  • CAPITAL IMPROVEMENT PLAN

    2021 - 2025

  • Table of Contents

    Approving Resolution

    Transmittal Letter

    Section One – Reports

    Section Two – Capital Improvement Plan Detail

  • RESOLUTION 20- 221

    Introduced by Councilor Baker

    RESOLUTION ADOPTING THE 2021 - 2025 CAPITAL IMPROVEMENT PLAN

    WHEREAS, a five-year Capital Improvement Plan has been prepared that takes

    into consideration the implementation of policies and programs previously established bythe City Council, the urgent need and necessity for certain projects, the appropriatesequence of construction of projects in relationship to other projects, and the capitalexpenditures necessary to carry on a balanced program; and

    WHEREAS, the five- year Capital Improvement Plan allows the City to constructimprovements in accordance with predetermined priorities that help stabilize tax rates

    while revealing the source and extent of funds needed in future years; and

    WHEREAS, the City Council intends to annually adopt a five-year CapitalImprovement Plan after reviewing, amending and extending the plan an additional year; and;

    WHEREAS, the scheduling of capital improvement projects allows the public tobecome aware of long- range municipal needs and provides a mechanism for coordination

    of projects both with one another and with the City' s long- range comprehensive plan.

    NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ALBERT LEA,

    MINNESOTA:

    Sec. 1 That the City Council of the City of Albert Lea, Minnesota, herebyapproves the Capital Improvement Plan for 2021 - 2025.

    That the motion for the adoption of the foregoing resolution was duly seconded byCouncilor Rasmussen, and upon a vote being taken thereon, the following voted in favorthereof: Councilors Murray, Baker, Howland, Olson, Rasmussen, Brooks and MayorRasmussen, Jr.;

    And the following voted against the same: None.

    Introduced and passed this 141 day of December 2020

    Mayor Verr1 Rasmussen Jr.

    Filed and attested this 151 day of December 2020

    cret ry o ncil

    KB: 12- 14- 20 Resolution 20- 221

  • Capital Improvement Plan

    City of Albert Lea, Minnesota

    DEPARTMENT SUMMARY

    2021 2025thru

    Total2021 2022 2023 2024 2025Department

    225 - Airport 4,834,500163,000 1,242,500 2,404,000 160,000 865,000

    601 - Water 8,669,0005,127,000 92,000 1,915,000 920,000 615,000

    602 - Sewer Fund 6,253,000463,000 1,120,000 930,000 610,000 3,130,000

    602 - WWTP 48,270,0001,730,000 3,065,000 6,136,000 17,069,000 20,270,000

    702 - IT Capital Fund 240,00040,000 50,000 50,000 50,000 50,000

    Aquatic Center 430,000115,000 95,000 20,000 100,000 100,000

    Arena 1,299,000624,000 225,000 180,000 100,000 170,000

    City Buildings 900,000430,000 80,000 350,000 40,000

    City Garage 6,890,00080,000 60,000 6,750,000

    Civic Theater 185,00070,000 20,000 10,000 25,000 60,000

    Engineering 39,929,3006,188,000 15,846,000 6,760,000 6,055,300 5,080,000

    Fire 1,209,000158,000 266,000 27,000 78,000 680,000

    Parks 11,090,000950,000 4,760,000 1,820,000 2,755,000 805,000

    Police 1,035,000110,000 370,000 135,000 135,000 285,000

    Recreation 252,000110,000 95,000 37,000 10,000

    Sidewalks 45,00045,000

    Storm Drainage 4,055,000465,000 395,000 2,565,000 500,000 130,000

    Street Dept Equipment 2,760,000770,000 405,000 735,000 330,000 520,000

    17,593,000 28,231,500 24,074,000 28,937,300 39,510,000 138,345,800TOTAL

    Tuesday, January 05, 2021

  • Capital Improvement Plan

    City of Albert Lea, Minnesota

    FUNDING SOURCE SUMMARY

    2021 thru 2025

    TotalSource 2021 2022 2023 2024 2025

    101 - General Fund Budget 446,00029,000 105,000 152,000 60,000 100,000

    225 - Airport Fund 1,228,90048,900 239,500 898,000 16,000 26,500

    250 - Fire Capital Fund 249,000158,000 16,000 27,000 18,000 30,000

    251 - Police Capital Fund 360,00020,000 190,000 150,000

    401 - Capital Project Fund 1,856,000936,000 280,000 480,000 160,000

    404 - Park Dedication Fund 35,00035,000

    406 - Building Maintenance Fund 1,035,000370,000 275,000 40,000 115,000 235,000

    409 - Storm Water Fund 365,000220,000 80,000 65,000

    601 - 601 Water Fund 2,206,50059,000 302,000 895,000 539,000 411,500

    601 - Bonding - GO Water Revenue Bond 5,290,0001,090,000 1,700,000 2,500,000

    601 - Bonding - PFA 4,700,0004,700,000

    602 - 602 Sewer Fund 16,196,0002,998,000 3,094,000 2,615,500 1,257,000 6,231,500

    602 - Bonding - GO Sewer Revenue Bond 42,436,500944,000 5,303,500 16,737,000 19,452,000

    701 - Central Garage Fund 6,773,0001,358,000 1,700,000 1,140,000 837,000 1,738,000

    702 - IT Capital Fund 340,00065,000 125,000 50,000 50,000 50,000

    Bonding - Capital Imp/Equipment 3,365,000560,000 190,000 170,000 100,000 2,345,000

    Bonding - Street Projects 10,206,6251,270,000 1,855,000 2,555,000 2,536,500 1,990,125

    DEED 1,500,0001,500,000

    Developer 1,190,00050,000 1,140,000

    Federal 1,440,0001,440,000

    Federal - FAA 1,539,500557,000 144,000 838,500

    Federal - ISTEA 400,000400,000

    Freeborn County 540,000540,000

    Grant 2,636,0002,536,000 100,000

    Private Funds/Donations 350,00020,000 300,000 5,000 25,000

    Shell Rock River Watershed 385,00070,000 15,000 300,000

    Special Assessments 5,943,6751,262,000 587,000 1,465,000 1,692,800 936,875

    State - DNR 4,580,000440,000 2,000,000 2,040,000 100,000

    State - MnDOT 7,090,000200,000 6,890,000

    State - Municipal State Aid 2,927,0001,675,000 717,000 320,000 215,000

    State MnDOT - Aeronautics 2,066,100114,100 446,000 1,506,000

    Undetermined Funding Source 8,670,000460,000 3,950,000 1,450,000 2,475,000 335,000

    17,593,000 28,231,500 24,074,000 28,937,300 39,510,000 138,345,800GRAND TOTAL

    Tuesday, January 05, 2021

  • Capital Improvement Plan

    City of Albert Lea, Minnesota

    PROJECTS BY DEPARTMENT

    2021 2025thru

    Total2021 2022 2023 2024 2025Department Project # Priority

    225 - Airport

    AIR-E-22-01 190,000190,000Tractor and Mower 4

    AIR-E-22-02 200,000200,000RCO Relocation 4

    AIR-E-23-01 25,00025,000Sweeper Attachment 4

    AIR-E-25-02 600,000600,000Instrument Landing System 4

    AIR-F-21-01 100,000100,000Relocate Fence and Tree Removal 4

    AIR-F-21-02 63,00063,000Installation of Maintenance Building Bi-fold Door 4

    AIR-F-22-01 145,000145,000Design Fixed Base Operator Hangar 4

    AIR-F-22-02 80,00080,000NAVAID Access Road Construction 4

    AIR-F-22-03 40,00040,000Demolish or Relocate Wood Hangar 4

    AIR-F-22-04 75,00075,000Design New T-Hangar 4

    AIR-F-22-05 412,500412,500Pavement Cleaning and Seal Coat 4

    AIR-F-23-01 1,500,0001,500,000Hangar Facility 4

    AIR-F-23-02 135,000135,000Hangar Site Preparation 4

    AIR-F-23-03 744,000744,000Construct New T-Hangar 4

    AIR-F-25-01 265,000265,000Precision Approach Preparation 4

    AIR-L-22-01 100,000100,000Land Purchase 4

    AIR-V-24-01 160,000160,000Snow Removal Equipment Vehicle 4

    4,834,500163,000 1,242,500 2,404,000 160,000 865,000225 - Airport Total

    601 - Water

    WAT-E-21-01 64,00032,000 32,000Replace Water Plant Backwash Valves 4

    WAT-E-21-02 15,00015,000Replace Backhoe Jack Hammer 4

    WAT-E-23-01 70,00035,000 35,000Water Plant Pump and Casing Inspection & Repair 4

    WAT-E-23-02 30,00030,000East Water Tower Lighting 4

    WAT-E-23-03 20,00020,000Replace 2002 Sull Air Air Compressor #776 4

    WAT-F-21-01 4,700,0004,700,000Central Water Tower Replacement 4

    WAT-F-21-02 350,000350,000West and North Water Treatment Air Quality Imp 4

    WAT-F-23-01 650,000650,000Repaint East Water Tower 4

    WAT-F-23-02 450,000450,000Plaza Street Water Main Extension 4

    WAT-F-23-03 700,000700,000East Water Tower Chlorine Bldg 4

    WAT-F-24-01 600,000600,000Replace 14th Street Water Main 4

    WAT-F-24-02 300,000300,000Replace 11th Street Water Main 4

    WAT-F-24-03 20,00020,000Replace Granular Material at the West Water Plant 4

    WAT-F-25-99 500,000500,0002025 Water Projects 4

    WAT-V-21-01 30,00030,000Replace 2011 GMC 1500 4

    WAT-V-22-01 30,00030,000Replace 2012 Ford Transit Cargo Van #19 4

    WAT-V-22-02 30,00030,000Replace 2012 GMC 1500 #18 4

    WAT-V-23-01 30,00030,000Replace 2012 Chevy 1500 #17 4

    WAT-V-25-01 30,00030,000Replace Ford F150 4

    WAT-V-25-02 50,00050,000Replace Ford F550 4

    8,669,0005,127,000 92,000 1,915,000 920,000 615,000601 - Water Total

    602 - Sewer Fund

    SCO-1 1,200,000300,000 300,000 300,000 300,000Sanitary Sewer Slip Lining Program 4

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    SCO-2 250,00050,000 50,000 50,000 50,000 50,000Lift Station Pump Rebuilding Project 4

    SCO-3 40,00020,000 20,000Smoke Test Sanitary Sewer 4

    SCO-4 50,00025,000 25,000Main Lift Station - Rebuild pumps 4

    SCO-E-21-01 8,0008,000Brush Cutter 4

    SCO-E-21-02 30,00030,000Rebuild Pumps at Hayek 4

    SCO-E-21-03 20,00020,000Rebuild Pumps at Plainview 4

    SCO-E-22-01 90,00090,000Sewer Camera/Crawler Replacement 4

    SCO-E-23-01 80,00080,000102 James Lift Station 4

    SCO-E-25-01 40,00040,000Installation of Filters on Force Main 4

    SCO-E-25-02 90,00090,000250 KW Generator Unit 701 4

    SCO-F-21-01 300,000300,000Slip Line Blackmere and Channel 4

    SCO-F-22-01 150,000150,000Replace Sanitary Sewer under S Broadway Tracks 4

    SCO-F-23-01 500,000500,000TH65 to 6th & St John Sewer Line Replacement 4

    SCO-F-24-01 240,000240,000Garfield Lift Station Force Main Replacement 4

    SCO-F-25-01 150,000150,000W 9th/Lincoln Avenue Sewer 4

    SCO-F-25-02 2,500,0002,500,000Eastside Sewer Upgrade 4

    SCO-V-21-01 30,00030,000Replace 2011 GMC 1500 4

    SCO-V-22-01 50,00050,000Replace 2012 Ford F250 #21 4

    SCO-V-22-02 400,000400,000Replace 2014 Jet Vac Truck - Unit 796 4

    SCO-V-22-03 35,00035,000Replace 2008 Chevrolet Pickup Unit 14 4

    6,253,000463,000 1,120,000 930,000 610,000 3,130,000602 - Sewer Fund Total

    602 - WWTP

    WWTP-E-21-01 50,00050,000Replace 1990 Allis Tractor with Bucket Unit 552 4

    WWTP-E-22-01 15,00015,000Replace Polaris Ranger 4

    WWTP-E-25-01 18,00018,000Replace Kubota 551 4

    WWTP-F-21 3,250,0001,650,000 1,600,000Design/Bidding Septic Receiving/Grit Building 4

    WWTP-F-22-01 3,195,0001,420,000 1,775,000New Septic Receiving Station/Grit Bldg Renovation 4

    WWTP-F-23-01 2,870,000861,000 2,009,000Coatings Replacement 4

    WWTP-F-23-02 1,670,000501,000 1,169,000Primary Treatment Improvements 4

    WWTP-F-23-03 10,500,0001,050,000 4,200,000 5,250,000Secondary Treatment - Phosphorus Removal 4

