carl j. amento, executive director scrcog meeting notice &...

61
SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & AGENDA March 26, 2014 – 10:00 A.M. Location: 127 Washington Avenue, 4 th Floor West North Haven, CT 06473 Full agenda materials can be found at our website – www.scrcog.org The agenda and attachments for this meeting are available on our website at www.scrcog.org. Please contact SCRCOG for copy of agenda in a language other than English. Auxiliary aids/services and limited English proficiency translators will be provided with two week’s notice. "Necesidades especiales: Audio de circuito cerrado para personas con deficiencia audita y/o intérprete de lenguaje de signos y traductor para personas con dominio limitado del inglés; son proporcionados por aviso a dos semanas de anticipación. Agenda puede solicitarse en un idioma distinto al inglés contactando a SCRCOG." 127 Washington Avenue, 4th Floor West, North Haven, CT 06473 www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected] 1. Call to Order and Introductions Mayor Scott Jackson, Chairman 2. Presentation: I-95 Corridor Record of Decision Report Mark Rolfe, District Engineer, Attached CDOT and Brian Mercure, Assistant District 3A Engineer, CDOT 3. Adoption of 2/26/14 SCRCOG Minutes First Selectman Fillmore McPherson, Secretary Pages 2-5 4. Treasurer’s Report for month ending 2/28/14 Mayor Benjamin Blake, Treasurer Pages 6, 7 5. Transportation Committee Report Mayor William Dickinson, Chairman Pages 8-26 a. Adopt Resolution to approve 2012-2015 TIP Amendment Twenty Three Pages 25, 26 b. Update on Local Transportation Capital Improvement Program (LOTCIP) 6. New SCRCOG Committee Descriptions Pages 27, 28 7. Title VI Public Participation Outreach Page 29 8. Adopt Resolution authorizing the Executive Director to partner with The Nature Conservancy Page 30 for Grant Application to develop a Greater New Haven Regional Coastal Resiliency Plan (will include up to $30,000 in-kind match over two years) 9. Appointment of Mayor Toni Harp to the Workforce Alliance CEO Executive Committee 10. Update on SCRCOG Shared Services Study Carl Amento, Executive Director 11. Congressional Report Louis Mangini, Legislative Aide to U.S. Rep. Rosa DeLauro and Riju Das, Aide to Senator Richard Blumenthal 12. State Legislative Report Carl Amento, Executive Director 13. SCRCOG Executive Director’s Report Carl Amento, Executive Director 14. REX Development Report Barbara Malmberg, REX Development Page 31 15. DESPP/ DEMHS Report John B. Field, Jr., Region 2 Coordinator Pages 32-34 16. RPC Action Table for March Page 35 17. Regional Cooperation / Other Business 18. Adjournment

Upload: others

Post on 26-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS

Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge

Carl J. Amento, Executive Director

SCRCOG MEETING NOTICE & AGENDA March 26, 2014 – 10:00 A.M.

Location: 127 Washington Avenue, 4th Floor West North Haven, CT 06473

Full agenda materials can be found at our website – www.scrcog.org

The agenda and attachments for this meeting are available on our website at www.scrcog.org. Please contact SCRCOG for copy of agenda in a language other than English. Auxiliary aids/services and limited English proficiency translators will be provided with two week’s notice. "Necesidades especiales: Audio de circuito cerrado para personas con deficiencia audita y/o intérprete de lenguaje de signos y traductor para personas con dominio limitado del inglés; son proporcionados por aviso a dos semanas de anticipación. Agenda puede solicitarse en un idioma distinto al inglés contactando a SCRCOG."

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

1. Call to Order and Introductions – Mayor Scott Jackson, Chairman

2. Presentation: I-95 Corridor Record of Decision Report – Mark Rolfe, District Engineer, Attached

CDOT and Brian Mercure, Assistant District 3A Engineer, CDOT

3. Adoption of 2/26/14 SCRCOG Minutes – First Selectman Fillmore McPherson, Secretary Pages 2-5

4. Treasurer’s Report for month ending 2/28/14 – Mayor Benjamin Blake, Treasurer Pages 6, 7

5. Transportation Committee Report – Mayor William Dickinson, Chairman Pages 8-26

a. Adopt Resolution to approve 2012-2015 TIP Amendment Twenty Three Pages 25, 26 b. Update on Local Transportation Capital Improvement Program (LOTCIP)

6. New SCRCOG Committee Descriptions Pages 27, 28 7. Title VI Public Participation Outreach Page 29 8. Adopt Resolution authorizing the Executive Director to partner with The Nature Conservancy Page 30

for Grant Application to develop a Greater New Haven Regional Coastal Resiliency Plan (will include up to $30,000 in-kind match over two years)

9. Appointment of Mayor Toni Harp to the Workforce Alliance CEO Executive Committee

10. Update on SCRCOG Shared Services Study – Carl Amento, Executive Director

11. Congressional Report – Louis Mangini, Legislative Aide to U.S. Rep. Rosa DeLauro and

Riju Das, Aide to Senator Richard Blumenthal

12. State Legislative Report – Carl Amento, Executive Director

13. SCRCOG Executive Director’s Report – Carl Amento, Executive Director

14. REX Development Report – Barbara Malmberg, REX Development Page 31

15. DESPP/ DEMHS Report – John B. Field, Jr., Region 2 Coordinator Pages 32-34

16. RPC Action Table for March Page 35 17. Regional Cooperation / Other Business 18. Adjournment

Page 2: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future

Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge

Carl J. Amento, Executive Director

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

TO: SCRCOG Board FROM: First Selectman Fillmore McPherson, Secretary DATE: March 19, 2014 SUBJECT: SCRCOG Minutes of February 26, 2014 Present: Bethany First Selectwoman Derrylyn Gorski Branford First Selectman James Cosgrove Hamden Mayor Scott Jackson – Chairman Guilford First Selectman Joseph Mazza Madison First Selectman Fillmore McPherson – Secretary Milford Mayor Benjamin Blake – Treasurer New Haven Mayor Toni Harp North Haven First Selectman Michael Freda – Vice-Chairman Orange First Selectman James Zeoli Wallingford Mayor William Dickinson Woodbridge First Selectwoman Ellen Scalettar SCRCOG Staff: Carl Amento – Executive Director, Stephen Dudley, Jim Rode, Al Ruggiero, Eugene Livshits, Chris Rappa Other Guests: State Comptroller Kevin Lembo; Josh Woijcik, Office of the State Comptroller; Donna Carter and Mary Bigelow, Greater New Haven Transit District; Ginny Kozlowski and Barbara Malmberg, REX Development; Shelly Saczynski and Tom Cariglio, United Illuminating; Michael Piscitelli, City of New Haven; Betsy Yagla, Town of Woodbridge; Robert Fort, Workforce Alliance; John Field, DESSP; Pam Hypolite, CTRides; Atty. Nan Birdwhistell, Murtha Cullina; Riju Das, Legislative Aide to Senator Richard Blumenthal

1. Call to order and Introductions: Chairman Scott Jackson called the meeting to order at 10:07 a.m. All present introduced themselves.

2. Presentation: Report from the State Comptroller’s Office:

State Comptroller Kevin Lembo’s presentation included comments on the Partnership Plan for health insurance, electronic transfer for state payments, the Open CT data initiative, and this year’s budget surplus.

3. Adoption of January 22, 2014 SCRCOG meeting minutes: First Selectman McPherson presented the minutes as shown on pages 2-5 of the agenda packet. First Selectman McPherson moved that the minutes be approved. First Selectman Mazza seconded the motion. It was approved by all.

2

Page 3: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

4. Treasurer’s Report for month ending January 31, 2014: Mayor Blake presented the Treasurer’s Report which is on pages 6-7 of the agenda packet. The balance sheet shows that we have $425,819 in cash and investments and $262,854 due from CDOT for transportation planning. Expenses seemed appropriate for the month. First Selectman Freda moved for acceptance of the Treasurer’s Report. First Selectwoman Gorski seconded the motion, which carried unanimously.

5. Transportation Committee Report:

Mayor Dickinson presented the Transportation Committee Report contained on pages 8-11 of the agenda packet. Mayor Dickinson moved for the approval of 2012-2015 TIP Amendment Twenty Two. The resolution is found on pages 10-11 of the agenda packet. First Selectman Cosgrove seconded the motion. It passed unanimously. Mayor Dickinson reported on CDOT’s Local Transportation Capital Improvement Program (LOTCIP). Mayor Dickinson, First Selectman Freda and Senior Transportation Planner Stephen Dudley reviewed their continued efforts, working with the SCRCOG Transportation Committee, to seek simplification of the LOTCIP process. Pursuant to the DOT Commissioner’s suggestion, SCRCOG submitted two pilot projects utilizing a simpler application than that detailed in the LOTCIP guidelines. The project from Wallingford was accepted as it had previously been approved under the local bridge program. The project from Guilford was rejected, but a meeting with CDOT was offered to work further on it. SCRCOG is soliciting projects from the member municipalities for consideration under the LOTCIP program.

6. Annual Self-Certification: The resolution is found on page 12 of the agenda packet. Mayor Jackson moved for adoption of the resolution. First Selectwoman Scalettar seconded the motion. It was approved unanimously.

7. Adoption of Affirmative Action Policy Resolution (renewed annually): The resolution is found on pages 13-16 of the agenda packet. First Selectman McPherson moved for its adoption. First Selectman Freda seconded. It was approved unanimously.

8. Proposed SCRCOG Committee Structure: Executive Director Amento reviewed the proposed new committee structure, which is found on Pages 17-19 of the agenda packet. After discussion, Mayor Jackson moved for approval. First Selectwoman Scalettar seconded. The motion was approved unanimously.

9. FY 2014 Budget Amendment #2: The resolution is found on Page 26 of the agenda packet. First Selectman Zeoli moved for adoption of the resolution. First Selectman Cosgrove seconded the motion, which was approved unanimously.

10. Update on SCRCOG Shared Services Study: Executive Director Amento reported that he is close to completing the written report on SCRCOG’s Shared Services Study. The Regional Purchasing Advisory Council, consisting of the purchasing agents

3

Page 4: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

from the SCRCOG cities and towns, has met twice and is investigating consortium purchasing arrangements, electronic purchasing systems and a “buy local” initiative. SCRCOG is coordinating its work in the shared services area with CRCOG which recently released a Back Office Service Sharing Study (a summary of that study was distributed).

11. Congressional Report: Riju Das from Senator Blumenthal’s Office reported that Senator Blumenthal sits on the House Transportation Committee and has been very involved in efforts to promote greater safety measures to be implemented on the Metro North rail line. As a result, Metro North has appointed a Chief Safety Officer and has embarked on a 100-day plan to identify and implement needed safety improvements. The Senator was also involved in a federal minimum wage increase roundtable discussion last week in Connecticut.

12. State Legislative Report: Executive Director Amento distributed a 16-page report on General Assembly bills of interest to municipalities and the region as of February 25, 2014. The report also included a guide to the legislative process and legislative committee deadlines.

13. SCROG Executive Director’s Report: Executive Director Amento noted that some members still needed to submit resolutions of approval from their cities and towns for the SCRCOG application for a state Regional Performance Grant for further development of the Regional GIS Program. The forms need to be submitted by the end of March. Executive Director Amento thanked the mayors and first selectmen of the 7 coastal communities for submitting letters of support for the Hurricane Sandy Coastal Resilience Grant application which was submitted to the National Fish and Wildlife Foundation on January 31, 2014. SCRCOG is partnering with the Greater Bridgeport Regional Council and The Nature Conservancy on that grant application.

Executive Director Amento reported that he was asked to determine if SCRCOG member communities would like to host meetings for rail commuters to discuss issues with CDOT and Metro North officials. There was great interest expressed in hosting such meetings.

14. REX Development Report: Executive Director Ginny Kozlowski referred to her written report on page 23 of the agenda packet. The Brownfield Inventory Grant that was recently received will result in a searchable database of brownfields in the region.

15. DESPP/ DEMHS Report: John Field, Region 2 Coordinator, reported that DESPP has a new Commissioner, Dora Schriro. A big issue, of course, has been road salt shortages. Hazard Mitigation grants for Hurricane Sandy damage are still in process. There will be a statewide exercise on June 21 and June 23. Cities and towns should choose one of the two dates.

4

Page 5: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

16. CTRides Report: Pam Hypolite reviewed the 4th Quarter Report which was attached to the agenda packet.

17. Regional Cooperation/ Other Business: First Selectwoman Gorski requested advice on how other towns handle public skating on municipally-owned lakes and ponds. Various responses were given ranging from no municipal involvement to park and recreation or public works posting of warning or “skate at your own risk” signs. Mayor Jackson asked if the date of the next SCRCOG meeting, March 26th, which is the same date as “CCM’s Day on the Hill” would cause a conflict for anyone. No one reported a conflict.

18. Adjournment: First Selectman Mazza moved for adjournment. First Selectman Zeoli seconded the motion and all approved. The meeting adjourned at 11:15 a.m.

