Executive Summary
Capacity Needs Assessment for Grid-Connected Bioenergy Development in Viet Nam (Biomass, Biogas and Waste to Energy)
hé· i x c ha ñß nh gg hn Üa« c nt aÖ miv
Ministry of Industry and Trade
Bản quyền thuộc về: DựánHỗtrợNănglượngtáitạoGIZ-GDE/MOIT
Nội dung: BáocáotómtắtnghiêncứuvềcơchếhỗtrợpháttriểnđiệnnănglượngsinhhọcnốilướitạiViệtNam
Để có thêm thông tin, xin liên hệ: DựánHỗtrợNănglượngTáitạoGIZ-GDE/MOIT Tầng5,85NguyễnDu,HàNội Tel:04-39412605Fax:04-39412606 Email:[email protected] Website:http://www.renewableenergy.org.vn/
Biên tập NguyễnQuốcKhánh
Executive Summary
Capacity Needs Assessment for Grid-Connected Bioenergy Development in Viet Nam (Biomass, Biogas and Waste to Energy)
4 EXECUTIVE SUMMARY
5ExEcutivE Summary
Renewableenergy(RE)andbioenergyinparticularareincreasinglybecomingoneofVietnamGovernment’sprimaryconcerns.Itstarget isforelectricitygenerationfromREtocontribute4.5%oftotalpowergenera-tionin2020and6%in2030.Duetoinsufficientsupportingpolicies,othereconomic,financial,institutionalandtechnicalbarriers,aswellaslimitedawareness,thegrid-connectedbioenergysectorstillhasmadelittleprogressandneedsfurthercapacitydevelopmentintermsoftechnologies,knowledgeandfinance,etc.Thestudy‘Capacityneedsassessmentforgrid-connectedbioenergydevelopmentinVietNam(biomass,biogasandwastetoenergy)’undertakenbyGIZandMOITisanattempttopromotethesector.Asaresult,recom-mendationsforcapacitydevelopmentweremadeinfivecoreareasandinvolveavarietyofstakeholders:
Figure 1: Fivecoreareasofstakeholderinvolvement
Theexistingandrequiredcapacitiesaswellasthecapacitygapsofdifferentstakeholderswereidentifiedatorganisationalandindividuallevel.Short-andmedium-termmeasuresforimprovementwerethenproposedforeachcorearea.
Key short-term recommendations include improving capacity in a range of areas such as technology,projectmanagementskills,trainingcurriculumdevelopment,equipmentandinternationalcooperationinre-search,training,andtechnologytransfer.
Medium-term recommendationsemphasisethenecessityforagoodinformationandcommunicationsys-temforREaswellastheestablishmentofatechnologytransfercentreandcapacity-buildingprogrammes. Thesemeasureswillsupportall involvedstakeholdersandhelptoupgradethecapacityofallresponsiblestaff.Withoutadoubt, thesuccessful implementationof thosestrategies forcapacity improvement in thegrid-connectedbioenergysector requiresclosecollaborationamongstakeholdersaswellas theeffectivecoordinationofMOITcentrallyandlocally.
1. The creation of a favorable developing
framework for grid-connected bio-energy
2. The regulation and adm inistration of the sector
3. The development of human resources
4. The provision of
equipment and services to grid-connected bio-energy projects
5. The development, planning,
building, O&M of grid-
connected bio-energy projects
Summary
6 EXECUTIVE SUMMARY
Summary ................................................................................................................................ 5
List of Figures ........................................................................................................................ 7
List of Tables .......................................................................................................................... 7
Abbreviations......................................................................................................................... 8
1. Rationale of the study ..................................................................................................111.1. Objectivesandscopeofthestudy....................................................................................................... 111.2. Policiesandlegalframeworkforthedevelopmentofrenewableenergieswithafocuson grid-connectedbioenergy....................................................................................................................111.3. Currentstatusofgrid-connectedbioenergygeneration.......................................................................12
2. Methodology ................................................................................................................ 132.1. Studymethod.......................................................................................................................................132.2. Overviewoftargetmodel.....................................................................................................................142.3. Timeframeofthestudy........................................................................................................................162.4. Stakeholdermap..................................................................................................................................17
3. Presentation of the results ......................................................................................... 193.1. Overviewofstakeholdersbycorearea................................................................................................193.2. Analysisofstakeholdercapacitybycorearea.....................................................................................21
4. Recommended capacity development measures .................................................... 274.1. Organisationallevel:Shortandmedium-termrecommendations........................................................274.2. Individuallevel:Shortandmedium-termrecommendations................................................................28
5. Conclusions ................................................................................................................. 31
Table of contents
7ExEcutivE Summary
List of Figures
Figure 1: Fivecoreareasofstakeholderinvolvement....................................................................................5Figure 2:Stakeholdermapofgrid-connectedbioenergysector...................................................................17Figure 3: Representativesofkeystakeholdersinfivecoreareasinterviewedandquestioned...................21
List of Tables
Table 1: Fourstepsinthestudymethodandachievedtasks.......................................................................13Table 2: Timeframeofthestudy....................................................................................................................16Table 3: Existingandrequiredcapacitiesandcapacitygapsatorganisationallevel....................................22Table 4: Existing andrequiredcapacitiesaswellascapacitygapsatindividuallevel.................................24Table 5: Shortandmedium-termrecommendationsfortheorganisationallevel..........................................27Table 6: Shortandmedium-termrecommendationsforindividuallevel.......................................................28
LIST OF FIGURESLISTOFTABLES
8 EXECUTIVE SUMMARY
ABBREVIATIONS
EPC Engineering,ProcurementandConstructionEPTC ElectricPowerTradingCompany(underEVN)FiT feed-intariffGO GovernmentOfficeNGO non-governmentalorganisationODA officialdevelopmentassistancePC People’sCommitteePDP PowerDevelopmentPlanPPA powerpurchaseagreementRE renewableenergySWOT strengths,weaknesses,opportunitiesandthreatsVGGS VietNamGreenGrowthStrategy ExtendedgroupofstakeholdersADB AsianDevelopmentBankAECID SpanishAgencyforInternationalCooperationandDevelopmentAFUHCM HCMCAgricultureandForestryUniversity