    WWTP-F-23-04 1,880,000564,000 1,316,000WAS Thickening Improvements 4

    WWTP-F-23-05 1,810,000543,000 1,267,000Sludge Storage Improvements 4

    WWTP-F-23-06 1,340,000402,000 938,000WWTP Electrical Improvements 4

    WWTP-F-23-07 140,000140,000B Side High Voltage Wire Replacement 4

    WWTP-F-24-01 780,000234,000 546,000Effluent Filter Improvements 4

    WWTP-F-24-02 180,00054,000 126,000Preaeration Tank Improvements 4

    WWTP-F-24-03 3,710,0001,113,000 2,597,000UV System Replacement 4

    WWTP-F-24-04 6,970,0002,091,000 4,879,000Anaerobic Digestion Improvements 4

    WWTP-F-24-05 4,140,0001,242,000 2,898,000Hot Water System Improvements 4

    WWTP-F-24-06 1,840,000552,000 1,288,000Building Roof Replacements 4

    WWTP-F-24-07 290,00087,000 203,000Utility Water Improvements 4

    WWTP-F-24-08 1,550,000465,000 1,085,000Digested Sludge Thickening Improvements 4

    WWTP-F-25-01 1,080,0001,080,000FRP Cover Replacement 4

    WWTP-F-99 900,000300,000 300,000 300,000Chemicals and Maintenance n/a

    WWTP-V-21-01 30,00030,000Replace 2002 Crew Cab Ford F250 Unit 93 4

    WWTP-V-22-01 30,00030,000Replace 2008 Ford Pickup Unit 374 4

    WWTP-V-24-01 32,00032,000Replace 2015 Ford Interceptor Unit 24 4

    48,270,0001,730,000 3,065,000 6,136,000 17,069,000 20,270,000602 - WWTP Total

    702 - IT Capital Fund

    IT Computers 200,00040,000 40,000 40,000 40,000 40,000Computer Replace Program n/a

    IT-COUNTY 40,0000 10,000 10,000 10,000 10,000County Hardware Costs n/a

    240,00040,000 50,000 50,000 50,000 50,000702 - IT Capital Fund Total

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    Aquatic Center

    AQU-E-22-01 10,00010,000Replace Pool Sound System 4

    AQU-E-23-01 20,00020,000Replace Feature Pool Boilers 4

    AQU-E-24-01 50,00050,000Replace Main Pool Boilers 4

    AQU-F-21-01 65,00065,000Bathhouse Project - Phase 1 4

    AQU-F-21-02 50,00050,000Gel Coat Pool Slide 4

    AQU-F-22-01 50,00050,000Bathhouse Project - Phase 2 4

    AQU-F-22-02 35,00035,000Paint Pool and Pool Decks 4

    AQU-F-24-01 50,00050,000Replace Play Features - Zero Depth Pool 4

    AQU-F-25-01 100,000100,000Aquatic Center Parking Area 4

    430,000115,000 95,000 20,000 100,000 100,000Aquatic Center Total

    Arena

    ARE-E-21-01 20,00020,000Arena Speaker System 4

    ARE-E-21-02 9,0009,000Sprinkler System Valve 4

    ARE-E-22-01 15,00015,000Replace John Deere Mower 4

    ARE-E-22-02 20,00020,000Lobby Area Furnace 4

    ARE-E-23-01 10,00010,000Replace Colstrup Arena Scoreboard 4

    ARE-E-24-01 100,000100,000Replace Arena Heaters 4

    ARE-E-25-01 25,00025,000Replace Arena Shower Unit 4

    ARE-E-25-02 95,00095,000HVAC - Colstrup Arena 4

    ARE-F-21-01 85,00085,000Replace Arena Flooring 4

    ARE-F-21-02 25,00025,000Arena Ditch Grading 4

    ARE-F-21-03 475,000475,000Replace Arena Roof 4

    ARE-F-21-04 10,00010,000Replace Fire Sprinkler Valve 4

    ARE-F-22-01 190,000190,000Colstrup - Replace Arena Bleachers 4

    ARE-F-23-01 170,000170,000Nystrom Bleachers - South Side 4

    ARE-F-25-01 50,00050,000Paint Nystrom Arena Ceiling 4

    1,299,000624,000 225,000 180,000 100,000 170,000Arena Total

    City Buildings

    CCR-F-21-01 100,00050,000 50,000City Center Renovation Plans 3

    CCR-F-21-02 300,000300,000211 Broadway Ave South - Façade Repair 4

    CCR-F-21-03 80,00080,000Vitality Center Roof 4

    CCR-F-22-01 30,00030,000Replace Library Carpet 4

    CCR-F-23-01 350,000350,000201 Broadway Ave South - Façade Repair 4

    CCR-F-24-01 40,00040,000Energy Efficient Lighting - City Hall 4

    900,000430,000 80,000 350,000 40,000City Buildings Total

    City Garage

    CIG-F-22-01 60,00060,000Replace City Garage Masonry Roof 4

    CIG-F-25-01 6,750,0006,750,000Public Works Facility Addition - Phase Two 4

    CIG-L-21-01 80,00080,000Acquire Property behind the City Garage 4

    6,890,00080,000 60,000 6,750,000City Garage Total

    Civic Theater

    PAC-E-21-01 10,00010,000Theater HVAC Sound Booth and Dressing Room 4

    PAC-E-21-02 60,00060,000Theater Elevator Hydraulic Shaft 4

    PAC-E-23-01 10,00010,000ADA Automatic Door Openers 4

    PAC-E-24-01 25,00025,000Replace Theater Digital Sign 4

    PAC-F-22-01 20,00020,000Theatre Updates 4

    PAC-F-25-01 60,00060,000Replace Theater Windows and Doors 4

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    185,00070,000 20,000 10,000 25,000 60,000Civic Theater Total

    Engineering

    CHN-24-01 2,000,0002,000,000Channel - DM&E RR to AL Lake 4

    ENG-F-21-01 2,000,0002,000,000Blazing Star Contaminated Soil Project 4

    ENG-V-24-01 32,00032,000Replace 2014 Ford Interceptor Unit 100 4

    PARKLT-21-01 150,000150,000Washington/Water Street 4

    PARKLT-22-01 110,000110,000Washington/Main Lot #7 4

    PARKLT-22-02 300,000300,000Freeborn Bank Parking Lot 4

    PARKLT-23-01 300,000300,000Bancroft Bay Park Upper/Lower 4

    PARKLT-23-02 180,000180,000Swimming Pool Park lot 4

    PW-25-01 1,300,0001,300,000Flying J Development 4

    PW-25-02 75,00075,000Bridge Pile Repair 4

    STCON-21-01 300,000300,000209th Street Bituminous Paving 4

    STCON-21-02 3,177,0003,177,0002021 Street Reconstruction Projects 4

    STCON-21-03 40,00020,000 20,000Decorative Lights LED Replacement 4

    STCON-22-01 1,500,0001,500,0002022 Neighborhood Project 4

    STCON-22-02 1,800,0001,800,000Main Street East Recon - I35 to CSAH 38 4

    STCON-22-03 70,00070,000Happy Trails Lane Overlay 4

    STCON-22-04 10,626,00010,626,000E Main Street (Newton to I-35) 4

    STCON-22-05 190,000190,000E Main Street Lighting 4

    STCON-23-01 3,000,0003,000,0005th Street and Frank Hall 4

    STCON-23-02 1,400,0001,400,000Marshall Street and Sibley Avenue Reconstruction 4

    STCON-23-03 50,00050,000Pearl Street Back in Parking/One Way 4

    STCON-23-04 80,00080,000Circle Drive Alley 4

    STCON-23-05 300,000300,000Cedar Avenue Reconstruction 4

    STCON-23-06 400,000400,000Lake Shore Drive Shoreline 4

    STCON-24-01 255,000255,000900 Block Spicer Road Reconstruction 4

    STCON-24-02 1,180,0001,180,000Winter Ave & 7th Street Reconstruction 4

    STCON-24-03 38,30038,300Plainview Lane Curb and Surfacing 4

    STCON-24-04 70,00070,000Clark Street Alley Reconstruction 4

    STCON-24-05 200,000200,000Wedgewood to Riviera Reconstruction 4

    STCON-25-01 1,500,0001,500,000Sunset Street Extension 4

    STCON-25-02 175,000175,000Lake Shore Drive - Pave or Close 4

    STOVL-21-01 541,000541,0002021 Neighborhood Overlay 4

    STOVL-22-01 140,000140,0002022 State Aid Overlay - Richway 4

    STOVL-22-02 850,000850,0002022 State Aid Overlay - Hammer Road 4

    STOVL-23-01 800,000800,0002023 State Aid Overlay 4

    STOVL-24-01 600,000600,000Greenwood Overlay and Sidewalk 4

    STOVL-24-02 1,300,0001,300,000Neighborhood Overlay - Fairlane 4

    STOVL-25-01 1,150,0001,150,000Overlay Crossroads, Lake Chapeau Dr, Marshall 4

    STOVL-25-02 280,000280,000State Aid Overlay - Garfield 4

    TRAIL-22-02 240,000240,000Blazing Star Bike Trail Maint - DNR Portion 4

    TRAIL-23-01 250,000250,000Blazing Star Trail Maintenance 4

    TRAIL-24-01 380,000380,000City Beach to Denmark Park 4

    TRAIL-25-01 600,000600,000New Denmark Park to Blazing Star Trail 4

    39,929,3006,188,000 15,846,000 6,760,000 6,055,300 5,080,000Engineering Total

    Fire

    FIR-E-21-01 22,00022,000Radio Replacement 4

    FIR-E-21-02 100,000100,000CAD Dispatching Equipment 4

    FIR-E-21-03 36,00036,000Apparatus Bay Fans 4

    FIR-E-22-01 16,00016,000SCBA 4

    FIR-E-23-01 5,0005,000SCBA - Self-Contained Breathing Apparatus 4

    FIR-E-23-02 22,00022,000Radio Replacement 4

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    FIR-E-24-01 18,00018,000SCBA - Self-Contained Breathing Apparatus 4

    FIR-E-25-01 5,0005,000SCBA - Self-Contained Breathing Apparatus 4

    FIR-E-25-02 25,00025,000Radio Replacement 4

    FIR-V-22-01 250,000250,000Mini-Rescue Replacement Unit 921 4

    FIR-V-24-01 60,00060,0003/4 Ton Pickup 4

    FIR-V-25-01 650,000650,000Fire Engine with Extrication Equipment 4

    1,209,000158,000 266,000 27,000 78,000 680,000Fire Total

    Parks

    PAR-E-21-01 60,00060,000Replace 2011 Kubota #587 4

    PAR-E-21-02 40,00040,000Replace JD Mower/Blower 4

    PAR-E-21-03 40,00040,000Replace JD Mower/Blower 4

    PAR-E-21-04 60,00060,000Replace JD Tractor Unit 571 4

    PAR-E-22-01 95,00095,000Replace John Deere 244J Loader Unit 581 4

    PAR-E-22-02 60,00060,000Replace JD 4720 Unit 579 4

    PAR-E-22-03 25,00025,000Replace Cushman Utility Vehicle 4

    PAR-E-23-01 35,00035,000New Denmark Park - Replace Fountain 4

    PAR-E-23-02 25,00025,000Palm Beach Pontoon/Hoist 4

    PAR-E-24-01 20,00020,000Replace 2019 Landpride All Flex Batwing Mower 4

    PAR-E-24-02 20,00020,000Replace 2019 Landpride All-Flex Mower 4

    PAR-E-24-03 105,000105,000Replace Toro 510D Wide Area Turf Mower 4

    PAR-E-24-04 50,00050,000Replace JD 1585 Mower/Blower 4

    PAR-E-24-05 85,00085,000Replace BC 1800 Brush Chipper 4

    PAR-E-25-01 20,00020,000Replace Toro Workman 4

    PAR-E-25-02 50,00050,000Wiedenmann Super 600 - Replace 4

    PAR-E-25-03 20,00020,000ExMarker Aereator/Fert Spreader 4

    PAR-F-21-01 55,00055,000Morin Park Shelter 4

    PAR-F-21-02 40,00040,000Playground Equipment - Sondergaard Park 4

    PAR-F-21-03 40,00040,000Replace Sondergaard Court 4

    PAR-F-21-04 50,00050,000Playground Equipment - Memorial Park 4

    PAR-F-21-05 30,00030,000Pickle Ball Court Painting 4

    PAR-F-22-01 40,00040,000Playground Equipment - Valley Park 4

    PAR-F-22-02 15,00015,000Lakeview Park Bathroom 4

    PAR-F-22-03 70,00070,000Edgewater Bay Pavilion Patio 4

    PAR-F-22-04 50,00050,000Playground Equipment - Troy Hammer Park 4

    PAR-F-22-05 15,00015,000Edgewater Path Replacement 4

    PAR-F-22-06 10,00010,000Edgewater Pavilion Breezeway 4

    PAR-F-22-07 300,000300,000Chapeau Neighborhood Park 4

    PAR-F-23-01 40,00040,000Playground Equipment - Lakeview Park 4

    PAR-F-23-02 80,00080,000Skate Park - Replace Equipment 4

    PAR-F-25-01 125,000125,000Pickleball Court Reconstruction 4

    PAR-F-25-02 100,000100,000Marina City Beach 4

    PARKSNYD-01 2,450,000100,000 50,000 2,300,000Snyder Complex Ballfield Improvements 4

    PARKSNYD-02 1,220,000360,000 200,000 150,000 175,000 335,000Snyder Complex Ballfield Improvements 4

    PARKSNYD-03 1,300,0001,300,000Snyder Complex Ballfield Improvements n/a

    PARKSNYD-04 3,700,0003,700,000Snyder Complex Ballfield Improvements n/a

    PAR-V-21-01 25,00025,000Replace F-150 Truck 4

    PAR-V-21-02 50,00050,000Replace F-350 Dump Truck 4

    PAR-V-22-01 30,00030,000Replace Ford F150 Unit #20 4

    PAR-V-22-02 45,00045,000Replace Ford F350 with Plow #140 4

    PAR-V-22-03 55,00055,000Replace F450 #141 4

    PAR-V-23-01 190,000190,000Replace International Bucket Truck Unit 245 4

    PAR-V-25-01 35,00035,000Ford F-250 - Replace 4

    PAR-V-25-02 35,00035,000Ford F-150 - Replace 4

    PAR-V-25-03 40,00040,000Ford F-150 Extra Cab - Replace 4

    PAR-V-25-04 45,00045,000Ford F-250 Crew Cab - Replace 4

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    11,090,000950,000 4,760,000 1,820,000 2,755,000 805,000Parks Total

