Case Studies Presentation:

MACTAN-CEBU INTERNATIONAL AIRPORT

UNESCAP WORKSHOP:

Infrastructure Financing and Public-Private Partnership

Network of Asia and the Pacific December 15, 2020

12:00 PM - 2:00 PM, Bangkok time, GMT +7

2

The project involves the construction of a new

passenger terminal building (PTB) and related

facilities to increase annual passenger capacity

from 4.5 million to 12.5 million passenger; airport

operations and maintenance (O&M); and

renovation and expansion of the existing PTB.

Mactan-Cebu International Airport Project

3

Implementing Agency Department of Transportation (DOTr)

and Mactan Cebu International Airport

Authority (MCIAA)

Project Sector Partner GMR-Megawide Cebu Airport

Corporation

Contract Signing Date April 24, 2014

Procurement Mode Solicited

PPP Scheme Build-Operate-Transfer (BOT)

Concession Period 25 Years

Objective To efficiently handle the increasing air

traffic demand, ensure convenience of

passengers; promote aircraft operational

efficiency; minimize passenger delay due

to reduction of passenger terminal

waiting time; and in the long-term,

increase revenues from tourism

activities.

Mactan-Cebu International Airport Project

Project information

4

▪ Fully operational

- Terminal 2 construction completed

on June 30, 2018

- Terminal 1 rehabilitation completed

on August 31, 2019

▪ Catered to a total of 107,794 flights (2019),

26% were international flights transporting a

total number of 4.2M passengers

▪ On-going monitoring of Key Performance

Indicators, measured in terms of:

- Subjective performance parameter

- Primary and secondary objective

performance parameters

Mactan-Cebu International Airport Project

Status of the Project

5

March 8

Presidential

Proclamation No.922

State of Public Health

Emergency throughout the

Philippines

IATF Resolution No. 11

Travel suspension via land,

domestic air, and domestic

sea to and from Metro Manila

March 12

Cebu Governor

Executive Order No. 5-J

Adopting the quarantine

protocols to all persons

arriving in the Province of

Cebu via air travel

originating from any

foreign country

March 15

Presidential Proclamation No.929

Enhanced Community Quarantine (ECQ) imposed to entire Luzon region.

March 16

Cebu Governor Executive Order No. 5-N

ECQ imposed to Entire Cebu Province, whereby strict

border control all over Cebu

City was implemented

March 25

Mactan-Cebu International Airport Project

Timeline of Covid19-related events affecting MCIA operations

6

• Reduced flights and passengers

had decreased the revenue

stream of the airport

• Consolidation and relocation of

some business operations (e.g.

int’l ticketing, check-in and

boarding of departures)

• Establishing the accreditation/

certification process of the PCR

Testing Laboratory

Mactan-Cebu International Airport Project

Project Challenges brought by Covid-19

7

▪ Philippines’ first airport-dedicated testing lab

▪ 26 days from conceptualization to

commissioning

▪ Biosafety Level 2 certified by the Department

of Health

▪ Capacity of 1,500 tests per day

▪ International operations of MCIA resumed on

July 14, 2020

▪ Serves the screening and testing needs of

the arriving international passengers

▪ As of August 3, 2020, catered nearly

12,000 overseas Filipinos, OFWs, seafarers

and long-term residents

Mactan-Cebu International Airport Project

COVID-19 RT-PCR testing facility and laboratory