Case Management Digital ServiceSprint ReviewSprint 5.1: 11/16/17 – 11/29/17
Agenda• Sprint Stories• Core County Brief• Sprint Backlog and Team Metrics• Feature Based Presentations:
Child Profile, Family Finding Tool, Landing Page• DesignOps & Other Efforts Presentation• Retrospective Items• Impediments & Challenges• What's Next
Stories• Research and Design
• Child Profile & Family Finding Tool SME research• Child Profile wireframe version 1 reviews• Landing Page Design Concepts• Family Finding Design Concepts Iteration• Navigation Design Exploration• Research Logistics Planning Lassen County
• Business• Research and Design Collaboration• Reviewed Wireframes• Support DOJ Interface Discussions• Support On-Site Logistics Planning
• Development• Landing Page• Pushed to 2 segments of pipeline (preint,
preview)• Client ID Page
REMINDERSAgile Training - January 17, 2018, 8:30-4:30
Bi-Weekly County Call - Dec. 6, 2017, 11:00-12:00
Case Management Sprint Review - Dec. 13, 2017, 2:30-3:30
• Survey for on-site core county meeting in
January 2018- Dec 1 Deadline.
• Transitioned to a different tool to track our
tasks from Pivotal Tracker to JIRA
Link to JIRA:
• Lassen County On-Site - Dec. 12, 2017
• Look for communication coming your way
soon about on-site research visit planning.
Core County Brief
#1 Team Stories
Sprint Metrics Sprint 4.5 Sprint 4.6 Sprint 5.1Iteration
Planned Capacity % / PTS
Accepted # of Planned Feature Stories / PTS
# of Completed Feature Stories / PTS
% Completed (by PTS)(Planned vs Completed)
# of Stretch Backlog Features / PTS
% Completed (including Stretch, by PTS)
Average Velocity over 3 sprints
Cycle time for Features (in hrs.)
Sprint Metrics
Child ProfileSprint 5.1
Child Profile: Design
• Met with B-Team and gather info about Child
Profile Data Fields on Client Notebook ID Tab.
• Created Wireframes for Child Profile Page
(Client Notebook: ID Tab)
• Reviewed Version 1 Wireframes with SME B-Team,
Cindy, and Development Team
• Logistics & Schedule for Lassen County On-Site visit
on 12/12/17
Child Profile: Development• Reviewed wireframes with Design and B-Team
• Researched and identified Components on Child
Profile Wireframes.
• Prioritized identified UI components to be
developed.
• Worked with API team to define the data retrieval
methods (and mock REST services)
• Built Version 1 client profile page template
Landing PageSprint 5.1
Landing Page • Discussed with Business Team SME’s the current login process in
CWS-CMS.
• Interviewed Business Team SME’s regarding the priorities a social
worker has when logging into a landing page or dashboard.
• Collaborated and leveraged Intake and CALs design concepts for
landing page.
• Explored alert and summary card concepts that surface valuable
information without requiring a “click.”
• Designed multiple landing page concepts to be validated during
core county feedback research.
DISCOVERY
Link to Design Concepts in progress:
https://pdmwlj.axshare.com/
pw:cwds123
Landing PageDELIVERY
DEMO
Family Finding ToolSprint 5.1
Family Finding Tool• Iterated on Family Finding Design Concepts based on core county
feedback (e.g. search filters, match scale).
• Begun to standardize designs based on project approved visual
design direction.
• Identified potential components that need to be updates or
added for implementation.
• Begun conversations with the Business and Development teams
on what a ‘version 1’ for implementation of Family Finding Tool
might be (based on legacy constraints and user priorities).
DISCOVERY
Link to Design Concepts in progress:
https://pdmwlj.axshare.com/
pw:cwds123
Design Ops / OtherSprint 5.1
Design Ops / Other Features
• Supported DOJ Interface discussions
for automated Background Checks
• Visual Exploration of Navigation
Options for Case Management
RetrospectiveWHAT WENT WELL
• Program Increment Planning (work for coming 6 sprints) went well. Based on learnings from the prior PI, the team worked in advance of the PI-5 Planning to identify the features and priorities that are to be delivered, as well as any risks and dependencies. This resulted in a well thought out and comprehensive plan for PI-5.
IMPROVEMENT OPPORTUNITY
• The team continues to work on consolidating meetings and selective participation in meetings / events to maximize available working time. The team is also looking to do more team building activities to fortify self-organizing team culture.
Impediments and ChallengesIMPEDIMENTS
TEAM CONTROL – none
TEAM INFLUENCE –
none
ORGANIZATIONAL –
none
CHALLENGESTEAM CONTROL – none
TEAM INFLUENCE -
Team and program working to develop a more structured
approach to features shared across multiple digital service
teams.
ORGANIZATIONAL -
Team directed to use JIRA although configuration and migration
was not complete prior to sprint start date.
• Iterate on CM Landing Page based on county input
• Iterate on Child Client Profile Page based on county input
• Iterate on Family Finding Design Concept with core counties
• Onsite research visit at Lassen County
• Work with CM core counties to arrange on-site visits
What’s Next?