    Police

    POL-E-21-01 20,00020,000Motorola Radios - 4 4

    POL-E-22-01 25,00025,000AED 4

    POL-E-22-02 100,000100,000HD In-Car Video System 4

    POL-E-22-03 30,00030,000Update BWC 4

    POL-E-22-04 35,00035,000Handguns 4

    POL-E-25-01 150,000150,000Firearms Range 4

    POL-V-21-01 45,00045,000Replace 2016 Ford Interceptor 4

    POL-V-21-02 45,00045,000Replace 2016 Ford Interceptor Unit 383 4

    POL-V-22-01 45,00045,000Replace 2017 Ford Explorer Unit 394 4

    POL-V-22-02 45,00045,000Replace 2017 Ford Explorer Unit 395 4

    POL-V-22-03 45,00045,000Replace 2017 Ford Interceptor Unit 384 4

    POL-V-22-04 45,00045,000Replace 2017 Ford Interceptor 4

    POL-V-23-01 45,00045,000Replace Vehicle 4

    POL-V-23-02 45,00045,000Replace Vehicle 4

    POL-V-23-03 45,00045,000Replace Vehicle 4

    POL-V-24-01 45,00045,000Replace Vehicle 4

    POL-V-24-02 45,00045,000Replace Vehicle 4

    POL-V-24-03 45,00045,000Replace Vehicle 4

    POL-V-25-01 45,00045,000Replace Vehicle 4

    POL-V-25-02 45,00045,000Replace Vehicle 4

    POL-V-25-03 45,00045,000Replace Vehicle 4

    1,035,000110,000 370,000 135,000 135,000 285,000Police Total

    Recreation

    REC-E-21-01 25,00025,000Max Galaxy Software Upgrade n/a

    REC-E-22-01 75,00075,000eSports Lab n/a

    REC-E-23-01 7,0007,000Block Party Trailer and Equipment n/a

    REC-E-24-01 10,00010,000Rental Equipment - Blazing Star Trail n/a

    REC-F-22-01 5,0005,000Arena/Recreation Sign n/a

    REC-F-22-02 15,00015,000Replace Stage n/a

    REC-V-21-01 45,00045,000Replace 2003 Ford F350 Unit 131 n/a

    REC-V-21-02 40,00040,000Replace 2004 Honda CRV Unit 435 with Van n/a

    REC-V-23-01 30,00030,000Replace Ford Taurus n/a

    252,000110,000 95,000 37,000 10,000Recreation Total

    Sidewalks

    SDWK-F-22-01 45,00045,000Sidewalk Katherine Island 4

    45,00045,000Sidewalks Total

    Storm Drainage

    STM-21-01 80,00080,000VA Place Storm Water Sewer System Study 4

    STM-21-02 250,000250,000Replace Plaza Street Culverts 4

    STM-21-03 50,00050,000Rain Garden in the Fairway Park 4

    STM-22-01 30,00030,000Academy Park Rain Garden 4

    STM-22-02 300,000300,000Stormwater Pond Construction - 4th & Front 4

    STM-23-01 2,500,0002,500,000Replace Fountain Lake Dam 4

    STM-24-01 500,000500,000Dredge Channel behind Pearl & Elizabeth 4

    STM-25-01 130,000130,00019 Street Retention Pond 4

    STM-E-21-01 195,00065,000 65,000 65,000Replace Virginia Place Lift Pump 4

    STM-E-21-02 20,00020,000Morin Storm Lift Pump 4

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    4,055,000465,000 395,000 2,565,000 500,000 130,000Storm Drainage Total

    Street Dept Equipment

    STR-E-21-01 260,000260,000Replace TYMCO 500X Sweeper Unit 779 4

    STR-E-21-02 10,00010,000Pressure Washer Replacement 4

    STR-E-21-03 10,00010,000Replace Concrete Saw 4

    STR-E-22-01 65,00065,000Crafco Melter SS 125 Unit 793 4

    STR-E-22-02 125,000125,000Caterpillar Roller Unit 762 4

    STR-E-22-03 10,00010,000Truck Mounted Compressor 4

    STR-E-22-04 175,000175,000Replace Snogo WK800 Snowblower 4

    STR-E-23-01 175,000175,000Replace Rosco Patching Machine 4

    STR-E-24-01 220,000220,000Replace Elgin Pelican Sweeper 4

    STR-E-24-02 50,00050,000Replace Bobcat Skid Loader 4

    STR-E-24-03 60,00060,000Replace Mini Excavator 4

    STR-E-25-01 245,000245,000Replace Etnyre Chip Spreader 4

    STR-E-25-02 185,000185,000CAT 924 Wheel Loader 4

    STR-E-25-03 90,00090,000250 KW Generator 4

    STR-V-21-01 40,00040,000Replace GMC Sierra 3500 Unit 139 4

    STR-V-21-02 250,000250,000Replace Sterling 2 Ton Dump Truck Unit 242 4

    STR-V-21-03 200,000200,000Replace Sterling 2 Ton Dump Truck Unit 243 4

    STR-V-22-01 30,00030,000Ford F-150 Pickup 4

    STR-V-23-01 205,000205,000Replace International 7400 SBA Unit 244 4

    STR-V-23-02 170,000170,000Replace International S Series Dump Truck Unit 246 4

    STR-V-23-03 185,000185,000Replace International 7300 - Brine Truck Unit 790 4

    2,760,000770,000 405,000 735,000 330,000 520,000Street Dept Equipment Total

    GRAND TOTAL 138,345,80017,593,000 28,231,500 24,074,000 28,937,300 39,510,000

    Tuesday, January 05, 2021

  • Capital Improvement Plan

    City of Albert Lea, Minnesota

    PROJECTS BY FUNDING SOURCE

    2021 2025thru

    TotalSource Project # Priority 2021 2022 2023 2024 2025

    101 - General Fund Budget

    AQU-F-24-01 50,00050,000Replace Play Features - Zero Depth Pool 4

    ARE-E-21-02 9,0009,000Sprinkler System Valve 4

    PAR-E-23-02 25,00025,000Palm Beach Pontoon/Hoist 4

    PAR-F-22-01 40,00040,000Playground Equipment - Valley Park 4

    PAR-F-22-02 15,00015,000Lakeview Park Bathroom 4

    PAR-F-22-06 10,00010,000Edgewater Pavilion Breezeway 4

    PAR-F-23-01 40,00040,000Playground Equipment - Lakeview Park 4

    PAR-F-23-02 80,00080,000Skate Park - Replace Equipment 4

    PAR-F-25-01 100,000100,000Pickleball Court Reconstruction 4

    REC-E-23-01 7,0007,000Block Party Trailer and Equipment n/a

    REC-E-24-01 10,00010,000Rental Equipment - Blazing Star Trail n/a

    REC-F-22-01 5,0005,000Arena/Recreation Sign n/a

    REC-F-22-02 15,00015,000Replace Stage n/a

    STCON-21-03 40,00020,000 20,000Decorative Lights LED Replacement 4

    446,00029,000 105,000 152,000 60,000 100,000101 - General Fund Budget Total

    225 - Airport Fund

    AIR-E-22-01 63,00063,000Tractor and Mower 4

    AIR-E-22-02 20,00020,000RCO Relocation 4

    AIR-E-23-01 8,5008,500Sweeper Attachment 4

    AIR-F-21-01 30,00030,000Relocate Fence and Tree Removal 4

    AIR-F-21-02 18,90018,900Installation of Maintenance Building Bi-fold Door 4

    AIR-F-22-01 43,50043,500Design Fixed Base Operator Hangar 4

    AIR-F-22-02 24,00024,000NAVAID Access Road Construction 4

    AIR-F-22-03 4,0004,000Demolish or Relocate Wood Hangar 4

    AIR-F-22-04 37,50037,500Design New T-Hangar 4

    AIR-F-22-05 37,50037,500Pavement Cleaning and Seal Coat 4

    AIR-F-23-01 450,000450,000Hangar Facility 4

    AIR-F-23-02 67,50067,500Hangar Site Preparation 4

    AIR-F-23-03 372,000372,000Construct New T-Hangar 4

    AIR-F-25-01 26,50026,500Precision Approach Preparation 4

    AIR-L-22-01 10,00010,000Land Purchase 4

    AIR-V-24-01 16,00016,000Snow Removal Equipment Vehicle 4

    1,228,90048,900 239,500 898,000 16,000 26,500225 - Airport Fund Total

    250 - Fire Capital Fund

    FIR-E-21-01 22,00022,000Radio Replacement 4

    FIR-E-21-02 100,000100,000CAD Dispatching Equipment 4

    FIR-E-21-03 36,00036,000Apparatus Bay Fans 4

    FIR-E-22-01 16,00016,000SCBA 4

    FIR-E-23-01 5,0005,000SCBA - Self-Contained Breathing Apparatus 4

    FIR-E-23-02 22,00022,000Radio Replacement 4

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    FIR-E-24-01 18,00018,000SCBA - Self-Contained Breathing Apparatus 4

    FIR-E-25-01 5,0005,000SCBA - Self-Contained Breathing Apparatus 4

    FIR-E-25-02 25,00025,000Radio Replacement 4

    249,000158,000 16,000 27,000 18,000 30,000250 - Fire Capital Fund Total

    251 - Police Capital Fund

    POL-E-21-01 20,00020,000Motorola Radios - 4 4

    POL-E-22-01 25,00025,000AED 4

    POL-E-22-02 100,000100,000HD In-Car Video System 4

    POL-E-22-03 30,00030,000Update BWC 4

    POL-E-22-04 35,00035,000Handguns 4

    POL-E-25-01 150,000150,000Firearms Range 4

    360,00020,000 190,000 150,000251 - Police Capital Fund Total

    401 - Capital Project Fund

    CCR-F-21-02 300,000300,000211 Broadway Ave South - Façade Repair 4

    CCR-F-23-01 350,000350,000201 Broadway Ave South - Façade Repair 4

    CIG-L-21-01 26,00026,000Acquire Property behind the City Garage 4

    ENG-F-21-01 450,000450,000Blazing Star Contaminated Soil Project 4

    PAR-E-23-01 30,00030,000New Denmark Park - Replace Fountain 4

    PAR-F-21-02 40,00040,000Playground Equipment - Sondergaard Park 4

    PAR-F-21-03 40,00040,000Replace Sondergaard Court 4

    PAR-F-21-04 50,00050,000Playground Equipment - Memorial Park 4

    PAR-F-21-05 30,00030,000Pickle Ball Court Painting 4

    PAR-F-22-03 70,00070,000Edgewater Bay Pavilion Patio 4

    PAR-F-22-04 50,00050,000Playground Equipment - Troy Hammer Park 4

    PAR-F-22-05 15,00015,000Edgewater Path Replacement 4

    PW-25-01 160,000160,000Flying J Development 4

    SDWK-F-22-01 45,00045,000Sidewalk Katherine Island 4

    STCON-23-06 100,000100,000Lake Shore Drive Shoreline 4

    STM-22-02 100,000100,000Stormwater Pond Construction - 4th & Front 4

    1,856,000936,000 280,000 480,000 160,000401 - Capital Project Fund Total

    404 - Park Dedication Fund

    PAR-F-21-01 35,00035,000Morin Park Shelter 4

    35,00035,000404 - Park Dedication Fund Total

    406 - Building Maintenance Fund

    AQU-E-22-01 10,00010,000Replace Pool Sound System 4

    AQU-E-23-01 20,00020,000Replace Feature Pool Boilers 4

    AQU-E-24-01 50,00050,000Replace Main Pool Boilers 4

    AQU-F-21-01 65,00065,000Bathhouse Project - Phase 1 4

    AQU-F-21-02 50,00050,000Gel Coat Pool Slide 4

    AQU-F-22-01 50,00050,000Bathhouse Project - Phase 2 4

    AQU-F-22-02 35,00035,000Paint Pool and Pool Decks 4

    AQU-F-25-01 100,000100,000Aquatic Center Parking Area 4

    ARE-E-21-01 20,00020,000Arena Speaker System 4

    ARE-E-22-02 20,00020,000Lobby Area Furnace 4

    ARE-E-23-01 10,00010,000Replace Colstrup Arena Scoreboard 4

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    ARE-E-25-01 25,00025,000Replace Arena Shower Unit 4

    ARE-F-21-02 25,00025,000Arena Ditch Grading 4

    ARE-F-21-04 10,00010,000Replace Fire Sprinkler Valve 4

    ARE-F-25-01 50,00050,000Paint Nystrom Arena Ceiling 4

    CCR-F-21-01 100,00050,000 50,000City Center Renovation Plans 3

    CCR-F-21-03 80,00080,000Vitality Center Roof 4

    CCR-F-22-01 30,00030,000Replace Library Carpet 4

    CCR-F-24-01 40,00040,000Energy Efficient Lighting - City Hall 4

    CIG-F-22-01 60,00060,000Replace City Garage Masonry Roof 4

    PAC-E-21-01 10,00010,000Theater HVAC Sound Booth and Dressing Room 4

    PAC-E-21-02 60,00060,000Theater Elevator Hydraulic Shaft 4

    PAC-E-23-01 10,00010,000ADA Automatic Door Openers 4

    PAC-E-24-01 25,00025,000Replace Theater Digital Sign 4

    PAC-F-22-01 20,00020,000Theatre Updates 4

    PAC-F-25-01 60,00060,000Replace Theater Windows and Doors 4

    1,035,000370,000 275,000 40,000 115,000 235,000406 - Building Maintenance Fund Total