AI-MOC AdministrationofInfrastructure–MinistryofConstructionCCO-MONRE ClimateChangeOffice–MinistryofNaturalResourcesandEnvironmentCEMRT-ERAV CenterforElectricityMarketResearchandTraining-ERAVCOP-MONRE CenterofOzoneProtection–MinistryofNaturalResourcesandEnvironment
DARD-CT ProvincialDepartmentofAgricultureandRuralDevelopment(CanThoPeople’s Committee)DC-MARD DepartmentofCrops–MinistryofAgricultureandRuralDevelopmentDCT-AFUHCM DepartmentofChemicalTechnology-HCMCAgricultureandForestryUniversityDDP-VDB DivisionofDevelopmentPolicies–VietnamDevelopmentBankDEM-DNU DepartmentofEquipmentManagement–DaNangUniversityDIE-MPI DepartmentofIndustrialEconomics–MinistryofPlanningandInvestmentDL-MARD DepartmentofLivestock-MinistryofAgricultureandRuralDevelopmentDOIT-HCMC DepartmentofIndustryandTrade–HoChiMinhCityPCDOIT-BD DepartmentofIndustryandTrade–BinhDuongPCDOIT-CT DepartmentofIndustryandTrade–CanThoPC
9ExEcutivE Summary
DOIT-DN DepartmentofIndustryandTrade–DaNangPCDOIT-HP DepartmentofIndustryandTrade–HaiPhongPCDOST DepartmentofScienceandTechnologyDOST-BD DepartmentofScienceandTechnology–BinhDuongPCDOST-CT DepartmentsofScienceandTechnology–CanThoPCDOST-DN DepartmentofScienceandTechnology–DaNangPCDOST-HCMC DepartmentofScienceandTechnology–HoChiMinhCityPCDOST-HP DepartmentofScienceandTechnology–HaiPhongPCDPI DepartmentofPlanningandInvestmentDSENRE-MPI DepartmentofScience,EducationandNaturalResourcesandEnvironment–Ministry ofInvestmentandPlanningFDE-MOF FinancialDepartmentforEnterprises-MinistryofFinanceFE-CTU FacultyofEnvironment–CanThoUniversityFE-UNREHCM FacultyofEnvironment–HoChiMinhUniversityofEnvironmentandNaturalResources
FF-CTU FacultyofFisheries–CanThoUniversityFMT-AFUHCMC Faculty of Mechanics and Technology – Ho Chi Minh City Agriculture and ForestryUniversityGIZ DeutscheGesellschaftfürInternationaleZusammenarbeitGIZ-TVET TechnicalandVocationalEducationandTrainingProgrammeVietNam–GIZGIZ-RESP SupportfortheDevelopmentofRenewableEnergyinVietNamProject–GIZGREEN-ID GreenInnovationandDevelopmentCenterHE-MOET HigherEducationDepartment–MinistryofEducationandTrainingIES InstituteofEnergySciencesIPSARD InstituteofPolicyandStrategyforAgricultureandRuralDevelopmentIPSI IndustrialPolicyandStrategyInstituteISPONRE InstituteofStrategyandPolicyforNaturalResourcesandEnvironmentNRED-MOIT NewandRenewableEnergyDepartment–MinistryofIndustryandTradePED-MOET ProfessionalEducationDepartment–MinistryofEducationandTrainingPMU-VBL-MARD ProjectManagementUnit–VietNamBiogasLivestockSector–MinistryofAgriculture andRuralDevelopmentSDCC SustainableDevelopmentandClimateChangeConsultancyCompany
SHEER-HUST School of Heat Engineering and Refrigeration – Hanoi University of Sciences andTechnologies
SIDA SwedishInternationalDevelopmentCooperationAgencySNV NetherlandsDevelopmentOrganisationSONGHONG SongHongJointStockCompanyUSAID UnitedStatesAgencyforInternationalDevelopmentVBA VietnamBiogasAssociationVEA-MONRE VietnamEnvironmentAdministration–MinistryofNaturalResourcesandEnvironment
10 EXECUTIVE SUMMARY
VSA VietNamSugarAssociationVSCs VietNamSugarCompanies WorldBank
Corestakeholdersaslistedunder3.1(Overview of stakeholders by core areas)AGU AnGiangUniversityAGVT AnGiangVocationalTrainingCollegeAIT AsianInstituteofTechnologyAIT-VN AsianInstituteofTechnologyinVietnamCAMIX wasteandwastewatersolutionscompanyCTU CanThoUniversityDNU DaNangUniversityDARD-CT DepartmentofAgricultureandRuralDevelopment–CanThoPCDOC DepartmentofConstructionDOIT DepartmentofIndustryandTradeDONRE DepartmentofNaturalResourcesandEnvironmentENERTEAM EnergyConservationResearch&DevelopmentCenterEPU ElectricPowerUniversityERAV ElectricityRegulationAuthorityofVietnamEVN VietnamElectricityGroupGDE-MOIT GeneralDirectorateofEnergy–MinistryofIndustryandTradeGMGC GoldMillenniumGroupConsultingHCMC-VC HoChiMinhCityElectricityVocationalCollegeHNHBGroup HoaiNamHoaiBacGroupHUSTHanoi HanoiUniversityofSciencesandTechnologiesHUSTHCM HoChiMinhUniversityofScienceandTechnologyICF IndoChinaCapitalFundIOE InstituteofEnergyIMST InstituteofMiningScienceTechnologiesIPSI IndustrialPolicyandStrategyInstituteMARD MinistryofAgricultureandRuralDevelopmentMOC MinistryofConstructionMOET MinistryofEducationandTrainingMOF MinistryofFinanceMONRE MinistryofNaturalResourcesandEnvironmentMOLISA MinistryofLabour,InvalidsandSocialAffairsMOST MinistryofScienceandTechnologyMPI MinistryofPlanningandInvestmentNTU NhaTrangUniversityPECC3 PowerEngineeringConsultingJointStockCompany3RCEE-NIRAS ResearchCenterforEnergyandEnvironment–NIRASTHIC TuyHoaIndustrialCollegeUNREHCMC HoChiMinhCityUniversityofEnvironmentandNaturalResourcesURENCO UrbanEnvironmentCompanyUSTH UniversityofScienceandTechnologyofHanoiSTAMEQ DirectorateofStandards,MetrologyandQualityVAST VietnamAcademyofScienceandTechnologyVDB VietnamDevelopmentBankTRANSERCO TransportServiceCorporationBWTE BiologyEnergy-WasteTreatmentCompanyLtdVEPFMONRE VietnamEnvironmentProtectionFundVLU VanLangUniversityVNU VietnamNationalUniversity
11ExEcutivE Summary
1. Rationale of the study
1.1. Objectives and scope of the study
Thedevelopmentof renewableenergy (RE)holdsgoodpromise in improvingVietNam’snationalpowersupplyand itsgeneral socio-economicdevelopment.RE-related targetshavebeen integrated ina rangeofdifferentnationaltargetprogrammesoftheGovernmentofVietNamstartingwith2008’sNationalTargetProgramforRespondingtoClimateChange,2007’sNationalEnergyDevelopmentStrategy,2011’sNationalClimateChangeStrategy,and2012’sVietNamGreenGrowthStrategy(VGGS).
Incentivemechanismssuchasfeed-intariff(FiT)ratesforbiomassandwastepowerprojects,taxreductionsforimported/exportedequipmentandmaterials,andfinancialsupportforthoseprojectswereintroducedbythegovernmentin2014.Inordertolayagoodfoundationforbioenergysectorpromotionanditsstrategicplanning, the Ministry of Industry and Trade (MOIT) and GIZ worked together on the ‘Capacity NeedsAssessmentStudyfortheGrid-connectedBio-energySectorwithaFocusonBiomass,BiogasandMunicipalDomesticWaste’(hereinafterreferredtoas‘CNAStudy’).AIT-VNwasselectedtoconductthestudy.TheCNAStudyaimedattwomajorobjectives:
i. assessanddeterminetheexistingandrequiredcapacitiesandcapacitygapsatinstitutionaland individuallevelforeachcoreareainthegrid-connectedbioenergysector;andii. proposeshort(upto2year)andmedium(2-5years)termrecommendationsoncapacitybuilding foreachcorearea.
Thestudyshallalsoactasareferencesourceforrelevantunitsandorganisations.
Threeareasofgrid-connectedbioenergyelectricity, includingbiomass,biogasandmunicipalsolidwaste,wereexaminedattheorganisationalandindividualcapacitylevel.Recommendationsweredevelopedinordertoovercometheidentifiedcapacitygaps.InvolvedstakeholdersincludefunctionalunitsatMOIT,universities,researchinstitutes,banks,consultingagencies,non-governmentalorganisations(NGOs),associationsandenterprisesinvestinginREprojects.
01
12 EXECUTIVE SUMMARY
1.2.Policies and legal framework for the development of renewable energies with a focus on grid-connected bioenergy
SupportingpoliciesonREdevelopmenthavebeenadoptedbytheGovernmentofVietNam.StrategiesandmasterplansincludetheElectricityLawNo.28/2004/QH11andthePowerDevelopmentPlan(PDP)No.7,whichplanforanREcontributiontototalelectricitygenerationof4.5%in2020and6.0%in2030.AsstatedinthePDPNo.7,biomasspowershallreachaninstalledcapacityof500MWby2020and2000MWby2030.
