2013 Four-CP Response for Transmission- and Distribution-Connected ESIIDs in ERCOT Competitive Area. Carl L Raish. 4 CP Response Methodology. Analysis was limited to ESIIDs in competitive ERCOT areas with ‘BUSIDRRQ’ profile types - PowerPoint PPT PresentationTRANSCRIPT
DSWG - June 25, 2014
2013 Four-CP Response for 2013 Four-CP Response for Transmission- and Distribution-Transmission- and Distribution-
Connected ESIIDs in ERCOT Connected ESIIDs in ERCOT Competitive AreaCompetitive Area
Carl L Raish
2
4 CP Response Methodology
Analysis was limited to ESIIDs in competitive ERCOT areas with ‘BUSIDRRQ’ profile types Transmission charges are based on ESIID-specific load during CP intervals ESIIDs classified by connection at transmission or distribution voltage level
Classified days as CP Days, Near-CP Days and Non-CP Days Near-CP days were iteratively determined
Started with 12 possible days Removed days from list if no response detected for the date Ended up with 7 Near-CP days
Non-CP days were all remaining non-holiday weekdays (June 1 – Sep 30)
Classified ESIIDs based on Weather Sensitivity and Load Factor Weather sensitivity (R2 for week-day use vs average temperature >= 0.6) Load Factor based on week-day afternoon usage (1:00 PM – 6:00 PM) High LF > 0.85 Medium LF > 0.60 Low LF ≤ 0.60
3
4 CP Response Methodology (continued)
ESIIDs were classified into three response categories based on how they modified usage on CP and Near-CP days
Reduced Day Use -- ESIIDs that lowered usage from 9:00 AM – 5:00 PM) on CP/Near-CP days.
Reduced CP Hour Use -- ESIID that lowered usage during 4:00 PM – 5:00 PM on CP/Near-CP days (but did not reduce day use).
Did not respond – All remaining ESIIDS
4
4 CP Response Methodology (continued)
Response Type
Load Factor Category
High Medium Low Total
Reduce Day Use
22 20 26 68
Reduce Peak Hour Use
35 28 18 81
Non-Respond 104 48 18 170
Total 161 96 62 319
Number of Transmission ESIIDs by Response Type
5
4 CP Response Methodology (continued)
Response Type
Load Factor Category
High Medium Low WS* Total
Reduce Day Use
31 376 886 1,293
Reduce Peak Hour Use
206 643 578 1,427
Non-Respond 2,456 3,046 831 1,661 7,994
Total 2,693 4,065 2,295 1,661 10,714
Number of Distribution ESIIDs by Response Type
* WS response and type needs additional analysis
6
4 CP Response Methodology (continued)
Baselines were created at the ESIID-level using Non-CP days (May 1 – Sep 30).
Average of 10 days before and 10 days after the CP/Near-CP day. Baselines were aggregated in groups by response type and load factor
category WS baseline was ERS Regression baseline
Scalar day-of-adjustment applied at the aggregated group level.
Day-of-adjustment window: 0:15 AM – 1:00 PM Baseline energy for the adjustment window was scaled to the actual energy
for the CP/Near-CP day No scalar adjustment was applied to the group with ‘day-use’ response Adjusted and unadjusted baselines are shown on graphs for non-responding
ESIIDs In general these ESIIDs had actual use higher than the baseline on
CP/Near-CP days than the unadjusted baseline If these ESIIDs are included in the overall class performance, their
increased usage would offset reductions by the remaining ESIIDs
7
4 CP Response Methodology (continued)
September 3, 2013 CP day special handling
Load shapes were different … probably related to being the day following the Labor Day holiday.
Tables and graphs show reductions for baselines with and without day-of-adjustment
Reductions based on scalar adjusted baselines reflect the actual load reduction on that day
Reductions based on unadjusted baselines are probably closer to reductions on more normal CP days.