Respectfully submitted,

First Selectman Fillmore McPherson, Secretary

5

Page 6: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

 

                       

BALANCE SHEET - February, 2014

ASSETS

Cash and InvestmentsFirst Niagara Bank 314,357Connecticut Short-Term Investment Fund - SCRCOG 155,405Start Bank 100,000Total Cash and Investments 569,763

Accounts ReceivableMunicipal Dues - FY 13/14 15,000Connecticut Department of Transportation 124,101Connecticut Office of Policy & Management 62,500RPA - Sustainable Communities 3,477OPM - RPI Grants 9,851CT DEEP - Regional Hazard Mitigation Plan 0Amount for Accrued Leave 12,815Pre-Paid Expense & Other Receivables 18,538Total Accounts Receivable 246,281

Property and EquipmentCOG Equipment 34,468Total Property & Equipment 34,468

TOTAL ASSETS 850,512

LIABILITIES AND FUND BALANCE

LiabilitiesAccounts Payable 1,656Deferred Revenue - Municipal 51,233Deferred Revenue - GIA 107,050RPI Grant - GIS Project 2,282RPI Grant - Shared Services -14,855Total Current Liabilities 147,366

Fund BalanceFund Balance - July 1, 2013 691,817Amount for Accrued Leave 12,815Investment in Equipment 34,468Change in Fund Balance -35,954Fund Balance - February, 2014 703,145

TOTAL LIABILITIES AND FUND BALANCE 850,512 

 

 

 

 

 

6

Page 7: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

 

    

Statement of Resources and Expenditures - February, 2014

Resources FY 14 Budget To Date

Municipal Contribution 153,700 12,808 102,467SCRCOG Reserves - FY12/13 Transportation Match 11,810SCRCOG Reserves - (for ROOF) 10,000 0 10,000

ConnDOT - Transportation PlanningU.S. Dept of Transportation 909,015 57,519 441,086U.S. Dept of Transportation - FY12/13 94,480 0Connecticut Dept of Transportation 113,627 7,190 55,136Connecticut Dept of Transportation - FY12/13 11,810 0

Connecticut Office of Policy & ManagementRegional Planning 125,000 10,950 17,950RPI Grant - GIS Project 374,800 8,978 61,292RPI Grant - Shared Services 40,923 0 42,856

Federal Emergency Management AgencyHazard Mitigation Plan 60,400 0 19,779Municipal - In-Kind Contribution 7,177 0 0

Sustainable Communities GrantSustainable Communities Reg Planning Grant 21,100 766 11,758

Interest 1,200 19 166

TOTAL 1,935,042 98,229 762,490

Expenses FY 14 Budget To DateTotal Labor - Salaries & Benefits 638,683 421,337

Salaries 33,725 297,927Fringe Benefits 24,969 123,411

Travel 8,300 940 5,381Data Process 45,400 1,225 14,253General Operations 171,085 106,512

Rent 8,596 76,019Postage & Telephone 254 2,317Office Supplies 37 696Equipment Maintenance 733 11,365Publications 175 1,811Insurance & Professional Services 0 8,906Meeting Expenses & Advertising 406 4,715Miscellaneous & Equipment Use 0 637

Transportion Consultants 520,100 19,483 143,933FEMA - PreDisaster Mitigation Plan 35,000 0 32,835ROOF - Regional Foreclosure Protection 10,000 0 10,000Regional GIS Program 194,300 8,690 32,534Regional GIS Program - Orthoimagery 42,907 0 0Shard Services Study 30,000 1,530 21,070Regional Plan Assoc. - Envision Greater New Haven 80,000 0 0Regional Jobs Access Study 12,000 0 0Municipal Shared Services - Operations Study 19,000 0 0Contingencies 128,268 0 0TOTAL 1,935,042 100,763 787,856

Month of Feb, 2014

Month of Feb, 2014

 

7

Page 8: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

South Central Regional Council of Governments 2012-2015 TRANSPORTATION IMPROVEMENT PROGRAM Amendment Number 23

Project 0014-0177 2011-A21-1 Replace Bridge 02675 over Sybil Creek Changes Amendment 23 adjusts schedule and funding amounts for ROW.

Reason Rights of Way is increased based on final estimate. Construction phase is moved to FY15 based on revised schedule

Project 0014-0184 2012-A11-1 Shoreline Greenway Branford Changes Amendment 23 adjusts schedule and funding amounts Reason Final Design is moved from FY13 to FY14 and costs are increased to adequately fund the

design fees. Construction phase is moved and Federal Share decreased to offset design fee increase.

Project 0014-0185 2014-A23-1 Replace Bridge 00196 which carries I95 over Rte 1 Changes Amendment 23 adds a new project

Reason Project is for the full replacement of Bridge #00196 which carries I-95 over Rte 1. This bridge is rated in poor condition and is functionally obsolete due to piers being too close to the Route 1 travel lanes. Project will utilize NHPP-BRX funding.

Project 0043-0128 2013-A13-1 Replace Bridge 01665 O/ Farm River Changes Amendment 23 adds CON phase Reason Action is necessary to add funding for the construction phase of the project. Project will utilize

STPA-BRX funding.

Project 0059-0157 2011-A21-2 Replace Bridge 02677 over Stream Changes Amendment 23 moves ROW to FY14

Reason Rights of Way phase is moved from FY13 to FY14 based on revised schedule

Project 0059-0161 2012-A27-1 Long Hill Rd Reconstruction Changes Amendment 23 adds FD and ROW phases Reason Action is necessary to add funding for the Final Design and Rights of Way phases for the

project. Project to be funded under the STP-Urban program

Project 0059-0163 2014-A23-3 Culvert Rehab I95 o/Spinning Mill Brook Changes Amendment 23 adds a new project Reason Project for the rehab of a culvert carrying I-95 over Spinning Mill Brook in Guilford.

This job was part of 170-2875 but was removed due to delays in permitting

8

Page 9: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

South Central Regional Council of Governments 2012-2015 TRANSPORTATION IMPROVEMENT PROGRAM Amendment Number 23

Project 0083-0262 2011-A15-3 Naugatuck Avenue Drainage Changes Amendment 23 moves CON to FY14 and increases funding Reason Construction funds are increased based on final estimate. And in order for funds to be obligated

they must be shown in the appropriate fiscal year.

Project 0083-0263 2013-A18-8 Replace BR 06755 Rte 162 over Turtle Creek Changes Amendment 23 adds a new project Reason Project is for the full replacement of bridge #06755 which carries Rte 162 over Turtle Creek.

Bridge is structurally deficient due to condition of existing corrugated metal pipes. Original request was to use STP-Urban funds but now the project will utilize STPA-BRX funding.

Project 0092-0627 2010-001 I-95 Corridor Improvement Project- contract B2 Changes Amendment 23 moves funding from FY15 to FY14

Reason Action is necessary to maintain schedule and cover costs of the project. In order for funds to be obligated they must be shown in the appropriate fiscal year.

Project 0092-0666 2012-A10-4 Traffic Signal Upgrade @ 15 Locations Changes Amendment 23 adds FD and moves CON to FY15 Reason Action is necessary to add the Final Design Phase to the project with funding from the CMAQ

program. Construction phase is moved out one year based on revised schedule

Project 0138-0221 2001-025 I-95: Housatonic River Bridge Replacement Changes Amendment 23 adds STPA-BRX funds to FY14.

Reason Action is necessary to utilize funds which were programmed but not obligated in FY13. The funding is a combination of I-M, BRX, & NHS program funds.

Project 0170-3163 2012-A27-3 CE Bridge Inspection - Underwater on/off FY12-14 Changes Amendment 23 changes funding source from BRXZ to NHPP-BRX for FY14

Reason Under MAP-21, the On/Off System Bridges program (BRXZ), is now part of the National Highway Performance Program (NPHH-BRX). Action is necessary to reflect this change for FY14

Project 0170-3303 2014-A23-2 Replace Overhead Sign Supports Changes Amendment 23 adds project Reason Project is for the continued replacement of overhead sign supports (Statewide) due to

deterioration and exceeding useful life. Locations TBD based on priority list from Bridge Safety.

9

Page 10: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2011-A21-1State Project 0014-0177Municipality Branford

Project Name Replace Bridge 02675 over Sybil Creek

Description Project for the Replacement of Bridge 02675 which carries Rte 146 over Sybil Creek. Only ROW phase at this time

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY10 TIP Amend 21 introduces new project. FY12 TIP Amendment 5 increases ROW funds. FY12 Amend 10 moves ROW to FY13. FY12 TIP Amend 14 changes STPA to STPNH. FY TIP Amend 23 moves out project schedule out one year and increases ROW funds.

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

60ROW FederalSTPNH

15State

2,240CON FederalSTPA

560State

7500Total Cost $2,875 2,800 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

66ROW FederalSTPNH

16State

2,240CON FederalSTPA-BRX

560State

00TIP Funds $2,882 02,800820

10

Page 11: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2012-A11-1State Project 0014-0184Municipality Branford

Project Name Shoreline Greenway Branford

Description Project for the construction of a 3,000 ft trail in Branford to run from Young's Pond Park to existing trail adjacent to Tilicon Rd

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY 12 TIP Amend 11 adds new Project. FY12 TIP Amend 23 Adjusts schedule and funding amounts

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

60PD FederalHPP

15Local

40FD Federal

10Local

404CON Federal

196Local

12500Total Cost $725 600 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

60PD FederalHPP

15Local

70FD Federal

18Local

364CON Federal

236Local

00TIP Funds $763 06008875

11

Page 12: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2014-A23-1State Project 0014-0185Municipality Branford

Project Name Replace Bridge 00196 which carries I95 Over Rte 1

Description Full replacement of Bridge #00196 which carries I-95 over Rte 1. Bridge is rated poor and is functionally obsolete due to piers being too close to the Route 1 travel lanes

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY 12 TIP Amend 23 adds project

Proposed TIP Funding (In Thousands)2012 2013 2014 2015 FYI PriorFunding Phase

180PD FederalNHPP-BRX

20State

540FD Federal

60State

45ROW Federal

5State

6,300CON Federal

700State

00TIP Funds $7,850 7,0006502000

12

Page 13: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2013-A13-1State Project 0043-0128Municipality East Haven

Project Name Replace Bridge 01665 O/ Farm Riv

Description Replacement of bridge 01665 which carries Route 100 over the Farm River in East Haven

Current TIP Funding (In Thousands)

Proposed

Amendment NotesAmendment 14 introduces project. FY12 TIP Amend 23 adds CON phase

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

160ROW FederalSTPNH

40State

20000Total Cost $200 0 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

160ROW FederalSTPNH

40State

2,560CON FederalSTPA-BRX

640State

00TIP Funds $3,400 03,2000200

13

Page 14: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2011-A21-2State Project 0059-0157Municipality Guilford

Project Name Replace Bridge 02677 over Stream

Description Project for the Replacement of Bridge 02677 which carries Rte 146 over an un-named Stream. Only ROW phase at this time

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY10 TIP Amend 21 introduces new project. FY12 TIP Amend 14 moves ROW to FY13 and replaces STPA with STPNH.FY 12 TIP Amend 23 moves ROW to FY14

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

40ROW FederalSTPNH

10State

1,920CON FederalSTPA

480State

5000Total Cost $2,450 2,400 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

40ROW FederalSTPNH

10State

1,920CON FederalSTPA

480State

00TIP Funds $2,450 002,4500

14

Page 15: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2012-A27-1State Project 0059-0161Municipality Guilford

Project Name Long Hill Rd Reconstruction

Description 3600' of Long Hill Rd will be widened to 30', a new culvert installed @ Spinning Mill Brook and Right turn radius at Route 1 will be improved.

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFy 10 TIP Amend introduces new project. FY12 TIP Amend 23 adds FD and ROW phases

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

200PD FederalSTPNH

25Local

25State

02500Total Cost $250 0 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

200PD FederalSTPNH

25Local

25State

200FD Federal

25Local

25State

80ROW Federal

10Local

10State

2500TIP Funds $600 003500

15

Page 16: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2014-A23-3State Project 0059-0163Municipality Guilford

Project Name Culvert Rehab I95 o/Spinning Mill Brook

Description Project for the rehab of a culvert carrying I-95 over Spinning Mill Brook in Guilford. This job was part of 170-2875 but was removed due to delays in permitting

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY12 TIP Amend 23 adds a new project

Proposed TIP Funding (In Thousands)2012 2013 2014 2015 FYI PriorFunding Phase

1,305CON FederalNHPP-BRX

145State

00TIP Funds $1,450 1,450000

16

Page 17: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2011-A15-3State Project 0083-0262Municipality Milford

Project Name Naugatuck Avenue Drainage

Description Project is for improvements to the city owned and maintained Naugatuck Ave storm drainage system

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY 10 TIP Amend 15 introduces a new project. FY12 TIP includes ongoing project, FY12 TIP Amend 9 moves ROW to FY13. FY12 TIP Amend 23 moves CON to FY14 and increases cost.

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

376ENG FederalSTPBS

47Local

47State

40ROW Federal

5Local

5State

3,040CON Federal

380Local

380State

3,8500470Total Cost $4,320 0 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

376ENG FederalSTPBS

47Local

47State

40ROW Federal

5Local

5State

3,528CON Federal

441Local

441State

0470TIP Funds $4,930 004,41050

17

Page 18: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2013-A18-8State Project 0083-0263Municipality Milford

Project Name Replace BR 06755 Rte 162 over Turtle Creek

Description Replacement of bridge #06755 which carries State Route 162 over Turtle Creek. Bridge is Structurally deficient due to Serious condition of existing metal pipe arches

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY 12 TIP Amend 23 adds project to be funded with STPA-BRX funding rather than STP-Urban

Proposed TIP Funding (In Thousands)2012 2013 2014 2015 FYI PriorFunding Phase

60PD FederalSTPA-BRX

15State

60FD Federal

15State

256ROW Federal

64State

1,280CON Federal

320State

00TIP Funds $2,070 1,600395750

18

Page 19: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2010-001State Project 0092-0627Municipality New Haven

Project Name I-95 Corridor Improvement Project- contract B2

Description Project No. 92-627, Contract B2, involves the construction of the I-95 SB West approach and river piers to the new Pearl Harbor Memorial Bridge. This project will be advertised with Project No. 92-531 Contract E,

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY10 TIP introduces new project. FY10 TIP Amend 5 adds NHS funds, FY10 TIP Amend 9 moves funds into FFY10. FY12 TIP includes ongoing project. FY12 TIP Amend 7 moves funds from FY13 to FY12. FY12 TIP Amend 16 changes funding source to NHPP-BRX. FY12 TIP Amend 23 moves $6.5 M FED from FY15 to FY14

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

20,200CON FederalBRXZ

3,018State

31,197 25,230 12,000FederalNHPP-BRX

4,041 2,803 1,333State

35,23823,2180Total Cost $99,822 28,033 13,333 0

2012 2013 2014 2015 FYI PriorFunding Phase

20,200CON FederalBRXZ

3,018State

31,197 31,730 5,500FederalNHPP-BRX

4,041 3,526 611State

23,2180TIP Funds $99,823 06,11135,25635,238

19

Page 20: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2012-A10-4State Project 0092-0666Municipality New Haven

Project Name Traffic Signal Upgrade @ 15 Locations

Description Project is for the upgrade of substandard and antiquated traffic signal in New Haven for compatability with the City's Central Operating System

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY12 Amend 10 introduces new project. FY12 TIP Amend 23 adds FD and moves CON to FY15

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

310PD FederalCMAQ

2,525CON Federal

31000Total Cost $2,835 2,525 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

310PD FederalCMAQ

140FD Federal

2,525CON Federal

00TIP Funds $2,975 02,525140310

20

Page 21: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2001-025State Project 0138-0221Municipality Regional

Project Name I-95: Housatonic River Bridge Replacement

Description Replace the current six-lane bridge with a new structure to the north (west) of the existing bridge though complicated by proximity to Metro North. FY02 includes $500,000 (total) ROW. Approximately four year construction period.

