cap amantex limited
TRANSCRIPT
-
8/9/2019 CAP Amantex Limited
1/63
Assessor Information
Assessor Company Name Bureau VeritasAssessor E-mail Address
Assessor Phone Number 2-8143387
ate o! Assessment 2"-Apr-14
ate o! CAP #inali$ation %-&ay-14
ate o! 'eport (ubmission 21-)an-1%
Facility Information
#a*ility Name Amante+ ,imited
#a*ility Address
ey #a*ility Conta*t Name &d. (amsu$$aman
#a*ility Phone Number
Conta*t Email samsu$$aman0amanroupbd.*om
,ead Brand Company
,ead Brand Conta*t Name
,ead Brand Conta*t Email
Audit ypeName
CAP 'esponder at #a*ility &d. (amsu$$aman
mportant Criterianstru*tions
Boirair*hala(reepur5 6a$ipur
(reepur5 6a$ipurhaaBanladesh
-
8/9/2019 CAP Amantex Limited
2/63
Audit Closin Comments
Subheader Question Description
(tru*tural (ystem Constru*tion
(tru*tural (ystem Constru*tion
(tru*tural (ystem Constru*tion
here are to main !a*tory buildins 9 somean*illary buildins in the premises o! Amante+,td. Auditor team ha:e one throuh thesubmitted do*uments and !ound no sini;*antde;*ien*ies e+*ept stru*tural desin reports inthe a:ailability o! ne*essary do*uments to assesthe said buildins. n the same ay throuh :isualobser:ations5 the !a*tory buildin-1 is !oundse:en storied but in eneral notes o! desindo*uments 5 it is noted si+ storied. oint o! to beams at the 3rd5 4th 9 %th?oors.
s the stru*tural system !ree o! distress5settlement5 shi!tin5 or *ra*in in *olumns oralls=
here is no :isual sin o! distress5 settlement5shi!tin5 or *ra*in in *olumns. But5 somehairline *ra*s ha:e been !ound in all atme$$anine as ell as /th ?oor o! se:en storiedbuildin.
Are all non-stru*tural elements suspended !rom5atta*hed to5 or restin atop the stru*tureade@uately an*hored and bra*ed to resistearth@uae !or*es=
here are some unbra*ed5 plasti*5 o:erheadater tans on the roo!.
-
8/9/2019 CAP Amantex Limited
3/63
(tru*tural (ystem esin
(tru*tural (ystem esin he li:e load !or storae as almost 8 ps!.
(tru*tural (ystem esin
(tru*tural (ystem esin
-
8/9/2019 CAP Amantex Limited
4/63
(tru*tural (ystem Constru*tion
(tru*tural (a!ety Prorams
(tru*tural (ystem Constru*tion
(tru*tural (a!ety Prorams
(tru*tural (a!ety Prorams #loor ,oad Plans are not posted as re@uired.
(tru*tural (a!ety Prorams
! the buildin is *urrently bein reno:ated ore+panded5 are the Constru*tion Pra*ti*es and(a!ety re@uirements o! (e*tion " bein !olloed=
he 8-storied !a*tory buildin buildin-2 isunder *onstru*tion but the sa!ety arranementsu*h as temporary *anopy and sa!ety net is notsuG*ient as per *onstru*tion Pra*ti*es and (a!ety
re@uirements o! Allian*e standard part-". heobser:ed steel shed *onstru*ted on the roo! !orbuildin-1. his *onstru*tion is appro:ed butdetailed the stru*tural desin do*uments isuna:ailable.
s a proram in pla*e to ensure that the li:e loads!or hi*h a ?oor or roo! is or has been desinedill not be e+*eeded=
here is no proram a:ailable to manae ?oorand roo! li:e loads. #loor load plans are also nota:ailable.
-
8/9/2019 CAP Amantex Limited
5/63
(tru*tural (a!ety Prorams
(tru*tural (ystem esin
(tru*tural (ystem esin
s a desinated representati:e #a*tory ,oad&anaer5 ho is onsite !ull time5 trainedreardin the stru*tural ?oor *apa*ity5 and ser:esas an onoin :endor resour*e and monitor o!operational !a*tory ?oor loadins=
#a*tory ,oad &anaer or desinatedrepresentati:e is not a:ailable.
s a 6eote*hni*al 'eport a:ailable !or re:ie andept on site=
6eote*hni*al report is a:ailable and ept on siteto re:ie5 but the EB no. o! the enineer is nota:ailable.
Are Certi;*ates o! **upan*y a:ailable !or
re:ie=
he !a*tory has not obtained the Certi;*ate o!
**upan*y !rom the authority.
-
8/9/2019 CAP Amantex Limited
6/63
/82%%2787
-
8/9/2019 CAP Amantex Limited
7/63
Suggested Plan of Action Standard
1%-(ep-14 Allian*e (tandard Part 8 (e*tion 8.3.3
1%-(ep-14 Allian*e (tandard Part 8 (e*tion 8.3.3
1%-(ep-14
Suggested DeadlineDateEnae a @uali;ed stru*tural enineer to pro:ide
additional in:estiations o! the *ra*in andpro:ide a remediation plan i! ne*essary.
-
8/9/2019 CAP Amantex Limited
8/63
1%-(ep-14 Allian*e (tandard Part 8 (e*tion 8.13 and 8.14
1%-(ep-14
1%-(ep-14
1%-(ep-14
'elo*ate ater tans to a sa!e lo*ation. Enae a@uali;ed stru*tural enineer to *on;rm anddo*ument that pro:isions ha:e been made toa**ommodate *on*entrated loads. ! pro:isions
ha:e not been made5 ha:e a @uali;ed stru*turalenineer de:elop a remediation plan.
-
8/9/2019 CAP Amantex Limited
9/63
1%-(ep-14
1%-(ep-14
1%-(ep-14
1%-(ep-14
1%-(ep-14 Allian*e (tandard Part 8 (e*tion 8.2.%.3
1%-(ep-14
Pro:ide suG*ient sa!ety arranements su*h astemporary *anopy ill be pro:ided >ust belo the*onstru*tion ?oor surround the buildin and alsosurrounded by sa!ety net as per *onstru*tionPra*ti*es and (a!ety re@uirements o! Allian*estandard part-".
Allian*e (tandard Part " Constru*tion Pra*ti*esand (a!ety.
e:elop a proram to ensure that all li:e loads!or hi*h a ?oor or roo! has been desined illnot be e+*eeded. he desinated ,oad &anaershall o:er see this proram and ensure it isen!or*ed.
Allian*e (tandard Part 13 (e*tion 13.7 and Part 8(e*tion 8.".
