Canutillo Phase II Floodwall/Levee Design International Boundary and Water Commission United States Section Engineering Services Division Xochitl Aranda, P.E. Civil Engineer

Upload: others

Post on 12-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Canutillo Phase IIFloodwall/Levee Design

International Boundary and Water CommissionUnited States Section

Engineering Services Division

Xochitl Aranda, P.E.Civil Engineer

Page 2: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Background

• In the 1930’s and 1940’s, the USIBWC constructed the Rio Grande Canalization Project (RGCP) as a water delivery and flood control project.

Page 3: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Background

• The RGCP stretches for 106 river miles from Percha Dam, NM to American Dam in El Paso.

Page 4: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Background

• In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC for the rehabilitation of levees.

• Portions of the ARRA funds have gone towards the rehabilitation of the RGCP in order to meet FEMA levee accreditation standards.

Page 5: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

RGCP Levee Rehabilitation• Several levee segments along the RGCP have already been

rehabilitated and submitted to FEMA for levee accreditation, including the west levee within the Vinton and Canutillo area.

Page 6: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

RGCP Levee Rehabilitation• Several levee segments along the RGCP have already been

rehabilitated and submitted to FEMA for levee accreditation, including the west levee within the Vinton and Canutillo area.

Page 7: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

RGCP Levee Rehabilitation• Several levee segments along the RGCP have already been

rehabilitated and submitted to FEMA for levee accreditation, including the west levee within the Vinton and Canutillo area.

Page 8: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

RGCP Levee Rehabilitation• The east levee along this reach is pending rehabilitation and

the USIBWC has begun to move forward with this project, also known as Canutillo Phase II.

Page 9: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Purpose

• The purpose of the Canutillo Phase II project is to improve the east levee of the river in order to protect the adjacent properties against flooding from the river.

• The improvements must meet 44 CFR 65.10 regulations for the levee to be accredited by FEMA.

• A FEMA-accredited levee removes the flood zone designation from the landside areas.

Page 10: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Limits of Project

Page 11: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Limits of Project

Page 12: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Limits of Project

Page 13: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Limits of Project

Page 14: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Limits of Project

Page 15: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Inundation Area in II-A

Per FEMA Natural Valley Analysis

Page 16: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Inundation Area in II-B

Page 17: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Inundation Area in II-C

Page 18: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Inundation Area in II-D

Page 19: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Design Constraints• Proximity of railroad tracks to river

Page 20: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Design Constraints• Limited Right of Way

Page 21: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Design Constraints• Existing structures

Page 22: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Design Constraints• Existing arroyos

Page 23: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Levee Design

Page 24: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Levee Design

Page 25: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Erosion Protection

Page 26: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Erosion Protection

Page 27: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Railroad Proximity

Page 28: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Floodwall Design

Page 29: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Floodwall Design

Page 30: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Contributing Arroyos

Page 31: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Contributing Arroyos

Page 32: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Culvert with Gates

Page 33: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Interior Drainage

Page 34: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Next Steps

• Obtain necessary permits and construction easements

• Obtain funding for construction

• Coordinate with local jurisdictions to meet interior drainage requirements

• Perform improvements

Page 35: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC

Questions