8
15-Minute Reductions on 4 CP Days - 2013
4 CP DaysTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
Response27-Jun-13 90.0 11.8 78.1 93.0 28.9 64.1 132.3 107.8 24.5 315.3 148.5 166.8
31-Jul-13 146.7 10.1 136.6 94.1 16.5 77.6 119.5 88.4 31.1 360.4 115.0 245.4
7-Aug-13 137.5 16.5 120.9 105.6 38.6 67.0 125.6 114.7 10.9 368.7 169.9 198.8
3-Sep-13 103.4 7.3 96.1 77.6 24.8 52.8 26.1 16.3 9.8 207.1 48.4 158.7(No Day of Adj) 105.9 9.8 96.1 111.0 58.2 52.8 114.1 34.0 9.8 331.0 102.0 158.7
TotalHigh Load Factor Medium Load Factor Low Load Factor
Reductions for ERCOT Coincident Peak Interval
Transmission Connected ESIIDs
9
15-Minute Reductions on 4 CP Days - 2013
Distribution Connected ESIIDs
4 CP DaysTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
Response27-Jun-13 45.3 17.6 27.7 80.7 54.1 26.7 27.5 17.3 10.2 153.6 89.0 64.6
31-Jul-13 36.8 15.3 21.5 60.4 31.8 28.6 40.8 21.7 19.1 138.0 68.8 69.2
7-Aug-13 45.4 17.8 27.6 84.6 49.6 35.0 47.8 23.7 24.1 177.8 91.1 86.8
3-Sep-13 13.3 6.4 7.0 6.6 -8.9 15.6 15.0 9.5 5.5 35.0 6.9 28.0(No Day of Adj) 17.2 10.2 7.0 13.5 -2.1 15.6 7.5 -64.9 5.5 38.1 -56.8 28.0
High Load Factor Medium Load Factor Low Load Factor
Reductions for ERCOT Coincident Peak Interval
Total
10
15-Minute Reductions on 4 CP Days - 2013
Transmission plus Distribution Connected ESIIDs
Largest Combined Summer 2013 reduction occurred on August 7
27-Jun-13 315.3 153.6 468.9
31-Jul-13 360.4 138.0 498.4
7-Aug-13 368.7 177.8 546.5
3-Sep-13 331.0 38.1 369.1
4 CP Days Transmission Distribution Total
11
Identify Near-CP Days – June 2013
40,000
45,000
50,000
55,000
60,000
65,000
70,000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
MW
Day of Month
Daily ERCOT Peak Intervals June 2013
4CP @ IE 17:00
Near-CPw/ response
12
Identify Near-CP Days – July 2013
40,000
45,000
50,000
55,000
60,000
65,000
70,000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
MW
Day of Month
Daily ERCOT Peak Intervals July 2013
4CP @ IE 17:00
Near-CPw/ response
Near-CPno response
13
Identify Near-CP Days – August 2013
40,000
45,000
50,000
55,000
60,000
65,000
70,000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
MW
Day of Month
Daily ERCOT Peak Intervals August 20134CP @ IE 17:00
Near-CPw/ response
Near-CPno response
14
Identify Near-CP Days – September 2013
40,000
45,000
50,000
55,000
60,000
65,000
70,000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
MW
Day of Month
Daily ERCOT Peak Intervals September 2013
4CP @ IE 16:45
Near-CPno response
Note: Sep 1, 2013 Sunday, Sep 2 Labor Day
15
15-Minute Reductions on Near Peak Days - 2013
Near CP DaysTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
Response26-Jun-13 36.4 6.1 30.3 40.7 18.3 22.4 105.7 90.7 15.0 182.8 115.1 67.7
28-Jun-13 98.2 17.6 80.6 82.9 34.3 48.6 120.8 103.0 17.8 301.9 154.9 147.0
10-Jul-13 53.4 12.3 41.1 40.0 24.5 15.5 125.9 110.0 15.9 219.3 146.7 72.6
12-Jul-13 39.9 3.1 36.8 67.7 41.8 25.9 114.2 112.0 2.2 221.9 156.9 65.0
1-Aug-13 111.6 9.7 101.9 112.8 35.8 77.1 156.7 133.6 23.1 381.1 179.0 202.0
5-Aug-13 29.2 5.2 23.9 48.9 30.3 18.5 50.3 59.0 -8.6 128.4 94.5 33.8
6-Aug-13 76.7 7.6 69.1 64.6 43.4 21.1 126.1 125.9 0.2 267.4 176.9 90.5
High Load Factor Medium Load Factor Low Load Factor Total
Reductions for ERCOT Daily Peak Interval
Largest Summer 2013 reduction occurred on August 1
Transmission Connected ESIIDs
16
15-Minute Reductions on Near Peak Days - 2013
Largest Summer 2013 reduction occurred on June 28
