Carmel (Melay) V. Abao and Alma Maria O. SalvadorFaculty, ADMU Political Science Department
June 15, 2012Astoria Plaza, Pasig City
I. Project Design and ImplementationII. Survey ResultsIII. Validation of Survey ResultsIV. Reflections
Carmel V. AbaoJune 15, 2012
Astoria Plaza, Pasig City
Terms of Reference (TOR)Actual Project Design and Implementation
CSOs as broadly defined:◦ Non-governmental and non-profit◦ Interacts with the state
Guimaras
Aug1– Sept 15, 2011 Sept 16–Dec 15, 2011 Jan – Feb 2012
Workplan
Project Management
Lead Researchers Field Researchers
ANSA-EAP Team
Guimaras
Aug 1–Sept 15, 2011 Sept 16–Dec 15, 2011 Jan–Feb 2012
-Software Development-Data Encoding-Generation of Reports
Consolidation of Data and Initial Analysis
Actual Timeline of Activities
Actual Project Management
Lead Researchers
Field Researchers
EncodersANSA-EAP
Software Developers
Albay: Rowena Olayta (ALPRODEV)Cam Norte: Jimmy Molina (SPACFI)Cam Sur: Berns Gavino-gumba (Ateneo De Naga)Catanduanes: Ma. Cristina Rabulan (DVSAFI-PPP)Sorsogon: Aurora De Guzman (MALAYA KA)
Aklan: Aissa Amerila (Archbishop Gabriel M. Reyes Memorial Foundation, Inc.)Antique: Dean Christi Oliver An (Antique Federation Of Ngos, Inc.)Guimaras: Antonia G.Pelina Guimaras People’s Economic Foundation, Inc.Iloilo: Freddie Salvania (Iloilo Code)Capiz: Nelson Rose (Capiz Code)Negros Occidental: Renato Banas (Negros Organic Agriculture Movement)
Bukidnon: Yumer Caringas (ABAG KALAMBUAN, INC.)Misamis Oriental: El Cisco Jun Ramos (GROUP FoundationMisamis Occidental: Mary Jane Gangoso (ECOLINK Philippines)
Interns of Ateneo de Manila Department of Information Systems and Computer Science:◦ John Paul Contillo◦ Alipio Gabriel
Rogelio CasibangRio Sajetnel
to identify CSOs that engage with local governmentsto look into how they specifically engage governmentto look into the skills that they have/use in dealing with governmentto establish their context
Cam Norte 26Cam Sur 69Albay 53Sorsogon 47
Antique 47Aklan 18Capiz 40Guimaras 52Iloilo 53Negros Occ 44
Bukidnon 28Mis Occ 31Mis Or 37
TOTAL: 545
Cam Norte 9Cam Sur 31Albay 8Sorsogon 6
Antique 11 Aklan 2Capiz 7Guimaras 17Iloilo 11Negros Occ 6
Bukidnon 11 Mis Occ 9Mis Or 6
TOTAL: 134
Phase 1: Bidding◦ Step 1: Observation of the pre-bid conference◦ Step 2: Observation of the submission and opening of
sealed bids◦ Step 3: Observation of contract awarding
Phase 2: Contract Implementation◦ Step 1: Monitoring of the delivery of the goods or services
procured◦ Step 2: Monitoring of the implementation vis-à-vis bids
specifications◦ Step 3: Monitoring of the completion of projects (eg.
construction)
Thank you!