Furtherdecisionsandregulationsencouraginginvestmentinbioenergyprojectsinclude:
- RegulationofavoidedcosttariffsandstandardPPAforsmallrenewableenergypowerplants connectedtothenationalgrid[MOIT2008]. - JointCircularNo.58/2008/TTLT-BTC-BTN&MTdated4July2008issuedbyMOFandMONRE explainingtherulesofgovernmentsupportforcleanenergyprojects. - EstablishmentoftheVEPFtosupportenvironmentalprojectslikegrid-connectedbioenergyprojects in2002. - Twodecisions(No.31/2014/QD-TTgdated5May2014onthesupportmechanismforthe developmentofsolidwastepowerprojectsandNo.24/2014/QD-TTgdated24May2014onthe supportmechanismforthedevelopmentofbiomasspowerprojectswereissued;theseincludea setFiTrateandotherincentivessuchastaxexemptions.
In addition, the government receives international financial and technical support in the field of RE, inparticular bioenergy. Projects co-implemented by international organisations include the GIZ RenewableEnergySupport(RESP)Projectwhichfocusesontheimprovementofthelegalframeworkandmechanismsforbioenergyprojects,theWorldBankEnergySectorManagementAssistanceProgramme,whichaimstomapbiomassresources,andprojectsbyotherdonorsinthebroaderfieldofREincludingSNVNetherlandsDevelopmentOrganisation,theEUDelegation,USAID,ADB,AECID,etc.
1.3.Current status of grid-connected bioenergy generation
Biomass
Biomassresourcesareabundant, ranging fromagriculturalwaste,straw,husk,bagasse,woodandwoodwastetopeanutshellsandcoconutandcashewwaste.Thepotentialelectricitygenerationcapacityofthesesourcesisabout2,500MW[Cuong2011a].Atpresent,electricityproductionfrombiomassonlymakesupapproximately150MWoutof21,500MWoftotalinstalledcapacityin2010.Consumptionofbiomassenergymostlylimitedtocookingandheatingpurposes.
Potentialgrid-connectedbiomasspowerprojectsinclude41sugarmillswithanestimatedcapacityof500MW; 6 grid-connected plants using bagasse electricity technology with a total capacity of 150 MW arecurrentlyinstalled.Otherprojectsincludesmall-scalepilotfacilities,withinefficientoperationandout-of-dateequipmentwhicharenotconnectedtothegrid.Therefore,thereshouldbefurthermechanismstoalleviatetheseconstraintsinordertomeettheVietnameseGovernmenttargetsoutlinedinthePDPNo.7.
Biogas
Withvarioussourcesfromfoodandcropprocessingaswellasdomesticanimals,biogaselectricityprojectsaremainlysmall-scale(e.g.200,000household-scalebiogasprojectsin53ruralandmountainousprovinces)andnotgrid-connected.Themainobjectiveistoprovidecookinggastohouseholds,meettheinternalpowerdemand,and increaseenvironmental protection, for example inwastewater treatment.There isonlyone2-MWindustrial-scalebiogasplantutilizingpigmanure,whichfacestheproblemofgasbeingunusedandaccordinglyflaredoffwithoutmakingproperuseofthisenergy.Populartechnologiesemployedarerestrictedtosmall-scalebiogasdigestersandbiogasstoragebags.
Waste
Twenty-eightmillion tonsofsolidwaste,70%domesticand30%industrial,construction,medicalorotherresidues,aregeneratedannually[VEA,2009].Wastetreatmenttechnologyisoflowstandard,suchaspoorlyoperatedlandfills,openburningorsimplydumpingwasteintorivers,canalsorfields.Someprojectshavebeen developed to promote grid-connected bioenergy power. For example, the Go Cat waste-to-energyelectricityplantinHoChiMinhCitywith2.4MWofinstalledcapacity,aJapanesefundedwaste-to-energyprojectatNamSonlandfill,isexpectedtobecomeoperationalin2014.Thismarketofinvestmentstillhaslimitations,includinghighinvestmentcost,economicinefficiencyandinadequateFiTs.
13ExEcutivE Summary
1 TheCADREmethodologywasdevelopedbyGIZandappliedinmanycountries.
2. Methodology
2.1. Study method
The‘CapacityDevelopmentNeedsDiagnosticsforRenewableEnergy(CADRE)’methodology1wasemployedtoidentify:(1)capacityneedsofthegrid-connectedbioenergysector;(2)existingcapacities;and(3)capacitygaps.
Thetarget modelforthegrid-connectedbio-energysectorwasconstructedtodetailthesethreeelements.Thebasictargetmodeliscomposedof(1)coreareasofthesectorincludinglegalframeworks,regulationandadministration,humanresources, investment,equipmentandservicesprovision,projectdevelopmentandoperation;and(2)applicationsandprocessesforeachcorearea.Thefollowingtablesummarisesthemethodologicalsteps.
02
Study method Content and tasksStep 1: Identification of the scope of the study
SWOT(strengths,weakness,opportunitiesandthreats)analysisofeachcorearea(inakick-offandscopingworkshop)andcompletionof:(1)basictargetmodelincl.5coreareasandrelatedprocesses/applications;(2)stakeholderlandscapefor5coreareas;(3)arrangementoftheparticipationofthekeyorganisationsinthestudy.
Step 2:Data collection
Collectionofdataonthecapacityneedsofparticipatingstakeholdersviainterviewsandquestionnairesheetsincludinginformationon:(1)organisation’smission;(2)organisation’scurrentcapacity;(3)relationshipamongstakeholders;(4)organisation’ssolutionstoimprovecapacityatorganisationalandindividual
levels.
14 EXECUTIVE SUMMARY
Step 3: Data analysis
Preparationofananalysissummaryincludingtheidentificationof:(1) organisation’sstatus,mandates,responsibilitiesandactivitiesrelatedtogrid-
connectedbioenergy;(2) existingcapacities;(3) requiredcapacitiesattheorganisationallevel;(4) organisationalcapacitygaps;(5) individualcapacitygaps;(6) solutionsandrecommendationsfromtheinterviewee’sperspectives.Thisinformationwasintegratedintothebasictargetmodel.
synthesis (3) organisationalcapacitygaps;(4) Existingindividualcapacities;(5) Requiredcapacitiesattheindividuallevel;(6) Individualcapacitygaps.Recommendationsforcapacitydevelopmentwereformulatedforeachcoreareaatorganisationalandindividuallevelsforashortandmedium-termperiod.
2.2. Overview of target model
Thetargetmodelwasdevelopedbasedonthefollowingfivecoreareas:
Core area 1: To create a favourable development framework for RE (focus on biomass, biogas and waste-to-energy)
Activitiesinclude:
i. development of strategies and plans relatedtobioenergy,suchasthePowerDevelopmentPlan (2011),regionalREdevelopmentplanssuchastheNationalEnergyDevelopmentStrategy(2007), etc.(involvedorganisations:MOIT/GDE,MPI,MOF,MOET,MONRE,MOC);
ii. development of policies and support mechanismstoencourageforeign/ODA/privateinvestmentin grid-connectedbioenergyprojects(involvedorganisations:MOF,MPI,MOIT/GDE);
iii. development of national target programmessuchasREnationaltargetprogrammesincluding onbioenergydevelopmentandspecificREtypes(e.g.biomass,biogas,waste-to-energy);integration ofREuseinkeynationalprogrammesliketheNationalEnergyEfficiencyProgram,ruralelectrification, afforestation,povertyalleviation,VGGS,etc.;
1.Capacitiestocreateafavorabledevelopmentframeworkforgrid-connectedbioenergy
3.Capacitiestodevelophumanresources
2.Capacitiestoregulateandadministerthesector
4.Capacitiestoprovideequipmentandservicesforgrid-connectedbioenergyprojects
5.Capacitiestodevelop,plan,build,operateandmaintaingrid-connectedbioenergyprojects
15ExEcutivE Summary
iv. developmentoffinancingoptionsincludingthedevelopmentoffiscalmechanismsforREinvestment, bioenergydevelopmentandtheset-upofREdevelopmentfundstosupportpotentialprojects (involvedorganisations:MOF,MONRE,MOIT/GDE);
v. development and introduction of technologiesincludingthedevelopmentoftechnologicalapplications ofgrid-connectedbioenergyandresearchonRE;taxincentivesandreductionsforequipment import,andprotectionofpatentsforinventionsandtechnicalimprovements(involvedorganisations: MOST,MOIT).
