case studies presentation: mactan-cebu international airport
TRANSCRIPT
Case Studies Presentation:
MACTAN-CEBU INTERNATIONAL AIRPORT
UNESCAP WORKSHOP:
Infrastructure Financing and Public-Private Partnership
Network of Asia and the Pacific December 15, 2020
12:00 PM - 2:00 PM, Bangkok time, GMT +7
2
The project involves the construction of a new
passenger terminal building (PTB) and related
facilities to increase annual passenger capacity
from 4.5 million to 12.5 million passenger; airport
operations and maintenance (O&M); and
renovation and expansion of the existing PTB.
Mactan-Cebu International Airport Project
3
Implementing Agency Department of Transportation (DOTr)
and Mactan Cebu International Airport
Authority (MCIAA)
Project Sector Partner GMR-Megawide Cebu Airport
Corporation
Contract Signing Date April 24, 2014
Procurement Mode Solicited
PPP Scheme Build-Operate-Transfer (BOT)
Concession Period 25 Years
Objective To efficiently handle the increasing air
traffic demand, ensure convenience of
passengers; promote aircraft operational
efficiency; minimize passenger delay due
to reduction of passenger terminal
waiting time; and in the long-term,
increase revenues from tourism
activities.
Mactan-Cebu International Airport Project
Project information
4
▪ Fully operational
- Terminal 2 construction completed
on June 30, 2018
- Terminal 1 rehabilitation completed
on August 31, 2019
▪ Catered to a total of 107,794 flights (2019),
26% were international flights transporting a
total number of 4.2M passengers
▪ On-going monitoring of Key Performance
Indicators, measured in terms of:
- Subjective performance parameter
- Primary and secondary objective
performance parameters
Mactan-Cebu International Airport Project
Status of the Project
5
March 8
Presidential
Proclamation No.922
State of Public Health
Emergency throughout the
Philippines
IATF Resolution No. 11
Travel suspension via land,
domestic air, and domestic
sea to and from Metro Manila
March 12
Cebu Governor
Executive Order No. 5-J
Adopting the quarantine
protocols to all persons
arriving in the Province of
Cebu via air travel
originating from any
foreign country
March 15
Presidential Proclamation No.929
Enhanced Community Quarantine (ECQ) imposed to entire Luzon region.
March 16
Cebu Governor Executive Order No. 5-N
ECQ imposed to Entire Cebu Province, whereby strict
border control all over Cebu
City was implemented
March 25
Mactan-Cebu International Airport Project
Timeline of Covid19-related events affecting MCIA operations
6
• Reduced flights and passengers
had decreased the revenue
stream of the airport
• Consolidation and relocation of
some business operations (e.g.
int’l ticketing, check-in and
boarding of departures)
• Establishing the accreditation/
certification process of the PCR
Testing Laboratory
Mactan-Cebu International Airport Project
Project Challenges brought by Covid-19
7
▪ Philippines’ first airport-dedicated testing lab
▪ 26 days from conceptualization to
commissioning
▪ Biosafety Level 2 certified by the Department
of Health
▪ Capacity of 1,500 tests per day
▪ International operations of MCIA resumed on
July 14, 2020
▪ Serves the screening and testing needs of
the arriving international passengers
▪ As of August 3, 2020, catered nearly
12,000 overseas Filipinos, OFWs, seafarers
and long-term residents
Mactan-Cebu International Airport Project
COVID-19 RT-PCR testing facility and laboratory