campagnone common - improvement maps

3
Campagnone Common: Phase 1 Improvements HAVERHILL STREET LAWRENCE STREET COMMON STREET JACKSON STREET Phase 2 Project Area Phase 2 Project Area Phase 2 Project Area Phase 2 Project Area Lighting and Electrical Renovations 1. irty-two energy efficient LED lights will be installed along the two main paths 2. All overhead wire and the majority of the existing lights will be removed 3. ree power pedestals will be installed to improve electricity distribution for festivals 4. ree damaged poles and fixtures will be replaced along Common Street 5. New spotlights will be installed at the flag pole Site Amenities 1. Nine benches will be installed 2. Seven trash receptacles will be installed 3. Two freeze resistant drinking fountains with jug fillers will be installed 4. Two groves of trees will be planted on Earth Day (April 21, 2012) 5. One 50 foot flag pole will be installed near the Frost Fountain

Upload: dan-rivera

Post on 24-Sep-2014

20 views

Category:

Documents


0 download

DESCRIPTION

Lawrence, MA Campagnone Common - Improvement Maps

TRANSCRIPT

Page 1: Campagnone Common - Improvement Maps

Campagnone Common: Phase 1 Improvements

HAVERHILL STREET

LAWREN

CE STREET

COMMON STREET

JACKSON

STREET

Phase 2 Project Area

Phase 2 Project Area

Phase 2 Project Area

Phase 2 Project Area

Lighting and Electrical Renovations1. Th irty-two energy effi cient LED lights will be installed along the two main paths

2. All overhead wire and the majority of the existing lights will be removed

3. Th ree power pedestals will be installed to improve electricity distribution for festivals

4. Th ree damaged poles and fi xtures will be replaced along Common Street

5. New spotlights will be installed at the fl ag pole

Site Amenities1. Nine benches will be installed

2. Seven trash receptacles will be installed

3. Two freeze resistant drinking fountains with jug fi llers will be installed

4. Two groves of trees will be planted on Earth Day (April 21, 2012)

5. One 50 foot fl ag pole will be installed near the Frost Fountain

Page 2: Campagnone Common - Improvement Maps

Campagnone Common: Phase 2 Improvements

Granite Inscriptions Entry

Site Amenities1. Fift een benches will be installed at the

renovated playground

2. Two game tables will be installed near the entry at Haverhill and Jackson Streets

3. A drinking fountain and three trash receptacles will be installed at the playground area

Granite Inscriptions1. Campagnone Common will be inscribed in granite

seat walls at entries

2. City seal will be inscribed in granite posts at entries

3. Opportunity exists for additional inscriptions

Haverhill / Jackson Street Entry

Common / Jackson Street EntryGame Tables Near the Northeast Entry

Playground Renovations

Page 3: Campagnone Common - Improvement Maps

Campagnone Common: Phase 2 Improvements

Playground Renovations1. Increases playground area by 30% (1800 square feet additional space for play)2. Playground equipment for multiple age groups and universally accessible3. Benches and drinking fountain for parents and children

age 5-12 equipment

age 2-5 equipment

Entrance Renovations1. New heavy duty brick pavers and granite walls2. City Seal and Campagnone Common inscribed into granite 3. Frames important site lines into the Common

Existing Entry at Haverhill & Jackson Streets

Proposed playground

Colorful paving patterns

Granite Seat Wall Option

Existing Conditions

Granite Planter Option

Proposed Playground Equipment

Existing Playground Footprint