Current TIP Funding (In Thousands)

Proposed

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

0CON AC-EntryBRXZ

26,000 26,000Federal

2,889 2,889State

0AC-EntryI-M

20,000 11,500Federal

2,222 1,278State

950FederalI-MD

39,500FederalNHPP-BRX

4,389State

0AC-EntryNHS

9,000Federal

1,000State

0AC-EntrySTPBS

4,000Federal

444State

100,00052,0610Total Cost $152,061 0 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

0CON AC-EntryBRXZ

26,000 26,000Federal

2,889 2,889State

0AC-EntryI-M

20,000 11,500Federal

2,222 1,278State

950FederalI-MD

39,500FederalNHPP-BRX

4,389State

0AC-EntryNHS21

Page 22: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

Amendment Notes FY07 TIP Amend 19 increases cost 18%. Region instructed to update TIP. FY10 TIP Amend 12 moves this project into the current TIPFY10 TIP 18 moves BRXZ funds from FY12 to FY11. FY10 TIP Amend 19 moves IMD to FY2012, FY10 TIP Amend 20 moves I-M from FY2013 to FY2011, FY10 TIP Amend 21 adjusts funding for FY12, FY12 amend 4 adjusts funding for fy12, FY12 TIP Amend 6 moves funds from FY13 to FY12. FY12 TIP Amend 11 adds NHPP eliminates IM and BRX for FY13. FY12 TIP Amend 12 add IM and BRX funds for FY13. FY12 TIP Amend 16 changes sources of funding. FY12 TIP Amend 23 add STPA-BRX funds to FY14. This funding is a combination of I-M, BRX, & NHS funds, programmed but not obligated in FY13.

9,000Federal

1,000State

20,000FederalSTPA-BRX

2,222State

0AC-EntrySTPBS

4,000Federal

444State

52,0610TIP Funds $174,283 0022,222100,000

22

Page 23: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2012-A27-3State Project 0170-3163Municipality Statewide

Project Name CE Bridge Inspection - Underwater on/off FY12-FY14

Description Project will provide for the underwater inspection of bridges statewide for Fiscal years 2012 -2014. replace project 170-2868 which expires 6/30/2012

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY10 TIP Amend 27 introduces new project FY12 TIP Amend 23 changes funding source for FY14

Proposed TIP Funding (In Thousands)

2012 2013 2014 2015 FYIPriorFunding Phase

0OTH AC-EntryBRXZ

880 880 880Federal

220 220 220State

1,1001,1000Total Cost $3,300 1,100 0 0

2012 2013 2014 2015 FYI PriorFunding Phase

0OTH AC-EntryBRXZ

880 880Federal

220 220State

880FederalNHPP-BRX

220State

1,1000TIP Funds $3,300 001,1001,100

23

Page 24: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

FFY2012-FFY2015 Transportation Improvement Program23

South Central Regional Council of Governments

Amendment

SCRCOG # 2014-A23-2State Project 0170-3303Municipality Statewide

Project Name Replace Overhead Sign Supports

Description Project is for the continued replacement of overhead sign supports(Statewide) due to deterioration and exceeding useful life. Locations TBD based on priority list from Bridge Safety.

Current TIP Funding (In Thousands)

Proposed

Amendment NotesFY 12 TIP Amend 23 adds project

Proposed TIP Funding (In Thousands)2012 2013 2014 2015 FYI PriorFunding Phase

152PD FederalNHPP

38State

8FD Federal

2State

3,200CON Federal

800State

00TIP Funds $4,200 04,0101900

24

Page 25: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future

Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge

Carl J. Amento, Executive Director

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

Resolution Fiscal Year 2012-Fiscal Year 2015 Transportation Improvement Program Amendment Twenty Three Whereas: U.S. Department of Transportation “Metropolitan Planning Regulations” (23 CFR

450) prescribe that each metropolitan planning organization maintain a financially constrained multi-modal transportation improvement program consistent with a State Implementation Plan for Air Quality (SIP) conforming to both U.S. Environmental Protection Administration-established air quality guidelines and SIP-established mobile source emissions budgets; and

Whereas: The Council, per 23 CFR 450.324 and in cooperation with the Connecticut

Department of Transportation (ConnDOT) and public transit operators and relying upon financial constraints offered by ConnDOT, adopted a Fiscal Year 2012-Fiscal Year 2015 Transportation Improvement Program on January 25, 2012, after finding the Program conforming per U.S. Environmental Protection Administration (U.S. EPA) final conformity rule (40 CFR 51 and 93) and relevant Connecticut Department of Transportation air quality conformity determinations: Air Quality Conformity Reports: Fiscal Year 2012-2015 Transportation Improvement Program and the Region’s Long-Range Transportation Plans—2011 to 2040, (April, 2011); and

Whereas: The Council, on January 25, 2012, indicated that periodic Program adjustment or

amendment was possible; and Whereas: Projects referenced in the Program amendment (below) are consistent with the

region’s long-range transportation plan (South Central Regional Long Range Transportation Plan—2011 to 2040, (April, 2011)); and

Whereas: Council Public Participation Guidelines: Transportation Planning have been

observed during the development of the proposed Program amendment (below); and Whereas: By agreement between the Council and the Connecticut Department of

Transportation, public involvement activities carried out by the South Central Regional Council of Governments in response to U.S. Department of Transportation metropolitan planning requirements are intended to satisfy the requirements associated with development of a Statewide Transportation Improvement Program and/or its amendment; and

Whereas: Council of Governments’ review of transportation goals, projects and opportunities

may result in further adjustment or amendment of the Program.

25

Page 26: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future

Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge

Carl J. Amento, Executive Director

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

Resolution Fiscal Year 2012-Fiscal Year 2015 Transportation Improvement Program Amendment Twenty Three (continued) Now, Therefore, Be It Resolved By the Council of Governments:

The Program Amendment Twenty Three shall be transmitted to the Connecticut Department of Transportation, for inclusion in the State Transportation Improvement Program

The undersigned duly qualified and acting Secretary of the South Central Regional Council of Governments certifies that the foregoing is a true and correct copy of a resolution adopted at a legally convened meeting of the South Central Regional Council of Governments on March 26, 2014

Date: March 26, 2014. By: ____________________________________ First Selectman Fillmore McPherson, Secretary South Central Regional Council of Governments

26

Page 27: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

Descriptions of New SCRCOG Committees

Background:

• At the March meeting, the SCRCOG Board approved a new committee structure going forward.

• The Executive Committee and the Transportation Committee will remain the same. • The Open Space Committee and the Public Safety/ Domestic Preparedness Committee

will cease to exist. • It is recommended that the three new committees (Emergency Management/ Hazard

Mitigation; Land Use & Environment; and Municipal Services) and the new Subcommittee of the Executive Committee (Administrative & Personnel) be organized and constituted for the next fiscal year beginning July 1, 2014.

• The Nominating Committee can solicit nominations for the new committees, and SCRCOG members can express their interest in serving on the new committees to the Nominating Committee.

Committee Descriptions:

• Emergency Management/Hazard Mitigation Committee This Committee will advise SCRCOG staff and make recommendations to the Executive Committee or the SCRCOG Board in the areas of Emergency Management and Hazard Mitigation. In particular, the Committee can serve as a means for issues and problems involving emergency management and arising at the municipal level to be discussed and resolved. Also, in the emergency management area, the committee can meet with state and regional emergency management officials and discuss issues of preparedness, resources, grants, and training. Regarding the Hazard Mitigation portion of the Committee’s charge, the Committee can help coordinate the recently completed Multi-Jurisdiction Hazard Mitigation Plan with the five individual municipal plans with an eye towards updating all or most of the plans at the same time. All of the Hazard Mitigation Plans contain specific projects identified for implementation. The Committee can work with SCRCOG staff and state DEEP and FEMA officials to ensure that the region obtains maximum advantage in funding and resources for project implementation. The Committee will provide input to SCRCOG staff regarding priorities for grant applications which can be pursued on a regional or multi-town basis to prevent flooding and storm damage and to promote resilience especially along the coastline.

27

Page 28: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

• Land Use & Environment Committee This Committee will advise SCRCOG staff and make recommendations to the Executive Committee or the SCRCOG Board in the areas of Land Use and Environmental Protection. In particular, the Committee can support the regional Land Use planning efforts of SCRCOG with regard to the Regional Plan of Conservation and Development, model zoning regulations to address specific issues, Transit-Oriented Development planning, affordable housing plans. The Committee can ensure that SCRCOG is responsive in the areas of Land Use Planning and Environmental Protection to the issues confronting the municipalities. The Committee can meet with state DEEP officials and state and regional planners, or legislators to discuss issues of development, conservation, watershed protection, storm water and green infrastructure planning, vegetation management, clean water funding and priorities for the development of data layers on the Regional GIS program. The Committee will provide input to SCRCOG staff regarding priorities for grant applications which can be pursued on a regional or multi-town basis.

• Municipal Services Committee This Committee will advise SCRCOG staff and make recommendations to the SCRCOG Board in the areas of municipal shared services and regional services. The State has increased funding significantly for COGs to encourage municipalities to share services and operations and to provide such services in a cost-effective and higher quality manner on a multi-town or regional basis. The first such effort by SCRCOG was the 10-municipality Hazard Mitigation Plan which was funded by a grant to the region and resulted in a multi-jurisdictional plan which serves as the precondition for implementation grants to mitigate identified hazards. Next, SCRCOG has embarked on a region-wide GIS program, also funded by a state grant, which will assist all the SCRCOG member municipalities in increasing their GIS capabilities. The grant-funded SCRCOG Shared Services Study will identify opportunities for the region or groups of municipalities in the region to provide services on a shared or regional basis. The Committee will help determine the priorities for funding and implementation of such projects.

• Administrative & Personnel Subcommittee This Subcommittee of the Executive Committee will make recommendations to the Executive Committee on administrative and personnel issues internal to SCRCOG’s operations. The Committee will advise SCRCOG staff and make recommendations to the SCRCOG Executive Committee in the areas of SCRCOG administration, operation, and personnel issues. Specifically, the Committee will review SCRCOG’s internal organization, leadership, functions, personnel policies, benefit structure, employee performance evaluations, and salary structure.

28

Page 29: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future

Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge

Carl J. Amento, Executive Director

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

MEMORANDUM

To: SCRCOG Mayors and First Selectmen From: Christopher Rappa Re: Community Contacts Date: March 19, 2014 SCRCOG regularly reviews its public participation and outreach efforts to improve effectiveness in reaching those portions of the region’s population that might not normally participate in transportation planning efforts. We would appreciate your help in identifying those organizations in your municipality which could be utilized to expand outreach to all segments of your communities. Please provide a list of the organizations and contact persons which represent various segments of your communities. We will incorporate these contacts into our distribution lists as part of our ongoing efforts to solicit increased public participation in the transportation planning process. Thank you for your assistance in this matter. If you have any questions, please contact me at 203-466-8610 or [email protected].

29

Page 30: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future

Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge

Carl J. Amento, Executive Director

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

Resolution Authorizing Partnership with The Nature Conservancy for Grant Application

to develop a Greater New Haven Regional Coastal Resiliency Plan Whereas: The Community Foundation for Greater New Haven is sponsoring a competitive solicitation for Responsive Grants for organizational support and projects that serve its region; Whereas: The Nature Conservancy has requested the South Central Regional Council of Governments to partner with them to apply for a $100,000 grant, which will include up to $30,000 of in-kind SCRCOG contribution and would enable the two organizations to develop a Greater New Haven Regional Coastal Resiliency Plan; Whereas: The Nature Conservancy will be the lead applicant/fiduciary for the grant; Whereas: The South Central Regional Council of Governments will expend up to $30,000 in in-kind contribution (from FY 2014-2015 and FY 2015-2016 State Grant-in-Aid) over a two-year period; Whereas: The South Central Regional Council of Governments is in support of: (1) the partnership with The Nature Conservancy; (2) the application for a grant from the Community Foundation for Greater New Haven; (3) the in-kind match; and (4) the goal of creating a Greater New Haven Regional Coastal Resiliency Plan; Now, Therefore, Be It Resolved By the Council of Governments The South Central Regional Council of Governments’ Executive Director is hereby authorized to be a partner with the Nature Conservancy for a $100,000 grant to fund the costs of developing a Greater New Haven Regional Coastal Resiliency Plan; Be It Further Resolved By the Council of Governments Its Executive Director is authorized to provide in-kind contribution match from FY 2014-2015 and FY 2015-2016 State Grant-in-Aid in a combined total not to exceed $30,000 over the two-year lifespan of the grant. Certificate The undersigned duly qualified and acting Secretary of the South Central Regional Council of Governments certifies that the foregoing is true and correct copy of a resolution adopted at a legally convened meeting of the Council of Governments on March 26, 2014. Date: March 26, 2014. By: _______________________________________ First Selectman Fillmore McPherson, Secretary South Central Regional Council of Governments

30

Page 31: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

195 Church Street, 14th Floor, New Haven, CT 06510 T 203 821 3682 F 203 821 3683 www.rexdevelopment.org

BETHANY BRANFORD EAST HAVEN GUILFORD HAMDEN MADISON MERIDEN MILFORD

NEW HAVEN NORTH BRANFORD NORTH HAVEN ORANGE WALLINGFORD WEST HAVEN WOODBRIDGE

Executive Director’s Report – March 19, 2014 Ginny Kozlowski

Brownfield Projects • Executed Grant Agreement on Hamden Incubator Site • 43 Atwater Assessment, Bethany – Submitted Grant Request to DECD for Assessment Funding • Developing Regional Brownfield Site Inventory for future EPA funding Business Development – Retention/Attraction • Executing Memoranda of Understanding with Team Leaders for the Regional Action Agenda – on-going • Continuing to work with a number of bioscience/life science companies looking to locate/expand in the

region • Moving forward on the establishment of a New Market Tax Credit and EB-5 programs • Regional Performance Incentive Grant Study – Final Stages of Next Street Buy Local Study launched in

December – on-going • Continuing work with the Regional Purchasing Council in conjunction with COG • Co-hosting a Regional Housing Group Summit with David Fink, Policy Director, Partnership for Strong

Communities, UIL Holdings and The Greater New Haven Community Loan Fund – April 3 • Preparing for Envision Greater New Haven project

Marketing • Attending BioMed Boston Trade Show • Attending MDM 2014 Trade Shoe - June • Hosting 14 German Travel Operators – May 17 • Executive Summary of the 2013 CEDS • Completing 2014-15 Cultural & Visitor Guide • Updated the downtown New Haven map • Created new Grid New Haven website • Collaborating with Market New Haven for video screen advertising at Tweed New Haven Regional Airport • Collaborating with Market New Haven and Park New Haven to promote art/museums in Crown & Temple

St. garages • Created B&B website for CLA • Created Bike, B&B Trail through CLA with Kip Bergstrom

Media Hits: • Hartford Business Journal

Media Inquiries: • AAA • Cars, Travel, Food Blog • Visit New England • Fox61 • Arrive Magazine