    409 - Storm Water Fund

    STM-21-01 60,00060,000VA Place Storm Water Sewer System Study 4

    STM-21-02 50,00050,000Replace Plaza Street Culverts 4

    STM-21-03 25,00025,000Rain Garden in the Fairway Park 4

    STM-22-01 15,00015,000Academy Park Rain Garden 4

    STM-E-21-01 195,00065,000 65,000 65,000Replace Virginia Place Lift Pump 4

    STM-E-21-02 20,00020,000Morin Storm Lift Pump 4

    365,000220,000 80,000 65,000409 - Storm Water Fund Total

    601 - 601 Water Fund

    CIG-L-21-01 27,00027,000Acquire Property behind the City Garage 4

    STCON-22-01 270,000270,0002022 Neighborhood Project 4

    STCON-23-01 630,000630,0005th Street and Frank Hall 4

    STCON-23-02 200,000200,000Marshall Street and Sibley Avenue Reconstruction 4

    STCON-24-01 52,00052,000900 Block Spicer Road Reconstruction 4

    STCON-24-02 210,000210,000Winter Ave & 7th Street Reconstruction 4

    STCON-25-01 126,500126,500Sunset Street Extension 4

    WAT-E-21-01 64,00032,000 32,000Replace Water Plant Backwash Valves 4

    WAT-E-23-01 70,00035,000 35,000Water Plant Pump and Casing Inspection & Repair 4

    WAT-E-23-02 30,00030,000East Water Tower Lighting 4

    WAT-F-24-01 187,000187,000Replace 14th Street Water Main 4

    WAT-F-24-02 70,00070,000Replace 11th Street Water Main 4

    WAT-F-24-03 20,00020,000Replace Granular Material at the West Water Plant 4

    WAT-F-25-99 250,000250,0002025 Water Projects 4

    2,206,50059,000 302,000 895,000 539,000 411,500601 - 601 Water Fund Total

    601 - Bonding - GO Water Revenue B

    CIG-F-25-01 2,250,0002,250,000Public Works Facility Addition - Phase Two 4

    STCON-21-02 740,000740,0002021 Street Reconstruction Projects 4

    WAT-F-21-02 350,000350,000West and North Water Treatment Air Quality Imp 4

    WAT-F-23-01 650,000650,000Repaint East Water Tower 4

    WAT-F-23-02 350,000350,000Plaza Street Water Main Extension 4

    WAT-F-23-03 700,000700,000East Water Tower Chlorine Bldg 4

    WAT-F-25-99 250,000250,0002025 Water Projects 4

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    5,290,0001,090,000 1,700,000 2,500,000601 - Bonding - GO Water Revenue

    Bond Total

    601 - Bonding - PFA

    WAT-F-21-01 4,700,0004,700,000Central Water Tower Replacement 4

    4,700,0004,700,000601 - Bonding - PFA Total

    602 - 602 Sewer Fund

    CIG-L-21-01 27,00027,000Acquire Property behind the City Garage 4

    SCO-1 1,200,000300,000 300,000 300,000 300,000Sanitary Sewer Slip Lining Program 4

    SCO-2 250,00050,000 50,000 50,000 50,000 50,000Lift Station Pump Rebuilding Project 4

    SCO-3 40,00020,000 20,000Smoke Test Sanitary Sewer 4

    SCO-4 50,00025,000 25,000Main Lift Station - Rebuild pumps 4

    SCO-E-21-02 30,00030,000Rebuild Pumps at Hayek 4

    SCO-E-21-03 20,00020,000Rebuild Pumps at Plainview 4

    SCO-E-22-01 90,00090,000Sewer Camera/Crawler Replacement 4

    SCO-E-23-01 80,00080,000102 James Lift Station 4

    SCO-E-25-01 40,00040,000Installation of Filters on Force Main 4

    SCO-F-21-01 300,000300,000Slip Line Blackmere and Channel 4

    SCO-F-22-01 150,000150,000Replace Sanitary Sewer under S Broadway Tracks 4

    SCO-F-23-01 500,000500,000TH65 to 6th & St John Sewer Line Replacement 4

    SCO-F-24-01 240,000240,000Garfield Lift Station Force Main Replacement 4

    SCO-F-25-01 75,00075,000W 9th/Lincoln Avenue Sewer 4

    SCO-V-22-01 50,00050,000Replace 2012 Ford F250 #21 4

    STCON-21-02 860,000860,0002021 Street Reconstruction Projects 4

    STCON-22-01 257,000257,0002022 Neighborhood Project 4

    STCON-23-01 630,000630,0005th Street and Frank Hall 4

    STCON-23-02 150,000150,000Marshall Street and Sibley Avenue Reconstruction 4

    STCON-24-02 200,000200,000Winter Ave & 7th Street Reconstruction 4

    STCON-25-01 126,500126,500Sunset Street Extension 4

    STOVL-21-01 36,00036,0002021 Neighborhood Overlay 4

    STOVL-22-01 20,00020,0002022 State Aid Overlay - Richway 4

    STOVL-22-02 56,00056,0002022 State Aid Overlay - Hammer Road 4

    STOVL-23-01 73,00073,0002023 State Aid Overlay 4

    STOVL-24-01 50,00050,000Greenwood Overlay and Sidewalk 4

    STOVL-24-02 65,00065,000Neighborhood Overlay - Fairlane 4

    STOVL-25-01 60,00060,000Overlay Crossroads, Lake Chapeau Dr, Marshall 4

    STOVL-25-02 30,00030,000State Aid Overlay - Garfield 4

    WWTP-F-21 3,250,0001,650,000 1,600,000Design/Bidding Septic Receiving/Grit Building 4

    WWTP-F-22-01 1,008,500476,000 532,500New Septic Receiving Station/Grit Bldg Renovation 4

    WWTP-F-23-03 5,250,0005,250,000Secondary Treatment - Phosphorus Removal 4

    WWTP-F-99 900,000300,000 300,000 300,000Chemicals and Maintenance n/a

    WWTP-V-24-01 32,00032,000Replace 2015 Ford Interceptor Unit 24 4

    16,196,0002,998,000 3,094,000 2,615,500 1,257,000 6,231,500602 - 602 Sewer Fund Total

    602 - Bonding - GO Sewer Revenue Bo

    CIG-F-25-01 2,250,0002,250,000Public Works Facility Addition - Phase Two 4

    SCO-F-25-02 2,500,0002,500,000Eastside Sewer Upgrade 4

    WWTP-F-22-01 2,186,500944,000 1,242,500New Septic Receiving Station/Grit Bldg Renovation 4

    WWTP-F-23-01 2,870,000861,000 2,009,000Coatings Replacement 4

    WWTP-F-23-02 1,670,000501,000 1,169,000Primary Treatment Improvements 4

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    WWTP-F-23-03 5,250,0001,050,000 4,200,000Secondary Treatment - Phosphorus Removal 4

    WWTP-F-23-04 1,880,000564,000 1,316,000WAS Thickening Improvements 4

    WWTP-F-23-05 1,810,000543,000 1,267,000Sludge Storage Improvements 4

    WWTP-F-23-06 1,340,000402,000 938,000WWTP Electrical Improvements 4

    WWTP-F-23-07 140,000140,000B Side High Voltage Wire Replacement 4

    WWTP-F-24-01 780,000234,000 546,000Effluent Filter Improvements 4

    WWTP-F-24-02 180,00054,000 126,000Preaeration Tank Improvements 4

    WWTP-F-24-03 3,710,0001,113,000 2,597,000UV System Replacement 4

    WWTP-F-24-04 6,970,0002,091,000 4,879,000Anaerobic Digestion Improvements 4

    WWTP-F-24-05 4,140,0001,242,000 2,898,000Hot Water System Improvements 4

    WWTP-F-24-06 1,840,000552,000 1,288,000Building Roof Replacements 4

    WWTP-F-24-07 290,00087,000 203,000Utility Water Improvements 4

    WWTP-F-24-08 1,550,000465,000 1,085,000Digested Sludge Thickening Improvements 4

    WWTP-F-25-01 1,080,0001,080,000FRP Cover Replacement 4

    42,436,500944,000 5,303,500 16,737,000 19,452,000602 - Bonding - GO Sewer Revenue

    Bond Total

    701 - Central Garage Fund

    ARE-E-22-01 15,00015,000Replace John Deere Mower 4

    ENG-V-24-01 32,00032,000Replace 2014 Ford Interceptor Unit 100 4

    FIR-V-22-01 250,000250,000Mini-Rescue Replacement Unit 921 4

    FIR-V-24-01 60,00060,0003/4 Ton Pickup 4

    FIR-V-25-01 650,000650,000Fire Engine with Extrication Equipment 4

    PAR-E-21-01 60,00060,000Replace 2011 Kubota #587 4

    PAR-E-21-02 40,00040,000Replace JD Mower/Blower 4

    PAR-E-21-03 40,00040,000Replace JD Mower/Blower 4

    PAR-E-21-04 60,00060,000Replace JD Tractor Unit 571 4

    PAR-E-22-01 95,00095,000Replace John Deere 244J Loader Unit 581 4

    PAR-E-22-02 60,00060,000Replace JD 4720 Unit 579 4

    PAR-E-22-03 25,00025,000Replace Cushman Utility Vehicle 4

    PAR-E-24-01 20,00020,000Replace 2019 Landpride All Flex Batwing Mower 4

    PAR-E-24-02 20,00020,000Replace 2019 Landpride All-Flex Mower 4

    PAR-E-24-03 105,000105,000Replace Toro 510D Wide Area Turf Mower 4

    PAR-E-24-04 50,00050,000Replace JD 1585 Mower/Blower 4

    PAR-E-24-05 85,00085,000Replace BC 1800 Brush Chipper 4

    PAR-E-25-01 20,00020,000Replace Toro Workman 4

    PAR-E-25-02 50,00050,000Wiedenmann Super 600 - Replace 4

    PAR-E-25-03 20,00020,000ExMarker Aereator/Fert Spreader 4

    PAR-V-21-01 25,00025,000Replace F-150 Truck 4

    PAR-V-21-02 50,00050,000Replace F-350 Dump Truck 4

    PAR-V-22-01 30,00030,000Replace Ford F150 Unit #20 4

    PAR-V-22-02 45,00045,000Replace Ford F350 with Plow #140 4

    PAR-V-22-03 55,00055,000Replace F450 #141 4

    PAR-V-23-01 190,000190,000Replace International Bucket Truck Unit 245 4

    PAR-V-25-01 35,00035,000Ford F-250 - Replace 4

    PAR-V-25-02 35,00035,000Ford F-150 - Replace 4

    PAR-V-25-03 40,00040,000Ford F-150 Extra Cab - Replace 4

    PAR-V-25-04 45,00045,000Ford F-250 Crew Cab - Replace 4

    POL-V-21-01 45,00045,000Replace 2016 Ford Interceptor 4

    POL-V-21-02 45,00045,000Replace 2016 Ford Interceptor Unit 383 4

    POL-V-22-01 45,00045,000Replace 2017 Ford Explorer Unit 394 4

    POL-V-22-02 45,00045,000Replace 2017 Ford Explorer Unit 395 4

    POL-V-22-03 45,00045,000Replace 2017 Ford Interceptor Unit 384 4

    POL-V-22-04 45,00045,000Replace 2017 Ford Interceptor 4

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    POL-V-23-01 45,00045,000Replace Vehicle 4