Inder uidan*e !rom a @uali;ed stru*turalenineer5 address all areas o! neededmaintenan*e.
Allian*e (tandard Part 8 (e*tion 8.2/ urabilityand &aintenan*e
-
8/9/2019 CAP Amantex Limited
10/63
1%-(ep-14
1%-(ep-14
1%-(ep-14
esinate a representati:e as the #a*tory ,oad&anaer. he #a*tory ner shall ensure thatone #a*tory ,oad &anaer is lo*ated onsite !ulltime. he #a*tory ,oad &anaer must be trainedin *al*ulatin operational load *hara*teristi*s o!the !a*tory. he #a*tory ,oad &anaer shall ser:eas an onoin resour*e to '&6 :endors and be
responsible to ensure that the !a*tory operationalloads do not at any time e+*eed the !a*tory ?oorloadin limits as des*ribed on the #loor ,oadinPlans.
Allian*e (tandards Part 8 (e*tion 8." #a*tory ,oad&anaer
he EB no. o! the enineer must be mentioned inthe eote*hni*al report.
Allian*e (tandard Part 8 (e*tion 8.2 (tru*turalnterity o! E+istin #a*tory Buildins
Apply !or issuan*e o! Certi;*ate o! **upan*y
and pursue the matter to obtain the same.
Allian*e (tandard Part 8 (e*tion 8.3 Preliminary
(tru*tural Assessment
-
8/9/2019 CAP Amantex Limited
11/63
-
8/9/2019 CAP Amantex Limited
12/63
Factory CAP Factory CAP Deadline Date
De ill do it ithin 2-No:-214. 2-No:-14 Enr. #aru@ Ahmed
De ill do it ithin 2-No:-214. 2-No:-14 Enr. #aru@ Ahmed
De ill do it ithin 2-No:-214. 1-)an-14 Enr. #aru@ Ahmed
Factory ResponsiblePerson
-
8/9/2019 CAP Amantex Limited
13/63
De ill do it ithin 2-No:-214. 2-No:-14 Enr. #aru@ Ahmed
2-No:-14 Enr. #aru@ Ahmed
2-No:-14 Enr. #aru@ Ahmed
2-No:-14 Enr. #aru@ Ahmed
Already *apa*ity plan *on;rm by (tru*turaldesiner
Already *redible load plan *on;rm by (tru*turaldesiner !or se:en storied buildin and sin ith&EB no.
Already *redible load plan *on;rm by (tru*turaldesiner !or se:en storied buildin and i:ennotes by sin ith &EB number.
-
8/9/2019 CAP Amantex Limited
14/63
2-No:-14 Enr. #aru@ Ahmed
/-No:-14 Enr. #aru@ Ahmed
De ill do it ithin 2-No:-214. 2-No:-14 Enr. #aru@ Ahmed
2-No:-14 Enr. #aru@ Ahmed
2-No:-14 Enr. #aru@ Ahmed
2-No:-14 Enr. #aru@ Ahmed
Already pro:ided suG*ient sa!ety arranementin*ludin temporary *anopy ith sa!ety net.
Already de:eloped a proram to ensure that allli:e loads.
Already de:eloped ?oor load plan by stru*tural*onsultant.
Already de:eloped ?oor load plan by stru*tural
*onsultant.
Already pro:ided appropriate marins at allareas used !or storae to indi*ate the a**eptableloadin limits detailed in the ,oad Plan.
-
8/9/2019 CAP Amantex Limited
15/63
/-No:-14 Enr. #aru@ Ahmed
2-No:-14 Enr. #aru@ Ahmed
2-No:-14 Enr. #aru@ Ahmed
De ill appoint a desinated representati:e asthe #a*tory ,oad &anaer.
6eote*hni*al report is a:ailable and ept on siteto re:ie hi*h sined by the &EB enineer.
De ill *olle*t the Certi;*ate o! **upan*y !rom
the authority.
-
8/9/2019 CAP Amantex Limited
16/63
-
8/9/2019 CAP Amantex Limited
17/63
Source of Findings Level on!Compliance Level
-
8/9/2019 CAP Amantex Limited
18/63
&edium 3
&edium 3
&edium 3
&edium 2
o*ument 'e:ieJ Based on the stru*turaldo*ument5 the pro:isions!or a *on*entrated load5 su*h as ater tans5ha:e not been made.5 Visual AssessmentJ
Arranement !or ater tans is not sa!e.
o*ument 'e:ieJ #loor load *apa*ity is notmentioned in the do*ument.5 Visual AssessmentJ,i:e load e+*eeds 42 ps!.
o*ument 'e:ieJ (tru*tural drains area:ailable !or si+ storied buildinF desin report isnot a:ailable.5 Visual AssessmentJ he si+ storiedbuildin shon in drain as noted as se:enstoried !rom :isual obser:ation.
o*ument 'e:ieJ (tru*tural drains sho thatthe buildin is desined to ha:e si+ stories.5Visual AssessmentJ he buildin has se:enstories.
-
8/9/2019 CAP Amantex Limited
19/63
&edium 2
&edium 2
&edium 1
o*ument 'e:ieJ No ,oad Plan is do*umented. ,o 3
,o 2
,o 2
Visual AssessmentJ bser:ations o! the !a*torybuildin-2.
Visual AssessmentJ #loor load plan is nota:ailable.
Visual AssessmentJ ampness has been !ound inthe 1st ?oor o! buildin 2.
Visual AssessmentJ n :isual assessment no load
plans ha:e been !ound.
Visual AssessmentJ No ,oad Plan is a:ailable inthe ?oor.
-
8/9/2019 CAP Amantex Limited
20/63
,o 2
,o 2
,o 1
o*ument 'e:ieJ he
-
8/9/2019 CAP Amantex Limited
21/63
Assessor Information
Assessor Company Name Bureau Veritas
Assessor E-mail Address
Assessor Phone Number 2-8143387
ate o! Assessment 1/-Apr-14
ate o! CAP #inali$ation 3-&ay-14
ate o! 'eport (ubmission 21-)an-1%
Facility Information
#a*ility Name Amante+ ,imited#a*ility Address
ey #a*ility Conta*t Name &d. (amsu$$aman
#a*ility Phone Number
Conta*t Email samsu$$aman0amanroupbd.*om
,ead Brand Company,ead Brand Conta*t Name
,ead Brand Conta*t Email
Audit ypeName
CAP 'esponder at #a*ility &d. (amsu$$aman
mportant Criterianstru*tions
Boirair*hala(reepur5 6a$ipur
(reepur5 6a$ipurhaaBanladesh
-
8/9/2019 CAP Amantex Limited
22/63
Audit Closin Comments
Subheader Question Description
&eans o! Eress
n the *losin meetin5 the non-*on!ormities eree+plained to the !a*tory personnel. he issues areas !ollos- K ne door idth !ound .7m atround ?oor hi*h is not suG*ient in a**ordan*eith Allian*e (tandard in Buildin-2. Visuallysome o! the doors are ;re rated.