vi. implementation of strategies and policies, which involves:
a. coordinationofactivitiesinbioenergyprojectlicensingandguidelinedevelopment(Involved organisations:MOIT/GDE,provincial/municipalPeople’sCommittees(PCs)); b. supportforinvestorswithregardtoresident’scompensation,siteclearance,infrastructure, humanresourcedevelopment,etc.;monitoringofbio-energyprojects,andmanagementof localelectricity-relatedactivitiesinconformitywithcurrentlegislation(involvedorganisations: districtPCs,regionalelectricityunit,communeauthorities,DOIT);
vii.human resources development:EstablishmentofanationalprogrammeforhumanresourcesinRE; developmentofanREmajorinhighereducationandvocationaltraininginstitutes/colleges(involved organisations:MOETandGDE/MOIT,seefurtherorganisationsundercorearea3)
Core area 2: To regulate and administer the sector
Activitiesinclude:
i. supportactivitiesforREandgrid-connectedbioenergyprojectsincludingtheissuanceofstandard powerpurchasingagreements(PPAs)andtechnicalstandardsforgrid-connectedbiogas,biomass andwaste-to-energy;developmentandupgradeofpowertransmissionlines,implementgovernmental decisionsandcircularsonsupportmechanismsforgridconnectedbioenergyincludingFiTs,l icenses,funding,loansforgrid-connectedbio-energyprojects(involvedorganisations:ERAV,EVN, MOST/STAMEQ,MONRE/VEPF);
ii. planningandsupplyingofREelectricity(bioenergy)toruralareasandislands(involvedorganisations: EVN,ERAV).
Core area 3: To develop human resources
Activitiesinclude:
i. upgradeoforganisationalandindividualcapacities(qualifications,technicalskills)forthosewho areinvolvedingrid-connectedbioenergydevelopment(involvedorganisations:MOET,MOIT/ GDE,MinistryofLabour,InvalidsandSocialAffairs(MOLISA),MOIT,MARD,MOC,MONRE, MOSTandrelatedPCdepartmentsofPCs).
ii. strengtheningofscientificresearchactivitiesincludinginfrastructurefacilities,trainingprogrammes, theapplicationofnewtechnologiesinthefieldsofbiomass,biogasandwaste-to-energy(involved organisations:universities,vocationaltraininginstitutions,researchinstitutes,consultingfirms(see detailedlistunder3.1)).
16 EXECUTIVE SUMMARY
Timeframe Participants Outcome
StageI:Identificationofthestudyscope
1to31May2013 Internationalconsultant,GIZRESPteam,AIT-VNlocalconsultingteam
Basictargetmodel:
(1)coreareaswithaccompanyingprocessesandapplications
(2)mapofstakeholdersinthegrid-connectedbioenergysector
(3)listofmainstakeholdersinthestudy
StageII:Datacollection
1Juneto30August2013
-67organisationsandstakeholdersinfivecoreareasinHanoi,HCMC,HaiPhong,DaNangandCanTho(interviews)
-81governmentalofficers,experts,engineersandconsultants,projectdevelopers,researcherswithbackgroundrelatedtogrid-connectedbioenergy(questionnaire)
(1)interviewtranscripts(2)statisticalanalysisofcapacityneedsatindividuallevels
(SeeAnnex2andAnnex3inlongversion)
StageIII:Analysisandsynthesisofcollecteddata
1Septemberto30December2013
Localconsultingteam,GIZofficeandinternationalconsultant
(1)identifiedcapacitygapsatorganisationalandindividuallevelsforeachparticipatingorganisation;togetherwithsolutionsandrecommendedmeasures
(2)proposalofrecommendationsforeachcoreareainashort-termperiod(upto2years)andmedium-termperiod(3–5years)
2.3. Timeframe of the study
Thetargetmodelwasdevelopedbasedonthefollowingfivecoreareas:
Table 2:Timeframeofthestudy
Core area 4: To provide equipment and services for bioenergy projects
Activitiesinclude:
i. adaptationsoftechnologiesforlocalmanufacturing,assembly,repairandmaintenanceofbioenergy equipment;engineering,procurementandconstruction(EPC)services(involvedorganisations: manufacturingandservicecompanies,consultingandconstructioncompanies(seedetailedlist under3.1);
ii. provisionofcapitalandfinancialmanagementservices;establishmentofnetworksand cooperationactivitiesinbioenergy.
Core area 5: To develop, plan, build, operate and maintain bioenergy projects
Activities cover different aspects: funding, project development and implementation (includingequipmentpurchaseandservicemanagement),managementandoperationofbioenergypowerplants(involvedorganisations:investors,projectdevelopers,professionalconsultingcompanies,constructioncompanies,EPCs(seedetailedlistunder3.1).
17ExEcutivE Summary
2.4. Stakeholder map
The stakeholder map illustrates a range of organisations involved in the grid-connected bioenergy sector within the five core areas. In the centre are organisations of high importance.
14
6
Figure 2: Stakeholder map of grid-connected bioenergy sector
Regulate and administer the
sector
Create favourable development
framework for grid-connected
bioenergy projects
Develop, plan, maintain and operate grid-
connected bioenergy
projects
12
3
4
5
LD, DC-MARD
DIE-MPI AI-MOC
PED-MOET
VEA-MONRE CCO-MONRE COP-MONRE
GDE-MOIT
MOST MOET
MPI
ERAV
STAMEQ
Research institutes
Universities
Associations/ NGOs
EPC
GO
DOIT DONRE
DOC DPI Advanced
training providers
Vocational training colleges
Professional Consulting Companies
Banks Investment
funds
Equipment Provider
Developer and owner of: biomass, biogas and waste-to-energy projects
Donors involved in the bioenergy sector: GIZ, SNV, USAID, WB, ADB, EU delegation
Develop human resources
Provide equipment and services for grid-connected bioenergy projects
EVN
VEPF
Figure 2:Stakeholdermapofgrid-connectedbioenergysector
18 EXECUTIVE SUMMARY
19ExEcutivE Summary
3. Presentation of the results
3.1. Overview of stakeholders by core area
Core area 1: Create a favourable development framework for grid-connected bioenerg
03
Stakeholder type National level Provincial levelDecision-maker role (highest responsibility)
GDE-MOIT(policyandlegalframeworkdevelopment;supportmechanismsforREprojects;state-ledgrid-connectedbioenergyplanning;approvalofREprojects>30MWinstalledcapacity)
ProvincialandmunicipalPCs(implementpoliciesandsupportingmechanismsaswellasalocalsupportingframeworkforgrid-connectedbioenergy;approvaloflocalgrid-connectedprojects<30MWinstalledcapacity)
Advisory role MPI,MOF,MONRE,MOSTE,MARD,MOET,MOC
DOIT,DOC,DONRE,DARD
Stakeholdert ResponsibilityElectricityRegulatoryAuthorityofVietnam(ERAV)
Regulationandmonitoringoftheelectricalgrid,setupanddevelopmentoftheelectricitymarket,licensingfornationalgrid-connectedbioenergyprojects,assuranceofgridstability,standardsforgrid-connectedREelectricity,PPA
ElectricityofVietnam(EVN)
Provisionoftransmissionlines,integrationofbioenergyprojectstothenationalgrid,REprojectconnectiontothegrid,signingofPPA
VietnamEnvironmentalProtectionFund(VEPF)
Financialresourcesforenvironmentalprotectionprojectsandactivities;financialnormsandstandardstosupportthoseprojects,includinggrid-connectedbioenergy.
