and surveyed There are energized overhead power lines near the jobsite along with underground utilities - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/1.jpg)
Case Study #2 BackgroundYou have selected your sub-contractors using
your criteria in Case Study #1 and work will now begin
The land has to be cleared and surveyedThere are energized overhead power lines near
the jobsite along with underground utilitiesThere is vehicular traffic and pedestrian traffic
around the jobsiteExcavating equipment will be used to remove
trees and grade the siteLaser levels will be used to lay out the
excavation stakes
![Page 2: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/2.jpg)
Case Study #2Using the Pre-planning Report Form,
identify two major activities that you would expect to take place during this phase of the construction project.
For each activity, identify two major hazards associated with each activity◦Describe the hazard◦ Justify the hazard◦Evaluate the hazard (Cite the OSHA
standard)◦Provide specific controls
![Page 3: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/3.jpg)
Hazards due to Contact with Energized LinesStandards designed to protect employees
from energized lines appear in a number of sections of the 1926 standards◦Subpart K – Employees working around
energized lines◦Subpart V – Employees engaged in the
construction of electric transmission lines and equipment
◦Subpart L – Scaffolds◦Subpart P –Excavations◦Subpart CC – Cranes and derricks in
Construction
![Page 4: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/4.jpg)
1926.416(a)(1)General Requirements
◦Protect employees who may be required to work in proximity to any part of an electric power circuit that the employee could contact the electric power circuit in the course of work, unless the employee is protected against electric shock by deenergizing the circuit and grounding it or by guarding it effectively by insulation or other means
![Page 5: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/5.jpg)
1926 Subpart K 1926.400 - .449 Addresses electrical safety requirements that are
necessary for the practical safeguarding of employees involved in construction work and is divided into four major divisions and applicable definitions as follows:◦ Installation safety requirements. Installation safety
requirements for electric equipment and installations used to provide electric power and light on jobsites.
◦ Safety-related work practices. Cover hazards arising from the use of electricity at jobsites, these regulations also cover the hazards arising from the accidental contact, direct or indirect, by employees with all energized lines, above or below ground, passing through or near the jobsite.
◦ Safety-related maintenance and environmental considerations.
◦ Safety requirements for special equipment.
![Page 6: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/6.jpg)
1926 Subpart KApplies to the safety requirements for
electrical equipment and installations used to provide electric power and light at the jobsite.
Applies to installations, both temporary and permanent, used on the jobsite; but these sections do not apply to existing permanent installations that were in place before the construction activity commenced.
![Page 7: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/7.jpg)
1926.416(a)(3)• Before work is begun, the
employer has to identify the location of any energized lines.
• Post and maintain warning signs• Advise employees of the location
of the lines, the hazards involved, and the protective measures to be taken
![Page 8: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/8.jpg)
1926.417Lockout/Tagout
◦Equipment or circuits that are deenergized shall be rendered inoperative and shall have tags attached at all points where such equipment or circuits can be energized.
![Page 9: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/9.jpg)
1926.651When excavating:
◦The employer is responsible for identifying the estimated location of utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, shall be determined prior to opening an excavation.
◦Utility companies or owners shall be contacted within established or customary local response times, advised of the proposed work, and asked to establish the location of the utility underground installations prior to the start of actual excavation.
![Page 10: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/10.jpg)
1926.651◦When utility companies or owners
cannot respond to a request to locate underground utility installations within 24 hours (unless a longer period is required by state or local law*), or cannot establish the exact location of these installations, the employer may proceed, provided the employer does so with caution, and provided detection equipment or other acceptable means to locate utility installations are used. *Note: Most states require 48 hours
notice
![Page 11: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/11.jpg)
Underground Utility Locating ServiceVaries from state to state and
could vary from county to county within a state
Determine what agency to contact
Utilities may include:◦Electric◦Cable TV◦Water◦Natural Gas◦Fiber Optics
![Page 12: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/12.jpg)
Marking SystemAPWA – American Public Works
Association◦Color coded system for marking
utilities
![Page 13: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/13.jpg)
Fines and PenaltiesIn addition to OSHA violations, states and
the federal government can impose fines.
