Capital Cost EstimatingQ&A
![Page 2: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/2.jpg)
Today Suggest you review
Equipment Costing Folder on CD Is this real? What do we do? How does it work?
Methods of estimating Using CapCost What is a “Capital Cost?” ‘Dealing’ with CapCost limitations
![Page 3: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/3.jpg)
Is This Real ? Question:
We seem to be applying simplifications and assumptions that this project doesn’t seem very ‘real.’
Your thoughts?
![Page 4: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/4.jpg)
Question 1: What do we do?
We will use CapCost which integrates
Estimation of equipment costs Utility costs Raw material costs and product
revenue Other costs Profitability analysis Sensitivity analysis
![Page 5: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/5.jpg)
CapCost See the material in the CapCost folder Install the program from the CD that
came with the text (run install.html) View the movies on the CD (run
cost.html) with a computer that has speakers and Quicktime (at home or use the TEAM computer)
Run Capcost.xls and look through it
![Page 6: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/6.jpg)
How Does It Work?
![Page 7: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/7.jpg)
x x FactorsFactors
Direct Field Cost (DFC)Direct Field Labour (DFL)
Indirect Field Cost (IFC)
Home Office Engineering
Total Project Cost (ITC)Allowances
0.25 x DFC
1.0 to 1.6 x DFL 0
.25
x
DFC
Equipment PurchasePrice Equipmen
t Factors“Off Sites” Cost
![Page 8: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/8.jpg)
Estimate•DIRECT FIELD COSTS
•Equipment Cost
•bulk materials (piping, valves, instruments) & labour to install
•off-sites (pipe racks, rail spurs …)
•INDIRECT FIELD COSTS
•engineering, freight, insurance, overhead, const supervision
•CONTINGENCY AND FEES
•first fill of plant, taxes, duties
•escalation
TOTAL PROJECT(CAPITAL)
COST
![Page 9: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/9.jpg)
Method 1: Lang Factored Estimate
Total Capital Cost =
Flang * (Sum Of Purchased Cost of Equipment)
Flang = 4.74 for fluid processing plant
![Page 10: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/10.jpg)
Method 2: The CapCost ApproachEquipment Parameters (Pressure, MOC, Size, Hp …)
“Base Cost” = Purchase Cost of Equipment - in Carbon Steel and 0 barg
BARE MODULE COST (Directs and Indirects) - installed equipment in actual materials and actual pressure
Bare Module Factor = f (Factorpressure, Factormaterial)
MODULE COST OF PLANT - for expansion to an existing Plant -contingency 15%, fees 3%
Module Factor = 1.18
GRASS ROOTS COST OF PLANT - infrastruction (utilities, off-sites aux. Buildings, product storage, loading and unloading facilities ...)
Grass Roots Factor = 1.30 CHEE470 StopsHere
Which One Do We Want?
![Page 11: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/11.jpg)
Determine Equipment Cost
Fixed Tube exch with28 m2 = $6500
Convert ToToday’s $’s using the CEPCI value
Note: Price for Carbon Steel Construction and 0 Bar(g)
![Page 12: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/12.jpg)
Factor to Today’s Cost
$6500 * (1999 CECPI / 1996 CECPI) = today’s cost
$6500 x (390.6 / 381.7) = $6650 in 1999
![Page 13: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/13.jpg)
Pressure Factor (Fp)
Pressure FactorFp = 1.14
![Page 14: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/14.jpg)
Material Factor (Fm)
![Page 15: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/15.jpg)
Bare Module Factor FBM
Fp Fm
1.14 x 3 = 3.42
Therefore FBM = 7
Bare Module Cost= Base Cost x FBM
= $6650 x 7= $46,550
Cost of Equipment Installed
![Page 16: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/16.jpg)
“Module Cost” Of Plant
Add Contingency and Fees (building permits, environmental permits etc.)
Module Cost = 1.18 (of Bare Module Cost for all equipment)
Module Cost = 1.18 x $46,550 = $ 54,900
![Page 17: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/17.jpg)
Now a Short Demo A movie to illustrate the capital cost
sections of CapCost One of the sheets in an Excel workbook The utilities, raw materials and cash
flow sections will be covered later in the Economic Analysis workshop
![Page 18: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/18.jpg)
Questions What do we do when equipment is
larger than CapCost can cost? Split it up into equal sized pieces Get a cost in CapCost and then apply
the capacity factor exponent new cost=old cost x capacity ratio0.6
![Page 19: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/19.jpg)
Special Equipment CapCost has an equipment type “User
Defined” If you know the cost of something, you
can supply A name Equipment cost Bare Module Cost
Set the first factor to 1, ignore the second
![Page 20: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/20.jpg)
User Defined Equipment
![Page 21: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/21.jpg)
Question What is a capital cost?
![Page 22: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/22.jpg)
Capital Cost What’s “Capital ?”
Capital is the money required to build a plant or facility
It’s separated from “Expense” money because of the Tax implications imposed by Revenue Canada, IRS, etc.
