captive power plant
DESCRIPTION
power plant pptTRANSCRIPT
25-JAN-06 2:00P.M.
1
CAPTIVE POWER PLANT
POWER AND STEAM PRODUCTION AND
DISTRIBUTION
- MANAVADARIA NAYAN K. (F.O.P.E.) C.P.P. (MECHANICAL MAINTENANCE)
25-JAN-06 2:00P.M.
2
POWER CAPABILITY
GAS TURBINES (GT) - 7 Nos. 7X30 MW = 210 MW
STEAM TURBINES (ST) - 2 Nos. 2X40 MW = 80 MW
TOTAL - 290 MW
25-JAN-06 2:00P.M.
3
STEAM CAPABILITY HEAT RECOVERY STEAM GENERATOR (HRSG) - 7 Nos. 7X125 TPH = 875 TPH
STEAM TURBINES (ST) - 2 Nos.
AUXILLIARY BOILER (AUX. BOILER) - 1 No. 95 TPH
TOTAL = 970 TPH
25-JAN-06 2:00P.M.
4
CONSUMERS MEG#1, 2, 3 VCM PVC PE#1, 2 POY CRACKER PTA#1,2 PP BUTADIENE OTHERS
25-JAN-06 2:00P.M.
5
POWER & STEAM DEMAND
POWER : INSTALLED CAPACITY - 290 MW (30X7+40X2) NORMAL AVAILABLE CAPACITY - 226 MW (26X6+35X2) PRESENT DEMAND - 222 MW SURPLUS - 4 MW FUTURE DEMAND - 67 MW TOTAL SURPLUS - -63 MW (226-222-67) STEAM : INSTALLED CAPACITY - 970TPH (125X7+95X1) NORMAL AVAILABLE CAPACITY - 810TPH (120X6+90X1) PRESENT DEMAND - 592TPH SURPLUS - 218TPH FUTURE DEMAND - 223TPH TOTAL SURPLUS - -5TPH (810-592-223)
25-JAN-06 2:00P.M.
6
NEW PROJECTS GAS TURBINES - 3 Nos. (#8, 9, 10)
HRSGS - 3 Nos. (#8, 9, 10)
25-JAN-06 2:00P.M.
7
FUTURE REQUIREMENTS
POWER STEAM DBN - MEG & CRACKER - 4.4 MW 39 TPH BUTADIENE - 3.7 MW 34 TPH POY & PSF - 43.8 MW 39 TPH PTA#3 - 13.3 MW 82.4 TPH ACETYLENE - 1.8 MW 37.7 TPH
TOTAL - 67 MW 223 TPH
25-JAN-06 2:00P.M.
8
GAS TURBINES & HRSGs
GT #1 & GT #2 - HRSG #1 & HRSG #2: MAKE - M/S THOMASSEN INTR. OF HOLLAND FUEL - NATURAL GAS, HSD, C-9 BLACK FIRED TURBINES
GT #3 TO GT #9 – HRSG #3 TO HRSG #7 : MAKE - BHEL OF INDIA FUEL - NATURAL GAS, HSD, C-9 & NAPHTHA HRSG #8 & HRSG #9 MAKE - THERMAX ENGG.
25-JAN-06 2:00P.M.
9
STEAM TURBINES STG #1 MAKE - SKODA BOILERS OF HOLLAND TYPE - DOUBLE EXTRACTING CUM CONDENSING
STG #2 MAKE - BHEL OF INDIA TYPE - EXTRACTION CUM INJECTION CUM CONDENSING
25-JAN-06 2:00P.M.
10
AUXILLIARY BOILER
MAKE - M/S STORK BOILERS OF HOLLAND CAPACITY - 95 TPH TYPE - NATURAL CIRCULATION, FORCED DRAFT
25-JAN-06 2:00P.M.
11
THANK YOU