-
8/9/2019 CAP Amantex Limited
23/63
&eans o! Eress
&eans o! Eress
#ire Prote*tion (ystems oes the buildin ha:e a (tandpipe (ystem=
oors are not lo*ed in the dire*tion o! eressunder any *onditions. All hasps5 lo*s5 slide bolts5and other lo*in de:i*es ha:e been remo:ed
here re@uired.
here are *ollapsible ates and steel slidin doorsith lo*in arranements at some eresslo*ations.
All doors in a means o! eress are o! the side-hined sinin type.
(ome doors in means o! eress are not side-hined sinin and sel!-lat*hin type. &ost o!them are *ollapsible5 slidin ates.
-
8/9/2019 CAP Amantex Limited
24/63
#ire Prote*tion (ystems oes the buildin ha:e a ;re pump=
#ire Prote*tion Constru*tion
#ire Prote*tion Constru*tion
&eans o! Eress
here is a dedi*ated ;re pump a:ailable in the!a*tory and one >o*ey pump ith alternati:eautomati* ba*up poer5 but no appro:ed desinith hydrauli* *al*ulation as !ound as per N#PA2.
Are e+it en*losures pro:ided ith ;re-resisti:erated *onstru*tion barriers=
here are 4 sets o! stairs in the main buildin. o o! them are interior stairs and to aree+ternal stairs. here are sinin lass doors atthe interior e+its.
Are separations beteen ha$ards pro:ided ith;re-resisti:e rated *onstru*tion barriers.
n round ?oor there is *hemi*al storae ithoutproper ;re separation. Chemi*al storae needs to
be ;re separated a**ordin to BNBC able-3.2.2p-13%%.n 2nd ?oor there is no proper ;re separationbeteen produ*tion ?oor and !abri* storae. ohour ;re separation re@uired beteen produ*tion?oor and !abri* storae a**ordin to BNBC able3.2.1 p-13%2.
**upant loads are posted !or e:ery assemblyand produ*tion ?oor in a *onspi*uous spa*e nearthe main point o! eress.
**upant loads are not posted !or e:eryassembly and produ*tion ?oor in a *onspi*uousspa*e near the main point o! eress.
-
8/9/2019 CAP Amantex Limited
25/63
&eans o! Eress
&eans o! Eress
&eans o! Eress
#ire Prote*tion (ystems
E:ery door in a stair en*losure ser:in more than% stories is pro:ided ith re-entry unless it meetsthe re@uirements o! Allian*e (tandards Part /(e*tion /.8.3.1.
here are no re-entry doors a:ailable ina**ordan*e ith (e*tion-/.8.3 and /.8.3.1a.
Emeren*y poer !or e+it sins is tested at leaston*e per year. ! battery operated5 these lihtsare tested on a monthly basis. #un*tional testino! battery poered sins is pro:ided !or aminimum " min on*e per year.
o*umentation o! periodi*al testin !oremeren*y poer o! means o! eress sins ere!ound but the do*umentation does not *omplyith the Allian*e (tandard.
Emeren*y poer !or means o! eressillumination is :eri;ed at least on*e per year. !
battery operated lihts are used5 these lihts aretested on a monthly basis. #un*tional testin o!battery poered lihts is pro:ided !or a minimum" min on*e per year.
A:ailable do*uments o! periodi*al testin o!emeren*y poer !or means o! eress ere
!ound but do not *omply ith Allian*e (tandard.
#ire e+tinuishers are inspe*ted5 tested5 andmaintained as re@uired.
E+tinuishers are inspe*ted monthly by !a*toryLsstaM. No do*uments ere !ound in support o! iannual maintenan*e o! e+tinuishers by aser:i*in aent5 ii annual testin o! no$$le5andor iii internal inspe*tion o! e+tinuishers at %
year inter:al.
#ire (a!ety Prorams Chemi*als and other ?ammable materials are Chemi*als and other ?ammable materials are not
-
8/9/2019 CAP Amantex Limited
26/63
#ire (a!ety Prorams
#ire Prote*tion (ystems
#ire Prote*tion (ystems
#ire (a!ety Prorams
#ire (a!ety Prorams
&eans o! Eress
#ire Prote*tion (ystems
stored ithin appro:ed en*losures. stored ithin appro:ed en*losures.
rainin prorams are implemented anddo*umented in a**ordan*e ith the Allian*e(a!ety rainin Curri*ulum.
No re*ords o! trainin prorams are a:ailable ina**ordan*e ith the Allian*e (a!ety raininCurri*ulum on ;re sa!ety.
(tandpipe system pipin is !ree o! me*hani*aldamae5 leaae5 and *orrosion=
Complete standpipe system not installed yet.Current standpipe system pipin is !ree o!
me*hani*al damae5 leaae5 and *orrosion.
s the ;re alarm and dete*tion system monitoredby a *entral station monitorin ser:i*e or dire*tly*onne*ted to the #ire (er:i*e and Ci:il e!ense=
An automati* ;re alarm and dete*tion system isa:ailable in the !a*tory. a*ent to thedoor.
(tair desination sins are not pro:ided at ea*h?oor. nly ?oor le:el is desinated in Benali 9Enlish.
Are inspe*tion5 maintenan*e5 and testinpro*edures o! the standpipe and hose systemdo*umented and up to date= n*ludin inspe*tion
and testin o! hoses i! pro:ided.
Complete standpipe system not installed yet. here are maintenan*e plans and re*ords !or thetestin and maintenan*e o! the *urrent standpipe
system.
-
8/9/2019 CAP Amantex Limited
27/63
#ire Prote*tion (ystems
#ire Prote*tion (ystems
#ire Prote*tion Constru*tion
#ire (a!ety Prorams
#ire (a!ety Prorams
s sinae !or the standpipe system installed atre@uired lo*ations and on re@uired *omponents=
Complete standpipe system is not installed yet.(inae !or the e+istin standpipe system is notinstalled.
Are inspe*tion5 maintenan*e5 and testinpro*edures o! the ;re pump do*umented and upto date=
Proper ;re pump has not been installed.nspe*tion5 maintenan*e5 and testin pro*edureso! the e+istin ;re pump has not beendo*umented or ept up to date.