![Page 23: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/23.jpg)
Facility Timeline
ConceptualEngineering
Detailed Engineering& Construction
Start-up
Capital $Expense $ Expense $
Capital Cost
Facility Creation Facility Operation
Expense $- Operating Expenses-Depreciation
![Page 24: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/24.jpg)
Capital vs ExpenseOnce the plant is running ‘Expenses’ are small items or costs which are incurred yearly, or have about a 1 year life.
i.e. Software, Office supplies, wages, advertising, heat, lighting, ...
When Calculating Yearly Income Subtract your Expenses From Your Income
![Page 25: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/25.jpg)
Capital vs Expense ‘Capital’ are expensive items or items which
have more than a year of life. i.e. House, lawnmower, TV, computer,
chemical plant equip, first fill of chemicals Revenue Canada etc. only allow you to
subtract a % of the Capital every year to account for the wearing out of the facility (depreciation). This is called the “Capital Cost Allowance”
![Page 26: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/26.jpg)
Capital vs Expense Capital Cost Allowance ( CCA )
Works Like a Bank Account Revenue Canada allow a % of the
remaining asset value to be claimed
RemainingAsset Value
Time (years)
![Page 27: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/27.jpg)
CCA Classes
![Page 28: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/28.jpg)
Capital vs Expense Revenue Canada Treat Depreciation per
above More common (?) to treat Depreciation
with a straight line for the economic analysis 10 year depreciation, therefore 10%
of capital is ‘expensed’ per year
![Page 29: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/29.jpg)
Taxable Income Income That’s Taxable (Net Income)
Taxable Income = Income - Expenses - CCA
Can’t use CCA if Expenses are greater than Income (can’t use CCA to claim a loss)
CCA can be ‘banked’ for later years where profit is occurring
![Page 30: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/30.jpg)
Small Business Tax- Revenue
![Page 31: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/31.jpg)
Small Business Tax - Expenses
CCA
![Page 32: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/32.jpg)
Capital - The Point Capital is only allowed to be
‘depreciated’ over years and thus it’s ability to minimize taxable income is limited.
Expenses are claimed in the year they’re paid. They’re better for minimizing your taxes.
The Games People play
![Page 33: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/33.jpg)
The Capital Cost Estimate
The tax implications of Capital money requires that you know how much Capital was spent on any asset.
The business financial analysis (NPV etc.) requires that you know the Capital Cost and the Operating Cost well ahead of actually spending any significant amounts of money.
![Page 34: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/34.jpg)
Capital Cost Estimate Summary:
The cost to initially build the facility which will be depreciated over time.
![Page 35: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/35.jpg)
Question: CapCost - arrggh! CapCost does not change price when we
change the maximum pressure. What’s wrong?
![Page 36: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/36.jpg)
Off The Shelf Items
Piping, Valves, Pumps and most equipment have been standarized in design pressures of the connecting Flange
Standards are called 150, 300, 600, 900, 1500, 2500 “lb” flange ratings. A 150lb rating 150 psig rating,
temperature is important in the ultimate strength of the item
Along with standard flanges are standard pipe wall thickness (Sch 40, Sch 80 etc.)
![Page 37: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/37.jpg)
Max Pressure vs Temp
0
200
400
600
800
1000
1200
1400
1600
0 500 1000
Temp (°F)
Pre
ssu
re (
psi
g) 150 lb Rating
300 lb Rating
600 lb Rating
300 lb 304 SS
600 lb 304 SS
Flange Rating
![Page 38: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/38.jpg)
Heat Exchanger Standards TEMA - Tubular Exchanger
Manufacturers Association dictates minimum requirements for
exchanger mechanical design Legislation does not require TEMA
standards be used.
![Page 39: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/39.jpg)
ASME- Pressure Vessel Standards ASME Code
It started in Chicago after a major explosion in a shoe factory that had a boiler. The boiler explosion caused the government to start regulating pressure vessels (including boilers).
A tool for regulating manufacturers of pressure vessels, heating exchangers, and piping, not pumps, not compressors (no rotating equipment)
![Page 40: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/40.jpg)
ASME- Pressure Vessel Standards
Since the explosion in Chicago codes were developed for the guidance in the calculation of pressure vessels, tables of metal strength vs temp
Safety factor of 4 has historically been applied to the mechanical strength of metal, recently (year 2000) it was reduced to 3.5
![Page 41: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/41.jpg)
ASME Code SectionsI - Power Boilers
II - Materials (properties i.e. allowable stresses)
III - Nuclear Power Plants
IV - Heating BoilersV - Non Destructive Examination
VII - Guidelines for the Care and Operation of Heating Boilers
IX - Welding and Brazing Qualifications
X - Fiber-Reinforced Plastic Pressure Vessels
XI - Rules for Inservice Inspection of Nuclear Power Plant Components
![Page 42: Capital Cost Estimating Q&A. Today Suggest you review Equipment Costing Folder on CD Is this real? What do we do? How does it work? Methods of estimating](https://reader035.vdocuments.us/reader035/viewer/2022081603/56649e805503460f94b843d1/html5/thumbnails/42.jpg)
Minimum Design and CapCost Allowing CapCost to choose a minimum
makes sense since the manufacturer would do the same.