carden avenue, brighton...carden avenue, brighton water management strategy 1&2 3 4 1. section...

2
Carden Avenue, Brighton Water Management Strategy 1&2 3 4 1. Section and Sketch View Through Drop Kerb Inlet. Scale: 1:20 @ A1 2. Section Through Lined Forebay Basin. Scale: 1:25 @ A1 Key Drop Kerb Inlet Lined Forebay Basin Inlet/Outlet Basket Connection Infiltration Basin Overflow to Road Raingarden and surface channel Bioretention Raingarden Porous Parking Bay Options Swale Storage Bund to Infiltration Basin Pavement Channel Balance Beams and Play Boulders Parking Bay with Retaining Wall Existing Trees 3. Section Through Inlet/ Outlet Basket Connection. Scale: 1:20 @ A1 4. Infiltration Basin with Overflow to Road. Scale: 1:25 @ A1 Sketch View Sketch View N

Upload: others

Post on 08-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Carden Avenue, Brighton...Carden Avenue, Brighton Water Management Strategy 1&2 3 4 1. Section and Sketch View Through Drop Kerb Inlet. Scale: 1:20 @ A1 2. Section Through Lined Forebay

Carden Avenue, BrightonWater Management Strategy

1&2

34

1. Section and Sketch View Through Drop Kerb Inlet. Scale: 1:20 @ A1

2. Section Through Lined Forebay Basin. Scale: 1:25 @ A1

KeyDrop Kerb Inlet

Lined Forebay Basin

Inlet/Outlet Basket ConnectionInfiltration Basin

Overflow to Road

Raingarden and surface channel

Bioretention Raingarden

Porous Parking Bay Options

Swale

Storage Bund to Infiltration Basin

Pavement Channel

Balance Beams and Play Boulders

Parking Bay with Retaining Wall

Existing Trees

3. Section Through Inlet/ Outlet Basket Connection. Scale: 1:20 @ A1

4. Infiltration Basin with Overflow to Road. Scale: 1:25 @ A1

Sketch View

Sketch View

N

Page 2: Carden Avenue, Brighton...Carden Avenue, Brighton Water Management Strategy 1&2 3 4 1. Section and Sketch View Through Drop Kerb Inlet. Scale: 1:20 @ A1 2. Section Through Lined Forebay

5

6

7

9

9

11

8

N

Carden Avenue, BrightonWater Management Strategy

5. Permeable Parking Bay Option. Scale: 1:25 @ A1 6. Pavement Channel. Scale: 1:25 @ A1

7. Storage Bund to Infiltration Basin. Scale: 1:25 @ A1

8. Balance Beam and Play Boulders. Scale: 1:25 @ A1

10. Parking Bay Near Retaining Wall. Scale: 1:25 @ A1

9. Rain Garden. Scale: 1:25 @ A1

11. Bioretention Raingarden. Scale: 1:20 @ A1

KeyDrop kerb inlet

Lined forebay basin

Inlet/outlet basket connectioninfiltration basin

Overflow to road

Raingarden and surface channel

Bioretention raingarden

Porous parking bay options

Swale

Storage bund to infiltration basin

Pavement channel

Raised pedestrian crossing and buffer directing water away from Darcy drive

Balance beams and play boulders

Parking bay with retaining wall

Existing trees