Case Studies in Resource Efficiency
Craigavon Civic Centre, November 13th 2009
![Page 2: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/2.jpg)
Content
1. What is resource efficiency?
2. Why be resource efficient?
3. The drivers
4. Good practice examples
5. Case Studies• Wilson’s Country• McAvoy Group
6. Envirowise Programme
![Page 3: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/3.jpg)
• Elimination
• Source reduction
• Re-use
• Recycling
• Treatment & disposal
Reducing the Cost of Waste
Mostpreferable
Leastpreferable
![Page 4: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/4.jpg)
Why be resource efficient?
• savings in costs
• reduced levels of waste (raw materials, product,
energy, water, etc)• improved products, packaging and processes• reduced levels of pollution• resources used more efficiently• increased profitability• improved environmental performance• helped to comply with legislation• helped towards suitable accreditation• improved level of sustainability
![Page 5: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/5.jpg)
Drivers
DRIVERS FOR IMPROVEMENT
Financial Benefits
Legislation
Financial Institutions
Government
CustomersEmployees
Suppliers
Pressure Groups
Shareholders
Competitors
![Page 6: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/6.jpg)
What do you need to do?
• WHAT• Understand your waste streams
• – consider water, energy and other wastes
• Understand what resources you use
• Understand your suppliers
• Use a ‘fresh pair of eyes’
• HOW• Conduct a walk-around survey
• Map your wastes
• Flow chart
• Diagnose and Prioritise
PROCESSRaw Material
INWasteOUT
PROCESSRaw Material
INWasteOUT
![Page 7: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/7.jpg)
Some Practical Tips
A FACTORY / PROCESS ENVIRONMENT
Improve Housekeeping
Segregate to reduce costs
Recover washings (pump / filter tank)
Don’t over order materials
Store more liquids in bulk
Schedule production to minimise washing
Recover or reuse vessel washing liquors
![Page 8: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/8.jpg)
Some Practical Tips
AN OFFICE ENVIRONMENT – It’s Simple
Using both sides cuts paper use by 50%
Cancel junk mail
Use electronic communication
Avoid overproduction of marketing material
Choose minimally packaged products
Hold an annual ‘stationary amnesty’ or ‘one bin day’
Turn off taps fully / fit push button taps
Check pipes for leaks
Switch off and replace with energy efficient
Travel planning
![Page 9: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/9.jpg)
Case studiesLots of examples
![Page 10: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/10.jpg)
Wilson’s Country
• Established in mid 1980’s• Pack potatoes and fresh fruit• 120 employees• £5m new facility Carn Road Industrial Estate (2005)
![Page 11: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/11.jpg)
Achievements
• Investors in People (IIP)• BRC (Higher Level)• Wilson’s Country Garden
Potatoes voted Top 10 ‘Tesco’s Customers favourite brands’
• No additives or preservatives used
WASH PEEL CUT PACK
![Page 12: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/12.jpg)
Envirowise Visit (FTV)Issues Highlighted
WATER USE / DISCHARGE• Approx 80% water used in washing
• 5 automated washers – 2 with leaks
• Cleaning Efficiencies
• Dirty water dumps (timed) – not in line with production quantities
• No water re-use or recycling
• Old ETP
![Page 13: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/13.jpg)
Envirowise FTVIssues (cont)
SOLID WASTE• Segregation of wood & green waste only• Volumes of waste in skips• Waste created at packaging brand changeover
MANAGEMENT• Scheduling of repairs• Cleaning of drainage channels (sweepings)
![Page 14: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/14.jpg)
Action Plan (1)
1. Better Leak ManagementMinimal Cost : Payback <6 monthsSavings – for every 1m3 = £1.59 saved (estimated that £133 could be saved in 24 hours)
2. Reduce Dirty Water Dumps – dependent on volumes washedMinimal Cost : Payback <6 monthsSavings – as for leak management
3. Recycle / Re-Use Water in processHigh Costs : New ETP with payback>24 months Savings of £47,000 – if 50% recycled
![Page 15: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/15.jpg)
Action Plan (2)4. Segregate Waste
Minimal Cost : Short Payback <6 months (receptacles)Savings – Cardboard = £19,000 & Plastic = £10,000
5. CompactionModerate Cost : Medium Payback 6 – 24 monthsSavings – dependent upon new compacted size. Less skips lifted.
6. Reduce brand changeoversMinimal Cost – scheduling / programmingSavings two fold – reduced volumes of material used (purchased) and reduced number of skip lifts
7. Reduce effluent strengthMinimal cost – cleaning regime changesSavings in reduction in effluent load – Mogden formula charges for BOD and Suspended solids.