31

Page 32: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

STATE OF CONNECTICUT DEPARTMENT OF EMERGENCY SERVICES & PUBLIC PROTECTION

DIVISION OF EMERGENCY MANAGEMENT & HOMELAND SECURITY

25 Sigourney Street, 6th floor, Hartford, CT 06106 Phone: 860.256.0800 / Fax: 860.256.0815

An Affirmative Action/Equal Employment Opportunity Employer

DEMHS Region 2 Area Coordinator John B. Field Jr. Re: March 2014 COG Report Planning/Preparedness Local Emergency Operations Plans (LEOP): The Region 2 Office continues to perform reviews of the 2013 LEOP for each of their communities. Unfortunately we have only received twelve (12) out of thirty (30) communities LEOPs for review. It is required for certain grants that we review these plans annually. So please encourage your emergency managers to submit their LEOPs for review if they have not yet done so. Training/Exercises: The Region 2 Office is working on multiple exercise and training initiatives. Region 2 animal control officers and emergency managers held a tabletop exercise on February 25th in Seymour. It was well attended and a after-action report is currently being developed. Region 2 personnel participated in the Annual Millstone exercise held on March 12th in Waterford. Representatives from local, state and federal agencies participated in a hostile invasion of the Millstone facility. The City of New Haven serves as a host community for people evacuated within the planning/evacuation zone. A after-action report is currently being developed. Region 2 personnel will be participating in next week’s four (4) day Mass Casualty Incident Training/Exercise involving the Yale University and the City of New Haven. More information may be provided next month. The Governor’s 2014 Exercise Preparedness Planning Initiative (EPPI) will be held June 21st and 23rd. Communities are requested to participate on one of the planned two days. Documents pertaining to the details of the exercise have and will continue to be forwarded. If you are not receiving the related information please feel free to contact the Region 2 Office. DEMHS is performing its first presentation of the CT School Emergency Planning Training Program. This Program will be offered in all five (5) regions within the next couple of months. The Program will provide guidance to community representatives who will be working on developing the All-Hazards School Emergency response Plan which will be required under State Statute. The Annual DEMHS/CCM Emergency Management Conference will be held May 6th. The event is being held at the Crown Plaza Hotel in Cromwell. Sign up to attend utilizing the CCM website. http://programs.ccm-ct.org/Calendar/events-training.aspx/Events%20and%20Training/2014/5/6/5213

32

Page 33: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

25 Sigourney Street, 6th floor, Hartford, CT 06106 Phone: 860.256.0800 / Fax: 860.256.0815

An Affirmative Action/Equal Opportunity Employer

Grants: The 2010/2011 Emergency Management Grant Program (EMPG) has been closed as of March 20th. Region 2 personnel will be working with the communities to begin completion of reimbursements for the 2011/2012 FY Grant. We will also continue to provide visits to communities needing assistance with the EMPG Grant Program. The focus is to have every community participate and receive funds identified for the community. Please do not hesitate to contact the Region 2 Office if your community is not participating and would like to start. Sheltering/Evacuation: Pack-N-Plays (Play pens) are being distributed to designated communities. These items will be utilized in your shelters when infants are present. If your community was designated to receive these items and have not done so yet please contact the Region 2 Office for guidance. Shoreline community evacuation maps have been updated and draft copies were distributed for review and comment. The evacuation maps are now being finalized based on the comments received. The Technical Advisory Sub-Committee of the State Innerops Committee has reviewed the three (3) proposals for the Region 2 communications equipment returned to the State following lack of assignment by the Region 2 REPT. The Technical Advisory Committee provided each party submitting a proposal an opportunity to present the details of their proposals. Committee members then scored each presentation on its merit and regional utilization, then providing a recommendation to the Deputy Commissioner for final approval. We are awaiting the Deputy Commissioner’s final decision on the communication equipment allocation. Response: Region 2 personnel provided assistance with the recent salt shortage. Serving as a liaison for CT DOT we provided guidance to acquiring the needed salt. DEMHS is developing CEO and EMD list serves to be utilized by State representatives when extending important information. These list serves will enhance important communications when needed. Mitigation/Recovery FEMA and CT continue to work on Public Assistance reimbursement of funds with communities affected by most recent disasters. Milford Deputy EMD Bill Richards has been appointed the Regional Long-Term Recovery Coordinator for DEMHS Region 2. DEMHS and the communities continue to work on Hazard Mitigation Grant Program applications. The State’s Interagency Hazard Mitigation Grant Review Committee had identified mitigation projects but were asked by the Governor to reassess their initial decision based on the needs of homeowners attempting to reoccupy their homes. At that time the communities were asked to assist in prioritization of the projects from their community. The deadline for the grant applications is March 29, 2014.

33

Page 34: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

25 Sigourney Street, 6th floor, Hartford, CT 06106 Phone: 860.256.0800 / Fax: 860.256.0815

An Affirmative Action/Equal Opportunity Employer

Application submittals for the 1st tranche of Community Development Block Grant (CDBG) for Disaster Recovery funds are currently being accepted. This tranche of funds was designated for critical infrastructure and public facilities damaged during Hurricane Sandy in Fairfield, New Haven, New London and Middlesex counties. The deadline for these applications is April 28th. There will be a 2nd tranche of CDBG funds coming in the future. Region 2 personnel continue to provide assistance as needed. Please do not hesitate to contact the Region 2 Office at any time. Respectfully submitted: John B. Field Jr. DEMHS Region 2 Emergency Management Area Coordinator P.O. Box 2794 1111 Country Club Road Middletown, CT 06457 (860)685-8105 Office (860)685-8366 Fax (860)250-3453 Cell (860)708-0748 24-Hour Pager [email protected]

34

Page 35: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

SOUTH CENTRAL CONNECTICUT

Regional Planning Commission

127 Washington Avenue, 4th Floor West, North Haven, CT 06473

www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]

March 2014 Action Table

Ref. # Received Description Adjacent RPC Towns Abridged RPC Action

2.1 02/27/2014

Town of Clinton: Proposed Zoning Regulation Amendments pertaining to Farms and Farming Operations, specifically Section 1.4, Section 3, Section 26.4, and Schedule 24

Madison

By resolution, the RPC has determined that the Proposed Zoning Regulation Amendments do not appear to cause any negative inter-municipal impacts to the towns in the South Central Region. There is potential for negative impacts to the habitat or ecosystem of the Long Island Sound due to the limitation of the setback requirement in Section 26.4.6 (2) to only water bodies from which water is taken for human consumption. Please consider making the 100’ setback requirement to be applicable to any body of water which flows into the Long Island Sound.

2.2 02/27/2014 Town of Branford: Small Cities Grant Application

East Haven, Guilford, North Branford

By resolution, the RPC recommends that the Department of Community and Economic Development award the Town of Branford a grant to fund renovations and improvements to Parkside Village I and II. The proposal is consistent with and meets important housing goals identified in the South Central Regional Plan of Conservation and Development of providing a diverse and affordable housing stock.

2.3 03/06/2014

Town of Hamden: Proposed Zoning Regulation Amendment: Section 670.5 – Temporary Moratorium on the Issuance of Zoning Permits for Student Housing

Bethany, New Haven, North Haven, Wallingford, Woodbridge

By resolution, the RPC has determined that the Proposed Zoning Regulation Amendment does not appear to cause any negative inter-municipal impacts to the towns in the South Central Region nor do there appear to be any impacts to the habitat or ecosystem of the Long Island Sound.

3.1 2014 Officers and Executive Committee Members

Chairman: Kevin DiAdamo, New Haven Vice Chair: Douglas Combs, North Branford Secretary: James Giulietti, North Haven Executive Committee: Kevin DiAdamo, New Haven Douglas Combs, North Branford James Giulietti, North Haven Charles Andres, Branford Peggy Rubens-Duhl, Woodbridge Christopher Traugh, Madison Christopher Suggs, West Haven

35

Page 36: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal
Page 37: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM

NEW HAVEN - EAST HAVEN - BRANFORD, CT

STATE PROJECT NO. 92-505

Record of Decision Transit and Transportation System Management (TSM) Components

Summary Report January 2012 – December 2013

Prepared For:

Submitted By:

Connecticut Department of Transportation 2800 Berlin Turnpike Newington, Connecticut 06111

Parsons Brinckerhoff 500 Winding Brook Drive Glastonbury, CT 06033

Page 38: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM New Haven – East Haven – Branford

ROD Transit and Transportation System Management (TSM) Requirements January 2012 – December 2013

i

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM

NEW HAVEN – EAST HAVEN – BRANFORD, CT

Record of Decision

Transit and Transportation System Management (TSM) Components Summary Report

January 2012 – December 2013 The I-95 New Haven Harbor Crossing (NHHC) Corridor Improvement Program (‘Program’) is one of Connecticut’s largest multi-modal transportation improvement initiatives. The program includes operational, safety and capacity improvements to over 7 miles of Interstate 95, including a new signature bridge over New Haven Harbor. In addition to new and upgraded Shore Line East commuter rail stations, there are numerous Transit and Transportation System Management (TSM) components included as part of the program.

The Federal Highway Administration Record of Decision for Interstate 95 New Haven Harbor Crossing Pearl Harbor Memorial Bridge (Q-Bridge) (‘ROD’), dated August 1999, (Section 1.2 (pp. 3-4)), documents the Transit and TSM commitments.

This report summarizes the current status of the implementation of the Transit and TSM components.

A report from the Program Commitment Database with commitments of regional interest that have been implemented throughout the construction of the various Program Projects is also included. They are as follows:

• Considerations to pedestrians and bicyclists • Construction of permanent roadside noise barriers • Minimizing construction noise levels • Coordination with municipalities, neighborhoods and other stakeholders • Providing alternate travel routes • Protection of the traveling public through the use of detailed maintenance and protection of traffic

plans during construction.

Also included is a NuRide Report for people who commute into and out of New Haven County. NuRide is an online ridematching and recording system that allows users to earn rewards for sharing rides. A reward can be earned whenever ride is shared or traffic on the roads is reduce, by way of - transit, vanpooling, carpooling, bike or walk – or even telecommuting or using a compressed work week schedule. The report counts the cumulative effort of people that are recording their rides in order to earn rewards, not the actual overall ridership, which is nearly impossible to count for some modes of travel.

Page 39: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM New Haven – East Haven – Branford

ROD Transit and Transportation System Management (TSM) Requirements January 2012 – December 2013

ii

Summary of ROD Requirement Findings The following is an overview and analysis, where possible, of the data related to the Transit and TSM Commitments. It accompanies the following charts and graphs and details ridership and related data as well as changes in ridership over time and changes in service that have been implemented to accommodate the changes, and some service changes that have resulted in increased ridership.

Shore Line East – Total # of Riders by Year

Since 2001, there have been numerous changes in service as a result of increased ridership and resulting in increased ridership: Expanded service on weekends and holidays (Summer 2008); Service to Stamford including Metro-North New Haven Line stops (SLE Express - one-seat/one-ride) (2002); Expanded midday weekday service; and Weekday service to New London was recently added.

An additional 136 SLE passengers took the bus from Union Station eastbound in summer of 2010 due to track construction.

Total number of riders per year does not include State Street Rail Station riders. Shore Line East service into State Street Station commenced in June 2002 (see ROD Requirement: Commuter Rail Station at State Street for additional station related statistics).

Shore Line East – Total # of Riders by Month for Weekend & Holiday Service

The spike in July ridership is due to Independence Day travel and Sailfest activities in the New London area in 2012. Additional trains have been scheduled during July to accommodate the increased ridership.

Shore Line East – Average # of Daily Riders for Weekday and Weekend & Holiday Service

The spike in July ridership is due to Independence Day travel and Sailfest activities in the New London area in 2012. Additional trains have been scheduled during July to accommodate the increased ridership.

Shore Line East – State Street Station – Average # of Daily Riders by Quarter

Shore Line East service into State Street Station commenced June 2002.

Shore Line East – State Street Station – Average # of Daily Riders by Month

The Union Station Shuttle, which started in December 2010, is a free weekday service connecting rail passengers using Union Station to additional off-site parking locations, including the Temple Street Garage and the parking lot at the former Coliseum site. All shuttle trips extend to the New Haven Green, creating easy connections to all other CTTRANSIT local bus routes in New Haven. The Union Station Shuttle runs continuously every 20 minutes, from 6:05 AM until 10:15 PM, Monday through Friday.

CTTransit – “S” Route – Monthly Ridership and Average Daily Riders

The ‘S’ Route was once operated by DATTCO and “interlined” with their Old Saybrook to Hartford express bus service (interlining is when a bus would run as the “S” to Old Saybrook, and then make the run up to Hartford as the express, and only be available to run the reverse route on the S when it returned – thus constraining the schedule). At some point in the past, this interlining no longer made sense and since around 2010 the route is operated by CTTRANSIT NH Division. Because the interlining no longer exists, there was more flexibility to change the scheduling and better align it with connecting services which may explain some of the ridership gains.

CTTransit – “F” and “G” Routes – Average Daily Riders

A major winter storm in February 2013 resulted in a drop in ridership.

Improved Transit and Carpool/Vanpool Marketing

Recent changes in the State’s Vanpool service providers have created a discrepancy in the most recent (2013) Vanpool data. New service providers are no longer required to give exact statistics for detailed Vanpool data such as a breakdown of the number of Vanpool Riders in the Corridor or the number of Vanpool seats.

Page 40: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM New Haven – East Haven – Branford

ROD Transit and Transportation System Management (TSM) Requirements January 2012 – December 2013

iii

Improved Access to Transit Information – Schedules and Brochures

The Total Number of Announcements Sent represents announcements which are sent out to the Program-maintained distribution list for weekly construction activities, holiday construction notifications, event notifications, and additional special announcements as needed. In addition to Program Announcements, the Program responds to any questions or comments received from the public. This statistic is the Number of Inquiry Responses sent out by the Program through email.

Improved Access to Transit Information – Website Visits

CTTransit data represents average monthly visits to the routes and the schedule listing pages of website only. The apparent large drop in website visitors between 2012 (5,923/mo) and 2013 (1,305/mo) is most likely the result of a technological data tracking issue rather than an actual drop in website visitors.

CTTransit has indicated that their overall site traffic has actually increased quite a bit, yet most visitors access the site using their mobile devices and the website is not able to track these visitors. Mobile technology has also provided visitors with alternatives to CTTransit’s online PDF format timetables, such as Trip Planner and Google Transit, along with other similar mobile apps.

The drop in CTRides website visits beginning in July 2013 was due to the end of advertising.

Improved Access to Transit Information – Phone Calls

In July 2013, SLE switched to a new phone service that is no longer able to distinguish between after-hours calls for Shore Line East and calls for CTRides.

The spike in CTRides calls in February 2012 is a result of the beginning of the campaign as well as a number of inclement winter weather days. Phone data for CTRides for the months of March-May and September-December of 2013 is unavailable due to changes in the data that AT&T provides.

CTTransit no longer supports the means to accurately determine the number of calls to Customer Service.

Optimized Flextime/Voluntary Rideshare (HOV) Preferential Parking/Guaranteed Ride Home

Employers were contacted and presented with a marketing information program for all options. The Program is presented to the clients as a comprehensive overview that covers the following related programs/options:

• Optimized flextime/telecommuting

• Voluntary Rideshare Programs

• Guaranteed Ride Program

• NuRide Program

Therefore, the data reflected in the ROD Requirement for each of these aspects is the same figure since an individual break out of each is not possible.