DirectorateofStandards,MetrologyandQuality(STAMEQ)
GovernmentalagencyunderMOSThavingresponsibilityforadvisinginthefieldsofstandardisation,metrologyandqualitywithintheframeworkofthedevelopmentofnationalpolicies,strategiesandmasterplans
Core area 2: Regulation and administrationconnected bioenerg
20 EXECUTIVE SUMMARY
Stakeholder ResponsibilityResearchinstitutes Basicandadaptiveresearch,advancedtechnologytransfer,draftingpolicies,
developmentstrategiesandincentivemechanismsforthegrid-connectedbioenergysectorRelevantorganisations:IOE,IPSI,IMST,AITtechnicalandconsultingcompanies(seecorearea4below),etc.
Universities UndergraduateandpostgraduatetraininginREtechnologies(includinggrid-connectedbioenergy)andRE-focusedeconomics&businessadministrationRelevantuniversities:AGU,CTU,DNU,NTU,HUST,HUST-HCM,VNU,EPU,UNREHCMC,USTH,VLU,VAST
Advancedtrainingproviders
Short-termtraining,longercapacity-buildingprogrammesinRE,professionalskillssuchaspreparationoftechnicalandfinancialproposalsforgrid-connectedbioenergyinvestment,REstrategies,bioenergyplanning,projectmonitoring.ThereisstillnoadvancedtrainingforREwithinVietNam
VocationalTrainingColleges
Educationoftechnicians,skilledworkersinREtechnologies(focusingonequipment,operationandmaintenanceinbioenergyplants).Uptonow,novocationaltrainingschoolsoffertrainingonRE-relatedtopics.Relevantcolleges:AGVT,HCMC-VC,THIC,etc.
Stakeholder ResponsibilityEquipmentprovider Productionofselectedaccessories,materials,technologytransfer,equipment,
replacementitems,plantconstructionandmaintenance.Relevantorganisations:HNHBGroup,DinhHaiEquipmentLtd,DaiPhatMachineryLtd.,MinhTuLtd,etc.
Engineering,procurementandconstruction(EPC)
Technicaldesign,equipmentprocurement,construction,technologytransfer,training,maintenance.Relevantorganisations:CAMIX,etc.
Professionalconsultingcompanies
Technicalandfinancialproposals,assessmentofeconomicefficiencyofinvestment,engineeringdesign,technologytransfer,consultationinconstructionandtraininginplantmanagementandoperationRelevantorganisations:PECC3,RCEE-NIRAS,FichtnerVietNamLtd,ENERTEAM,GMGC,technicaluniversities(seeabove),researchinstitutions(seeabove),NGOs(seebelow),etc.
Banksandinvestmentfunds
Loanstogrid-connectedbioenergyprojects,assessmentofinvestmentefficiency,possibleriskandprojectmonitoringRelevantorganisations:ICF,VDB,commercialbanks,ODAfunding
AssociationsandNGOs
Introductionofnewtechnologies,incentivemechanisms,consultationsonprojectdevelopmentandimplementation,awarenesstrainingRelevantorganisations:VietNamBiogasAssociation,VietNamSugarAssociation,VietNamEnergyAssociation,CleanEnergyAssociation;AssociationforEnvironmentalProtection,Green-ID,LiveandLearn
Core area 3: Develop human resources
Core area 4: Provide equipment and services to grid-connected bioenergy projects
21ExEcutivE Summary
Field Stakeholders in the field includeBiogas Localandforeigninvestorsandprojectdevelopers,large-scalepig,poultryormilkcow
farmersRelevantorganisations:SanMiguelPureFoodsVietnamLtd,TNHTruemilk,TRANSERCO,etc.
Biomass Localandforeigninvestors,sugarfactoriesRelevantorganisations:LamSonSugarCaneJointStockCompany(JSC),GiaLaiSugar–ThermalPowerJSC,KhanhHoaSugarJSC,NinhHoaSugarJSC,TTCGroup,TRANSERCO,etc.
Waste Localandforeigninvestors,state-runurbanenvironmentcompaniesRelevantorganisations:URENCOs,Hitachi,NamSonwaste-basedpowerplant–fundedbyJapanese-VietnameseGreenAidProgramme(GAP),TamSinhNghiaInvestment-DevelopmentJSC,VietnamWasteSolutionInc.,BEWTE,etc.
Core area 5: Project development and operation
Alsoactiveinthebioenergysectoraredonor organisationsincludingSNVNetherlandsDevelopmentOrganisa-tion,ADB,WorldBank,USAID,theEUdelegationandGIZ.
3.2. Analysis of stakeholder capacity by core area
Theanalysiswasundertakenviaquestionnaire-basedsurveysandinterviews.Intotal,67keystakeholderswereselectedfor interviewand81keystakeholdersoptedforquestionnaires.ThesekeystakeholderswerecarefullychosentoberepresentativesoffiveCoreAreasaswellasinternationaldonors.
Inaddition,27capacityneedsassessmentreportsof27keyparticipatingorganisationsinthestudywereanalysedfor existing capacities, required capacities and capacity gapsattheorganisationalandindividuallevel.