Distribution Connected ESIIDs
Near CP DaysTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
Response26-Jun-13 4.3 3.8 0.5 44.6 30.8 13.8 27.2 14.9 12.3 76.1 49.5 26.5
28-Jun-13 38.3 22.1 16.2 98.0 48.1 50.0 51.2 27.6 23.6 187.5 97.8 89.8
10-Jul-13 16.2 6.5 9.7 34.6 30.0 4.6 1.4 6.3 -4.9 52.2 42.8 9.4
12-Jul-13 20.2 7.8 12.3 47.2 18.2 29.0 40.7 29.7 11.0 108.1 55.7 52.4
1-Aug-13 30.5 16.3 14.2 72.5 34.7 37.8 42.1 16.6 25.5 145.2 67.6 77.5
5-Aug-13 5.1 2.1 2.9 19.5 -3.7 23.2 48.3 22.4 26.0 72.9 20.8 52.1
6-Aug-13 41.5 15.3 26.2 70.9 36.7 34.2 46.3 15.1 31.3 158.8 67.0 91.7
Total
Reductions for ERCOT Daily Peak Interval
High Load Factor Medium Load Factor Low Load Factor
17
15-Minute Reductions on Near CP Days - 2013
Transmission plus Distribution Connected ESIIDs
26-Jun-13 182.8 76.1 258.9
28-Jun-13 301.9 187.5 489.4
10-Jul-13 219.3 52.2 271.5
12-Jul-13 221.9 108.1 330.0
1-Aug-13 381.1 145.2 526.3
5-Aug-13 128.4 72.9 201.3
6-Aug-13 267.4 158.8 426.2
Near CP Days Transmission Distribution Total
18
Hour-ending 17:00 Reductions on 4 CP Days - 2013
4 CP DaysTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
Response27-Jun-13 90.5 12.0 78.5 90.3 27.2 63.1 117.4 93.3 24.1 298.2 132.5 165.7
31-Jul-13 146.7 10.1 136.6 94.2 15.1 79.1 128.9 100.4 28.4 369.8 125.7 244.1
7-Aug-13 131.0 15.3 115.7 101.0 34.8 66.2 125.6 114.7 10.9 357.6 164.9 192.7
3-Sep-13 103.3 6.5 96.8 77.9 24.3 53.6 28.5 18.2 10.4 209.7 48.9 160.8(No Day of Adj) 105.8 9.0 96.8 111.3 57.7 53.6 118.8 108.5 10.4 335.9 175.1 160.8
High Load Factor Medium Load Factor Low Load Factor Total
Reductions for Hour Ending 17:00 on Day of ERCOT Coincident Peak
Transmission Connected ESIIDs
19
Hour-ending 17:00 Reductions on 4 CP Days - 2013
Distribution Connected ESIIDs
4 CP DaysTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
Response27-Jun-13 43.2 16.7 26.5 81.0 52.4 28.6 23.5 11.8 11.8 147.7 80.9 66.8
31-Jul-13 36.8 15.3 21.5 59.5 29.7 29.8 41.9 21.0 20.8 138.1 66.1 72.1
7-Aug-13 47.0 18.2 28.8 81.6 46.6 35.0 47.8 23.7 24.1 176.5 88.5 87.9
3-Sep-13 14.5 8.0 6.5 12.1 -4.8 16.9 11.8 8.6 3.2 38.4 11.8 26.6(No Day of Adj) 18.3 11.9 6.5 19.0 2.1 16.9 4.0 0.9 3.2 41.4 14.8 26.6
High Load Factor Medium Load Factor Low Load Factor Total
Reductions for Hour Ending 17:00 on Day of ERCOT Coincident Peak
20
Hour-ending 17:00 Reductions on 4 CP Days - 2013
Transmission plus Distribution Connected ESIIDs
27-Jun-13 298.2 147.7 445.9
31-Jul-13 369.8 138.1 507.9
7-Aug-13 357.6 176.5 534.1
3-Sep-13 335.9 41.4 377.3
4 CP Days Transmission Distribution Total
Largest Combined Summer 2013 reduction occurred on August 7
21
Hour-ending 17:00 Reductions on Near Peak Days - 2013
Transmission Connected ESIIDs
Near CP DaysTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
Response26-Jun-13 36.7 7.2 29.4 41.7 18.3 24.2 95.7 83.2 12.4 174.0 108.7 66.0
28-Jun-13 71.4 15.0 56.4 40.2 17.6 22.5 113.2 96.1 17.1 224.8 128.7 96.1
10-Jul-13 53.4 12.3 41.1 34.7 18.9 15.8 125.9 110.0 15.9 214.0 141.1 72.9
12-Jul-13 41.6 4.4 37.2 53.4 28.0 25.4 78.5 72.8 5.6 173.4 105.2 68.2
1-Aug-13 112.8 11.9 101.0 96.9 20.8 76.2 145.4 123.1 22.3 355.2 155.7 199.5
5-Aug-13 27.4 5.2 23.9 15.6 -0.7 16.3 53.3 62.2 -8.8 96.3 66.7 31.4
6-Aug-13 72.5 6.0 66.5 52.4 31.3 21.1 119.5 117.9 1.6 244.4 155.2 89.2
High Load Factor Medium Load Factor Low Load Factor Total
Reductions for Hour Ending 17:00
22
Hour-ending 17:00 Reductions on Near Peak Days - 2013