The large discrepancy between the 2012 and 2013 figures is due to change in what types of data are collected. The 2012 figure represents the total number of meetings, calls, and drop in’s. The 2013 figure represents the total number of meetings and presentations conducted, as call data is no longer being collected due to new changes in CTRides’ tracking procedures.

In 2012 there were 433 new employee meetings. In 2013 there were 200 new employee meetings.

Insurance Breaks ($40) for Rideshare (HOV)/Transit

The Insurance contacted were companies licensed to write auto insurance policies in the state.

Page 41: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

298,829

345,206

385,501405,436

423,470

458,070483,578

568,144 557,497584,524

603,297 605,102631,534

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Shore Line East Total # of Riders by Year

2001 2002 2003 2004 2005 2006 2007 2008 2009 *2010 2011 2012 2013Total Riders 298,829 345,206 385,501 405,436 423,470 458,070 483,578 568,144 557,497 584,524 603,297 605,102 631,534Difference 15.5% 11.7% 5.2% 4.4% 8.2% 5.6% 17.5% -1.9% 4.8% 3.2% 0.3% 4.4%

ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

298,829

345,206

385,501405,436

423,470

458,070483,578

568,144 557,497584,524

603,297 605,102631,534

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Shore Line East Total # of Riders by Year

1

Page 42: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 20 20 21 19 20 19 23 22 21 21 21 22Total Weekday Riders

35,563 42,547 44,503 36,140 41,033 38,233 46,505 45,332 46,599 44,457 43,895 47,578

2011 - 2012 Diff.2012 - 2013 Diff.

19.6% -1.3%-2.5%13.5%

January February March April

4.6% -6.8% 2.8% 8.4%

May June July August

ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

35,56336,140

46,50544,457

47,01549,576

44,684 46,53545,939

47,76144,850

41,82942,547

41,033

45,332 43,89544,639

45,242

47,647 48,794

41,941

44,06541,557

36,803

44,503

38,233

46,59947,578

45,868

45,742

47,350

51,896

44,186

49,473

41,64644,654

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

Shore Line East Total # of Riders by Month for Weekday Service2011 Weekday Riders by Month 2012 Weekday Riders by Month 2013 Weekday Riders by Month

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 22 22 22 21 20 20 21 21 22 23 22Total Weekday Riders

47,015 44,639 45,868 49,576 45,242 45,742 44,684 47,647 47,350 46,535 48,794 51,896

2011 - 2012 Diff.2012 - 2013 Diff.

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 19 20 21 20 23 20 20 19 21 18 21Total Weekday Riders

45,939 41,941 44,186 47,761 44,065 49,473 44,850 41,557 41,646 41,829 36,803 44,654

2011 - 2012 Diff.2012 - 2013 Diff.

YearDays of Service

2011 - 2012 Difference2012 - 2013 Difference

-5.1% -8.7% 6.6%

Jan-Dec Totals2011 2012 2013253 247 252

-8.7%5.4%

-7.7%12.3%

Total Weekday Riders

4.6%

530,854 523,495 547,728-1.4%

December

-12.0%

November

2.8% 1.1%

May June July August

September October

4.9%

-7.3%

-0.6% 6.4%

0.2% 21.3%

ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

35,56336,140

46,50544,457

47,01549,576

44,684 46,53545,939

47,76144,850

41,82942,547

41,033

45,332 43,89544,639

45,242

47,647 48,794

41,941

44,06541,557

36,803

44,503

38,233

46,59947,578

45,868

45,742

47,350

51,896

44,186

49,473

41,64644,654

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

Shore Line East Total # of Riders by Month for Weekday Service2011 Weekday Riders by Month 2012 Weekday Riders by Month 2013 Weekday Riders by Month

2

Page 43: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 11 11 10 9 9 7 8 9 10 9 9 8Total Weekend & Holiday Riders

5,576 6,034 5,860 5,095 5,336 4,144 4,505 5,231 6,128 5,263 5,986 4,721

2011 - 2012 Diff.2012 - 2013 Diff.

8.2% 4.7% 16.1% 13.7%-2.9%

January April

-22.3% 17.1% -21.1%

February March

ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

5,576 5,095 4,5055,263

6,941

5,969

8,578

5,035

5,3465,900

7,4826,753

6,0345,336 5,231

5,986

6,201

6,549

11,226

5,815

8,407

5,161

6,640

9,021

5,860 4,144

6,128

4,721

5,127

7,751

10,9198,804

7,879

5,489

8,8298,155

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

Shore Line East Total # of Riders by Month for Weekend & Holiday Service 

2011 Total Riders 2012 Total Riders 2013 Total Riders

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 10 9 9 8 9 10 10 10 10 8 8 9Total Weekend & Holiday Riders

6,941 6,201 5,127 5,969 6,549 7,751 8,578 11,226 10,919 5,035 5,815 8,804

2011 - 2012 Diff.2012 - 2013 Diff.

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 9 11 10 10 8 8 10 10 11 10 13 10Total Weekend & Holiday Riders

5,346 8,407 7,879 5,900 5,161 5,489 7,482 6,640 8,829 6,753 9,021 8,155

2011 - 2012 Diff.2012 - 2013 Diff.

YearDays of ServiceTotal Riders2011 - 2012 Difference2012 - 2013 Difference

-2.7%18.4%15.5%

August

9.7%-10.7%

July

30.9%

JuneMay

-17.3%

112 116 11272,443 81,607 83,806

51.4%

December

33.6%

November

-11.3%

12.6%2.7%

September October

57.3% -12.5%-6.3% 6.4%

2011 2012 2013Jan-Dec Totals

-9.6%33.0%

ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

5,576 5,095 4,5055,263

6,941

5,969

8,578

5,035

5,3465,900

7,4826,753

6,0345,336 5,231

5,986

6,201

6,549

11,226

5,815

8,407

5,161

6,640

9,021

5,860 4,144

6,128

4,721

5,127

7,751

10,9198,804

7,879

5,489

8,8298,155

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

Shore Line East Total # of Riders by Month for Weekend & Holiday Service 

2011 Total Riders 2012 Total Riders 2013 Total Riders

3

Page 44: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

1,901 1,967 2,040

2,198

2,3562,316

2,356 2,180

2,267 2,3422,348

2,131

2,128 2,061

2,0822,108

2,043 2,217

2,525

2,207

2,220

2,245 2,215

2,115

2,120 2,037

2,220

2,165

2,1212,315 2,336

2,416

2,203

2,1372,258

2,145

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

Shore Line East Average # of Daily Riders for Weekday Service2011 Average Daily Riders 2012 Average Daily Riders 2013 Average Daily Riders for

2,295

Shore Line East Average # of Daily Riders for Weekend & Holiday Service 

2011 Average Daily Riders 2012 Average Daily Riders 2013 Average Daily Riders

ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

1,901 1,967 2,040

2,198

2,3562,316

2,356 2,180

2,267 2,3422,348

2,131

2,128 2,061

2,0822,108

2,043 2,217

2,525

2,207

2,220

2,245 2,215

2,115

2,120 2,037

2,220

2,165

2,1212,315 2,336

2,416

2,203

2,1372,258

2,145

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

Shore Line East Average # of Daily Riders for Weekday Service2011 Average Daily Riders 2012 Average Daily Riders 2013 Average Daily Riders for

724842

563

584694

746 780

694596 590

906

819

772

970

580

665 700

727

2,295

727

765649

794

859

761883

678

589 583709

1,433

839

675644

862

752

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

Shore Line East Average # of Daily Riders for Weekend & Holiday Service 

2011 Average Daily Riders 2012 Average Daily Riders 2013 Average Daily Riders

4

Page 45: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Commuter Rail Station at State Street - CONSTRUCTION COMPLETEDConstruct a new commuter rail passenger station stop on State Street, between Court and Chapel Streets in New Haven. This station will serve rail commuters who desire more direct access to downtown New Haven. The new State Street station stop would be in addition to stops currently served by the Shore Line East commuter rail service (New Haven to New London).

RIDERSHIP WILL CONTINUE TO BE MONITORED.

254223

272

219

226

268 271

374

231

161187

173 176

240

265

206

144179

258

185

297

368

285

436

253226

261248

187

255

235

248

Q1‐10 Q2‐10 Q3‐10 Q4‐10 Q1‐11 Q2‐11 Q3‐11 Q4‐11 Q1‐12 Q2‐12 Q3‐12 Q4‐12 Q1‐13 Q2‐13 Q3‐13 Q4‐13

State Street Commuter Rail StationShore Line East Average # of Daily Riders by Quarter

Average Daily Riders Westbound Average Daily Riders Eastbound

ROD Requirement: Commuter Rail Station at State Street - CONSTRUCTION COMPLETEDConstruct a new commuter rail passenger station stop on State Street, between Court and Chapel Streets in New Haven. This station will serve rail commuters who desire more direct access to downtown New Haven. The new State Street station stop would be in addition to stops currently served by the Shore Line East commuter rail service (New Haven to New London).

RIDERSHIP WILL CONTINUE TO BE MONITORED.

254223

272

219

226

268 271

374

231

161187

173 176

240

265

206

144179

258

185

297

368

285

436

253226

261248

187

255

235

248

Q1‐10 Q2‐10 Q3‐10 Q4‐10 Q1‐11 Q2‐11 Q3‐11 Q4‐11 Q1‐12 Q2‐12 Q3‐12 Q4‐12 Q1‐13 Q2‐13 Q3‐13 Q4‐13

State Street Commuter Rail StationShore Line East Average # of Daily Riders by Quarter

Average Daily Riders Westbound Average Daily Riders Eastbound

5

Page 46: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Commuter Rail Station at State Street - CONSTRUCTION COMPLETEDConstruct a new commuter rail passenger station stop on State Street, between Court and Chapel Streets in New Haven. This station will serve rail commuters who desire more direct access to downtown New Haven. The new State Street station stop would be in addition to stops currently served by the Shore Line East commuter rail service (New Haven to New London).

RIDERSHIP WILL CONTINUE TO BE MONITORED.

234238

222

181

137

166

211

182 167 178161

179

249 249 262231

225

222

267

245

270280

240

223

177187

163

208 221

292

262276

256 245210

164

198

186

177

242 274

249

225

225

256254

243

248

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

State Street Commuter Railroad StationShore Line East Average # of Daily Riders by Month

2012 Avg Daily Riders Westbound 2012 Avg Daily Riders Eastbound

2013 Avg Daily Riders Westbound 2013 Avg Daily Riders Eastbound

ROD Requirement: Commuter Rail Station at State Street - CONSTRUCTION COMPLETEDConstruct a new commuter rail passenger station stop on State Street, between Court and Chapel Streets in New Haven. This station will serve rail commuters who desire more direct access to downtown New Haven. The new State Street station stop would be in addition to stops currently served by the Shore Line East commuter rail service (New Haven to New London).

RIDERSHIP WILL CONTINUE TO BE MONITORED.

234238

222

181

137

166

211

182 167 178161

179

249 249 262231

225

222

267

245

270280

240

223

177187

163

208 221

292

262276

256 245210

164

198

186

177

242 274

249

225

225

256254

243

248

Jan Feb  Mar Apr May Jun Jul Aug  Sep Oct Nov Dec

State Street Commuter Railroad StationShore Line East Average # of Daily Riders by Month

2012 Avg Daily Riders Westbound 2012 Avg Daily Riders Eastbound

2013 Avg Daily Riders Westbound 2013 Avg Daily Riders Eastbound

Commuter Connection buses pick up at State Street in the morning and drop off at Union Station in the afternoon/evening.

6

Page 47: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Bus ServiceContinue to provide bus service between Branford and New Haven via the Tomlinson (Route 1) Bridge at service levels in operation at the time of the start of construction. This will include service on Connecticut Transit Routes F & G. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

378 397

346 378 378361

397346

378 378 378318331

389

415

423 395

470437 461 456 447 454

375390 379

391

433 434389

410 421 395432

381 360

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CTTransit "S" Route Average ‐ Daily Riders2011 2012 2013

7,7337,365

8,470 7,733 7,733 8,1027,365

8,4707,733 7,733 7,733 9,206

8,2779,729

11,216

10,576 10,270

12,21610,925

12,44210,940

11,185

10,4339,381

10,144

8,33310,170

11,263 11,2869,719

10,666 11,3639,488

11,668

9,525 9,010

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CTTransit "S" Route ‐Monthly Ridership2011 2012 2013

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 25 26 20 25 22 23 27 26 21 25 26Total Riders 7,733 8,277 10,144 7,365 9,729 8,333 8,470 11,216 10,170 7,733 10,576 11,263

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 26 26 22 26 25 20 25 26 23 27 27Total Riders 7,733 10,270 11,286 8,102 12,216 9,719 7,365 10,925 10,666 8,470 12,442 11,363

Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 24 24 21 25 27 21 23 25 25 25 25Total Riders 7,733 10,940 9,488 7,733 11,185 11,668 7,733 10,433 9,525 9,206 9,381 9,010

YearDays of ServiceTotal Riders

Jan-Dec Totals

May

April

July AugustJune

January February March

DecemberNovemberSeptember October

2011 2012 2013259 303 305

95,377 127,590 122,635

ROD Requirement: Bus ServiceContinue to provide bus service between Branford and New Haven via the Tomlinson (Route 1) Bridge at service levels in operation at the time of the start of construction. This will include service on Connecticut Transit Routes F & G. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

378 397

346 378 378361

397346

378 378 378318331

389

415

423 395

470437 461 456 447 454

375390 379

391

433 434389

410 421 395432

381 360

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CTTransit "S" Route Average ‐ Daily Riders2011 2012 2013

7,7337,365

8,470 7,733 7,733 8,1027,365

8,4707,733 7,733 7,733 9,206

8,2779,729

11,216

10,576 10,270

12,21610,925

12,44210,940

11,185

10,4339,381

10,144

8,33310,170

11,263 11,2869,719

10,666 11,3639,488

11,668

9,525 9,010

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CTTransit "S" Route ‐Monthly Ridership2011 2012 2013

7

Page 48: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Bus ServiceContinue to provide bus service between Branford and New Haven via the Tomlinson (Route 1) Bridge at service levels in operation at the time of the start of construction. This will include service on Connecticut Transit Routes F & G. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

865

794724

683

706

904

804876

928 965 1,001955

736

809 728

766

723792 770

907

895831

763

768

821

500

658

803829

802 791700

841

836

682

808

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CTTransit F Route ‐ Average Daily Riders(2nd Tuesday of Month)

2011 2012 2013

950

CTTransit G Route ‐ Average Daily Riders(2nd Tuesday of Month)

2011 2012 2013

ROD Requirement: Bus ServiceContinue to provide bus service between Branford and New Haven via the Tomlinson (Route 1) Bridge at service levels in operation at the time of the start of construction. This will include service on Connecticut Transit Routes F & G. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.

