carden avenue, brighton...carden avenue, brighton water management strategy 1&2 3 4 1. section...
TRANSCRIPT
Carden Avenue, BrightonWater Management Strategy
1&2
34
1. Section and Sketch View Through Drop Kerb Inlet. Scale: 1:20 @ A1
2. Section Through Lined Forebay Basin. Scale: 1:25 @ A1
KeyDrop Kerb Inlet
Lined Forebay Basin
Inlet/Outlet Basket ConnectionInfiltration Basin
Overflow to Road
Raingarden and surface channel
Bioretention Raingarden
Porous Parking Bay Options
Swale
Storage Bund to Infiltration Basin
Pavement Channel
Balance Beams and Play Boulders
Parking Bay with Retaining Wall
Existing Trees
3. Section Through Inlet/ Outlet Basket Connection. Scale: 1:20 @ A1
4. Infiltration Basin with Overflow to Road. Scale: 1:25 @ A1
Sketch View
Sketch View
N
5
6
7
9
9
11
8
N
Carden Avenue, BrightonWater Management Strategy
5. Permeable Parking Bay Option. Scale: 1:25 @ A1 6. Pavement Channel. Scale: 1:25 @ A1
7. Storage Bund to Infiltration Basin. Scale: 1:25 @ A1
8. Balance Beam and Play Boulders. Scale: 1:25 @ A1
10. Parking Bay Near Retaining Wall. Scale: 1:25 @ A1
9. Rain Garden. Scale: 1:25 @ A1
11. Bioretention Raingarden. Scale: 1:20 @ A1
KeyDrop kerb inlet
Lined forebay basin
Inlet/outlet basket connectioninfiltration basin
Overflow to road
Raingarden and surface channel
Bioretention raingarden
Porous parking bay options
Swale
Storage bund to infiltration basin
Pavement channel
Raised pedestrian crossing and buffer directing water away from Darcy drive
Balance beams and play boulders
Parking bay with retaining wall
Existing trees