Certi;*ates o! **upan*y !or ea*h buildin ha:ebeen issued and are on ;le.
No o**upan*y *erti;*ates are a:ailable !or anybuildins.
A hot-or permit proram has been established. A hot-or permit proram has not beenestablished.
A ritten houseeepin poli*y is established and
en!or*ed.
he a:ailable re*ord is not in *omplian*e ith the
Allian*e standard.
-
8/9/2019 CAP Amantex Limited
28/63
/82%%2787
-
8/9/2019 CAP Amantex Limited
29/63
Suggested Plan of Action Standard
8-Au-14
Suggested DeadlineDatePro:ide 1.% hour ;re-rated openin assemblies in
2 hour ;re-rated e+it en*losure. n*rease dooridth to .8m or reater by demolishin allad>a*ent to the door. ! this door is not re@uired tosatis!y the re@uirement o! total e+it idth basedon o**upant load and ma+imum tra:el distan*e5eliminate this door.
Allian*e (tandard Part / (e*tion /.%./ &inimumDidths. n*reased o**upant loads ill re@uire adoor idth reater than .8 m.
-
8/9/2019 CAP Amantex Limited
30/63
3-&ay-14
8-Au-14
8-Au-14
Pro:ide side-sinin5 sel!-*losin and lat*hinnon-lo*able *erti;ed 1.% hour ;re-rated doorsthat open in the dire*tion o! erees in 2 hour
rated e+it en*losures. E+its shall be en*losed iththe same ;re-resistan*e ratin as the ?oorpenetrated but ill not need to e+*eed 2 hour.
Allian*e (tandards Part / (e*tion /.8 oors and6ates
'epla*e all *ollapsible5 slidin ates and shuttersin means o! eresses ith side-hined sinin5sel!-lat*hin doors o! proper idth and ratin to*omply ith (e*tion-/.8.1.
Allian*e (tandards Part / (e*tion /.8 oors and6ates
nstall a standpipe system at re@uired lo*ations
hi*h are to be desined by a @uali;ed ;reprote*tion enineer. he system must be*ompliant ith the re@uirements o! N#PA 14. hehydrauli* *al*ulations should be re:ieed byAllian*e and re:ie to be *ompleted prior to starto! or. All standpipe system installations shallbe submitted !or re:ie by the Allian*e !or re:ieprior to *ommen*ement o! installation a**ordinto %.4.3.2. estin o! the installation shall be*ondu*ted in a**ordan*e ith N#PA 14a**eptan*e testin re@uirements. o*umentation
o! all testin shall be submitted !or re:ie by theAllian*e. #inal inspe*tion and testin o! theinstallation shall be itnessed by the Allian*e asper *lause %.4.3.3.
oes the buildin ha:e a standpipe system
installed here re@uired. Allian*e (tandard Part %(e*tion %.4.2
31-*t-14 Allian*e (tandard Part % #ire Prote*tion (ystemsnstall a pump dedi*ated !or ;re ;htin or ;re
-
8/9/2019 CAP Amantex Limited
31/63
31 *t 14 Allian*e (tandard Part % #ire Prote*tion (ystems
8-Au-14
31-*t-14
13-)un-14
nstall a pump dedi*ated !or ;re ;htin or ;reprote*tion. (hould !ollo the re@uirements o!N#PA 2. Pump desin should also a**ount !or %th?oor hi*h is under *onstru*tion. #ire pumpinstallation is to be tested !or ;nal a**eptan*e inpresen*e o! Allian*e and a ;nal inspe*tion o! theinstallation shall be *ondu*ted by the Allian*eprior to ;nal a**eptan*e o! the installation.
A**eptan*e testin o! the installation shall be ina**ordan*e ith N#PA 25 225 and 24 testinre@uirements. o*umentation o! all testin shallbe submitted to the Allian*e !or re:ie prior to;nal a**eptan*e. his pump is to be *onne*ted toan alternati:e poer sour*e lie a enerator andthe enerator is to be *onne*ted ith A( autostarter.
Pro:ide 2 hr ;re-resisti:e rated *onstru*tionbarriers at e+it en*losures. #it outard openin5side-sinin5 sel!-*losin and lat*hin5 non-lo*able *erti;ed ;re doors o! 1.% hr ratin in allstairell en*losures. Consult a @uali;ed ;reprote*tion enineer to desin the re@uired rated*onstru*tion barriers.
'e!eren*e Allian*e (tandards Part 4 (e*tion 4.%(eparation
Pro:ide ;re-resisti:e rated *onstru*tion barriersbeteen ha$ard types !olloin able 4.4.1 o!Allian*e (tandard or able 4.1.1 !rom BNBC Part4. Consult a @uali;ed ;re prote*tion enineer todesin the re@uired rated *onstru*tion barrier.
'e!eren*e Allian*e (tandards Part 4 (e*tion 4.%(eparation
Post the o**upant load !or e:ery assembly andprodu*tion ?oor in a !a*ility in a *onspi*uousspa*e near the main e+it or e+it a**ess dooray
!or the spa*e.
Allian*e (tandards Part / (e*tion /.4.4 Postin o!**upant ,oad
8-Au-14E:ery door in a stair en*losure ser:in more than Allian*e (tandards Part / (e*tion /.8 oors and
-
8/9/2019 CAP Amantex Limited
32/63
8 Au 14
13-)un-14
13-)un-14
31-*t-14 N#PA 1 Chapter 7
E:ery door in a stair en*losure ser:in more than% stories shall be pro:ided ith re-entry unless itmeets the !olloin re@uirements. (tair doorsmay be permitted to be lo*ed !rom the stairinress side that pre:ents re-entry to the ?oorpro:ided at least to ?oors alloin re-entry toa**ess another e+it are pro:ided5 there are notmore than 4 stories inter:enin beteen re-entry
?oors5 re-entry is alloed on the top or ne+t totop le:el5 reentry doors are identi;ed as su*h onthe stair side5 and lo*ed doors shall be identi;edas to the nearest re-entry ?oors. Dhen thedis*hare ?oor is determined to be a re@uired re-entry ?oor usin the abo:e re@uirements5 re-entry does not ha:e to be pro:ided ba* into thebuildin on this le:el.
Allian*e (tandards Part / (e*tion /.8 oors and6ates
e:elop a testin and maintenan*e proram thatensures the emeren*y poer !or e+it sins istested at least on*e per year. ! battery operatedsins are used5 these lihts must be tested on amonthly basis. #un*tional testin o! batterypoered sins must be *ondu*ted !or a minimum" min on*e per year.