    POL-V-23-02 45,00045,000Replace Vehicle 4

    POL-V-23-03 45,00045,000Replace Vehicle 4

    POL-V-24-01 45,00045,000Replace Vehicle 4

    POL-V-24-02 45,00045,000Replace Vehicle 4

    POL-V-24-03 45,00045,000Replace Vehicle 4

    POL-V-25-01 45,00045,000Replace Vehicle 4

    POL-V-25-02 45,00045,000Replace Vehicle 4

    POL-V-25-03 45,00045,000Replace Vehicle 4

    REC-V-21-01 45,00045,000Replace 2003 Ford F350 Unit 131 n/a

    REC-V-21-02 40,00040,000Replace 2004 Honda CRV Unit 435 with Van n/a

    REC-V-23-01 30,00030,000Replace Ford Taurus n/a

    SCO-E-21-01 8,0008,000Brush Cutter 4

    SCO-E-25-02 90,00090,000250 KW Generator Unit 701 4

    SCO-V-21-01 30,00030,000Replace 2011 GMC 1500 4

    SCO-V-22-02 400,000400,000Replace 2014 Jet Vac Truck - Unit 796 4

    SCO-V-22-03 35,00035,000Replace 2008 Chevrolet Pickup Unit 14 4

    STR-E-21-01 235,000235,000Replace TYMCO 500X Sweeper Unit 779 4

    STR-E-21-02 10,00010,000Pressure Washer Replacement 4

    STR-E-21-03 10,00010,000Replace Concrete Saw 4

    STR-E-22-01 65,00065,000Crafco Melter SS 125 Unit 793 4

    STR-E-22-02 125,000125,000Caterpillar Roller Unit 762 4

    STR-E-22-03 10,00010,000Truck Mounted Compressor 4

    STR-E-22-04 175,000175,000Replace Snogo WK800 Snowblower 4

    STR-E-23-01 175,000175,000Replace Rosco Patching Machine 4

    STR-E-24-01 220,000220,000Replace Elgin Pelican Sweeper 4

    STR-E-24-02 50,00050,000Replace Bobcat Skid Loader 4

    STR-E-24-03 60,00060,000Replace Mini Excavator 4

    STR-E-25-01 245,000245,000Replace Etnyre Chip Spreader 4

    STR-E-25-02 185,000185,000CAT 924 Wheel Loader 4

    STR-E-25-03 90,00090,000250 KW Generator 4

    STR-V-21-01 40,00040,000Replace GMC Sierra 3500 Unit 139 4

    STR-V-21-02 250,000250,000Replace Sterling 2 Ton Dump Truck Unit 242 4

    STR-V-21-03 200,000200,000Replace Sterling 2 Ton Dump Truck Unit 243 4

    STR-V-22-01 30,00030,000Ford F-150 Pickup 4

    STR-V-23-01 205,000205,000Replace International 7400 SBA Unit 244 4

    STR-V-23-02 170,000170,000Replace International S Series Dump Truck Unit 246 4

    STR-V-23-03 185,000185,000Replace International 7300 - Brine Truck Unit 790 4

    WAT-E-21-02 15,00015,000Replace Backhoe Jack Hammer 4

    WAT-E-23-03 20,00020,000Replace 2002 Sull Air Air Compressor #776 4

    WAT-V-21-01 30,00030,000Replace 2011 GMC 1500 4

    WAT-V-22-01 30,00030,000Replace 2012 Ford Transit Cargo Van #19 4

    WAT-V-22-02 30,00030,000Replace 2012 GMC 1500 #18 4

    WAT-V-23-01 30,00030,000Replace 2012 Chevy 1500 #17 4

    WAT-V-25-01 30,00030,000Replace Ford F150 4

    WAT-V-25-02 50,00050,000Replace Ford F550 4

    WWTP-E-21-01 50,00050,000Replace 1990 Allis Tractor with Bucket Unit 552 4

    WWTP-E-22-01 15,00015,000Replace Polaris Ranger 4

    WWTP-E-25-01 18,00018,000Replace Kubota 551 4

    WWTP-V-21-01 30,00030,000Replace 2002 Crew Cab Ford F250 Unit 93 4

    WWTP-V-22-01 30,00030,000Replace 2008 Ford Pickup Unit 374 4

    6,773,0001,358,000 1,700,000 1,140,000 837,000 1,738,000701 - Central Garage Fund Total

    702 - IT Capital Fund

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    IT Computers 200,00040,000 40,000 40,000 40,000 40,000Computer Replace Program n/a

    IT-COUNTY 40,00010,000 10,000 10,000 10,000County Hardware Costs n/a

    REC-E-21-01 25,00025,000Max Galaxy Software Upgrade n/a

    REC-E-22-01 75,00075,000eSports Lab n/a

    340,00065,000 125,000 50,000 50,000 50,000702 - IT Capital Fund Total

    Bonding - Capital Imp/Equipment

    ARE-E-24-01 100,000100,000Replace Arena Heaters 4

    ARE-E-25-02 95,00095,000HVAC - Colstrup Arena 4

    ARE-F-21-01 85,00085,000Replace Arena Flooring 4

    ARE-F-21-03 475,000475,000Replace Arena Roof 4

    ARE-F-22-01 190,000190,000Colstrup - Replace Arena Bleachers 4

    ARE-F-23-01 170,000170,000Nystrom Bleachers - South Side 4

    CIG-F-25-01 2,250,0002,250,000Public Works Facility Addition - Phase Two 4

    3,365,000560,000 190,000 170,000 100,000 2,345,000Bonding - Capital Imp/Equipment Total

    Bonding - Street Projects

    CHN-24-01 500,000500,000Channel - DM&E RR to AL Lake 4

    PARKLT-21-01 150,000150,000Washington/Water Street 4

    PARKLT-22-01 110,000110,000Washington/Main Lot #7 4

    PARKLT-22-02 300,000300,000Freeborn Bank Parking Lot 4

    PARKLT-23-01 300,000300,000Bancroft Bay Park Upper/Lower 4

    PARKLT-23-02 180,000180,000Swimming Pool Park lot 4

    STCON-21-01 200,000200,000209th Street Bituminous Paving 4

    STCON-21-02 766,000766,0002021 Street Reconstruction Projects 4

    STCON-22-01 633,000633,0002022 Neighborhood Project 4

    STCON-22-02 180,000180,000Main Street East Recon - I35 to CSAH 38 4

    STCON-22-03 42,00042,000Happy Trails Lane Overlay 4

    STCON-22-04 400,000400,000E Main Street (Newton to I-35) 4

    STCON-22-05 190,000190,000E Main Street Lighting 4

    STCON-23-01 960,000960,0005th Street and Frank Hall 4

    STCON-23-03 50,00050,000Pearl Street Back in Parking/One Way 4

    STCON-23-04 15,00015,000Circle Drive Alley 4

    STCON-23-05 300,000300,000Cedar Avenue Reconstruction 4

    STCON-24-01 88,00088,000900 Block Spicer Road Reconstruction 4

    STCON-24-02 500,000500,000Winter Ave & 7th Street Reconstruction 4

    STCON-24-03 18,50018,500Plainview Lane Curb and Surfacing 4

    STCON-24-04 30,00030,000Clark Street Alley Reconstruction 4

    STCON-24-05 100,000100,000Wedgewood to Riviera Reconstruction 4

    STCON-25-01 1,012,0001,012,000Sunset Street Extension 4

    STCON-25-02 118,125118,125Lake Shore Drive - Pave or Close 4

    STM-23-01 500,000500,000Replace Fountain Lake Dam 4

    STM-24-01 250,000250,000Dredge Channel behind Pearl & Elizabeth 4

    STM-25-01 130,000130,00019 Street Retention Pond 4

    STOVL-21-01 154,000154,0002021 Neighborhood Overlay 4

    STOVL-24-01 100,000100,000Greenwood Overlay and Sidewalk 4

    STOVL-24-02 550,000550,000Neighborhood Overlay - Fairlane 4

    STOVL-25-01 630,000630,000Overlay Crossroads, Lake Chapeau Dr, Marshall 4

    TRAIL-23-01 250,000250,000Blazing Star Trail Maintenance 4

    TRAIL-24-01 90,00090,000City Beach to Denmark Park 4

    TRAIL-25-01 100,000100,000New Denmark Park to Blazing Star Trail 4

    WAT-F-24-01 200,000200,000Replace 14th Street Water Main 4

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    WAT-F-24-02 110,000110,000Replace 11th Street Water Main 4

    10,206,6251,270,000 1,855,000 2,555,000 2,536,500 1,990,125Bonding - Street Projects Total

    DEED

    ENG-F-21-01 1,500,0001,500,000Blazing Star Contaminated Soil Project 4

    1,500,0001,500,000DEED Total

    Developer

    ENG-F-21-01 50,00050,000Blazing Star Contaminated Soil Project 4

    PW-25-01 1,140,0001,140,000Flying J Development 4

    1,190,00050,000 1,140,000Developer Total

    Federal

    STCON-22-02 1,440,0001,440,000Main Street East Recon - I35 to CSAH 38 4

    1,440,0001,440,000Federal Total

    Federal - FAA

    AIR-E-25-02 600,000600,000Instrument Landing System 4

    AIR-F-22-02 56,00056,000NAVAID Access Road Construction 4

    AIR-F-22-03 36,00036,000Demolish or Relocate Wood Hangar 4

    AIR-F-22-05 375,000375,000Pavement Cleaning and Seal Coat 4

    AIR-F-25-01 238,500238,500Precision Approach Preparation 4

    AIR-L-22-01 90,00090,000Land Purchase 4

    AIR-V-24-01 144,000144,000Snow Removal Equipment Vehicle 4

    1,539,500557,000 144,000 838,500Federal - FAA Total

    Federal - ISTEA

    TRAIL-25-01 400,000400,000New Denmark Park to Blazing Star Trail 4

    400,000400,000Federal - ISTEA Total

    Freeborn County

    STCON-23-02 540,000540,000Marshall Street and Sibley Avenue Reconstruction 4

    540,000540,000Freeborn County Total

    Grant

    PAR-F-25-02 100,000100,000Marina City Beach 4

    STCON-22-04 2,536,0002,536,000E Main Street (Newton to I-35) 4

    2,636,0002,536,000 100,000Grant Total

    Private Funds/Donations

    PAR-E-23-01 5,0005,000New Denmark Park - Replace Fountain 4

    PAR-F-21-01 20,00020,000Morin Park Shelter 4

    PAR-F-22-07 300,000300,000Chapeau Neighborhood Park 4

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    PAR-F-25-01 25,00025,000Pickleball Court Reconstruction 4

    350,00020,000 300,000 5,000 25,000Private Funds/Donations Total

    Shell Rock River Watershed

    STCON-23-06 300,000300,000Lake Shore Drive Shoreline 4

    STM-21-01 20,00020,000VA Place Storm Water Sewer System Study 4

    STM-21-03 25,00025,000Rain Garden in the Fairway Park 4

    STM-22-01 15,00015,000Academy Park Rain Garden 4

    STR-E-21-01 25,00025,000Replace TYMCO 500X Sweeper Unit 779 4

    385,00070,000 15,000 300,000Shell Rock River Watershed Total

    Special Assessments

    SCO-F-25-01 75,00075,000W 9th/Lincoln Avenue Sewer 4

    STCON-21-01 100,000100,000209th Street Bituminous Paving 4

    STCON-21-02 811,000811,0002021 Street Reconstruction Projects 4

    STCON-22-01 340,000340,0002022 Neighborhood Project 4

    STCON-22-03 28,00028,000Happy Trails Lane Overlay 4

    STCON-23-01 780,000780,0005th Street and Frank Hall 4

    STCON-23-02 200,000200,000Marshall Street and Sibley Avenue Reconstruction 4

    STCON-23-04 65,00065,000Circle Drive Alley 4

    STCON-24-01 115,000115,000900 Block Spicer Road Reconstruction 4

    STCON-24-02 270,000270,000Winter Ave & 7th Street Reconstruction 4

    STCON-24-03 19,80019,800Plainview Lane Curb and Surfacing 4

    STCON-24-04 40,00040,000Clark Street Alley Reconstruction 4

    STCON-24-05 100,000100,000Wedgewood to Riviera Reconstruction 4

    STCON-25-01 235,000235,000Sunset Street Extension 4

    STCON-25-02 56,87556,875Lake Shore Drive - Pave or Close 4

    STOVL-21-01 351,000351,0002021 Neighborhood Overlay 4

    STOVL-22-01 77,00077,0002022 State Aid Overlay - Richway 4

    STOVL-22-02 142,000142,0002022 State Aid Overlay - Hammer Road 4

    STOVL-23-01 320,000320,0002023 State Aid Overlay 4

    STOVL-24-01 130,000130,000Greenwood Overlay and Sidewalk 4

    STOVL-24-02 685,000685,000Neighborhood Overlay - Fairlane 4

    STOVL-25-01 460,000460,000Overlay Crossroads, Lake Chapeau Dr, Marshall 4

    STOVL-25-02 110,000110,000State Aid Overlay - Garfield 4

    WAT-F-23-02 100,000100,000Plaza Street Water Main Extension 4

    WAT-F-24-01 213,000213,000Replace 14th Street Water Main 4

    WAT-F-24-02 120,000120,000Replace 11th Street Water Main 4

    5,943,6751,262,000 587,000 1,465,000 1,692,800 936,875Special Assessments Total

    State - DNR

    CHN-24-01 1,500,0001,500,000Channel - DM&E RR to AL Lake 4

    STM-22-02 200,000200,000Stormwater Pond Construction - 4th & Front 4

    STM-23-01 2,000,0002,000,000Replace Fountain Lake Dam 4

    STM-24-01 250,000250,000Dredge Channel behind Pearl & Elizabeth 4

    TRAIL-22-02 240,000240,000Blazing Star Bike Trail Maint - DNR Portion 4

    TRAIL-24-01 290,000290,000City Beach to Denmark Park 4

    TRAIL-25-01 100,000100,000New Denmark Park to Blazing Star Trail 4

    4,580,000440,000 2,000,000 2,040,000 100,000State - DNR Total

    Tuesday, January 05, 2021

  • TotalSource Project # Priority 2021 2022 2023 2024 2025

    State - MnDOT

    STCON-22-04 6,890,0006,890,000E Main Street (Newton to I-35) 4

    STM-21-02 200,000200,000Replace Plaza Street Culverts 4

    7,090,000200,000 6,890,000State - MnDOT Total

    State - Municipal State Aid

    PW-25-02 75,00075,000Bridge Pile Repair 4

    STCON-22-02 180,000180,000Main Street East Recon - I35 to CSAH 38 4

    STCON-22-04 800,000800,000E Main Street (Newton to I-35) 4

    STCON-23-02 310,000310,000Marshall Street and Sibley Avenue Reconstruction 4

    STOVL-22-01 43,00043,0002022 State Aid Overlay - Richway 4

    STOVL-22-02 652,000652,0002022 State Aid Overlay - Hammer Road 4

    STOVL-23-01 407,000407,0002023 State Aid Overlay 4

    STOVL-24-01 320,000320,000Greenwood Overlay and Sidewalk 4

    STOVL-25-02 140,000140,000State Aid Overlay - Garfield 4

    2,927,0001,675,000 717,000 320,000 215,000State - Municipal State Aid Total

    State MnDOT - Aeronautics

    AIR-E-22-01 127,000127,000Tractor and Mower 4

    AIR-E-22-02 180,000180,000RCO Relocation 4

    AIR-E-23-01 16,50016,500Sweeper Attachment 4

    AIR-F-21-01 70,00070,000Relocate Fence and Tree Removal 4

    AIR-F-21-02 44,10044,100Installation of Maintenance Building Bi-fold Door 4

    AIR-F-22-01 101,500101,500Design Fixed Base Operator Hangar 4

    AIR-F-22-04 37,50037,500Design New T-Hangar 4

    AIR-F-23-01 1,050,0001,050,000Hangar Facility 4

    AIR-F-23-02 67,50067,500Hangar Site Preparation 4

    AIR-F-23-03 372,000372,000Construct New T-Hangar 4

    2,066,100114,100 446,000 1,506,000State MnDOT - Aeronautics Total

    Undetermined Funding Source

    PARKSNYD-01 2,450,000100,000 50,000 2,300,000Snyder Complex Ballfield Improvements 4