24
4 4 2
15
36
15
26
3
13
6 0
67
81
0
10
20
30
40
50
60
70
80
90
eriannoitseuQweivretnI
Core Area 1
Core Area 2
Core Area 3
Core Area 4
Core Area 5
Int. donors
Total
Figure 3:Representativesofkeystakeholdersinfivecoreareasinterviewedandquestioned
22 EXECUTIVE SUMMARY
Table 3:Existingandrequiredcapacitiesandcapacitygapsatorganisationallevel
Core area
Currentsituationandexistingcapacities
Requiredcapacities Capacitygaps
1 Centrallevel:- limitedstaffnumberinchargeofRE- technicalstaffhavelimitedREeducationorspecificexpertiseingrid-connectedbioenergy
- ineffectivemanagementprocedures,insufficientcoordination
- limitedexperienceinpolicyformulation,projectdevelopment
Locallevel- staffwithoutREknowledgeandspecificskills
- noresponsiblestaffforRE/grid-connectedbioenergy
- noguidelinesforpolicyimplementation,planningforREonlyselectivelyavailable
- DOITlacksupportingdata,toolsandmethods,andfinancialandhumanresourcestofulfiltheassignedduties,includingprojectevaluationandresearchplanning
Forbothcentral&locallevel:- effectivemanagementandcoordinationofstakeholders
- strategyandpolicydevelopment
- implementationandmonitoringofnationaltargetprogrammes
- projectassessment- monitoringandevaluationofgrid-connectedbioenergyprojects
- improvedcommunication
Thereshouldbe:- 3–4newrecruitsatDepartmentofNew&RenewableEnergyunderGDE
- 1–2recruitsresponsibleforRE/grid-connectedbioenergyatDOITatcentralandlocallevel
Inadequateexperiencein:- REpotentialandprojectassessment
- monitoringandevaluationofgrid-connectedbioenergyprojects
Lackof:- completeinformationsystemforimprovedflowbetweencentralandlocalunits
- expertise,tools,dataforsharing
2 - staffwithREexperienceatERAVandVEPFbutnotwithregardtogrid-connectedbioenergyprojects
- limitedbudgetforREcapacitybuilding
VEPF:standardsforfinancialsupportapproval
ERAV:evaluationofgrid-connectedbioenergyprojects
budgetforbioenergyandrelatedtechnologytraining
3 - limitedstaffwithintensivebioenergytrainingfromtechnicaluniversitiesandresearchinstitutions
- limitedqualifiedinstructorsingrid-connectedbioenergy
- currentcurriculacanonlyberevisedbysomeinstructorsandresearcherswhotookpartininternationalREprojects
- laboratoriesforresearchandadvancedtrainingingrid-connectedbioenergy
- developmentandintegrationofgrid-connectedbioenergyintothetrainingcurricula
- technologyresearchandadaptation
- nolaboratoryforresearchongrid-connectedbioenergytechnologiesandtechnologyadaptation
- lackofbudgetforfundamentalandadaptiveresearchonnewtechnologies
- littledemandfromyoungscientistsforgrid-connectedbioenergytechnologies
- shortageofadvancedtrainingopportunitiesforyoungstaffinresearchinstituteanduniversities
4 (1)Constructionservicecompanies
- Servicesforsmall-andmedium-scalebiogasprojectswithlimitedtechnologicalcapacity
- Combinationoftraditionalandnewtechnologies,reducingoperationalcostsforinvestors
Capacityin:- pre-feasibility/feasibility studies- structuredesign,construction,management,monitoringandtechnical-financialevaluationforbiogasenergyprojects
- knowledgeandskillsinbiogasenergyprojects
- expertiseinconstructiondesignandsafetytechniquesforbiogasenergyprojects
- projectmanagementandmonitoring
23ExEcutivE Summary
4 (2)Professionalconsultingcompanies
- specializationintechnologyresearchandreplicationinbiogas
- lackofexperienceinindustrial-scaleprojectsandtheapplicationofadvancedtechnologies
- lackofinfrastructure,equipmentandlaboratoriesforresearchingrid-connectedbioenergy
- experienceinforeign-fundedprojects(landfillgasrecovery,wastedisposaltechnology)
- employeeswithsolidbackgroundsinenvironmentalengineering,notinwaste-to-energytechniques
Capacityin:- pre-feasibility/feasibility
studies- preparationoftechnicalandfinancialproposals
- newtechnologyresearchandapplicationreplication
- evaluationofeconomic/financialefficiencyofbioenergyprojects
- consultationonbioenergytechnologyandprojectmanagement
- laboratoriesforresearchanddevelopment
- professionalsandexpertsingrid-connectedbioenergy
(3)Banksandfundingagencies
- staffinchargehasfinancialbackgroundandself-studiedRE
- VDBinvolvedinhydropowerandwasteinvestmentprojects;notingrid-connectedbioenergyyet
- VDBandIndoChinaCapitalconsidersREinvestment;staffequippedwithbioenergybackgroundbutfoundnorelevanttrainingcoursesinVN
- assessmentofeconomic-financialaspectsandbioenergyinvestmentefficiency
- assessmentoflegalissues- managementandsupervisionofgrid-connectedbioenergyprojects
- understandingofsupportmechanisms
- knowledgeingrid-connectedbioenergyandrelatedtechnologies
- skillsinprojectassessment,evaluationandprojectinvestmentcost-efficiency
(4)Associations
- currentstaff:olderwithextensiveexperienceandprofessionalknowledge;urgentneedforyoungexperts
- limitedknowledgeandskillsingrid-connectedbagasseorbiogasenergy;limitedbudget
- forums,seminarsandconferenceorganisationongrid-connectedbagasseandbiogasenergy
- consultationonbiomass,biogaspowertechnologies,servicesandtrainingingrid-connectedbiomass
- goodknowledgeofRE-relatedstrategiesandpolicies
Lackof:- qualifiedresourcestaffandexperts
- budgetforadvocacy,humanresources,R&D
(5)NGOs
- staffavailablewithexperienceworkingwithinternationalexperts,householdbiogasapplicationandenergyplanning
- understandingofgrid-connectedbioenergyandrelatedtechnologies
- generalknowledgeingrid-connectedbioenergyandrelatedtechnologies
5 (1)Biogasprojectdevelopers
- smallinvestorswithlimitedhumancapacityandinvestmentcapital
- limitedcapacityinprojectmanagementandpost-handoveroperations
- limitedaccesstogovernmentpoliciesandmechanisms
- lackofknowledgeonbiogasenergyandtechnologies
- management,operationandmaintenanceofgrid-connectedbiogasenergyplants
- funds/capitalforinvestment- understandingoftechnologiesandpoliciesinthefield
capitalshortageforinvestmentingrid-connectedbiogasplantsandlackofadvancedbiogastechnologies
24 EXECUTIVE SUMMARY
5 (2)Biomassprojectdevelopers
- sugarcompaniesarethemainbiomassenergydeveloperswithoutdatedtechnologies
- lackofexpertstaffongrid-connectedbioenergyfrombagasse
- limitedcapacityinmanagementandoperationofelectricitygenerationequipment
- technicalandfinancialproposalwriting
- evaluationofeconomic/financialeffectivenessofprojects
- managementofbagasseprojects
- operationandmaintenanceofgridconnectedbagasseenergyprojects
- understandingofbiomassenergyandtechnologies
- out-of-datetechnologies- lackofmodernequipmentforbiomassenergy
- lackofcapitalforinvestment
(3)Waste-to-energyprojectdevelopers
- URENCOsarepotentialinvestorsinwaste-to-energy
- URENCOslackofprofessionalstaffinwaste-to-energyprocesses;notrainingcoursesprovideduptonow
- technicalandfinancialproposalwriting
- assessmentandplanningofwastecollection/disposalpotentials
- managementandsupervisionofwaste-to-energyprojects
- understandingofwaste-to-energyprocessandtechnologies
Lackof:- qualifiedhumanresourcesinthefield
- advancedtechnologiesingrid-connectedwaste-to-energy
Core area
Currentsituationandexistingcapacities
Requiredcapacities Capacitygaps
1 Centrallevel
- responsiblestaffhasnobackgroundinREtechnologies
- managementandadministrationtrainingcoursesareprovidedonannualbasis,butnotrainingonRE
- strategy/goal/actionplanpreparation
- draftingofincentivesandsupportmechanisms
- coordinationandimplementationofnationaltargetprogrammes
- coordinationofinformationflowamongministries/stakeholdersinvolved
- appraisalofproposalsforfinancialsupport
- monitoringandevaluationoflarge-scalebioenergyprojects
- community-basedadvocacyandeducation
*Lackofskillsin:-managingstakeholders- developingandimplementingstrategies,actionplans,andnationalandregionalREdevelopmentplans
- developingnationaltargetprogrammesandsupportpackages
- writingreports/proposals/legaldocuments
- assessingpolicyimpactandcurrentsituationofbioenergydevelopment
- preparingbioenergystandardsandregulations
- evaluating,supervisingandmonitoringbioenergyprojects
*Lackofknowledgeonbioenergytechnologiesandsupportpolicies;lessonlearnedfromothercountries
Table 4:Existingandrequiredcapacitiesaswellascapacitygapsatindividuallevel
25ExEcutivE Summary
1 Locallevel
DOIT:Staff(mainlyelectricalengineers,powermanagersandoperators)withnobackgroundinRE/REplanning,assessmentofbioenergypotentialand/orREprojectmonitoringDOST:staffwithnoexperienceworkingingrid-connectedbioenergyprojects/withforeignexpertsorconsultants;nottrainedinthefield.