865

794724

683

706

904

804876

928 965 1,001955

736

809 728

766

723792 770

907

895831

763

768

821

500

658

803829

802 791700

841

836

682

808

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CTTransit F Route ‐ Average Daily Riders(2nd Tuesday of Month)

2011 2012 2013

494

556

769

581

717

923

805

567

704

746

732

686

667

950

667

761

695

729 714647

693

790

580

791721

300

532

709666

718 715550

588

712

579 457

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CTTransit G Route ‐ Average Daily Riders(2nd Tuesday of Month)

2011 2012 2013

8

Page 49: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

Year

20122013

Year

20122013

Year20122013

Distribution of I-95 Brochures

1,200

# of Vanpool Riders in Corridor # of Vanpool Seats

Total # of New Brochures:

# of Vans in Corridor11 31

Distribution of SLE Schedules

Total # of Announcements Sent:

Total # of Inquiries Responded to:

Total # of Presentations:

Total # of Regular Schedules Distributed:

220,000210,000

Total # of Sailfest Schedules Distributed:

25,00018,000

1,7931,435

Van Service

75,884122,654

3248

1984

(Data Unavailable) (Data Unavailable)

2528

I-95 Webletters Public Information Presentations

Total # of Attendees:

2,500

ROD Requirement: Improved Transit and Carpool/Vanpool MarketingMarketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.

ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.

ROD Requirement: Improved Transit and Carpool/Vanpool MarketingMarketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.

ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.

9

Page 50: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Improved Transit and Carpool/Vanpool Marketing Marketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.

ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.

52,687 52,01154,858

51,680

66,10867,436

84,955

78,452

56,323 51,01956,157

60,249

43,38241,722

45,244

54,67962,841

75,132

66,897 67,822

53,187

57,144

64,978

62,059

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Jan FebMar AprMay Jun Jul Aug Sep Oct Nov Dec

Website Visits2012 I‐95 NHHCCI Program 2013 I‐95 NHHCCI Program 2012 CTTransit 2012 CTRides

2012 Shore Line East 2013 CTTransit 2013 CTRides 2013 Shore Line East

Year 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013Shore Line East 31,743 37,307 30,342 38,407 32,943 41,143 36,704 36,744 41,028 45,760 47,820 53,413CTRides 3,882 12,713 3,736 10,941 4,351 10,699 9,013 11,386 12,492 14,030 11,697 10,706CTTransit 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305I-95 NHHCIP 1,834 1,362 1,721 1,358 2,027 1,711 3,039 2,245 3,398 5,013 9,692 2,012Monthly Totals 43,382 52,687 41,722 52,011 45,244 54,858 54,679 51,680 62,841 66,108 75,132 67,436

Year 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013Shore Line East 52,282 68,920 53,660 67,020 39,783 47,022 40,019 42,120 45,242 47,775 44,613 52,502CTRides 5,895 5,829 6,174 7,406 5,886 6,287 7,819 5,924 12,333 5,302 10,278 5,276CTTransit 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305I-95 NHHCIP 2,797 8,901 2,065 2,721 1,595 1,709 3,383 1,670 1,480 1,775 1,245 1,166Monthly Totals 66,897 84,955 67,822 78,452 53,187 56,323 57,144 51,019 64,978 56,157 62,059 60,249

2012 Total Yearly Website Visits:2013 Total Yearly Website Visits:

JunJan Feb Mar Apr May

DecNov OctSepAugJul

695,091731,930

ROD Requirement: Improved Transit and Carpool/Vanpool Marketing Marketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.

ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.

52,687 52,01154,858

51,680

66,10867,436

84,955

78,452

56,323 51,01956,157

60,249

43,38241,722

45,244

54,67962,841

75,132

66,897 67,822

53,187

57,144

64,978

62,059

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Jan FebMar AprMay Jun Jul Aug Sep Oct Nov Dec

Website Visits2012 I‐95 NHHCCI Program 2013 I‐95 NHHCCI Program 2012 CTTransit 2012 CTRides

2012 Shore Line East 2013 CTTransit 2013 CTRides 2013 Shore Line East

10

Page 51: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Improved Transit and Carpool/Vanpool Marketing Marketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.

ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.

2,923

2,402

855 835 841

3,406

3,030

3,621

574 653 537 610

1,294

5,181

2,170

2,631

3,195 3,076

3,167 3,483

3,0542,876

3,850

2,668

J F b M A M J J l A S O t N D

Jan FebMar AprMay Jun Jul Aug Sep Oct NovDec

Phone Calls 

2012 CTRides 2012 Shore Line East 2013 CTRides 2013 Shore Line East

Phone CallsYear 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013

Shore Line East 1,242 930 717 1,028 684 855 817 835 923 841 1,024 1,216CTRides 52 1,993 4,464 1,374 1,486 0 1,814 0 2,272 0 2,052 2,190Monthly Totals 1,294 2,923 5,181 2,402 2,170 855 2,631 835 3,195 841 3,076 3,406

Phone CallsYear 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013

Shore Line East 1,038 790 1,063 736 812 574 1,107 653 1,064 537 826 610CTRides 2,129 2,240 2,420 2,885 2,242 0 1,769 0 2,786 0 1,842 0Monthly Totals 3,167 3,030 3,483 3,621 3,054 574 2,876 653 3,850 537 2,668 610

36,64520,287

2012 Total Yearly Phone Calls:

Jan Feb

2013 Total Yearly Phone Calls:

AugJul DecNov OctSep

MayMar Apr Jun

ROD Requirement: Improved Transit and Carpool/Vanpool Marketing Marketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.

ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.

2,923

2,402

855 835 841

3,406

3,030

3,621

574 653 537 610

1,294

5,181

2,170

2,631

3,195 3,076

3,167 3,483

3,0542,876

3,850

2,668

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Jan FebMar AprMay Jun Jul Aug Sep Oct NovDec

Phone Calls 

2012 CTRides 2012 Shore Line East 2013 CTRides 2013 Shore Line East

11

Page 52: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

ROD Requirement: Optimized FlextimeEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) with a marketing information program about the employer voluntarily providing flextime work schedules. Ongoing or periodic reviews and surveys will be made to ascertain the level of participation; adjustments to the program will be made to concentrate on the most productive types of employees.

ROD Requirement: Voluntary Rideshare (HOV) Preferential ParkingEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) with a marketing information program about the employer voluntarily providing preferential parking for rideshare (HOV) participants. Ongoing or periodic reviews and surveys will be made to ascertain the level of participation; adjustments to the program will be made to concentrate on the most productive types of employees.

ROD Requirement: Guaranteed Ride HomeEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) to set up a program in which the employer would voluntarily provide for documented rideshare (HOV/transit) riders taxi or equivalent service to the home from the workplace in the event of certain unusual or emergency conditions comprising up to one percent of workdays.

5,041 5,041 5,041

996 996 996

Total Employers Contacted2012 2013

ROD Requirement: Optimized FlextimeEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) with a marketing information program about the employer voluntarily providing flextime work schedules. Ongoing or periodic reviews and surveys will be made to ascertain the level of participation; adjustments to the program will be made to concentrate on the most productive types of employees.

ROD Requirement: Voluntary Rideshare (HOV) Preferential ParkingEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) with a marketing information program about the employer voluntarily providing preferential parking for rideshare (HOV) participants. Ongoing or periodic reviews and surveys will be made to ascertain the level of participation; adjustments to the program will be made to concentrate on the most productive types of employees.

ROD Requirement: Guaranteed Ride HomeEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) to set up a program in which the employer would voluntarily provide for documented rideshare (HOV/transit) riders taxi or equivalent service to the home from the workplace in the event of certain unusual or emergency conditions comprising up to one percent of workdays.

Optimized Flextime/Telecommuting Voluntary Rideshare (HOV)/Preferential Parking

Guaranteed Ride Program

5,041 5,041 5,041

996 996 996

Total Employers Contacted2012 2013

12

Page 53: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford

ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013

467 Companies were contacted between June 2002 and

December 2002

# of Insurance Companies Contacted

THIS COMMITMENT HAS BEEN FULFILLED

ROD Requirement: Insurance Breaks ($40) for Rideshare (HOV)/TransitAll insurance providers serving the region will be approached by ConnDOT or its representative to set up a program in which the insurance company would voluntarily provide an annual rebate to auto insurance policy holders who could document regular transit or HOV use.

13

Page 54: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

New

Hav

en -

Eas

t Hav

en -

Bra

nfo

rdM

ITIG

AT

ION

ME

AS

UR

ES

AN

D P

RO

GR

AM

C

OM

MIT

ME

NT

DA

TA

BA

SE

I- 9

5 N

ew H

aven

Har

bor

Cro

ssin

g C

orri

dor

Impr

ovem

ent P

rogr

am

3/18

/201

4O

VE

RV

IEW

The

Rec

ord

of D

ecis

ion

(Aug

ust

, 199

9) fo

r the

I-95

New

Hav

en H

arbo

r Cro

ssin

g (P

age

35; S

ectio

n 6.

Mon

itorin

g an

d En

forc

emen

t) st

ipul

ates

that

to a

ssur

e co

mm

itmen

ts m

ade

in th

e FE

IS/4

(f) a

nd th

e R

OD

are

inco

rpor

ated

into

fina

l des

ign

plan

s and

con

stru

ctio

n, a

des

ign

and

cons

truc

tion

man

agem

ent c

onsu

ltant

has

bee

n re

tain

ed b

y C

onnD

OT

. D

esig

n re

finem

ents

w

ill a

lso

be re

view

ed fo

r env

ironm

enta

l sen

sitiv

ity.

Spec

ific

miti

gatio

n co

mm

itmen

ts a

re m

ade

in th

e FE

IS/4

(f),

Cha

pter

4 f

ollo

win

g th

e di

scus

sion

of e

ach

impa

ct.

The

se c

omm

itmen

ts

are

sum

mar

ized

in th

e FE

IS/4

(f) E

xecu

tive

Sum

mar

y. M

itiga

tion

to c

ultu

ral r

esou

rces

is a

lso

cont

aine

d in

the

M.O

.A. c

onta

ined

in A

ppen

dix

B o

f the

FIE

S/4(

f). T

raff

ic n

oise

m

itiga

tion

will

be

prov

ided

in a

ccor

danc

e w

ith c

ondi

tions

as

desc

ribed

in th

e FE

IS/4

(f) (

Cha

pter

4, p

ages

4-9

5 th

roug

h 4-

106)

. All

cons

truc

tion

activ

ities

will

be

cont

inuo

usly

mon

itore

d by

the

FHW

A, C

onnD

OT

, and

DEP

. C

onst

ruct

ion

activ

ities

will

be

cond

ucte

d in

acc

orda

nce

with

regu

lato

ry p

erm

it st

ipul

atio

ns a

nd B

est M

anag

emen

t Pra

ctic

es f

or th

e pr

otec

tion

of th

e en

viro

nmen

t. Th

e pu

rpos

e of

this

Co

mm

itm

ent D

atab

ase

is to

satis

fy th

e m

onito

ring

and

enfo

rcem

ent s

ectio

n of

the

ROD

by

track

ing,

on

a pe

r con

trac

t bas

is, a

ll of

the

com

mitm

ents

iden

tifie

d in

the

FEIS

/RO

D.

Seve

ral a

dditi

onal

cat

egor

ies

of c

omm

itm

ents

, suc

h as

“C

ity o

f New

Hav

en”

com

mitm

ents

, are

als

o tra

cked

in th

e da

taba

se.

The

data

base

con

tain

s, fo

r eac

h co

mm

itm

ent,

a de

scrip

tion

of th

e co

mm

itmen

t, a

uniq

ue ID

num

ber,

the

refe

renc

e do

cum

ent (

FEIS

/RO

D) a

nd p

age,

the

Prog

ram

con

trac

ts th

e co

mm

itmen

t app

lies

to, t

he d

esig

n/co

nstru

ctio

n sta

tus

and

impl

emen

tatio

n du

e da

te, t

he lo

catio

ns w

ithin

the

desi

gn d

ocum

ents

whe

re th

e co

mm

itmen

t is a

ddre

ssed

, and

the

parti

es

resp

onsi

ble

for

inco

rpor

atin

g th

e co

mm

itmen

t int

o th

e fin

al d

esig

n pl

ans

and

the

cons

truc

tion.

Com

mitm

ents

that

app

ly to

the

I-95

Pro

gram

on

a co

rrid

or-w

ide

basi

s ar

e de

sign

ated

as

“Pro

gram

(92-

505)

” un

der t

he “

Con

tract

/Sta

te P

roje

ct N

umbe

r“ fi

eld.

T

rack

ing

The

Man

agem

ent C

onsu

ltant

trac

ks th

e id

entif

ied

com

mitm

ents

dur

ing

desig

n to

ens

ure

the

com

mitm

ents

hav

e be

en in

corp

orat

ed in

to th

e fin

al d

esig

n pl

ans.

The

man

ner i

n w

hich

co

mm

itmen

ts h

ave

been

add

ress

ed in

the

cont

ract

pla

ns a

nd sp

ecifi

catio

ns a

re c

onfir

med

and

doc

umen

ted

in th

e da

taba

se u

nder

the “

Des

ign

Doc

umen

t Loc

atio

ns”

field

. W

hen

adeq

uate

ly a

ddre

ssed

, the

com

mitm

ent i

s m

arke

d as

“Co

mpl

eted

” un

der

the

“Des

ign

Stat

us”

field

. So

me

com

mitm

ents

are

“cl

osed

out

” du

ring

the

desi

gn p

hase

and

, the

refo

re, n

ot tr

acke

d du

ring

the

cons

truct

ion

phas

e. O

ther

com

mitm

ents

are

trac

ked

and

“clo

sed

out”

dur

ing

the

cons

truc

tion

phas

e. W

hen

adeq

uate

ly a

ddre

ssed

, the

se c

omm

itmen

ts a

re m

arke

d as

“C

ompl

eted

” un

der t

he “

Con

stru

ctio

n St

atus

” fi

eld.

A li

tera

l rea

ding

of

each

com

mitm

ent w

as u

sed

in d

eter

min

ing

whe

ther

a c

omm

itmen

t was

trac

ked

duri

ng d

esig

n on

ly o

r thr

ough

the

cons

truct

ion

phas

e al

so.

Clo

se-O

ut

Whe

n a

cont

ract

com

mitm

ent i

s “c

lose

d ou

t” in

the

desi

gn p

hase

, thi

s sig

nifie

s th

at th

e co

mm

itmen

t has

bee

n ad

dres

sed

in th

e de

sign

and

that

the

com

mitm

ent w

ill n

ot b

e tra

cked

dur

ing

cons

truc

tion.

