Canutillo Phase IIFloodwall/Levee Design
International Boundary and Water CommissionUnited States Section
Engineering Services Division
Xochitl Aranda, P.E.Civil Engineer
![Page 2: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/2.jpg)
Background
• In the 1930’s and 1940’s, the USIBWC constructed the Rio Grande Canalization Project (RGCP) as a water delivery and flood control project.
![Page 3: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/3.jpg)
Background
• The RGCP stretches for 106 river miles from Percha Dam, NM to American Dam in El Paso.
![Page 4: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/4.jpg)
Background
• In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC for the rehabilitation of levees.
• Portions of the ARRA funds have gone towards the rehabilitation of the RGCP in order to meet FEMA levee accreditation standards.
![Page 5: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/5.jpg)
RGCP Levee Rehabilitation• Several levee segments along the RGCP have already been
rehabilitated and submitted to FEMA for levee accreditation, including the west levee within the Vinton and Canutillo area.
![Page 6: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/6.jpg)
RGCP Levee Rehabilitation• Several levee segments along the RGCP have already been
rehabilitated and submitted to FEMA for levee accreditation, including the west levee within the Vinton and Canutillo area.
![Page 7: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/7.jpg)
RGCP Levee Rehabilitation• Several levee segments along the RGCP have already been
rehabilitated and submitted to FEMA for levee accreditation, including the west levee within the Vinton and Canutillo area.
![Page 8: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/8.jpg)
RGCP Levee Rehabilitation• The east levee along this reach is pending rehabilitation and
the USIBWC has begun to move forward with this project, also known as Canutillo Phase II.
![Page 9: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/9.jpg)
Purpose
• The purpose of the Canutillo Phase II project is to improve the east levee of the river in order to protect the adjacent properties against flooding from the river.
• The improvements must meet 44 CFR 65.10 regulations for the levee to be accredited by FEMA.
• A FEMA-accredited levee removes the flood zone designation from the landside areas.
![Page 10: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/10.jpg)
Limits of Project
![Page 11: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/11.jpg)
Limits of Project
![Page 12: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/12.jpg)
Limits of Project
![Page 13: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/13.jpg)
Limits of Project
![Page 14: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/14.jpg)
Limits of Project
![Page 15: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/15.jpg)
Inundation Area in II-A
Per FEMA Natural Valley Analysis
![Page 16: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/16.jpg)
Inundation Area in II-B
![Page 17: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/17.jpg)
Inundation Area in II-C
![Page 18: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/18.jpg)
Inundation Area in II-D
![Page 19: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/19.jpg)
Design Constraints• Proximity of railroad tracks to river
![Page 20: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/20.jpg)
Design Constraints• Limited Right of Way
![Page 21: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/21.jpg)
Design Constraints• Existing structures
![Page 22: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/22.jpg)
Design Constraints• Existing arroyos
![Page 23: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/23.jpg)
Levee Design
![Page 24: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/24.jpg)
Levee Design
![Page 25: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/25.jpg)
Erosion Protection
![Page 26: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/26.jpg)
Erosion Protection
![Page 27: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/27.jpg)
Railroad Proximity
![Page 28: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/28.jpg)
Floodwall Design
![Page 29: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/29.jpg)
Floodwall Design
![Page 30: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/30.jpg)
Contributing Arroyos
![Page 31: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/31.jpg)
Contributing Arroyos
![Page 32: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/32.jpg)
Culvert with Gates
![Page 33: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/33.jpg)
Interior Drainage
![Page 34: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/34.jpg)
Next Steps
• Obtain necessary permits and construction easements
• Obtain funding for construction
• Coordinate with local jurisdictions to meet interior drainage requirements
• Perform improvements
![Page 35: Canutillo Phase II - ibwc.gov · Percha Dam, NM to American Dam in El Paso. Background • In 2009, the American Recovery and Reinvestment Act (ARRA) allocated funds to the USIBWC](https://reader035.vdocuments.us/reader035/viewer/2022071215/60451403d9ab111c5b7fd87f/html5/thumbnails/35.jpg)
Questions