BA Mines 2009-09-02 1 Bildplatshållare Capital Markets Day 2 September 2009 Boliden Area 2010 Staffan Sandström General Manager Boliden Area 2 Boliden Area Operations Two underground mines - Renström and Kristineberg One open pit mine, Maurliden A concentrator and a gold leaching plant. All mines have complex sulphide ores containing zinc, copper, lead, gold and silver. Production 2008 Ore 1,062 ktonnes Slag 293 ktonnes Metal Copper (t) 9,413 Lead (t) 1,896 Zinc (t) 38,479 Silver (kg) 47,671 Gold (kg) 1,141 2009-09-02 BA Mines

Upload: others

Post on 17-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Capital Markets Day 2 September 2009 - Boliden · Udden Åsen Kedträsk Maurliden V Storliden 2008-01-23 / GA BA Mines 2009-09-02 4 *) Assuming environmental permits latest end of

BA Mines 2009-09-021

Bildplatshållare

Capital Markets Day 2 September 2009

Boliden Area 2010Staffan SandströmGeneral Manager Boliden Area

2

Boliden Area Operations

� Two underground mines - Renström and Kristineberg

� One open pit mine, Maurliden

� A concentrator and a gold leaching plant.

� All mines have complex sulphide ores containing zinc, copper, lead, gold and silver.

� Production 2008– Ore 1,062 ktonnes

– Slag 293 ktonnes

� Metal – Copper (t) 9,413

– Lead (t) 1,896

– Zinc (t) 38,479

– Silver (kg) 47,671

– Gold (kg) 1,141

2009-09-02BA Mines

Page 2: Capital Markets Day 2 September 2009 - Boliden · Udden Åsen Kedträsk Maurliden V Storliden 2008-01-23 / GA BA Mines 2009-09-02 4 *) Assuming environmental permits latest end of

3

Production history from 29 mines in the Skellefte District 1925-2008In total 106.6 million tonnes produced by Boliden

0

500 000

1 000 000

1 500 000

2 000 000

2 500 00019

24

1927

1930

1933

1936

1939

1942

1945

1948

1951

1954

1957

1960

1963

1966

1969

1972

1975

1978

1981

1984

1987

1990

1993

1996

1999

2002

2005

2008

tonnes/ year

Adak Lindsköld Brännmyran Rudtjebäcken Lainijaur BolidenLångsele Långdal Kankberg Åkulla V Åkulla Ö ÅkerbergBjurfors Högkulla Ö Holmtjärn Kristineberg Rävlidmyran RävlidenKimheden Hornträsk Näsliden Rakkejaur Renström Petiknäs SUdden Åsen Kedträsk Maurliden V Storliden

2008-01-23 / GA

2009-09-02BA Mines

4

*) Assuming environmental permits latest end of Q2 2010

Year 2009 and part of 2010 production in the mill is reduced.

SiteYear

2011 2012 2013

Maurliden EastExpansion*

Production

Push back

Production

Renström

Kristineberg

Slag (Rönnskär)

2009 2010

Tailing Gillervattnet

Tailing Hötjärn

Maurliden

Production plan

2009-09-02BA Mines

Page 3: Capital Markets Day 2 September 2009 - Boliden · Udden Åsen Kedträsk Maurliden V Storliden 2008-01-23 / GA BA Mines 2009-09-02 4 *) Assuming environmental permits latest end of

5

Boliden Area – Production and ore reserves

2009-09-02BA Mines

0

5 000

10 000

15 000

20 000

25 000

30 000

2004 2005 2006 2007 2008

Ktonnes

Proven Probable Measured Indicated Inferred Ore prod*10

6

Tailing pond will get filled up in 2009 at maximal production capacity. With reduced production it will last until 2011

Tailing pond will get filled up in 2009 at maximal production capacity. With reduced production it will last until 2011

Gillervattnet – Existing tailing pond

2009-09-02BA Mines

Page 4: Capital Markets Day 2 September 2009 - Boliden · Udden Åsen Kedträsk Maurliden V Storliden 2008-01-23 / GA BA Mines 2009-09-02 4 *) Assuming environmental permits latest end of

7

Construction of the new pond started in 2008 – Crossroads for the Boliden Area

Hötjärn – New tailing pond

2009-09-02BA Mines

8

Maurliden mines

2009-09-02BA Mines

Page 5: Capital Markets Day 2 September 2009 - Boliden · Udden Åsen Kedträsk Maurliden V Storliden 2008-01-23 / GA BA Mines 2009-09-02 4 *) Assuming environmental permits latest end of

0

1 000

2 000

3 000

4 000

5 000

6 000

2004 2005 2006 2007 2008

Ktonnes

Proven Probable Measured Indicated Inferred Ore prod*10

2009-09-029

Maurliden - Production and ore reserves

BA Mines

2009-09-0210

1200 Y 1400 Y1000 Y800 Y

0 Z

200 Z

400 Z

600 Z

800 Z

1000 Z

1200 Z

1400 Z

1600 Y

Simonmalmen

Julia Vilma

Undersökningsort 1125

Ore reserve

Mineral resource

Potential

Mined out

Renström mine

BA Mines

Page 6: Capital Markets Day 2 September 2009 - Boliden · Udden Åsen Kedträsk Maurliden V Storliden 2008-01-23 / GA BA Mines 2009-09-02 4 *) Assuming environmental permits latest end of

2009-09-0211

Renström - Production and ore reserves

BA Mines

0

500

1 000

1 500

2 000

2 500

3 000

3 500

4 000

2004 2005 2006 2007 2008

Ktonnes

Proven Probable Measured Indicated Inferred Ore prod*10

Ore reserves

Mineral resources

Mined-out

Rävliden Kristineber

g

J-zone

B-ore

L-zone

M-zone

Kristineberg mine

2009-09-0212BA Mines

Page 7: Capital Markets Day 2 September 2009 - Boliden · Udden Åsen Kedträsk Maurliden V Storliden 2008-01-23 / GA BA Mines 2009-09-02 4 *) Assuming environmental permits latest end of

Kristineberg mine (horizontal projection)

2009-09-0213BA Mines

0

2 000

4 000

6 000

8 000

10 000

12 000

2004 2005 2006 2007 2008

Ktonnes

Proven Probable Measured Indicated Inferred Ore prod*10

2009-09-0214

Kristineberg - Production and ore reserves

BA Mines

Page 8: Capital Markets Day 2 September 2009 - Boliden · Udden Åsen Kedträsk Maurliden V Storliden 2008-01-23 / GA BA Mines 2009-09-02 4 *) Assuming environmental permits latest end of

2009-09-0215

2007 2008 2009 2010 2011 2012 2013

YearOreproduction

Copper

Zink

GoldSilver

Kto

nne

s

No scale

Production (indicative only)

BA Mines

Bildplatshållare