Distribution Connected ESIIDs
Near CP DaysTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
ResponseTotal
ResponsePeak
ResponseDay
Response26-Jun-13 2.6 2.0 0.6 42.4 30.8 11.6 28.9 14.9 14.0 73.9 47.8 26.1
28-Jun-13 38.1 21.8 16.2 103.1 49.4 53.7 58.0 30.3 27.7 199.2 101.5 97.7
10-Jul-13 16.2 6.5 9.7 26.9 24.5 2.4 1.4 6.3 -4.9 44.5 37.3 7.2
12-Jul-13 20.1 8.1 12.0 52.3 20.7 31.7 50.0 31.9 18.1 122.4 60.7 61.7
1-Aug-13 29.6 16.2 13.3 71.6 34.1 37.4 43.3 17.5 25.7 144.4 67.9 76.5
5-Aug-13 4.9 2.1 2.9 18.2 -5.8 24.0 47.7 20.4 27.3 70.8 16.7 54.2
6-Aug-13 41.6 15.4 26.3 70.2 35.7 34.5 48.1 15.0 33.1 159.9 66.0 93.9
High Load Factor Medium Load Factor Low Load Factor Total
Reductions for Hour Ending 17:00
23
Hour-ending 17:00 Reductions on Near CP Days - 2013
Transmission plus Distribution Connected ESIIDs
26-Jun-13 174.0 73.9 247.9
28-Jun-13 224.8 199.2 424.0
10-Jul-13 214.0 44.5 258.5
12-Jul-13 173.4 122.4 295.8
1-Aug-13 355.2 144.4 499.6
5-Aug-13 96.3 70.8 167.1
6-Aug-13 244.4 159.9 404.3
Near CP Days Transmission Distribution Total
24
Reduction Percent by Load Factor - Transmission
Total Reduction
Responders Total Load
Non-Responders Total Load Total Load
Response as Percent of Total Load
Total Reduction
Responders Total Load
Non-Responders Total Load Total Load
Response as Percent of Total
Load
27-Jun-13 90.5 1,142 1,609 2,751 3.3% 90.3 509 206 715 12.6%
31-Jul-13 146.7 1,135 1,633 2,768 5.3% 94.2 496 209 705 13.4%
7-Aug-13 131.0 1,152 1,636 2,788 4.7% 101.0 516 215 731 13.8%
3-Sep-13 103.3 1,159 1,641 2,800 3.7% 77.9 471 223 694 11.2%(No Day of Adj)
27-Jun-13 117.4 238 11 249 47.2% 298.2 1,889 1,826 3,715 8.0%
31-Jul-13 128.9 219 12 231 55.8% 369.8 1,850 1,854 3,704 10.0%
7-Aug-13 125.6 244 12 256 49.1% 357.6 1,912 1,863 3,775 9.5%
3-Sep-13 28.5 164 13 177 16.1% 209.7 1,794 1,877 3,671 5.7%(No Day of Adj)
High Load Factor MW Medium Load Factor MW
Low Load Factor Total
CP Date
25
Reduction Percent by Load Factor - Distribution
Total Reduction
Responders Total Load
Non-Responders Total Load Total Load
Response as Percent of Total Load
Total Reduction
Responders Total Load
Non-Responders Total Load Total Load
Response as Percent of Total
Load
27-Jun-13 43.2 1,142 1,609 2,751 1.6% 81.0 509 206 715 11.3%
31-Jul-13 36.8 1,135 1,633 2,768 1.3% 59.5 496 209 705 8.4%
7-Aug-13 47.0 1,152 1,636 2,788 1.7% 81.6 516 215 731 11.2%
3-Sep-13 14.5 1,159 1,641 2,800 0.5% 12.1 471 223 694 1.7%(No Day of Adj)
27-Jun-13 23.5 238 11 249 9.5% 147.7 1,889 1,826 3,715 4.0%
31-Jul-13 41.9 219 12 231 18.1% 138.1 1,850 1,854 3,704 3.7%
7-Aug-13 47.8 244 12 256 18.7% 176.5 1,912 1,863 3,775 4.7%
3-Sep-13 11.8 164 13 177 6.7% 38.4 1,794 1,877 3,671 1.0%(No Day of Adj)
High Load Factor MW Medium Load Factor MW
Low Load Factor Total
CP Date
26
Percent Reduction by Load Factor - Transmission
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction27-Jun-13 90.5 30.3% 90.3 30.3% 117.4 39.4% 298.2
31-Jul-13 146.7 39.7% 94.2 25.5% 128.9 34.8% 369.8
7-Aug-13 131.0 36.6% 101.0 28.2% 125.6 35.1% 357.6
3-Sep-13 103.3 49.2% 77.9 37.2% 28.5 13.6% 209.7(No Day of Adj)
High Load Factor Medium Load Factor Low Load FactorTotal
Reduction
27
Percent Reduction by Load Factor - Distribution
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction27-Jun-13 43.2 29.2% 81.0 54.8% 23.5 15.9% 147.7
31-Jul-13 36.8 26.6% 59.5 43.1% 41.9 30.3% 138.1
7-Aug-13 47.0 26.6% 81.6 46.3% 47.8 27.1% 176.5
3-Sep-13 14.5 37.7% 12.1 31.6% 11.8 30.7% 38.4(No Day of Adj)