In

this

cas

e a

chec

k m

ark

is p

lace

d in

the

“Cls

d D

sn”

box

(i.e.

clo

sed

in d

esig

n) in

the

data

base

.

Whe

n a

cont

ract

com

mitm

ent i

s “c

lose

d ou

t” in

the

cons

truc

tion

phas

e, th

is s

igni

fies t

hat t

he c

omm

itmen

t has

bee

n ad

dres

sed

duri

ng c

onst

ruct

ion.

In

this

cas

e a

chec

k m

ark

is p

lace

d in

th

e “C

lsd

Cns

” bo

x (i

.e. c

lose

d in

con

stru

ctio

n) in

the

data

base

. It

shou

ld b

e n

oted

tha

t a c

ontr

act

com

mitm

ent

is e

ithe

r “cl

osed

out

” du

ring

the

desi

gn

pha

se O

R th

e co

nst

ruct

ion

pha

se,

but n

ever

bot

h.

Con

stru

ctio

n P

hase

Env

iron

men

tal P

roce

sses

C

ompl

ianc

e w

ith p

rogr

am c

omm

itmen

ts is

add

ress

ed th

roug

h th

e co

ntra

ct d

ocum

ents

, env

iron

men

tal p

erm

its, a

nd c

onst

ruct

ion

phas

e en

viro

nmen

tal p

roce

sses

incl

udin

g bu

t not

lim

ited

to: C

TDO

T / C

TD

EEP

MO

U –

On

Site

CT

DE

EP R

epre

sent

ativ

e, I

nspe

ctio

n R

epor

ting

Proc

ess,

Cha

nge

to W

ork

/ Per

mit

Rev

isio

ns P

roce

ss, E

mer

genc

y R

espo

nse

Spill

/ R

elea

se

Proc

edur

e, E

nvir

onm

enta

l Rev

iew

Mee

tings

, MPT

Mee

tings

/ C

oord

inat

ion

Proc

ess,

TMP

Rev

iew

and

Upd

ates

, Bic

ycle

and

Ped

estri

an Im

prov

emen

ts, a

nd P

ublic

Out

reac

h.

This

repo

rt w

as p

rinte

d on

3/1

8/20

14 5

:36:

43 P

M

Page 55: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

New

Hav

en -

Eas

t Hav

en -

Bra

nfo

rdM

ITIG

AT

ION

ME

AS

UR

ES

AN

D P

RO

GR

AM

C

OM

MIT

ME

NT

DA

TA

BA

SE

This

repo

rt w

as p

rinte

d on

3/1

8/20

14 5

:36:

44 P

M

Thi

s re

port

con

tain

s 19

6 co

mm

itm

ents

.

I- 9

5 N

ew H

aven

Har

bor

Cro

ssin

g C

orri

dor

Impr

ovem

ent P

rogr

am

3/18

/201

4

GGLL

OOSS

SSAA

RRYY

OOFF

TTEE

RRMM

SS

TTEE

RRMM

DD

EEFF

IINNIITT

IIOONN

ID #

Un

ique

num

ber i

dent

ifica

tion

for

eac

h co

mm

itmen

t

Com

mit

men

t Br

ief n

ame

of c

omm

itm

ent

Des

crip

tion

Com

mitm

ent d

escr

iptio

n pa

raph

rase

d fr

om r

epor

t, p

rim

arily

from

mul

tiple

sou

rces

(Not

e: S

ee s

ourc

e fo

r fu

ll de

scri

ptio

n.)

Stat

us-

Des

ign

and

Con

stru

ctio

n Cu

rren

t lev

el of

com

plet

ion

– D

esig

n/C

onst

ruct

ion

Pha

se: “

On-

Hol

d,”

“Pen

ding

” [s

tart

of f

inal

de

sign

/con

stru

ctio

n], “

On-

goin

g,”

“Com

plet

ed”

PD

Pr

elim

inar

y D

esig

n

FD

P Fi

nal D

esig

n Pl

ans

ADV

Ad

vert

isem

ent d

ate

for

cont

ract

CCD

Co

nstr

ucti

on C

ompl

etio

n D

ate

TB

D

To

Be

Det

erm

ined

Res

pons

ible

Par

ty- D

esig

n an

d C

onst

ruct

ion

Resp

onsi

ble p

arty

for i

mpl

emen

tati

on o

f com

mitm

ent i

n co

ntra

ct d

ocu

men

ts a

nd in

fiel

d

Ref

eren

ce D

ocu

men

t and

Pag

e Num

ber

Repo

rt(s)

whe

re c

omm

itm

ent i

s sp

ecifi

cally

men

tione

d an

d pa

ge n

umbe

rs

Due

Dat

e- D

esig

n an

d C

onst

ruct

ion

Tim

e or

desc

ript

ion

whe

n co

mm

itm

ent s

houl

d be

add

ress

ed in

Des

ign

Com

men

ts o

r in

Fie

ld

Impl

emen

tati

on C

omm

ents

An

y co

mm

ents

rela

ted

to im

plem

enta

tion

of C

omm

itmen

t D

esig

n D

ocum

ent L

ocat

ions

- C

ontr

act

Plan

s and

Sp

ecif

icat

ions

De

sign

Doc

umen

t(s) w

here

com

mitm

ent h

as b

een

inco

rpor

ated

or

addr

esse

d

Pro

gram

(92-

505)

Re

fers

to c

omm

itm

ents

that

do

not s

pecif

ical

ly a

pply

to a

pro

gram

cont

ract

or

appl

y to

the

prog

ram

in

a gen

eral

sen

se.

NTC

No

tice t

o C

ontr

acto

r

FE

IS

Fina

l Env

iron

men

tal I

mpa

ct S

tate

men

t (M

ay, 1

999)

RO

D

Reco

rd o

f Dec

isio

n (A

ugus

t, 1

999)

MO

A

Mem

oran

dum

of

Agr

eem

ent b

etw

een

Con

nDO

T a

nd S

HPO

(M

ay, 1

999)

TIP

Am

endm

ent S

ix

Tran

spor

tatio

n Im

prov

emen

t Pla

n A

men

dmen

t Six

(Apr

il, 1

999)

Page 56: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

New

Hav

en -

Eas

t Hav

en -

Bra

nfor

dM

ITIG

AT

ION

ME

AS

UR

ES

AN

D P

RO

GR

AM

C

OM

MIT

ME

NT

DA

TA

BA

SE

Thi

s re

port

con

tain

s 19

6 co

mm

itm

ents

.

I- 9

5 N

ew H

aven

Har

bor

Cro

ssin

g C

orri

dor

Impr

ovem

ent P

rogr

am

3/18

/201

4

NO

TE: T

he F

EIS/

RO

D c

ateg

ory

entit

led

"Ene

rgy"

is n

ot in

clud

ed.

It's t

wo

com

mitm

ents

- Tr

ansi

t and

TSM

Com

pone

nts,

and

Con

stru

ctio

n Tr

affic

Man

agem

ent P

lan

- are

list

ed u

nder

the

cate

gorie

s "Tr

ansi

t and

TSM

Ele

men

ts"

and

"Pro

gram

C

omm

itmen

ts,"

resp

ectiv

ely.

Cat

egor

y O

rder

:T

rans

it an

d TS

M E

lem

ents

Hig

hway

Com

pone

nts

Oth

er C

onsi

dera

tions

/Rel

ated

Pro

ject

s/Stu

dies

P

rogr

am C

omm

itmen

ts

Env

iron

men

tal M

itig

atio

n –

Lan

d U

se

Env

iron

men

tal M

itig

atio

n –

Soci

oeco

nom

ics

Env

iron

men

tal M

itig

atio

n –

Inst

ituti

onal

Res

ourc

es a

nd P

ublic

4(f

) Lan

ds

Env

iron

men

tal M

itig

atio

n –

Farm

land

E

nvir

onm

enta

l Mit

igat

ion

– H

isto

ric

Res

ourc

es/S

ecti

on 4

(f)

Env

iron

men

tal M

itig

atio

n –

Arc

haeo

logi

cal R

esou

rces

E

nvir

onm

enta

l Mit

igat

ion

– A

ir Q

ualit

y E

nvir

onm

enta

l Mit

igat

ion

– T

raff

ic N

oise

E

nvir

onm

enta

l Mit

igat

ion

– V

isua

l & A

esth

etic

Cha

ract

er

Env

iron

men

tal M

itig

atio

n –

Ter

rest

rial

Eco

logy

E

nvir

onm

enta

l Mit

igat

ion

– Fi

sher

ies

Env

iron

men

tal M

itig

atio

n –

Wat

er R

esou

rces

/Wat

er Q

ualit

y E

nvir

onm

enta

l Mit

igat

ion

– C

oast

al Z

one/

Coa

stal

Res

ourc

es

Env

iron

men

tal M

itig

atio

n –

Wat

er D

epen

dent

Use

s E

nvir

onm

enta

l Mit

igat

ion

– Fl

oodp

lain

s E

nvir

onm

enta

l Mit

igat

ion

– W

etla

nds

Env

iron

men

tal M

itig

atio

n –

Wat

erbo

dies

E

nvir

onm

enta

l Mit

igat

ion

– E

nvir

onm

enta

l Ris

k Si

tes

Env

iron

men

tal M

itig

atio

n –

Con

side

rati

ons

rela

ting

to P

edes

tria

ns &

Bic

yclis

ts

Env

iron

men

tal M

itig

atio

n –

Con

stru

ctio

n Im

pac

ts a

nd E

ngin

eeri

ng C

onsid

erat

ions

E

nvir

onm

enta

l Mit

igat

ion

– Se

cond

ary

& C

umul

ativ

e E

nvir

onm

enta

l Mit

igat

ion

– Pe

rmits

and

App

rova

ls

Mon

itor

ing

and

Enf

orce

men

t F

Y 1

999

- FY

200

1 T

rans

port

atio

n Im

prov

emen

t Pro

gram

(TIP

) “A

men

dmen

t Six

” V

E D

esig

n Su

gges

tions

10/

26/0

1 V

E R

ecom

men

dati

ons

10/2

6/01

C

ity o

f New

Hav

en C

omm

itm

ents/

Miti

gatio

n M

easu

res

Tow

n of

Eas

t Hav

en C

omm

itmen

ts/M

itig

atio

n M

easu

res

Ree

valu

atio

n of

Pro

ject

No.

92-

619

and

the

FEIS

/Sec

tion

4(f)

: 3/

29/1

0 an

d 2/

29/1

2 M

iscel

lane

ous

This

repo

rt w

as p

rinte

d on

3/1

8/20

14 5

:36:

44 P

M

Page 57: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

New

Hav

en -

Eas

t Hav

en -

Bra

nfo

rd

MIT

IGA

TIO

N M

EA

SUR

ES

AN

D

PR

OG

RA

M C

OM

MIT

ME

NT

DA

TA

BA

SE

Com

mitm

ent S

umm

ary

ID#

Ref

eren

ce D

ocu

men

t and

Pag

eD

escr

ipti

on

I- 9

5 N

ew H

aven

Har

bor

Cro

ssin

g C

orri

dor

Impr

ovem

ent P

rogr

am

Tra

nsi

t and

TS

M E

lem

ents

35Pu

blic

and

Priv

ate

Car

pool

Mat

chin

gD

istri

butio

n of

"how

to" k

its to

em

ploy

ers a

nd a

pub

lic fu

ll tim

e co

ordi

nato

r with

a

PC-b

ased

syst

em fo

r mat

chin

g.FE

ISES

-16;

2-4

8R

OD

4, 3

2

154

Bus

Ser

vice

Con

tinue

to p

rovi

de b

us se

rvic

e be

twee

n B

ranf

ord

and

New

Hav

en v

ia th

e To

mlin

son

Brid

ge a

t ser

vice

leve

ls in

ope

ratio

n at

the

time

of th

e st

art o

f co

nstru

ctio

n (6

/28/

02).

RO

D3,

32

FEIS

ES-1

6; 2

-19;

2-4

8

155

Impr

oved

Tra

nsit

Mar

ketin

gM

arke

ting

mea

sure

s can

incl

ude

dire

ct m

ail,

new

spap

er a

dver

tisem

ents

and

te

levi

sion

spot

s, m

ore

freq

uent

dis

tribu

tion

of im

prov

ed sc

hedu

les,

mor

e is

suin

g of

an

up-

to-d

ate

regi

onal

tran

sit g

uide

and

"tra

nsit

in th

e sc

hool

s" p

rogr

am.

RO

D3,

32

FEIS

ES-1

6; 2

-48

156

Tran

sit I

nfor

mat

ion

Up-

to-d

ate

sche

dule

s will

be

mai

ntai

ned

at e

ach

trans

it st

op a

nd th

e tra

nsit

info

rmat

ion

tele

phon

e lin

e w

ill b

e im

prov

ed to

min

imiz

e "b

usy"

sign

als.

RO

D4,

32

FEIS

ES-1

6; 2

-48

157

Opt

imiz

ed F

lext

ime

Empl

oyer

s in

the

regi

on w

ill b

e ap

proa

ched

by

Con

nDO

T or

its r

epre

sent

ativ

es

with

a m

arke

ting

info

rmat

ion

prog

ram

abo

ut th

e em

ploy

er v

olun

taril

y pr

ovid

ing

flext

ime

wor

k sc

hedu

les.

RO

D4,

32

FEIS

ES-1

6; 2

-48

158

Gua

rant

eed

Rid

e H

ome

Empl

oyer

s in

the

regi

ons w

ill b

e ap

proa

ched

by

Con

nDO

T or

its r

epre

sent

ativ

es to

se

t up

a pr

ogra

m in

whi

ch th

e em

ploy

er w

ould

vol

unta

rily

prov

ide

for d

ocum

ente

d rid

esha

re ri

ders

, tax

i or e

quiv

alen

t ser

vice

hom

e fro

m w

ork.

RO

D4,

32

FEIS

ES-1

6; 2

-49

188

Shor

e Li

ne E

ast S

ervi

ceC

ontin

ue to

pro

vide

Sho

re L

ine

East

rail

pass

enge

r ser

vice

bet

wee

n N

ew H

aven

an

d N

ew L

ondo

n. S

ervi

ce le

vels

in o

pera

tion

at th

e tim

e of

the

star

t of

cons

truct

ion

will

be

cont

inue

d. R

ider

ship

and

serv

ice

freq

uenc

ies w

ill b

e m

onito

red

regu

larly

to d

eter

min

e th

e ne

ed fo

r ser

vice

mod

ifica

tions

.

