camp daisy hindman, splash park / review 1
DESCRIPTION
Adam Reilly, Ryan Halford, and Bo Steadman's proposal for the splash park and bathhouse at Camp Daisy HindmanTRANSCRIPT
Camp Daisy Hindman
Splash Park and bath house
POOL AREA
ENTRY AREAS
Splash Park
Outdoor seating
Storage
Restrooms
Showers / Changing Rooms
Picnic Area
Splash Park
Outdoor seating
Storage
Restrooms
Showers / Changing Rooms
Picnic Area
SITE PLAN
SITE SECTION
TREE TRANSPLANT
GENERIC OR PREFABRICATED BARN/SHED
PROGRAMMATIC VOLUMES
Changing Room
Showers
Outdoor showers
Water Closets
ADA StoragePicnic Area
Storage
Sinks
UtilityStorage
Sinks
Splash Park
Outdoor seating
Storage
Restrooms
Showers / Changing Rooms
Picnic Area
PLAN
SECTION
FEBRUARYMARCHAPRILMAY
Site work begins immediately for the foundations of two sheds.
FEBRUARY
Schematic design is solidified and documentation begins.
FEB MARCH APRIL MAY
FEBRUARYMARCHAPRILMAY
A prefabraicated system of wooden posts and beams is purchased and assembled.
FEBRUARY
Documentation of interior volumes are underway.
FEB MARCH APRIL MAY
FEBRUARYMARCHAPRILMAY
Building is clad. One side remains open so volumes can be inserted.
Construction of interior volumes begin.
FEBRUARYFEB MARCH APRIL MAY
FEBRUARYMARCHAPRILMAY
Interior volumes are constructed off-site in April and part of May. The volumes are then shipped to the site and placed inside the already completed structure, attached to utilities and the buildings are completely closed off.
Construction of interior volumes are completed and they are shipped to site.
FEB MARCH APRIL MAY
CEDAR SIDING
POLYGAL ROOF \ ~$1.50 PER SF
EAST BUILDING INTERIOR
WEST BUILDING
WEST BUILDING INTERIOR