    PARKSNYD-02 1,220,000360,000 200,000 150,000 175,000 335,000Snyder Complex Ballfield Improvements 4

    PARKSNYD-03 1,300,0001,300,000Snyder Complex Ballfield Improvements n/a

    PARKSNYD-04 3,700,0003,700,000Snyder Complex Ballfield Improvements n/a

    8,670,000460,000 3,950,000 1,450,000 2,475,000 335,000Undetermined Funding Source Total

    138,345,80017,593,000 28,231,500 24,074,000 28,937,300 39,510,000GRAND TOTAL

    Tuesday, January 05, 2021

  • Capital Improvement Plan

    City of Albert Lea, Minnesota

    PROJECTS & FUNDING SOURCES BY DEPARTMENT

    2021 2025thru

    Total2021 2022 2023 2024 2025Department Project # Priority

    225 - Airport

    AIR-E-22-01 190,000190,000Tractor and Mower 4

    225 - Airport Fund 63,000 63,000

    State MnDOT - Aeronautics 127,000 127,000

    AIR-E-22-02 200,000200,000RCO Relocation 4

    225 - Airport Fund 20,000 20,000

    State MnDOT - Aeronautics 180,000 180,000

    AIR-E-23-01 25,00025,000Sweeper Attachment 4

    225 - Airport Fund 8,500 8,500

    State MnDOT - Aeronautics 16,500 16,500

    AIR-E-25-02 600,000600,000Instrument Landing System 4

    Federal - FAA 600,000 600,000

    AIR-F-21-01 100,000100,000Relocate Fence and Tree Removal 4

    225 - Airport Fund 30,000 30,000

    State MnDOT - Aeronautics 70,000 70,000

    AIR-F-21-02 63,00063,000Installation of Maintenance Building Bi-fold Door 4

    225 - Airport Fund 18,900 18,900

    State MnDOT - Aeronautics 44,100 44,100

    AIR-F-22-01 145,000145,000Design Fixed Base Operator Hangar 4

    225 - Airport Fund 43,500 43,500

    State MnDOT - Aeronautics 101,500 101,500

    AIR-F-22-02 80,00080,000NAVAID Access Road Construction 4

    225 - Airport Fund 24,000 24,000

    Federal - FAA 56,000 56,000

    AIR-F-22-03 40,00040,000Demolish or Relocate Wood Hangar 4

    225 - Airport Fund 4,000 4,000

    Federal - FAA 36,000 36,000

    AIR-F-22-04 75,00075,000Design New T-Hangar 4

    225 - Airport Fund 37,500 37,500

    State MnDOT - Aeronautics 37,500 37,500

    AIR-F-22-05 412,500412,500Pavement Cleaning and Seal Coat 4

    225 - Airport Fund 37,500 37,500

    Federal - FAA 375,000 375,000

    AIR-F-23-01 1,500,0001,500,000Hangar Facility 4

    225 - Airport Fund 450,000 450,000

    State MnDOT - Aeronautics 1,050,000 1,050,000

    AIR-F-23-02 135,000135,000Hangar Site Preparation 4

    225 - Airport Fund 67,500 67,500

    State MnDOT - Aeronautics 67,500 67,500

    AIR-F-23-03 744,000744,000Construct New T-Hangar 4

    225 - Airport Fund 372,000 372,000

    State MnDOT - Aeronautics 372,000 372,000

    AIR-F-25-01 265,000265,000Precision Approach Preparation 4

    225 - Airport Fund 26,500 26,500

    Federal - FAA 238,500 238,500

    AIR-L-22-01 100,000100,000Land Purchase 4

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    225 - Airport Fund 10,000 10,000

    Federal - FAA 90,000 90,000

    AIR-V-24-01 160,000160,000Snow Removal Equipment Vehicle 4

    225 - Airport Fund 16,000 16,000

    Federal - FAA 144,000 144,000

    4,834,500163,000 1,242,500 2,404,000 160,000 865,000225 - Airport Total

    601 - Water

    WAT-E-21-01 64,00032,000 32,000Replace Water Plant Backwash Valves 4

    601 - 601 Water Fund 32,000 32,000 64,000

    WAT-E-21-02 15,00015,000Replace Backhoe Jack Hammer 4

    701 - Central Garage Fund 15,000 15,000

    WAT-E-23-01 70,00035,000 35,000Water Plant Pump and Casing Inspection & Repair 4

    601 - 601 Water Fund 35,000 35,000 70,000

    WAT-E-23-02 30,00030,000East Water Tower Lighting 4

    601 - 601 Water Fund 30,000 30,000

    WAT-E-23-03 20,00020,000Replace 2002 Sull Air Air Compressor #776 4

    701 - Central Garage Fund 20,000 20,000

    WAT-F-21-01 4,700,0004,700,000Central Water Tower Replacement 4

    601 - Bonding - PFA 4,700,000 4,700,000

    WAT-F-21-02 350,000350,000West and North Water Treatment Air Quality Imp 4

    601 - Bonding - GO Water Revenue Bond 350,000 350,000

    WAT-F-23-01 650,000650,000Repaint East Water Tower 4

    601 - Bonding - GO Water Revenue Bond 650,000 650,000

    WAT-F-23-02 450,000450,000Plaza Street Water Main Extension 4

    601 - Bonding - GO Water Revenue Bond 350,000 350,000

    Special Assessments 100,000 100,000

    WAT-F-23-03 700,000700,000East Water Tower Chlorine Bldg 4

    601 - Bonding - GO Water Revenue Bond 700,000 700,000

    WAT-F-24-01 600,000600,000Replace 14th Street Water Main 4

    601 - 601 Water Fund 187,000 187,000

    Bonding - Street Projects 200,000 200,000

    Special Assessments 213,000 213,000

    WAT-F-24-02 300,000300,000Replace 11th Street Water Main 4

    601 - 601 Water Fund 70,000 70,000

    Bonding - Street Projects 110,000 110,000

    Special Assessments 120,000 120,000

    WAT-F-24-03 20,00020,000Replace Granular Material at the West Water Plant 4

    601 - 601 Water Fund 20,000 20,000

    WAT-F-25-99 500,000500,0002025 Water Projects 4

    601 - 601 Water Fund 250,000 250,000

    601 - Bonding - GO Water Revenue Bond 250,000 250,000

    WAT-V-21-01 30,00030,000Replace 2011 GMC 1500 4

    701 - Central Garage Fund 30,000 30,000

    WAT-V-22-01 30,00030,000Replace 2012 Ford Transit Cargo Van #19 4

    701 - Central Garage Fund 30,000 30,000

    WAT-V-22-02 30,00030,000Replace 2012 GMC 1500 #18 4

    701 - Central Garage Fund 30,000 30,000

    WAT-V-23-01 30,00030,000Replace 2012 Chevy 1500 #17 4

    701 - Central Garage Fund 30,000 30,000

    WAT-V-25-01 30,00030,000Replace Ford F150 4

    701 - Central Garage Fund 30,000 30,000

    WAT-V-25-02 50,00050,000Replace Ford F550 4

    701 - Central Garage Fund 50,000 50,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    8,669,0005,127,000 92,000 1,915,000 920,000 615,000601 - Water Total

    602 - Sewer Fund

    SCO-1 1,200,000300,000 300,000 300,000 300,000Sanitary Sewer Slip Lining Program 4

    602 - 602 Sewer Fund 300,000 300,000 300,000 300,000 1,200,000

    SCO-2 250,00050,000 50,000 50,000 50,000 50,000Lift Station Pump Rebuilding Project 4

    602 - 602 Sewer Fund 50,000 50,000 50,000 50,000 50,000 250,000

    SCO-3 40,00020,000 20,000Smoke Test Sanitary Sewer 4

    602 - 602 Sewer Fund 20,000 20,000 40,000

    SCO-4 50,00025,000 25,000Main Lift Station - Rebuild pumps 4

    602 - 602 Sewer Fund 25,000 25,000 50,000

    SCO-E-21-01 8,0008,000Brush Cutter 4

    701 - Central Garage Fund 8,000 8,000

    SCO-E-21-02 30,00030,000Rebuild Pumps at Hayek 4

    602 - 602 Sewer Fund 30,000 30,000

    SCO-E-21-03 20,00020,000Rebuild Pumps at Plainview 4

    602 - 602 Sewer Fund 20,000 20,000

    SCO-E-22-01 90,00090,000Sewer Camera/Crawler Replacement 4

    602 - 602 Sewer Fund 90,000 90,000

    SCO-E-23-01 80,00080,000102 James Lift Station 4

    602 - 602 Sewer Fund 80,000 80,000

    SCO-E-25-01 40,00040,000Installation of Filters on Force Main 4

    602 - 602 Sewer Fund 40,000 40,000

    SCO-E-25-02 90,00090,000250 KW Generator Unit 701 4

    701 - Central Garage Fund 90,000 90,000

    SCO-F-21-01 300,000300,000Slip Line Blackmere and Channel 4

    602 - 602 Sewer Fund 300,000 300,000

    SCO-F-22-01 150,000150,000Replace Sanitary Sewer under S Broadway Tracks 4

    602 - 602 Sewer Fund 150,000 150,000

    SCO-F-23-01 500,000500,000TH65 to 6th & St John Sewer Line Replacement 4

    602 - 602 Sewer Fund 500,000 500,000

    SCO-F-24-01 240,000240,000Garfield Lift Station Force Main Replacement 4

    602 - 602 Sewer Fund 240,000 240,000

    SCO-F-25-01 150,000150,000W 9th/Lincoln Avenue Sewer 4

    602 - 602 Sewer Fund 75,000 75,000

    Special Assessments 75,000 75,000

    SCO-F-25-02 2,500,0002,500,000Eastside Sewer Upgrade 4

    602 - Bonding - GO Sewer Revenue Bond 2,500,000 2,500,000

    SCO-V-21-01 30,00030,000Replace 2011 GMC 1500 4

    701 - Central Garage Fund 30,000 30,000

    SCO-V-22-01 50,00050,000Replace 2012 Ford F250 #21 4

    602 - 602 Sewer Fund 50,000 50,000

    SCO-V-22-02 400,000400,000Replace 2014 Jet Vac Truck - Unit 796 4

    701 - Central Garage Fund 400,000 400,000

    SCO-V-22-03 35,00035,000Replace 2008 Chevrolet Pickup Unit 14 4

    701 - Central Garage Fund 35,000 35,000

    6,253,000463,000 1,120,000 930,000 610,000 3,130,000602 - Sewer Fund Total

    602 - WWTP

    WWTP-E-21-01 50,00050,000Replace 1990 Allis Tractor with Bucket Unit 552 4

    701 - Central Garage Fund 50,000 50,000

    WWTP-E-22-01 15,00015,000Replace Polaris Ranger 4

    701 - Central Garage Fund 15,000 15,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    WWTP-E-25-01 18,00018,000Replace Kubota 551 4

    701 - Central Garage Fund 18,000 18,000

    WWTP-F-21 3,250,0001,650,000 1,600,000Design/Bidding Septic Receiving/Grit Building 4

    602 - 602 Sewer Fund 1,650,000 1,600,000 3,250,000

    WWTP-F-22-01 3,195,0001,420,000 1,775,000New Septic Receiving Station/Grit Bldg Renovation 4

    602 - 602 Sewer Fund 476,000 532,500 1,008,500

    602 - Bonding - GO Sewer Revenue Bond 944,000 1,242,500 2,186,500

    WWTP-F-23-01 2,870,000861,000 2,009,000Coatings Replacement 4

    602 - Bonding - GO Sewer Revenue Bond 861,000 2,009,000 2,870,000

    WWTP-F-23-02 1,670,000501,000 1,169,000Primary Treatment Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 501,000 1,169,000 1,670,000

    WWTP-F-23-03 10,500,0001,050,000 4,200,000 5,250,000Secondary Treatment - Phosphorus Removal 4

    602 - 602 Sewer Fund 5,250,000 5,250,000

    602 - Bonding - GO Sewer Revenue Bond 1,050,000 4,200,000 5,250,000

    WWTP-F-23-04 1,880,000564,000 1,316,000WAS Thickening Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 564,000 1,316,000 1,880,000

    WWTP-F-23-05 1,810,000543,000 1,267,000Sludge Storage Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 543,000 1,267,000 1,810,000

    WWTP-F-23-06 1,340,000402,000 938,000WWTP Electrical Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 402,000 938,000 1,340,000

    WWTP-F-23-07 140,000140,000B Side High Voltage Wire Replacement 4

    602 - Bonding - GO Sewer Revenue Bond 140,000 140,000

    WWTP-F-24-01 780,000234,000 546,000Effluent Filter Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 234,000 546,000 780,000