- Responsiblestaffneedindividualcapacitiesin:
- preparationofREdevelopmentstrategiesandplanning;technical/financialproposalsatprovinciallevel
- implementationofsupportingpoliciesforgrid-connectedbioenergyprojects
- supervisingandmonitoringgrid-connectedbioenergyprojects
- managementandcoordinationofstakeholdersandconsultants
- knowledgeofgrid-connectedbioenergyandrelatedtechnologies;incentives/policiesforbiomass,biogasandwaste-to-energyprojects.
*Lackofskillsin:- managementandcoordinationofstakeholders
- analysisandforecastingofelectricityneedsandpotentialbioenergyatprovinciallevel
- preparationandimplementationofstrategiesandactionplansforthebioenergysubsector
- evaluationandmonitoringofgrid-connectedbioenergyprojectsatprovinciallevel
- assessmentofinvestmentefficiency
- riskmanagement*Lackofknowledgeonrelatedtechnologiesandpoliciesinthefield
2 ERAVProfessionalstaffwithgoodeducation(PhD,MSc,etc.),economicsandenergyengineeringbackgroundsfromHUSTandgoodEnglishskills,butnotinvolvedinanybioenergyprojectsandhavenotattendedanytrainingcourseinbioenergy
Abilityto:- setuptechnicalstandardsfortheintegrationofgrid-connectedbioenergytothegrid
- researchintegratedtechnicalsolutions
- understandREandtheelectricitymarket
N/A(noinfoontheanalysisofindividualcapacitygaps)
VEPF
Responsiblestaff:well-educatedwitheconomic/financebackgrounds,self-studiedRE,notinvolvedinbioenergyprojects,noopportunitiestolearnaboutREincentives
abilitytoappraisegrid-connectedbioenergyprojectstoobtainfunding-understandingofREandtechnologies/policiesforbiomass,biogasandwaste-to-energy
*Lackskillsin:appraisinggrid-connectedbioenergyprojects;estimationofinvestmentcost,preparationoftechnicalguidelines;evaluationofeconomicefficiency*Lackknowledgeonsupportpolicies,experiencesfromdevelopedcountries,andrelevantbioenergytechnologies
3 Researchinstitutes
- researcherswithnobackgroundingrid-connectedbioenergy
- knowledgeofgrid-connectedbioen-ergywasgainedviaself-learningandshort-termtraining
- goodcapacityinbasicandadaptiveresearchinbiogas/biomassandindesigningsmallandmedium-scalebioenergyprojects
- needforprofessionalskillsinplan-ningforbioenergydevelopment,calculatingFiT,evaluatingeconomiceffectiveness,etc.
- basicandappliedresearchandin-depthknowledgeofgrid-connectedbioenergytechnologies
- teachinganddevelopmentofcurriculuminthefield
- theoryandpracticecombina-tion
Lackofcapacityinlarge-scaleapplicationresearchprojects;in-depthknowledgeofgrid-connectedbioenergytechnologies
26 EXECUTIVE SUMMARY
3 Universities
- 2–3keylecturersattechnicaluniversitiesweretrainedoverseasforMastersorPhDsinRE
- 1–2groupsoflecturersineachuniversitytransferredtechnologiesrelatedtobiogas/biomassandreplicatestudymodelsforpractice
- lecturersparticipatedininternationalcooperationREprojects
4 Constructionservicecompanies Capacityin- feasibilityassessment,technicaldesignandfinancialproposalsforgrid-connectedbioenergyprojects;
- constructionsupervision,projectmanagement,economicevaluation,technologyresearchandtransfer
Lackofcapacityin:- feasibilityassessment,technicaldesignandfinancialproposalsforgrid-connectedbioenergyprojects;
constructionsupervision,projectmanagement,economicevaluation,technologyresearchandtransfer
- Lackofcapacityinengineeringdesignforlarge-scaleprojectsandknowledge/backgroundinrelatedtechnologies;
- capacityimprovedmainlythroughpracticalexperiencesandself-learning;
- limitedmanagementskills,lackofspecialists
ProfessionalconsultingcompaniesAbilitytoresearchanddeployinpractice;experienceinbiogas/biomasssmallandmedium-sizedprojects;qualifiedstaffFinance-bankingservicesMoststaffmajorinfinanceandeconomicsandlackknowledgeingrid-connectedbioenergyandrelatedtechnologies
5 Biogas,biomassandwaste-to-energyprojectdevelopers
Capacityin:- assessmentofpotentialbioenergyinvestments
- technicalandfinancialproposalformulation
- outsourcingandcontractor/consultantmanagement
- projectmanagement- capitalmanagement- managementandoperation,evaluationofgrid-connectedbioenergyplants
- understandingoflegalformalitiesandrelatedtechnologies
Lackof:- capacitytoassessinvestment
- capacityinformulatingtechnical-financialproposals
- capacityinoutsourcingandcontractor/consultantmanagement
- capacityinproject/capitalmanagement
- capacitytoevaluate,manageandoperategrid-connectedbioenergyplants
- understandingoflegalformalitiesandrelatedtechnologies
- limitedknowledgeoftechnologiesinREandgrid-connectedbioenergy
-poorcapacityinbioenergyprojectmanagementandoperation
-limitedunderstandingofpoliciesandsupportmechanismsforbio-energyprojects
-limitedtechnologiesrelatedtobiogasandbiomasswasteprocessing
27ExEcutivE Summary
4. Recommended capacity development measures
4.1. Organisational level: Short and medium-term recommendations
Table 5:Shortandmedium-termrecommendationsfortheorganisationallevel
04
Core area Shortterm(upto2years) Mediumterm(2–5years)1.Policyandstrategy
(R1):Performawareness-raisingandcapacitydevelopmentonbioenergypolicyandmechanismsforcentralisedanddecentralisedgovernmentunits.
(R2):MakeadditionalstafffortheDepartmentofNewandRenewableEnergyavailablethroughdonorsupport.
(R3):IntroducefirstpilotcommunicationschemesbetweenMOITandrelevantministries/PCsfortheproperimplementationofsupportpolicies;anddevelopandmaintainanonlineconsultationsystem.
(R4):Recruitstaffforgrid-connectedbioenergyforMOCandMARD;AppointonestaffmemberinMARDandMOCtocoordinateeffectivecooperationwithMOIT,MOCandMARD.
(R5):Assignresponsiblestaffforestablishingproceduresandguidelinesonmethodsforconductingbioenergyplanning,assessingcurrentstatusandpotentialandpredictingelectricityneedsatlocallevels.
(R6):EquiptheunderstaffedDepartmentofNewandRenewableEnergy,whichplaysacrucialroleinestablishinglegalframeworksandimplementingREmasterplans,withadditionalemployees.
(R7):Establishnation-widecommunicationschemesbetweenMOITandrelevantministries/PCsfortheproperimplementationofsupportpolicies;anddevelopandmaintainonlineconsultationsystem.(R8):Maintainaninformationsystemtosupportstakeholders(managedbyMOIT)inmakingdecisionsandpreparinginvestmentproposals.(R9):IncreaseandestablishmediacommunicationsonRE,grid-connectedbioenergyanditsrolesintheVGGSviachannelsinprovincesandcities.(R10):Recruitfurtherstaffongrid-connectedbioenergyforMOC&MARD;increasecapacityofstaffinMARD&MOCresponsibleforcoordinatingeffectivecooperationwithMOIT,MOC&MARD.(R11):Furtherdevelopthecapacitiesofresponsiblestaffwithregardtobioenergyplanning,assessmentofcurrentstatusandpotentialandpredictionofelectricityneedsatlocallevel.
28 EXECUTIVE SUMMARY
2.Regulationand Administration
Norecommendations(butpartlycoveredwithinotherrecommendations)
(R12):Strengthencapacityinthemanagementofgrid-connectedbioenergyforcorestaffofERAVandEVN.