C=R+V+Vb+B(Ot)+S(St)C=R+V+Vb+B(Ot)+S(St)
![Page 16: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/16.jpg)
TOTAL SAVINGS
At least
£76,000
![Page 17: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/17.jpg)
McAvoy Group
• Portable building manufacture • ‘Off Site’ construction• 35 years in operation• 2 modern factories in Northern Ireland (Lisburn &
Dungannon)• 300 employees• Hospitals, schools, government buildings, offices,
airports
![Page 18: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/18.jpg)
Achievements to date
• Investors in People• Safe-T-Cert• Construction Line• McAvoy Group Director – Entrepreneurial Hall of Fame• Innovation Award for McAvoy Pods
![Page 19: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/19.jpg)
Products
• McAvoy Off Site Building Solutions• ‘fast track buildings’
• McAvoy Safe Space• Eg. construction site accommodation
• McAvoy Multi Space• Long and short term accommodation – used at
London Marathon, Henley Regatta and
North West 200
• McAvoy Pod• Sealed units for connection to plumbing &
services eg. Hotel bathrooms
![Page 20: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/20.jpg)
Issues & Solutions (1)Envirowise Intervention – KREEC II
1. Packaging MaterialChange from use of screws and fixings in small quantities – to a consignment stock operationSavings - reduced cardboard and plastic wasteCapital Costs – low
2. Waste Monitoring & TargetingSet KPI’s eg. wastes per unit. Smarter purchasing choices eg. wood in desired lengths.Savings – reduced off cuts (up to £20,000)Capital Costs – low (discuss with supplier)
3. Production / Utilities Monitoring & TargetingPractice electricity conservation measuresSub-meteringSavings – through greater efficienciesCapital Costs - Low
![Page 21: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/21.jpg)
Issues & Solutions (2)Envirowise Intervention – KREEC II
4. Value Engineering
Consider design elements – floor bracing & window cut outs
Savings – up to 5% of total steel costs (and same for wood)
Capital Costs – Medium (review of nesting / cutting)
5. Housekeeping
Improve stock rotation, segregation and use up ‘odds’
Savings - £2,000
Capital Costs – Nil
6. Compressed Air
Introduce inspection system and maintain airlines to reduce leaks
Savings - £1,000
Capital Costs - Nil
![Page 23: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/23.jpg)
Summary of Envirowise assistanceAdvice Line 0800 585794
Free advice
Tailored Visits
Publications
IT Tools – Resource Diagnostic Tool
Workshops & seminars
Sector Based Projects
![Page 24: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/24.jpg)
Publications & ToolsGood Practice Guides
• How to do it
Environmental Performance Guides
• Benchmarking
Case Studies
Newsletters, leaflets
Videos & software
![Page 25: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/25.jpg)
www.envirowise.gov.uk
Local Information Pages
Up to date news
Events
Download all publications
Interactive Helpline pages
Email notification of what’s
new
Links to other sites
![Page 26: Case Studies in Resource Efficiency Craigavon Civic Centre, November 13 th 2009](https://reader030.vdocuments.us/reader030/viewer/2022032704/56649d405503460f94a1a8f8/html5/thumbnails/26.jpg)
Contacts
Advice Line 0800 585794
Website www.envirowise.gov.uk
Northern Ireland Regional Team
• 028 7135 5400 / 028 9070 6080
Contact :
• Sam McCloskey (NI Country Manager)
• Nuala Devlin – (Envirowise Co-Ordinator)