Medium Load Factor Low Load FactorTotal
Reduction
High Load Factor
28
June CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 27, 2013
Actual Baseline Reduce
Transmission Connected ESIIDs
29
June CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 27, 2013
Actual Baseline Reduce
Distribution Connected ESIIDs
30
June CP Day Load – Responding ESIIDs - 2013
Transmission Plus Distribution Connected ESIIDs
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 27, 2013
Actual Baseline Reduce
31
July CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 31, 2013
Actual Baseline Reduce
Transmission Connected ESIIDs
32
July CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 31, 2013
Actual Baseline Reduce
Distribution Connected ESIIDs
33
July CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 31, 2013
Actual Baseline Reduce
Transmission Plus Distribution Connected ESIIDs
34
August CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 7, 2013
Actual Baseline Reduce
Transmission Connected ESIIDs
35
August CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 7, 2013
Actual Baseline Reduce
Distribution Connected ESIIDs
36
August CP Day Load – Responding ESIIDs - 2013
Transmission Plus Distribution Connected ESIIDs
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 7, 2013
Actual Baseline Reduce
37
September CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 3, 2013
Actual Baseline Reduce Baseline No Adj
Transmission Connected ESIIDs
38
September CP Day Load – Responding ESIIDs - 2013
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 3, 2013
Actual Baseline Reduce
Distribution Connected ESIIDs
39
September CP Day Load – Responding ESIIDs - 2013
Transmission Plus Distribution Connected ESIIDs
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 3, 2013
Actual Baseline Reduce
40
June CP Day Load by Reduction Type - 2013
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 27, 2013
CP Respond Reduce Day Baseline CP Respond Baseline Reduce Day
Transmission Connected ESIIDs
41
June CP Day Load by Reduction Type - 2013
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 27, 2013
CP Respond Reduce Day Baseline CP Respond Baseline Reduce Day
Distribution Connected ESIIDs
42
July CP Day Load by Reduction Type - 2013
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 31, 2013
CP Respond Reduce Day Baseline CP Respond Baseline Reduce Day
Transmission Connected ESIIDs
43
July CP Day Load by Reduction Type - 2013
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 31, 2013
CP Respond Reduce Day Baseline CP Respond Baseline Reduce Day
Distribution Connected ESIIDs
44
August CP Day Load by Reduction Type - 2013
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 7, 2013
CP Respond Reduce Day Baseline CP Respond Baseline Reduce Day
Transmission Connected ESIIDs
45
August CP Day Load by Reduction Type - 2013
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 7, 2013
CP Respond Reduce Day Baseline CP Respond Baseline Reduce Day
Distribution Connected ESIIDs
46
September CP Day Load by Reduction Type - 2013
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 3, 2013
CP Respond Reduce Day Baseline CP Respond Baseline Reduce Day
Transmission Connected ESIIDs
47
September CP Day Load by Reduction Type - 2013
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 3, 2013
CP Respond Reduce Day Baseline CP Respond Baseline Reduce Day