    WWTP-F-24-02 180,00054,000 126,000Preaeration Tank Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 54,000 126,000 180,000

    WWTP-F-24-03 3,710,0001,113,000 2,597,000UV System Replacement 4

    602 - Bonding - GO Sewer Revenue Bond 1,113,000 2,597,000 3,710,000

    WWTP-F-24-04 6,970,0002,091,000 4,879,000Anaerobic Digestion Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 2,091,000 4,879,000 6,970,000

    WWTP-F-24-05 4,140,0001,242,000 2,898,000Hot Water System Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 1,242,000 2,898,000 4,140,000

    WWTP-F-24-06 1,840,000552,000 1,288,000Building Roof Replacements 4

    602 - Bonding - GO Sewer Revenue Bond 552,000 1,288,000 1,840,000

    WWTP-F-24-07 290,00087,000 203,000Utility Water Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 87,000 203,000 290,000

    WWTP-F-24-08 1,550,000465,000 1,085,000Digested Sludge Thickening Improvements 4

    602 - Bonding - GO Sewer Revenue Bond 465,000 1,085,000 1,550,000

    WWTP-F-25-01 1,080,0001,080,000FRP Cover Replacement 4

    602 - Bonding - GO Sewer Revenue Bond 1,080,000 1,080,000

    WWTP-F-99 900,000300,000 300,000 300,000Chemicals and Maintenance n/a

    602 - 602 Sewer Fund 300,000 300,000 300,000 900,000

    WWTP-V-21-01 30,00030,000Replace 2002 Crew Cab Ford F250 Unit 93 4

    701 - Central Garage Fund 30,000 30,000

    WWTP-V-22-01 30,00030,000Replace 2008 Ford Pickup Unit 374 4

    701 - Central Garage Fund 30,000 30,000

    WWTP-V-24-01 32,00032,000Replace 2015 Ford Interceptor Unit 24 4

    602 - 602 Sewer Fund 32,000 32,000

    48,270,0001,730,000 3,065,000 6,136,000 17,069,000 20,270,000602 - WWTP Total

    702 - IT Capital Fund

    IT Computers 200,00040,000 40,000 40,000 40,000 40,000Computer Replace Program n/a

    702 - IT Capital Fund 40,000 40,000 40,000 40,000 40,000 200,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    IT-COUNTY 40,0000 10,000 10,000 10,000 10,000County Hardware Costs n/a

    702 - IT Capital Fund 10,000 10,000 10,000 10,000 40,000

    240,00040,000 50,000 50,000 50,000 50,000702 - IT Capital Fund Total

    Aquatic Center

    AQU-E-22-01 10,00010,000Replace Pool Sound System 4

    406 - Building Maintenance Fund 10,000 10,000

    AQU-E-23-01 20,00020,000Replace Feature Pool Boilers 4

    406 - Building Maintenance Fund 20,000 20,000

    AQU-E-24-01 50,00050,000Replace Main Pool Boilers 4

    406 - Building Maintenance Fund 50,000 50,000

    AQU-F-21-01 65,00065,000Bathhouse Project - Phase 1 4

    406 - Building Maintenance Fund 65,000 65,000

    AQU-F-21-02 50,00050,000Gel Coat Pool Slide 4

    406 - Building Maintenance Fund 50,000 50,000

    AQU-F-22-01 50,00050,000Bathhouse Project - Phase 2 4

    406 - Building Maintenance Fund 50,000 50,000

    AQU-F-22-02 35,00035,000Paint Pool and Pool Decks 4

    406 - Building Maintenance Fund 35,000 35,000

    AQU-F-24-01 50,00050,000Replace Play Features - Zero Depth Pool 4

    101 - General Fund Budget 50,000 50,000

    AQU-F-25-01 100,000100,000Aquatic Center Parking Area 4

    406 - Building Maintenance Fund 100,000 100,000

    430,000115,000 95,000 20,000 100,000 100,000Aquatic Center Total

    Arena

    ARE-E-21-01 20,00020,000Arena Speaker System 4

    406 - Building Maintenance Fund 20,000 20,000

    ARE-E-21-02 9,0009,000Sprinkler System Valve 4

    101 - General Fund Budget 9,000 9,000

    ARE-E-22-01 15,00015,000Replace John Deere Mower 4

    701 - Central Garage Fund 15,000 15,000

    ARE-E-22-02 20,00020,000Lobby Area Furnace 4

    406 - Building Maintenance Fund 20,000 20,000

    ARE-E-23-01 10,00010,000Replace Colstrup Arena Scoreboard 4

    406 - Building Maintenance Fund 10,000 10,000

    ARE-E-24-01 100,000100,000Replace Arena Heaters 4

    Bonding - Capital Imp/Equipment 100,000 100,000

    ARE-E-25-01 25,00025,000Replace Arena Shower Unit 4

    406 - Building Maintenance Fund 25,000 25,000

    ARE-E-25-02 95,00095,000HVAC - Colstrup Arena 4

    Bonding - Capital Imp/Equipment 95,000 95,000

    ARE-F-21-01 85,00085,000Replace Arena Flooring 4

    Bonding - Capital Imp/Equipment 85,000 85,000

    ARE-F-21-02 25,00025,000Arena Ditch Grading 4

    406 - Building Maintenance Fund 25,000 25,000

    ARE-F-21-03 475,000475,000Replace Arena Roof 4

    Bonding - Capital Imp/Equipment 475,000 475,000

    ARE-F-21-04 10,00010,000Replace Fire Sprinkler Valve 4

    406 - Building Maintenance Fund 10,000 10,000

    ARE-F-22-01 190,000190,000Colstrup - Replace Arena Bleachers 4

    Bonding - Capital Imp/Equipment 190,000 190,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    ARE-F-23-01 170,000170,000Nystrom Bleachers - South Side 4

    Bonding - Capital Imp/Equipment 170,000 170,000

    ARE-F-25-01 50,00050,000Paint Nystrom Arena Ceiling 4

    406 - Building Maintenance Fund 50,000 50,000

    1,299,000624,000 225,000 180,000 100,000 170,000Arena Total

    City Buildings

    CCR-F-21-01 100,00050,000 50,000City Center Renovation Plans 3

    406 - Building Maintenance Fund 50,000 50,000 100,000

    CCR-F-21-02 300,000300,000211 Broadway Ave South - Façade Repair 4

    401 - Capital Project Fund 300,000 300,000

    CCR-F-21-03 80,00080,000Vitality Center Roof 4

    406 - Building Maintenance Fund 80,000 80,000

    CCR-F-22-01 30,00030,000Replace Library Carpet 4

    406 - Building Maintenance Fund 30,000 30,000

    CCR-F-23-01 350,000350,000201 Broadway Ave South - Façade Repair 4

    401 - Capital Project Fund 350,000 350,000

    CCR-F-24-01 40,00040,000Energy Efficient Lighting - City Hall 4

    406 - Building Maintenance Fund 40,000 40,000

    900,000430,000 80,000 350,000 40,000City Buildings Total

    City Garage

    CIG-F-22-01 60,00060,000Replace City Garage Masonry Roof 4

    406 - Building Maintenance Fund 60,000 60,000

    CIG-F-25-01 6,750,0006,750,000Public Works Facility Addition - Phase Two 4

    601 - Bonding - GO Water Revenue Bond 2,250,000 2,250,000

    602 - Bonding - GO Sewer Revenue Bond 2,250,000 2,250,000

    Bonding - Capital Imp/Equipment 2,250,000 2,250,000

    CIG-L-21-01 80,00080,000Acquire Property behind the City Garage 4

    401 - Capital Project Fund 26,000 26,000

    601 - 601 Water Fund 27,000 27,000

    602 - 602 Sewer Fund 27,000 27,000

    6,890,00080,000 60,000 6,750,000City Garage Total

    Civic Theater

    PAC-E-21-01 10,00010,000Theater HVAC Sound Booth and Dressing Room 4

    406 - Building Maintenance Fund 10,000 10,000

    PAC-E-21-02 60,00060,000Theater Elevator Hydraulic Shaft 4

    406 - Building Maintenance Fund 60,000 60,000

    PAC-E-23-01 10,00010,000ADA Automatic Door Openers 4

    406 - Building Maintenance Fund 10,000 10,000

    PAC-E-24-01 25,00025,000Replace Theater Digital Sign 4

    406 - Building Maintenance Fund 25,000 25,000

    PAC-F-22-01 20,00020,000Theatre Updates 4

    406 - Building Maintenance Fund 20,000 20,000

    PAC-F-25-01 60,00060,000Replace Theater Windows and Doors 4

    406 - Building Maintenance Fund 60,000 60,000

    185,00070,000 20,000 10,000 25,000 60,000Civic Theater Total

    Engineering

    CHN-24-01 2,000,0002,000,000Channel - DM&E RR to AL Lake 4

    Bonding - Street Projects 500,000 500,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    State - DNR 1,500,000 1,500,000

    ENG-F-21-01 2,000,0002,000,000Blazing Star Contaminated Soil Project 4

    401 - Capital Project Fund 450,000 450,000

    DEED 1,500,000 1,500,000

    Developer 50,000 50,000

    ENG-V-24-01 32,00032,000Replace 2014 Ford Interceptor Unit 100 4

    701 - Central Garage Fund 32,000 32,000

    PARKLT-21-01 150,000150,000Washington/Water Street 4

    Bonding - Street Projects 150,000 150,000

    PARKLT-22-01 110,000110,000Washington/Main Lot #7 4

    Bonding - Street Projects 110,000 110,000

    PARKLT-22-02 300,000300,000Freeborn Bank Parking Lot 4

    Bonding - Street Projects 300,000 300,000

    PARKLT-23-01 300,000300,000Bancroft Bay Park Upper/Lower 4

    Bonding - Street Projects 300,000 300,000

    PARKLT-23-02 180,000180,000Swimming Pool Park lot 4

    Bonding - Street Projects 180,000 180,000

    PW-25-01 1,300,0001,300,000Flying J Development 4

    401 - Capital Project Fund 160,000 160,000

    Developer 1,140,000 1,140,000

    PW-25-02 75,00075,000Bridge Pile Repair 4

    State - Municipal State Aid 75,000 75,000

    STCON-21-01 300,000300,000209th Street Bituminous Paving 4

    Bonding - Street Projects 200,000 200,000

    Special Assessments 100,000 100,000

    STCON-21-02 3,177,0003,177,0002021 Street Reconstruction Projects 4

    601 - Bonding - GO Water Revenue Bond 740,000 740,000

    602 - 602 Sewer Fund 860,000 860,000

    Bonding - Street Projects 766,000 766,000

    Special Assessments 811,000 811,000

    STCON-21-03 40,00020,000 20,000Decorative Lights LED Replacement 4

    101 - General Fund Budget 20,000 20,000 40,000

    STCON-22-01 1,500,0001,500,0002022 Neighborhood Project 4

    601 - 601 Water Fund 270,000 270,000

    602 - 602 Sewer Fund 257,000 257,000

    Bonding - Street Projects 633,000 633,000

    Special Assessments 340,000 340,000

    STCON-22-02 1,800,0001,800,000Main Street East Recon - I35 to CSAH 38 4

    Bonding - Street Projects 180,000 180,000

    Federal 1,440,000 1,440,000

    State - Municipal State Aid 180,000 180,000

    STCON-22-03 70,00070,000Happy Trails Lane Overlay 4

    Bonding - Street Projects 42,000 42,000

    Special Assessments 28,000 28,000

    STCON-22-04 10,626,00010,626,000E Main Street (Newton to I-35) 4

    Bonding - Street Projects 400,000 400,000

    Grant 2,536,000 2,536,000

    State - MnDOT 6,890,000 6,890,000

    State - Municipal State Aid 800,000 800,000

    STCON-22-05 190,000190,000E Main Street Lighting 4

    Bonding - Street Projects 190,000 190,000

    STCON-23-01 3,000,0003,000,0005th Street and Frank Hall 4

    601 - 601 Water Fund 630,000 630,000

    602 - 602 Sewer Fund 630,000 630,000

    Bonding - Street Projects 960,000 960,000

    Special Assessments 780,000 780,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    STCON-23-02 1,400,0001,400,000Marshall Street and Sibley Avenue Reconstruction 4