Allian*e (tandard Part 1 (e*tion 1.12llumination o! E+it (ins and &eans ! Es*ape.
e:elop a testin and maintenan*e proram thatensures the operation o! all e+it sins is :eri;edat least on*e per year. ! battery-operated sinsare used5 these lihts shall be tested on amonthly basis. #un*tional testin o! batterypoered sins shall be pro:ided !or a minimum" minutes on*e per year.
Allian*e (tandards Part 1 (e*tion 1.12llumination o! E+it (ins and &eans ! Es*ape,ihtin
#ire e+tinuishers are to be inspe*ted5 tested5 andmaintained in a**ordan*e ith N#PA 1 Chapter7.
3-)un-14(tore *hemi*als and all ?ammable materials inappro:ed en*losure in a sa!e manner.
-
8/9/2019 CAP Amantex Limited
33/63
13-)un-14 Allian*e (tandards Part 13
31-*t-14 N#PA 2% Chapter / (tandpipe and a*ent to ea*h stair doorindi*atin the stair name and the ?oor le:el atthe noted lo*ations in a**ordan*e ith (e*tion/.".3.1.
Allian*e (tandard Part / (e*tion /." (tairs
An appropriate standpipe system needs to bedesined by a @uali;ed ;re prote*tion enineerand installed at re@uired lo*ations. he system
must *omply ith the re@uirements o! N#PA 14.
'e!eren*e N#PA 2% Chapter / (tandpipe and
-
8/9/2019 CAP Amantex Limited
34/63
27-)un-14 'e!eren*e N#PA 14 Chapter /
31-*t-14
27-)un-14
31-*t-14
23-)an-1%
An appropriate standpipe system needs to beinstalled at the re@uired lo*ations desined by a@uali;ed ;re prote*tion enineer. he system isto be *ompliant ith the re@uirements o! N#PA14. Also5 install re@uired identi;*ation sins at thenoted lo*ations. (inae must *omply ith N#PA14 Chapter /.
nstall a pump dedi*ated !or ;re ;htin or ;reprote*tion !olloin the re@uirements o! N#PA 2.Also Establish an inspe*tion5 maintenan*e5 andtestin proram !or the ;re pump. Proram must*omply ith N#PA 2%.
'e!eren*e N#PA 2% Chapter 8 #ire Pumps
Apply to PD !or issuan*e o! o**upan*y*erti;*ate and pursue the matter to e+pedite.
Are *erti;*ates o! o**upan*y pro:ided !or ea*hbuildin or an*illary stru*ture=
e:elop a hot-or permit proram that *ompliesith (e*tion-".1.7 and N#PA %1B. n eneral5 thisproram should address the pro*ess o! re@uestand appro:al o! authorities5 ne*essary *he*sprior to appro:al5 standby ;re at*h and;re;htin e@uipment5 soundin o! alarmpro*edure5 duration and e+piry o! permit5 and re-appro:al pro*edures5 et*.
Allian*e (tandards Part 13 (e*tion 13.4
-
8/9/2019 CAP Amantex Limited
35/63
-
8/9/2019 CAP Amantex Limited
36/63
Factory CAP Factory CAP Deadline Date
De ill do it ithin 3-No:-214. 23-#eb-1% &r. Abdur 'ahim
Factory ResponsiblePerson
-
8/9/2019 CAP Amantex Limited
37/63
one &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 23-#eb-1% &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 23-#eb-1% &r. Abdur 'ahim
De ill do it ithin 2%.2.21% 18-&ay-1% &r. Abdur 'ahim
-
8/9/2019 CAP Amantex Limited
38/63
De ill do it ithin 2%.2.21% 23-#eb-1% &r. Abdur 'ahim
De ill do it ithin 2%.2.21% 18-&ay-1% &r. Abdur 'ahim
one. &r. Abdur 'ahim
23-#eb-1% &r. Abdur 'ahimDe are orin on it. De need hue *onstru*tionors
-
8/9/2019 CAP Amantex Limited
39/63
De ill do it ithin 31-e*-214. 2"-e*-14 &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 2"-e*-14 &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 18-&ay-1% &r. Abdur 'ahim
ors.
De ill do it ithin 31.1.21%. 1%-e*-14 &r. Abdur 'ahim
-
8/9/2019 CAP Amantex Limited
40/63
De ill do it ithin 31-e*-214. 2"-e*-14 &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 18-&ay-1% &r. Abdur 'ahim
one. &r. Abdur 'ahim
one. &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 2"-e*-14 &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 2"-e*-14 &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 18-&ay-1% &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 12-)an-1% &r. Abdur 'ahim
-
8/9/2019 CAP Amantex Limited
41/63
)
18-&ay-1% &r. Abdur 'ahim
De ill do it ithin 31-e*-214. 12-)an-1% &r. Abdur 'ahim
one. &r. Abdur 'ahim
De ill do it ithin 31.1.21%. 1-Au-1% &r. Abdur 'ahim
De ha:e ;re pump. De ill maintain do*umenton maintenan*e5 and testin.
-
8/9/2019 CAP Amantex Limited
42/63
-
8/9/2019 CAP Amantex Limited
43/63
Source of Findings Level on!Compliance Level
-
8/9/2019 CAP Amantex Limited
44/63
-
8/9/2019 CAP Amantex Limited
45/63
-
8/9/2019 CAP Amantex Limited
46/63
&edium 2
&edium 2
&edium 2
o*ument 'e:ieJ 'ele:ant do*ument a:ailablebut is not *omplyin ith the allian*e standard.
o*ument 'e:ieJ 'ele:ant do*ument !ound o!periodi*al testin o! emeren*y poer !or meanso! eress ere !ound but do not *omply ith
Allian*e (tandard.
o*ument 'e:ieJ o*uments sho that ;ree+tinuishers are inspe*ted5 tested5 andmaintained on a monthly basis.5 PhotoraphJ #iree+tinuishers are inspe*ted5 tested5 andmaintained monthly.
&edium 2
&edium 2
Visual AssessmentJ Chemi*als and other?ammable materials are not stored ithinappro:ed en*losures.
o*ument 'e:ieJ No re*ords o! trainin
-
8/9/2019 CAP Amantex Limited
47/63
&edium 2
&edium 2
&edium 2
&edium 1
,o 2
,o 2
,o 2
o*ument 'e:ieJ No re*ords o! traininprorams are a:ailable in a**ordan*e ith theAllian*e (a!ety rainin Curri*ulum on ;re sa!ety.
PhotoraphJ No me*hani*al damae5 leaae5 or*orrosion is identi;able on *urrent standpipe
system.