3.HumanResources
(R13): Enhanceinternationalcooperationamonguniversities,researchinstitutesandinternationalorganisations,e.g.intheformofjointprogrammesinresearchingnewtechnologiesinbiogasandbiomass;jointtrainingprogrammesinHUST,HCMCUTandotheruniversities;exchangeprogrammeintechnologytransferinIOE;internationalconferencesongrid-connectedbioenergy;andfacultyexchangeprogrammesinkeytechnicaluniversities.
(R14):Integratebiomassandbiogastraininginuniversitycurriculums.
(R15):Organizeannualconferences,expertseminarsandforumssupportedbytheGovernment/donorstoexchangeideasandexperiencesinbioenergysector.
(R16): TrainhighqualifiedcandidatesalreadyholdingaDoctordegreeinREforresearchinstitutionsandtechnicaluniversities.(R17):TeachRE,includingbioenergy,inselecteduniversitiesoverthenextthreeyears.
(R18) & (R19):Investinfacilitiesandlaboratoriesrelatedtobiogas,biomassandwaste-to-energytechnologiesatuniversitiessuchasHUST,HCMUT,NongLamUniversityandHUA,aswellasatselectedresearchinstitutions.
(R20):EstablishaNationalProfessionalTrainingCenteronRE,includinggrid-connectedbioenergy,fordevelopingREhumanresourcesandcooperatingwithnationalandinternationaluniversities/institutes.
4Equipmentandservices
Norecommendations(butpartlycoveredwithinotherrecommendations).
(R21):Investinfacilitiesandlaboratories(relatedtobiogas,biomassandmunicipaldomesticwastetechnologies)forresearchcentresandprofessionalconsultingcompanies(HUST,HCMCUT,UNRE-HCMC,IOE,IES,etc.).
5Projectdevelopmentandoperation
(R22):Upgraderelatedtechnologiesinsugarfactorieswhichhavealreadyinstalledheat/powergenerationequipment.
(R23): EstablishaCentralTechnologyTransferCenterinDARD&MARDforbiogasandbiomasstechnologytransferaswellastrainingforcommunities.
4.2. Individual level: Short and medium-term recommendations
Table 6: Shortandmedium-termrecommendationsforindividuallevel
Core area Short term (up to 2 years) Medium term (2 to 5 years)1.Policyandstrategy
(R1):Capacity-buildingprogramme(phaseI)forMOIT-responsiblestaffincluding(1)capacitybuildingindevelopingandimplementingREstrategies;(2)anintroductorycourseongrid-connectedbioenergyandrelatedadvancedtechnologies;(3)managementskillstraining;and(4)professionalskillstrainingtodevelopsupportmechanismsforgrid-connectedbioenergy.
(R2):Enhanceknowledgeonsupportingpolicies/mechanismsandrelevanttechnologiesforresponsiblestaffofministriesandprovinceswhocontributedirectlytotheREdevelopmentstrategyofVietNam;anddesigntrainingprogrammetoenhanceknowledgeandskillsrelatedtogrid-connectedbioenergyandrelevanttechnologiesforstafffromMPI,MOF,MONRE,MOC,MOET,MOSTandrelatedprovincialdepartments.
(R3): Capacity-buildingprogramme(phase II)forresponsiblestaffatMOITimpartsskillson(1)nationalandregionalbioenergyplanning;(2)technicalstandardsforbiomass,biogasandwaste-to-energyprojects;(3)assessmentofgrid-connectedbioenergyprojects;and(4)monitoringandevaluationoftheseprojects.
(R4) & (R5):EnhanceindividualcapacityoftheresponsiblestaffofMARD,DARD,CentersofAgricultureTraininginprovinces,MOC,DOCinprovinceswithregardto(1)anoverviewofbioenergyandrelatedtechnologies;(2)anoverviewofsupportmechanismsandincentivesforbioenergy;(3)planningrelatedtobiogas,biomassandmunicipalwasteresources.
29ExEcutivE Summary
2.Regulationandadministration
(R6):OverviewforresponsiblestaffatERAV,EPTC-EVNon(1)REandgrid-connectedbioenergy;and(2)electricitygenerationtechnologiesandstandardsforthepowernetworkintegrationofbioenergyprojects.(R7):Overviewforresponsiblestaffatinvestmentfunds,commercialbanksandVEPFon(1)RE,biogas,biomassandwaste-to-energytechnologies;(2)policies,incentivemechanismsandfundprocessforgrid-connectedbioenergyprojects.
(R8):Businessadministrationtraininginbioenergyforcorestaffinrelevantunits(ERAV,EPTC,DOIT,etc.)
3.Humanresources
(R9):Upgradecapacitiesofselectedresearchersandinstructorsattechnicaluniversitiesandinstitutionson(1)grid-connectedbioenergyandrelatedtechnologies;(2)biogas,biomassandwaste-to-energytechnologies;and(4)curriculum-developmentskillsandREtraining.
(R10):Elaborateanationaltargetprogrammetobuildupagroupofstrongexpertsandprofessionalsinthefieldwithinternationalcertificates.
4.EquipmentandServices
(R11):Capacity-buildingprogrammeforcivilengineersin(1)advancedbiogastechnologies;(2)constructionengineeringdesignforlarge-scalebiogasprojects;(3)structureandconstructiontechniques;and(4)safetytechniques.
(R12):Enhanceindividualcapacityofkeytechnicalconsultantsingrid-connectedbioenergyprojects.
(R13):Enhancecapacitiesofresponsiblestaffatselectedcommercialbanksandinvestmentfundson(1)grid-connectedbioenergyandrelatedtechnologies;(2)assessmentofthoseprojects;(3)businessmodelsingrid-connectedbioenergy;and(4)projectmonitoring.
(R14):Projectmanagementcoursesforprofessionalconsultingandconstructioncompanies.
(R15): DevelopthecapacityofresponsiblestafffromVSA,VBAandotherassociationsaswellasNGOson(1)promotionskills;(2)advancedbiomasstechnologies;(3)technicalandfinancialproposalsforgrid-connectedbioenergyprojectinvestment;and(4)voiceofassociationsandNGOsinpolicymaking.
5.Projectdevelopmentandoperation
(R16):Capacity-buildingprogramme(phaseI)on(1)understandingofgrid-connectedbiogasenergy;(2)overviewofgrid-connectedbiogas;and(3)developmentoftechnicalandfinancialproposalsforinvestmentinthefield.
(R17):Capacity-buildingprogrammeforurbanenvironmentalcompaniesfocusingongrid-connectedwaste-to-energytechnologiesandthedevelopment/managementofthoseprojects.
(R18):Capacity-buildingprogrammeforpotentialsugarcompaniesfocusingon(1)cogenerationtechnologiesinsugarcompanies;(2)calculationofbagasseenergypriceperkw;and(3)assessmentofprojecteffectiveness.
(R19):Capacity-buildingprogramme(phaseII)forbiogasprojectdevelopersontheassessmentofeconomicandfinancialaspectsofthoseprojects;projectmanagementskills;andoperation/maintenanceskills.Trainingneedsassessmentsforeachtargetgroupofparticipants
30 EXECUTIVE SUMMARY
31ExEcutivE Summary
5. Conclusions
Bioenergy has great potential for power generation and a positive impact on the environment and livingconditionsofcommunities.Itshouldbeoffirstprioritytohaveasynchronisedandsystematicdevelopmentofhumanresourcesatcentralandlocallevelsforthesustainabledevelopmentofthissector.
CapacitydevelopmentmeasuresarecrucialtopromoteREdevelopment.Closecooperationofallstakeholdersinthesectorisimportantinorderto(1)introduceregulatingpolicies;(2)promoteinnovation;(3)develophigh-qualityhumanresources;and(4)strengthenscienceandtechnology.Thosefourpillarsshallhelptobuildupasustainablegrid-connectedbioenergysectorinthefuture.