    601 - 601 Water Fund 200,000 200,000

    602 - 602 Sewer Fund 150,000 150,000

    Freeborn County 540,000 540,000

    Special Assessments 200,000 200,000

    State - Municipal State Aid 310,000 310,000

    STCON-23-03 50,00050,000Pearl Street Back in Parking/One Way 4

    Bonding - Street Projects 50,000 50,000

    STCON-23-04 80,00080,000Circle Drive Alley 4

    Bonding - Street Projects 15,000 15,000

    Special Assessments 65,000 65,000

    STCON-23-05 300,000300,000Cedar Avenue Reconstruction 4

    Bonding - Street Projects 300,000 300,000

    STCON-23-06 400,000400,000Lake Shore Drive Shoreline 4

    401 - Capital Project Fund 100,000 100,000

    Shell Rock River Watershed 300,000 300,000

    STCON-24-01 255,000255,000900 Block Spicer Road Reconstruction 4

    601 - 601 Water Fund 52,000 52,000

    Bonding - Street Projects 88,000 88,000

    Special Assessments 115,000 115,000

    STCON-24-02 1,180,0001,180,000Winter Ave & 7th Street Reconstruction 4

    601 - 601 Water Fund 210,000 210,000

    602 - 602 Sewer Fund 200,000 200,000

    Bonding - Street Projects 500,000 500,000

    Special Assessments 270,000 270,000

    STCON-24-03 38,30038,300Plainview Lane Curb and Surfacing 4

    Bonding - Street Projects 18,500 18,500

    Special Assessments 19,800 19,800

    STCON-24-04 70,00070,000Clark Street Alley Reconstruction 4

    Bonding - Street Projects 30,000 30,000

    Special Assessments 40,000 40,000

    STCON-24-05 200,000200,000Wedgewood to Riviera Reconstruction 4

    Bonding - Street Projects 100,000 100,000

    Special Assessments 100,000 100,000

    STCON-25-01 1,500,0001,500,000Sunset Street Extension 4

    601 - 601 Water Fund 126,500 126,500

    602 - 602 Sewer Fund 126,500 126,500

    Bonding - Street Projects 1,012,000 1,012,000

    Special Assessments 235,000 235,000

    STCON-25-02 175,000175,000Lake Shore Drive - Pave or Close 4

    Bonding - Street Projects 118,125 118,125

    Special Assessments 56,875 56,875

    STOVL-21-01 541,000541,0002021 Neighborhood Overlay 4

    602 - 602 Sewer Fund 36,000 36,000

    Bonding - Street Projects 154,000 154,000

    Special Assessments 351,000 351,000

    STOVL-22-01 140,000140,0002022 State Aid Overlay - Richway 4

    602 - 602 Sewer Fund 20,000 20,000

    Special Assessments 77,000 77,000

    State - Municipal State Aid 43,000 43,000

    STOVL-22-02 850,000850,0002022 State Aid Overlay - Hammer Road 4

    602 - 602 Sewer Fund 56,000 56,000

    Special Assessments 142,000 142,000

    State - Municipal State Aid 652,000 652,000

    STOVL-23-01 800,000800,0002023 State Aid Overlay 4

    602 - 602 Sewer Fund 73,000 73,000

    Special Assessments 320,000 320,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    State - Municipal State Aid 407,000 407,000

    STOVL-24-01 600,000600,000Greenwood Overlay and Sidewalk 4

    602 - 602 Sewer Fund 50,000 50,000

    Bonding - Street Projects 100,000 100,000

    Special Assessments 130,000 130,000

    State - Municipal State Aid 320,000 320,000

    STOVL-24-02 1,300,0001,300,000Neighborhood Overlay - Fairlane 4

    602 - 602 Sewer Fund 65,000 65,000

    Bonding - Street Projects 550,000 550,000

    Special Assessments 685,000 685,000

    STOVL-25-01 1,150,0001,150,000Overlay Crossroads, Lake Chapeau Dr, Marshall 4

    602 - 602 Sewer Fund 60,000 60,000

    Bonding - Street Projects 630,000 630,000

    Special Assessments 460,000 460,000

    STOVL-25-02 280,000280,000State Aid Overlay - Garfield 4

    602 - 602 Sewer Fund 30,000 30,000

    Special Assessments 110,000 110,000

    State - Municipal State Aid 140,000 140,000

    TRAIL-22-02 240,000240,000Blazing Star Bike Trail Maint - DNR Portion 4

    State - DNR 240,000 240,000

    TRAIL-23-01 250,000250,000Blazing Star Trail Maintenance 4

    Bonding - Street Projects 250,000 250,000

    TRAIL-24-01 380,000380,000City Beach to Denmark Park 4

    Bonding - Street Projects 90,000 90,000

    State - DNR 290,000 290,000

    TRAIL-25-01 600,000600,000New Denmark Park to Blazing Star Trail 4

    Bonding - Street Projects 100,000 100,000

    Federal - ISTEA 400,000 400,000

    State - DNR 100,000 100,000

    39,929,3006,188,000 15,846,000 6,760,000 6,055,300 5,080,000Engineering Total

    Fire

    FIR-E-21-01 22,00022,000Radio Replacement 4

    250 - Fire Capital Fund 22,000 22,000

    FIR-E-21-02 100,000100,000CAD Dispatching Equipment 4

    250 - Fire Capital Fund 100,000 100,000

    FIR-E-21-03 36,00036,000Apparatus Bay Fans 4

    250 - Fire Capital Fund 36,000 36,000

    FIR-E-22-01 16,00016,000SCBA 4

    250 - Fire Capital Fund 16,000 16,000

    FIR-E-23-01 5,0005,000SCBA - Self-Contained Breathing Apparatus 4

    250 - Fire Capital Fund 5,000 5,000

    FIR-E-23-02 22,00022,000Radio Replacement 4

    250 - Fire Capital Fund 22,000 22,000

    FIR-E-24-01 18,00018,000SCBA - Self-Contained Breathing Apparatus 4

    250 - Fire Capital Fund 18,000 18,000

    FIR-E-25-01 5,0005,000SCBA - Self-Contained Breathing Apparatus 4

    250 - Fire Capital Fund 5,000 5,000

    FIR-E-25-02 25,00025,000Radio Replacement 4

    250 - Fire Capital Fund 25,000 25,000

    FIR-V-22-01 250,000250,000Mini-Rescue Replacement Unit 921 4

    701 - Central Garage Fund 250,000 250,000

    FIR-V-24-01 60,00060,0003/4 Ton Pickup 4

    701 - Central Garage Fund 60,000 60,000

    FIR-V-25-01 650,000650,000Fire Engine with Extrication Equipment 4

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    701 - Central Garage Fund 650,000 650,000

    1,209,000158,000 266,000 27,000 78,000 680,000Fire Total

    Parks

    PAR-E-21-01 60,00060,000Replace 2011 Kubota #587 4

    701 - Central Garage Fund 60,000 60,000

    PAR-E-21-02 40,00040,000Replace JD Mower/Blower 4

    701 - Central Garage Fund 40,000 40,000

    PAR-E-21-03 40,00040,000Replace JD Mower/Blower 4

    701 - Central Garage Fund 40,000 40,000

    PAR-E-21-04 60,00060,000Replace JD Tractor Unit 571 4

    701 - Central Garage Fund 60,000 60,000

    PAR-E-22-01 95,00095,000Replace John Deere 244J Loader Unit 581 4

    701 - Central Garage Fund 95,000 95,000

    PAR-E-22-02 60,00060,000Replace JD 4720 Unit 579 4

    701 - Central Garage Fund 60,000 60,000

    PAR-E-22-03 25,00025,000Replace Cushman Utility Vehicle 4

    701 - Central Garage Fund 25,000 25,000

    PAR-E-23-01 35,00035,000New Denmark Park - Replace Fountain 4

    401 - Capital Project Fund 30,000 30,000

    Private Funds/Donations 5,000 5,000

    PAR-E-23-02 25,00025,000Palm Beach Pontoon/Hoist 4

    101 - General Fund Budget 25,000 25,000

    PAR-E-24-01 20,00020,000Replace 2019 Landpride All Flex Batwing Mower 4

    701 - Central Garage Fund 20,000 20,000

    PAR-E-24-02 20,00020,000Replace 2019 Landpride All-Flex Mower 4

    701 - Central Garage Fund 20,000 20,000

    PAR-E-24-03 105,000105,000Replace Toro 510D Wide Area Turf Mower 4

    701 - Central Garage Fund 105,000 105,000

    PAR-E-24-04 50,00050,000Replace JD 1585 Mower/Blower 4

    701 - Central Garage Fund 50,000 50,000

    PAR-E-24-05 85,00085,000Replace BC 1800 Brush Chipper 4

    701 - Central Garage Fund 85,000 85,000

    PAR-E-25-01 20,00020,000Replace Toro Workman 4

    701 - Central Garage Fund 20,000 20,000

    PAR-E-25-02 50,00050,000Wiedenmann Super 600 - Replace 4

    701 - Central Garage Fund 50,000 50,000

    PAR-E-25-03 20,00020,000ExMarker Aereator/Fert Spreader 4

    701 - Central Garage Fund 20,000 20,000

    PAR-F-21-01 55,00055,000Morin Park Shelter 4

    404 - Park Dedication Fund 35,000 35,000

    Private Funds/Donations 20,000 20,000

    PAR-F-21-02 40,00040,000Playground Equipment - Sondergaard Park 4

    401 - Capital Project Fund 40,000 40,000

    PAR-F-21-03 40,00040,000Replace Sondergaard Court 4

    401 - Capital Project Fund 40,000 40,000

    PAR-F-21-04 50,00050,000Playground Equipment - Memorial Park 4

    401 - Capital Project Fund 50,000 50,000

    PAR-F-21-05 30,00030,000Pickle Ball Court Painting 4

    401 - Capital Project Fund 30,000 30,000

    PAR-F-22-01 40,00040,000Playground Equipment - Valley Park 4

    101 - General Fund Budget 40,000 40,000

    PAR-F-22-02 15,00015,000Lakeview Park Bathroom 4

    101 - General Fund Budget 15,000 15,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority

    PAR-F-22-03 70,00070,000Edgewater Bay Pavilion Patio 4

    401 - Capital Project Fund 70,000 70,000

    PAR-F-22-04 50,00050,000Playground Equipment - Troy Hammer Park 4

    401 - Capital Project Fund 50,000 50,000

    PAR-F-22-05 15,00015,000Edgewater Path Replacement 4

    401 - Capital Project Fund 15,000 15,000

    PAR-F-22-06 10,00010,000Edgewater Pavilion Breezeway 4

    101 - General Fund Budget 10,000 10,000

    PAR-F-22-07 300,000300,000Chapeau Neighborhood Park 4

    Private Funds/Donations 300,000 300,000

    PAR-F-23-01 40,00040,000Playground Equipment - Lakeview Park 4

    101 - General Fund Budget 40,000 40,000

    PAR-F-23-02 80,00080,000Skate Park - Replace Equipment 4

    101 - General Fund Budget 80,000 80,000

    PAR-F-25-01 125,000125,000Pickleball Court Reconstruction 4

    101 - General Fund Budget 100,000 100,000

    Private Funds/Donations 25,000 25,000

    PAR-F-25-02 100,000100,000Marina City Beach 4

    Grant 100,000 100,000

    PARKSNYD-01 2,450,000100,000 50,000 2,300,000Snyder Complex Ballfield Improvements 4

    Undetermined Funding Source 100,000 50,000 2,300,000 2,450,000

    PARKSNYD-02 1,220,000360,000 200,000 150,000 175,000 335,000Snyder Complex Ballfield Improvements 4

    Undetermined Funding Source 360,000 200,000 150,000 175,000 335,000 1,220,000

    PARKSNYD-03 1,300,0001,300,000Snyder Complex Ballfield Improvements n/a

    Undetermined Funding Source 1,300,000 1,300,000

    PARKSNYD-04 3,700,0003,700,000Snyder Complex Ballfield Improvements n/a

    Undetermined Funding Source 3,700,000 3,700,000

    PAR-V-21-01 25,00025,000Replace F-150 Truck 4

    701 - Central Garage Fund 25,000 25,000

    PAR-V-21-02 50,00050,000Replace F-350 Dump Truck 4

    701 - Central Garage Fund 50,000 50,000

    PAR-V-22-01 30,00030,000Replace Ford F150 Unit #20 4

    701 - Central Garage Fund 30,000 30,000

    PAR-V-22-02 45,00045,000Replace Ford F350 with Plow #140 4

    701 - Central Garage Fund 45,000 45,000

    PAR-V-22-03 55,00055,000Replace F450 #141 4

    701 - Central Garage Fund 55,000 55,000

    PAR-V-23-01 190,000190,000Replace International Bucket Truck Unit 245 4

    701 - Central Garage Fund 190,000 190,000

    PAR-V-25-01 35,00035,000Ford F-250 - Replace 4

    701 - Central Garage Fund 35,000 35,000

    PAR-V-25-02 35,00035,000Ford F-150 - Replace 4

    701 - Central Garage Fund 35,000 35,000

    PAR-V-25-03 40,00040,000Ford F-150 Extra Cab - Replace 4

    701 - Central Garage Fund 40,000 40,000

    PAR-V-25-04 45,00045,000Ford F-250 Crew Cab - Replace 4

    701 - Central Garage Fund 45,000 45,000

    11,090,000950,000 4,760,000 1,820,000 2,755,000 805,000Parks Total

    Police

    POL-E-21-01 20,00020,000Motorola Radios - 4 4

    251 - Police Capital Fund 20,000 20,000

    POL-E-22-01 25,00025,000AED 4

    251 - Police Capital Fund 25,000 25,000

    Tuesday, January 05, 2021

  • Total2021 2022 2023 2024 2025Department Project # Priority25,000 25,000

    POL-E-22-02 100,000100,000HD In-Car Video System 4

    251 - Police Capital Fund 100,000 100,000

    POL-E-22-03 30,00030,000Update BWC 4

    251 - Police Capital Fund 30,000 30,000

    POL-E-22-04 35,00035,000Handguns 4

    251 - Police Capital Fund 35,000 35,000

    POL-E-25-01 150,000150,000Firearms Range 4

    251 - Police Capital Fund 150,000 150,000

    POL-V-21-01 45,00045,000Replace 2016 Ford Interceptor 4

    701 - Central Garage Fund 45,000 45,000

    POL-V-21-02 45,00045,000Replace 2016 Ford Interceptor Unit 383 4

    701 - Central Garage Fund 45,000 45,000

    POL-V-22-01 45,00045,000Replace 2017 Ford Explorer Unit 394 4

    701 - Central Garage Fund 45,000 45,000

    POL-V-22-02 45,00045,000Replace 2017 Ford Explorer Unit 395 4

    701 - Central Garage Fund 45,000 45,000

    POL-V-22-03 4