PhotoraphJ Automati* ;re alarm and dete*tionsystem is a:ailable in the !a*tory.
o*ument 'e:ieJ Amon the do*uments shonby the !a*tory personnel5 no proper emeren*ye:a*uation plan as !ound.
o*ument 'e:ieJ o*uments sho that #ire
epartment pre-plannin has not been *ompletedyet.
PhotoraphJ #loor le:el is mentioned in Benali 9Enlish only.
PhotoraphJ 'eistry boo o! maintenan*e andtestin pro*edures o! the standpipe and hosesystem. his shos that the !a*tory *ondu*tedproper inspe*tion5 maintenan*e5 and testinpro*edures o! the standpipe and hose system.
,o 2Visual AssessmentJ No sinae is !ound !or thea:ailable standpipe.
-
8/9/2019 CAP Amantex Limited
48/63
,o 1
,o 1
,o 1
,o 1
a:ailable standpipe.
o*ument 'e:ieJ here is no e:iden*e o! a planor re*ord !or maintenan*e o! the ;re pump.
o*ument 'e:ieJ o*ument re:ie shos thatthe !a*tory has no o**upan*y *erti;*ate !or anyo! its stru*tures.
o*ument 'e:ieJ A hot-or permit proramhas not been established.
o*ument 'e:ieJ A:ailable re*ord is not in*omplian*e ith the Allian*e standard.
Assessor Information
Assessor Company Name Bureau Veritas
Assessor E-mail Address
-
8/9/2019 CAP Amantex Limited
49/63
Assessor Phone Number 2-8143387
ate o! Assessment 1/-Apr-14
ate o! CAP #inali$ation 3-&ay-14
ate o! 'eport (ubmission 21-)an-1%
Facility Information
#a*ility Name Amante+ ,imited
#a*ility Address
ey #a*ility Conta*t Name &d. (amsu$$aman
#a*ility Phone Number
Conta*t Email samsu$$aman0amanroupbd.*om
,ead Brand Company
,ead Brand Conta*t Name
,ead Brand Conta*t Email
Audit ypeName
CAP 'esponder at #a*ility &d. (amsu$$aman
mportant Criterianstru*tions
Audit Closin Comments
Boirair*hala(reepur5 6a$ipur
(reepur5 6a$ipurhaaBanladesh
Number o! obser:ations ere !ound durin Audit5but !olloin obser:ations ere hihlihteddurin *losin meetinJ 1. ,oopin at Cir*uitBreaer erminal B-Init 215 B-Init 31. 2.,int and irt present inside the istribution PanelB-Init 32. 3. Non 6raded rubber mat presentin!ront o! istribution Panel B-%6#5 B-&id,e:el '5 B-6#25 &B-Dash. 4. No Phaseseparator at Cir*uit Breaer terminal B-Canteen.
Subheader Question Description
Ele*tri*al (ystem &aintenan*e
-
8/9/2019 CAP Amantex Limited
50/63
Ele*tri*al (ystem Conditions
Emeren*y Poer (ystem
Emeren*y Poer (ystem
Emeren*y Poer (ystem
Emeren*y Poer (ystem
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
y ytrainin= s trainin do*umentation on site=
y y ytrainin.
Are all sit*hboards andor distribution boardsmetal en*losed ith a dead !ront *onstru*tion=
All distribution boards are metal en*losed but la*dead !ront *onstru*tion.
Are li!e sa!ety loads ;re alarm5 ;re pump5ele:ators5 emeren*y lihtin5 e+it sinae5 et**onne*tin to the emeren*y poer system=
he emeren*y enerator is not under Amante+manaement nor is it in the Amante+ *ompound.
Are emeren*y poer sit*hboards5 distributionboards5 and *ir*uits properly identi;ed=
Emeren*y poer sit*hboards5 distributionboards5 and *ir*uits are not properly identi;ed.
s an uninterruptable poer supply IP(pro:ided=
No uninterruptible poer supply IP( has beenpro:ided !or *ertain ele*tri*al applian*es thatre@uire uninterruptible *onditioned sinusoidala:e.
Are *able tren*hes properly *o:ered= No *o:er on *able tren*h.,o*ationJ Boiler 'oom.
,iht ;+tures ithout prote*ti:e *o:ers are notinstalled in storae areas or in any area herethe nspe*tor o! the #a*tories 'ules 1.%.3.% Part%3 disallos these ;+tures.
,iht ;+tures ithout prote*ti:e *o:ers areinstalled in storae areas.,o*ationJ 4th ?oor5 &ain Buildin
No *ir*uits are dran !or loads ithout thein*orporation o! a o:er*urrent prote*tion de:i*e*ir*uit breaer.
Cir*uits are dran !or loads ithout thein*orporation o! an o:er*urrent prote*tion de:i*e*ir*uit breaer.
,o*ationJ B-6#/5 6round #loor5 &ain Buildin
s ele*tri*al irin*ables si$ed a**ordin to*apa*ity o! *ir*uit breaers No hiher rated*ir*uit breaers ith loer rated irin=
Ele*tri*al *ables are not si$ed a**ordin to*apa*ity o! *ir*uit breaers.
,o*ationJ B- D5 6round #loor5 &ain BuildinProblem !ound 2 Bs out o! 32 Bs.
Ele*tri*al (ystem Conditions ndi*ations o! o:erheatin5 o:erloadin5 or sinso! burnin ere not obser:ed.
ndi*ations o! o:erheatin ere obser:ed Criti*al emperature 7/.7 !ound in thermoraphy s*an.
-
8/9/2019 CAP Amantex Limited
51/63
Ele*tri*al (ystem &aintenan*e
Ele*tri*al (ystem &aintenan*e
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem &aintenan*e
Ele*tri*al (ystem Conditions
,o*ationJ , Panel5 (ubstation room.
Are re*ords *on*ernin the testin and inspe*tiono! the ele*tri*al systems maintained on site and
up to date=
'e*ords *on*ernin the testin and inspe*tion o!the ele*tri*al systems are not maintained.
Are thermoraphi* s*ans o! ele*tri*al e@uipment*ompleted at least e:ery three years=
hermoraphi* s*ans o! ele*tri*al e@uipment arenot *ompleted properly.
o sit*hboards andor distribution boards ha:e*lear identi;*ation marins=
istribution boards ha:e no *lear identi;*ationmarins.,o*ation J All istribution boards.
o sit*hboards andor distribution boards ha:e*apa*ity in!ormation labels=
istribution boards do not ha:e *apa*ityin!ormation labels.,o*ationJ All distribution boards.