States have Underground Damage Prevention Act’s in place◦Example: In Illinois, $5,000 for each separate
offense and shall be liable for the damage caused to the owners or operators of the facility.
◦If willfully fails to comply, subject to additional penalties of up to $2,500 per offense
![Page 14: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/14.jpg)
Outside Open ConductorsOn a construction site, it is possible that energized
overhead power lines may be near the construction site.
Open Conductor – A single conductor not enclosed in a raceway or cable sheath
29 CFR 1926.404(c)◦ Open conductors shall conform to the following minimum
clearances: 10 feet (3.05 m)-above finished grade, sidewalks, or from any
platform or projection from which they might be reached. 12 feet (3.66 m)-over areas subject to vehicular traffic other than
truck traffic. 15 feet (4.57 m)-over areas other than those specified in
paragraph (c)(1)(ii)(D) of this section that are subject to truck traffic.
18 feet (5.49 m)-over public streets, alleys, roads, and driveways.
![Page 15: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/15.jpg)
1926.604 Site ClearingEmployees engaged in site clearing shall
be protected from hazards of irritant and toxic plants and instructed in the first aid treatment available.
All equipment used in site clearing operations shall be equipped with rollover guards meeting OSHA requirements.
Rider-operated equipment shall be equipped with an overhead and rear canopy guard meeting OSHA requirements.
![Page 16: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/16.jpg)
Laser SafetyLaser hazards associated with
surveying, may fall under 1926 Subpart D, Occupational health and environmental controls ◦1926.54 – Non-ionizing radiation
1926 Subpart E, Personal protective and life saving equipment addresses PPE requirements◦1926.102, Eye and face protection
1926.102(b)(2), Laser protection
![Page 17: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/17.jpg)
Classes of LasersClass 1- incapable of producing damaging
radiation during operations and use.◦Users of Class 1 lasers are generally exempt
from radiation hazard controls during operation and maintenance, but not necessarily during service. Most Class 1 industrial lasers consist of a higher class laser enclosed in a properly interlocked and labeled protective enclosure.
Class 2-(low power) 2 and 2a, 400nm to 700 NM range (Example: a supermarket laser scanner.)
![Page 18: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/18.jpg)
Classes of LasersClass 3- (medium power) 3A and 3Bb,
hazardous under direct and reflective viewing conditions. 1 milliwatt to 55 milliwatt range. Not a fire hazard.
Class 4- (high power) pose hazards to eyes and skin due to direct beam and from diffused reflection in some cases. Can be a fire hazard, produces air contaminants and plasma radiation. Power above 500 milliwatt. Only qualified trained employees are to operate the lasers.(Excimer laser operating in the ultraviolet)
![Page 19: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/19.jpg)
Construction Industry Standards and Laser ClassesThe Construction Industry standard does not
recognize different classes of lasers. All of the provisions of the standard technically
apply to all uses of lasers in the construction industry.
However, Class I lasers are determined to present no hazard.◦ For example: Some construction laser levels can be a
Class I laserViolations of the 1926 standards which should
really only apply to higher class lasers should, in the case of Class I lasers, be regarded as "de minimus," which means there would be no citation, no penalty, and no compliance date.
![Page 20: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/20.jpg)
Laser TrainingThe employer shall provide for the
instruction of each laser equipment operator and instructor in accordance with the applicable manufacturer's recommendations.
The instruction process shall inform the operator of various hazards associated with the use of the equipment and the necessary or recommended control measures for the elimination of hazards to personnel.
![Page 21: Case Study #2 Background](https://reader036.vdocuments.us/reader036/viewer/2022081507/56816474550346895dd6587c/html5/thumbnails/21.jpg)
Laser TrainingIn addition to information from
the manufacturer, the American National Standard ANSI Z136.1-1986 could be reviewed for training information.
Instruction should be conducted by a qualified representative of the manufacturer, or by a knowledgeable individual designated by the employer.