FEIS

ES- 1

6; 2

-18,

30

RO

D3,

32

203

Vol

unta

ry R

ides

hare

Pre

fere

ntia

l Par

king

Empl

oyer

s in

the

regi

on w

ill b

e ap

proa

ched

by

Con

nDO

T or

its r

epre

sent

ativ

e w

ith

a m

arke

ting/

info

rmat

ion

prog

ram

abo

ut th

e em

ploy

er v

olun

taril

y pr

ovid

ing

pref

eren

tial p

arki

ng fo

r rid

esha

re (H

OV

) par

ticip

ants

. Pre

fere

ntia

l par

king

cou

ld

cons

ist o

f bot

h fr

ee p

arki

ng fo

r Hig

h O

ccup

ancy

Veh

icle

s (H

OV

) and

a p

hysi

cal

arra

ngem

ent,

whe

re p

ossi

ble,

such

that

the

long

est w

alk

from

a re

serv

ed H

OV

sp

ace

wou

ld b

e no

long

er th

an th

e sh

orte

st w

alk

from

a n

on-H

OV

spac

e. O

ngoi

ng

or p

erio

dic

revi

ews a

nd su

rvey

s will

be

mad

e to

asc

erta

in th

e le

vel o

f par

ticip

atio

n,

and

adju

stm

ents

to th

e pr

ogra

m w

ill b

e m

ade

to c

once

ntra

te o

n th

e m

ost p

rodu

ctiv

e ty

pes o

f em

ploy

ers.

FEIS

ES-1

6; 2

-48

RO

D4,

32

204

Insu

ranc

e B

reak

s for

Rid

esha

reA

ll in

sura

nce

prov

ider

s ser

ving

the

regi

on w

ill b

e ap

proa

ched

by

Con

nDO

T or

its

repr

esen

tativ

e to

set u

p a

prog

ram

in w

hich

the

insu

ranc

e co

mpa

ny w

ould

vo

lunt

arily

pro

vide

an

annu

al re

bate

to a

uto

insu

ranc

e po

licy

hold

ers w

ho c

ould

do

cum

ent r

egul

ar tr

ansi

t or H

OV

use

. It

is a

ssum

ed th

at tr

avel

ers c

hoos

ing

to

trave

l by

HO

V o

r tra

nsit

wou

ld b

e ab

le to

obt

ain

such

doc

umen

tatio

n w

ith

negl

igib

le in

conv

enie

nce.

FEIS

ES-1

6; 2

-49

RO

D4,

32

Tu

esda

y, M

arch

18,

201

4

Pag

e 4

of 6

Page 58: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

New

Hav

en -

Eas

t Hav

en -

Bra

nfo

rd

MIT

IGA

TIO

N M

EA

SUR

ES

AN

D

PR

OG

RA

M C

OM

MIT

ME

NT

DA

TA

BA

SE

Com

mitm

ent S

umm

ary

ID#

Ref

eren

ce D

ocu

men

t and

Pag

eD

escr

ipti

on

I- 9

5 N

ew H

aven

Har

bor

Cro

ssin

g C

orri

dor

Impr

ovem

ent P

rogr

am

Tra

nsi

t and

TS

M E

lem

ents

271

Shor

e Li

ne E

ast S

tatio

n U

pgra

des

(Sta

te P

roje

ct N

os. 3

10-0

19, -

020,

-021

, -02

2, -0

26) C

onst

ruct

ion

of th

e B

ranf

ord,

G

uilfo

rd, a

nd C

linto

n St

atio

n up

grad

esN

/AN

/A

Oth

er C

onsi

dera

tion

s/R

elat

ed P

roje

cts/

Stu

dies

234

Har

bors

ide

Trai

lTh

is is

a C

SRC

OG

pro

ject

(in

asso

ciat

ion

w/C

ity o

f New

Hav

en, C

ity o

f Wes

t H

aven

, and

Vis

ion

for G

reat

er N

ew H

aven

) to

prov

ide

a fo

ot tr

ail a

long

New

H

aven

Har

bor f

rom

Sav

in R

ock

in W

est H

aven

, thr

ough

Lon

g W

harf

, and

acr

oss

the

Tom

linso

n B

ridge

to L

ight

hous

e Pa

rk o

n th

e ea

st sh

ore

in N

ew H

aven

. Th

e R

ecom

men

ded

Act

ion

will

not

aff

ect t

he d

evel

opm

ent a

nd im

plem

enta

tion

of th

is

proj

ect.

FEIS

8-3

Pro

gram

Com

mit

men

ts19

6Tr

affic

Pla

nsA

con

stru

ctio

n Tr

affic

Man

agem

ent P

lan

shal

l be

impl

emen

ted.

The

Pla

n w

ill

addr

ess o

ppor

tuni

ty fo

r alte

rnat

e tra

vel m

odes

dur

ing

cons

truct

ion.

Thi

s pla

n w

ill

be d

evel

oped

in c

oord

inat

ion

with

the

Sout

h C

entra

l Reg

ion

Cou

ncil

Of

Gov

ernm

ents

, inc

ludi

ng th

e fir

st e

lect

ed o

ffic

ials

of t

he a

ffec

ted

corr

idor

tow

ns.

The

Plan

will

incl

ude

Shor

e Li

ne E

ast r

ail p

asse

nger

stat

ion

and

park

ing

impr

ovem

ents

and

fixe

d ro

ute

bus s

ervi

ce im

prov

emen

ts in

the

East

Sho

re/M

orris

C

ove

area

(New

Hav

en/E

ast H

aven

).

RO

D11

; 32;

33

En

viro

nm

enta

l Mit

igat

ion

- L

and

Use

5A

ltern

ate

trave

l rou

tes

Alte

rnat

e tra

vel r

oute

s will

be

prov

ided

(to

the

exte

nt p

ossi

ble)

to re

plac

e af

fect

ed

rout

es.

Ther

e w

ill b

e on

goin

g ev

alua

tion

of th

e ef

fect

iven

ess o

f rou

tes a

nd d

etou

rs

corr

idor

wid

e.

FEIS

ES-1

1; 4

-7, 7

0R

OD

19

En

viro

nm

enta

l Mit

igat

ion

- S

ocio

econ

omic

s21

Coo

rdin

atio

nC

ontin

ued

coor

dina

tion

with

the

mun

icip

aliti

es a

nd n

eigh

borh

ood

asso

ciat

ions

will

be

und

erta

ken

to m

inim

ize

any

soci

oeco

nom

ic im

pact

s of p

roje

ct.

FEIS

ES-1

1; 4

-7; 4

-77

RO

D19

En

viro

nm

enta

l Mit

igat

ion

- T

raff

ic N

oise

96N

oise

Bar

rier

Noi

se b

arrie

r will

be

cons

truct

ed a

t Ram

ona

Way

, alo

ng so

uth

side

of I

-95,

ap

prox

imat

ely

6.1

met

ers i

n he

ight

and

283

.5 m

eter

s in

leng

th.

FEIS

ES-1

2; 4

-8; 4

-100

RO

D25

97N

oise

Bar

rier

Noi

se b

arrie

r will

be

cons

truct

ed a

t O'B

rien

Roa

d, a

long

the

north

side

of I

-95,

ap

prox

imat

ely

3.0

met

ers i

n he

ight

and

213

met

ers i

n le

ngth

.FE

ISES

-12;

4-8

; 4-1

00R

OD

25

Tu

esda

y, M

arch

18,

201

4

Pag

e 5

of 6

Page 59: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

New

Hav

en -

Eas

t Hav

en -

Bra

nfo

rd

MIT

IGA

TIO

N M

EA

SUR

ES

AN

D

PR

OG

RA

M C

OM

MIT

ME

NT

DA

TA

BA

SE

Com

mitm

ent S

umm

ary

ID#

Ref

eren

ce D

ocu

men

t and

Pag

eD

escr

ipti

on

I- 9

5 N

ew H

aven

Har

bor

Cro

ssin

g C

orri

dor

Impr

ovem

ent P

rogr

am

En

viro

nm

enta

l Mit

igat

ion

- T

raff

ic N

oise

98N

oise

Bar

rier

Noi

se b

arrie

r will

be

cons

truct

ed a

t Gre

enfie

ld A

venu

e, a

long

nor

th si

de o

f I-9

5,

appr

oxim

atel

y 4.

3 to

5.5

met

ers i

n he

ight

and

210

met

ers i

n le

ngth

.FE

ISES

-12;

4-8

; 4-1

00R

OD

25

99N

oise

Bar

rier

Noi

se b

arrie

r will

be

cons

truct

ed a

t Alle

n Pl

ace,

alo

ng th

e so

uth

side

of I

-95,

ap

prox

imat

ely

3.0

met

ers i

n he

ight

and

121

. 9 m

eter

s in

leng

th.

FEIS

ES-1

2; 4

-8; 4

-100

RO

D25

100

Noi

se B

arrie

rEx

istin

g no

ise

barr

ier n

ear t

he W

oost

er S

quar

e ar

ea o

f New

Hav

en a

long

the

wes

t si

de o

f I-9

1 (s

outh

boun

d) w

ill b

e re

plac

ed, a

s req

uire

dFE

ISES

-12;

4-8

; 4-1

00R

OD

25

En

viro

nm

enta

l Mit

igat

ion

- C

onsi

dera

tion

s R

elat

ing

to P

edes

tria

ns

and

Bic

ycli

sts

104

Pede

stria

ns a

nd B

icyc

lists

The

disp

ositi

on o

f any

aba

ndon

ed ri

ght-o

f-w

ay w

ill b

e de

term

ined

by

the

syst

emat

ic p

rope

rty tr

ansf

er p

roce

ss.

Con

nDO

T w

ill c

onsi

der t

he p

ossi

bilit

y of

m

akin

g su

ch la

nd a

vaila

ble

for p

ublic

spac

e, w

here

app

ropr

iate

for p

edes

trian

and

bi

cycl

e us

e.

FEIS

ES-1

7; 4

-12;

4-1

43R

OD

24, 3

2

105

Pede

stria

ns a

nd B

icyc

lists

Pede

stria

n an

d bi

cycl

e de

tour

s will

be

inco

rpor

ated

in th

e de

sign

if a

nd w

hen

path

way

s are

clo

sed.

FEIS

ES-1

7; 4

-12;

4-1

43R

OD

24, 3

2

209

Pede

stria

ns a

nd B

icyc

lists

Whe

re w

arra

nted

and

reas

onab

le, a

ccom

mod

atio

ns fo

r bic

yclis

ts a

nd p

edes

trian

s w

ill b

e m

ade

part

of d

esig

n, c

onst

ruct

ion,

ope

ratio

n, a

nd m

aint

enan

ce a

ctiv

ities

.R

OD

24, 3

2

En

viro

nm

enta

l Mit

igat

ion

- C

onst

ruct

ion

Im

pact

s an

d E

ngi

nee

rin

g C

onsi

dera

tion

s90

Min

imiz

e N

oise

Lev

els

All

cons

truct

ion

unde

rtake

n sh

ould

be

cons

iste

nt w

ith D

OT

Stan

dard

sp

ecifi

catio

ns fo

r noi

se le

vels

(For

m 8

16).

FEIS

4-15

8

136

Traf

fic P

lans

Mai

nten

ance

and

pro

tect

ion

of tr

affic

pla

ns a

ssur

ing

safe

and

reas

onab

ly

unin

terru

pted

trav

el o

f veh

icle

s thr

ough

out t

he a

rea

of c

onst

ruct

ion.

FEIS

4-15

7

Tu

esda

y, M

arch

18,

201

4

Pag

e 6

of 6

Page 60: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

SUMMARY REPORT

NuRiders

New NuRiders 6,318 (60% prev. dr. alone)

Total NuRiders 6,318 (60% prev. dr. alone)

Active NuRiders (#) 2,189 (41% prev. dr. alone)

Active NuRiders (%) 35%

Organizations 918

Male / female 38% / 62%

Activity All trips Adjusted

Recorded trips 1,371,570

Avg trip distance (mi) 26.8

Avg vehicle occupancy - -

Reduced car trips 1,229,296 394,024

Reduced miles (VMT) 33,221,081 11,383,825

Reduced starts (VT) 1,107,440 335,682

Gallons of gas saved 1,493,479

Reduced NOx (tons) 26.82 9.14

Reduced VOC (tons) 10.81 3.59

Reduced CO2 (tons) 14,636.1 4,871.67

Total reduced emissions 14,673.73 4,884.4

Money saved $17,999,265

Calories burned 66,062,868

Rewards

Rewards redeemed $258,461

Redemptions 19,889

Other

Parking spots saved 616.4 avg per week day

All trips

Reduced miles (VMT) - cumulative

Select NuRiders Select Date Range

Affiliated with: Any organization Time period: Monthly

Who live: in New Haven County, CT or Start date: Jan 05

Who commute: to New Haven County, CT End date: Mar 14

Promotion: Any

Co-branding: Any

All trips

Compweek

Bike

Walk

Tele...

Tra...

Van...

Car...

Jan-05Mar-0

6May-07

Jul-08Sep-09

Nov-10Jan-12

Mar-13

0

10,000

20,000

30,000

40,000

Reduced miles (VMT) - cumulative

Compweek

Bike

Walk

Tele...

Tra...

Van...

Car...

Jan-05Mar-0

6May-07

Jul-08Sep-09

Nov-10Jan-12

Mar-13

0

10,000,000

20,000,000

30,000,000

40,000,000

Page 61: Carl J. Amento, Executive Director SCRCOG MEETING NOTICE & …scrcog.org/wp-content/uploads/board/2014/3_scrcog_Mar14.pdf · 2016-03-28 · Riju Das, Aide to Senator Richard Blumenthal

DEFINITIONS & VARIABLES

New NuRiders = NuRiders who joined during the specified period

Total NuRiders = total NuRiders as of the end date

Active NuRiders (#) = all NuRiders who have taken at least 1 trip as of the end date

Active NuRiders (%) = (active NuRiders) / (total NuRiders)

Prev. dr. alone = abbreviation for "previously drove alone" — the percent of people who drove alone prior to joining NuRide

Organizations = the number of organizations in the selected region(s) that have at least 1 NuRide member

Recorded trips = number of recorded trips during the specified period

Reduced car trips = the number of car trips not taken during the specified period

Reduced miles (VMT) = the number of vehicle miles not driven during the specified period

Reduced car starts (VT) = the number of times a car was not started during the specified period

Reduced NOx (tons) = the total NOx not emitted during the specified period

Reduced VOC (tons) = the total VOC not emitted during the specified period

Reduced CO2 (tons) = the total CO2 not emitted during the specified period

Total reduced emissions = the total NOx, VOC & CO2 not emitted during the specified period

Adjusted results = recorded results multiplied by the Prev. dr. alone percentage, indicating trips taken by people who used to drive alone

Money saved = the value of the savings realized by not driving during the specified period

Rewards redeemed = the value of the rewards redeemed during the specified period

Redemptions = total number of redemptions during the specified period

Parking spots saved = the average number of parking spots saved for the most recent 4-week period

NOx - trip end emissions = 0.9905 grams per one-way VT

NOx - running emissions = 0.6995 grams per VMT

VOC - trip end emissions = 2.3454 grams per one-way VT

VOC - running emissions = 0.217 grams per VMT