Are sit*hboards andor distribution boardspro:ided ith physi*al means to pre:ent theinstallation o! more o:er *urrent de:i*es thanthat number !or hi*h the panel board asdesined5 rated5 and listed.
istribution boards are not pro:ided ith physi*almeans to pre:ent the installation o! more o:er*urrent de:i*es than that number !or hi*h thepanel board as desined5 rated5 and listed.,o*ationJ All distribution boards.
Are periodi* sa!ety inspe*tions o! the ele*tri*alsystem *omponents *ompleted and do*umented=
Periodi* sa!ety inspe*tions o! the ele*tri*alsystem *omponents ere neither *ompleted nordo*umented.
Are ele*tri*al irin*ables properly identi;ed= Ele*tri*al *ables are not properly identi;ed.
,o*ationJ All distribution boards.
Ele*tri*al (ystem Conditions No *able sha!t is pro:ided !or the hole buildin.A ire*able sha!t is pro:ided !or the holebuildin. Dirin and *ables are arraned in sha!t!or ease o! inspe*tion and maintenan*e.
-
8/9/2019 CAP Amantex Limited
52/63
,ihtnin Prote*tion (ystem
,ihtnin Prote*tion (ystem
,ihtnin Prote*tion (ystem
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
Ele*tri*al (ystem Conditions
he air termination netor :erti*al andhori$ontal *ondu*tors are appropriately spa*ed.
No desins or do*uments ere !ound to :eri!y airtermination netor :erti*al and hori$ontal*ondu*tors are appropriately spa*ed.
he appropriate number o! don *ondu*tors areinstalled based on the buildin si$e.
No desins or do*uments ere !ound to :eri!y i!the appropriate number o! don *ondu*tors ereinstalled based on the buildin si$e.,o*ationJ 'oo! top o! the buildin
he lihtnin prote*tion round terminals arebonded to the buildin or stru*ture roundin.
he lihtnin prote*tion round terminals are notbonded to the buildin or stru*ture roundin.
Ea*h *ir*uit is pro:ided ith a dedi*ated neutral. (ome *ir*uits are not pro:ided ith a dedi*ated
neutral.,o*ationJ B- Boiler5 6round #loor5 Boiler 'oomProblem !ound 12 Bs out o! 32 Bs.
,ihtin ;+tures are supported !rom the stru*tureand seismi* bra*in is installed as re@uired.
,ihtin ;+tures are not supported properly.,o*ationJ 2nd #loor5 rainin se*tion.
Cable >oints are throuh por*elainPVC *onne*torsith PB tape ound around >oint.
mproper *able >oints ere !ound.,o*ationJ (B-15 rainin5 1st #loor5 rainin(e*tion. All Bs o! 6round ?oor main buildinand 1st ?oor5 main buildin Problem !ound 8
Bs out o! 31 Bs.
Ele*tri*al *onne*tions at e@uipment5 ;+tures5 et*are properly se*ured.
Ele*tri*al *onne*tions at e@uipment are notproperly se*ured.,o*ationJ 4th ?oor5 &ain Buildin.
Ele*tri*al irin and *onduit is properlysupported.
Ele*tri*al irin and *onduits are not properlysupported.,o*ationJ 1. B- D5 6round #loor5 &ain Buildin.
Are ele*tri*al insulation mats pro:ided in !ront o!substation5 sit*hboards andor distribution
boards=
Ele*tri*al insulation mats are non-raded andinsuG*ient in !ront o! distribution boards.
,o*ationJ All distribution boards.
-
8/9/2019 CAP Amantex Limited
53/63
Ele*tri*al (ystem Conditions Are meters and other ele*tri*al de:i*es
Ammeter5 Voltmeter5 P# Auto Controller5 et*installed on the main ele*tri*al e@uipmentoperational=
&eters and other ele*tri*al de:i*es Ammeter5
Voltmeter and indi*ator liht are not installed onthe main ele*tri*al e@uipment.,o*ationJ &B-Itility5 6round #loor5 &ainBuildin.
-
8/9/2019 CAP Amantex Limited
54/63
/82%%2787
Suggested Plan of Action Standard Factory CAP
2"-)un-14 'e!eren*e N#PA 7e !or e+ample
Suggested DeadlineDatee:elop and implement an ele*tri*al sa!ety
proram. n*lude ey topi*s su*h as lo*-out ta-out pro*edures personal prote*ti:e e@uipment
-
8/9/2019 CAP Amantex Limited
55/63
14-&ay-1%
11-)un-14
1-)un-14
13-)ul-14 Not Appli*able
Pro:ide ade@uate *o:er on *able tren*h. 14-&ay-14
4-&ay-14
1%-)un-14
2"-)un-14
out pro*edures5 personal prote*ti:e e@uipmentre@uirements5 et*. Pro:ide trainin do*ument onsite.
Ensure sit*hboards andor distribution boardsare metal en*losed ith a dead !ront
*onstru*tion.
Allian*e (tandards Part 1 (e*tion 1.7 &ain(it*h5 (it*hboards and &etal Clad (it*hear
Pro:ide emeren*y poer *onne*tion !or li!esa!ety loads ;re alarm5 ;re pump5 ele:ators5emeren*y lihtin5 e+it sinae5 et*..
Allian*e (tandard Part 1 (e*tion 1.8 (tandbyPoer
Ensure proper identi;*ation o! emeren*y poersit*hboards5 distribution boards5 and *ir*uits.
N#PA 7 Chapter 7 Arti*le 7.1 Dirin5Emeren*y (ystem
Pro:ide uninterruptable poer supply IP( !orli!e sa!ety loads ;re alarm5 ;re pump5 ele:ators5emeren*y lihtin5 e+it sinae5 et*..
Allian*e (tandard Part 1 (e*tion 1.13.7nspe*tion o! the nstallation
Ensure liht ;+tures ithout prote*ti:e *o:ers arenot installed in storae areas or in any areahere the nspe*tor o! the #a*tories 'ules1.%.3.% Part %3 disallos these ;+tures.
Allian*e (tandards Part 1 (e*tion 1.1% Naed,ihts
Ensure o:er*urrent prote*tion de:i*e *ir*uitbreaer is in*orporated in e:ery *ir*uit.
Allian*e (tandards Part 1 (e*tion 1." Prote*tiono! Cir*uits
Consult ith a @uali;ed Ele*tri*al Enineer andensure ele*tri*al irin*ables are si$eda**ordin to *apa*ity o! *ir*uit breaers.
Allian*e (tandard Part 1 (e*tion 1.3.1 Ele*tri*alConne*tions.
4-&ay-14 Allian*e (tandard Part 1 (e*tion 1.3.%n:estiate the *ause o! the o:erheatin and taeproper a*tion.
-
8/9/2019 CAP Amantex Limited
56/63
2"-)un-14
2"-)un-14
2%-&ay-14
8-)un-14
2"-)un-14
2"-)un-14
2"-)un-14 Banladesh Ele*tri*ity 'ules 1"37 'ule %1 and %/
e:elop an ele*tri*al maintenan*e proram thatin*ludes inspe*tions and testin o! the ele*tri*alsystems. eep re*ords on site.
Allian*e (tandards Part 1 (e*tion 1.13.8Ele*tri*al nspe*tions
Complete thermoraphi* s*ans at least on a threeyear *y*le. Qhermoraphi* s*ans should be*ompleted in a**ordan*e ith the (tandard !orn!rared nspe*tion o! Ele*tri*al (ystems 9'otatin E@uipment and N#PA7B or a*omparable standard.R
Allian*e (tandards Part 1 (e*tion 1.13.8Ele*tri*al nspe*tions
Ensure *lear and permanent identi;*ation marsare painted in all distribution boards5sit*hboards5 sub main boards and sit*hes.
Allian*e (tandard Part 1 (e*tion 1.7BNBC Part 8 (e*tion 2.11.%.4
Pro:ide *apa*ity in!ormation labels ma+imum*urrent ratin5 number o! *ir*uit breaers5 et*.!or sit*hboards andor distribution boards.
Allian*e (tandard Part 1 (e*tion 1.7 &ain(it*h5 (it*hboards And &etal Clad (it*hearand 1.13.7 nspe*tion o! the nstallation
Ensure sit*hboards andor distribution boardsare pro:ided ith physi*al means to pre:ent theinstallation o! more o:er *urrent de:i*es thanthat number !or hi*h the panel board asdesined5 rated5 and listed !olloin N#PA 7se*tion 48.%4.
Allian*e (tandards Part 1 (e*tion 1.7 &ain(it*h5 (it*hboards and &etal Clad (it*hear
Establish a periodi* inspe*tion proram to ensurethe ele*tri*al systems are !ree !rom damae5debris5 dirt5 lint5 et*. &aintain re*ords *on*ernininspe*tions and !ollo up a*tions.
Allian*e (tandard Part 1 (e*tion 1.13nspe*tion and estin and Part 13 (e*tion 13./
-
8/9/2019 CAP Amantex Limited
57/63
8-)un-14
22-)un-14
1%-)un-14
2"-)un-14
1-)un-14
2"-)un-14
1%-)un-14
1%-)un-14
1-)un-14
Consult ith an e+pert ele*tri*al enineer andmae sure the system is se*ure.
Allian*e (tandards Part 1 (e*tion 1.11,ihtnin Prote*tion
Consult ith an e+pert ele*tri*al enineer andmae sure the system is se*ure.
Allian*e (tandards Part 1 (e*tion 1.11,ihtnin Prote*tion
Ensure the lihtnin prote*tion round terminalsare bonded to the buildin or stru*ture roundin.
Allian*e (tandards Part 1 (e*tion 1.11,ihtnin Prote*tion
Pro:ide dedi*ated neutral !or ea*h and e:ery
*ir*uit.
Allian*e (tandards Part 1 (e*tion 1.3 Ele*tri*al
Dirin and Cablin
Ensure lihtin ;+tures are supported !rom thestru*ture and seismi* bra*in is installed asre@uired.
Allian*e (tandards Part 1 (e*tion 1.3./ ,ihtin#ittins
Ensure *able >oints are throuh por*elainPVC*onne*tors ith PB tape ound around >oint.
Allian*e (tandards Part 1 (e*tion 1.3.8.4 Cable )oints
Ensure ele*tri*al *onne*tions at e@uipment areproperly se*ured.
Allian*e (tandards Part 1 (e*tion 1.3.1Ele*tri*al Conne*tions
Pro:ide ade@uate supports !or ele*tri*al irinand *onduits.
Allian*e (tandard Part 1 (e*tion 1.3.251.3.4.35 and 1.3.%
Pro:ide raded ele*tri*al insulation mats in !ronto! distribution boards.
Allian*e (tandard Part 1 (e*tion 1.13.7nspe*tion o! the nstallation.
-
8/9/2019 CAP Amantex Limited
58/63
1%-)un-14Ensure meters and other ele*tri*al de:i*es
installed on the main ele*tri*al e@uipment areoperational.
Allian*e (tandard 1.13.7 nspe*tion o! the
nstallation
-
8/9/2019 CAP Amantex Limited
59/63
Factory CAP Deadline Date Source of Findings Level on!Compliance Level
-
8/9/2019 CAP Amantex Limited
60/63
PhotoraphJ No dead !ront *onstru*tion.
-
8/9/2019 CAP Amantex Limited
61/63
&edium 3
&edium 3
PhotoraphJ No *lear identi;*ation marins. &edium 3
PhotoraphJ No B *apa*ity in!ormation labels. &edium 3
&edium 3
&edium 3
PhotoraphJ Ele*tri*al *ables are not identi;ed. &edium 3
o*ument 'e:ieJ No testin and inspe*tionre*ords o! the ele*tri*al systems.
o*ument 'e:ieJ No thermoraphi* s*ans !orele*tri*al e@uipment.
PhotoraphJ No means to pre:ent the installationo! more o:er *urrent de:i*es.
o*ument 'e:ieJ No periodi* sa!ety inspe*tionso! the ele*tri*al system.
Visual AssessmentJ No *able sha!t. &edium 3
-
8/9/2019 CAP Amantex Limited
62/63
o*ument 'e:ieJ No su*h do*ument !ound. &edium 3
o*ument 'e:ieJ No su*h do*ument !ound. &edium 3
&edium 3
PhotoraphJ No dedi*ated neutral. &edium 2
&edium 1
PhotoraphJ mproper *able >oints. &edium 1
&edium 1
PhotoraphJ nade@uate *able support. &edium 1
,o 3
Visual AssessmentJ he lihtnin prote*tionround terminals are not bonded to the buildinor stru*ture roundin.
PhotoraphJ ,ihtin ;+tures are not supportedproperly.
PhotoraphJ Ele*tri*al *onne*tions are notse*ured.
PhotoraphJ Non-raded mats pro:ided in !ront o!distribution boards.
-
8/9/2019 CAP Amantex Limited
63/63
,o 1PhotoraphJ No &eters and other ele*tri*alde:i*es Ammeter5 Voltmeter and indi*ator lampare installed.