caltrans district 4 contractors’ outreach meeting august 31, 2005
TRANSCRIPT
Caltrans District 4
Contractors’ Outreach
MeetingAugust 31, 2005
Caltrans District 4
Introductions
Janet AdamsSFOBB East Span Project
Manager, Caltrans
Caltrans District 4
Welcome
Bijan SartipiDistrict 4 Director, Caltrans
Caltrans District 4
Welcome
Olivia FonsecaDeputy Director
Civil Rights Program and Small Business Advocate
Caltrans District 4
SFOBB Self-Anchored Suspension Span Contract
Janet AdamsSFOBB East Span Project
Manager, Caltrans
Caltrans District 4
San Francisco - Oakland Bay Bridge
East SpanSeismic Safety
Replacement Project
Caltrans District 4
Contract 04-0120F4
• This contract constructs the self-anchored suspension portion of the new East Span
• Advertised on 8/1/05• Bids open on 2/1/06• Estimated cost is $1,450,000,000• Project funded by Toll revenues and State
funds, therefore Buy America is not required
• Contract duration is 2130 working days (7 days/week)
Caltrans District 4
Contract 04-0120F4• Contract consists of the following
components:– Two steel orthotropic box girders and decks– Steel tower consisting of 4 tower shafts with
elevator– Concrete cap beam at Piers W2 and E2– Steel bike path– Steel prefabricated parallel wire strand
cable system– All steel fabrication will be off-site
Caltrans District 4
Self-Anchored Suspension Span
Caltrans District 4
SAS and Skyway
Caltrans District 4
View from Yerba Buena Island
Caltrans District 4
District Contracts
Bob FinneyDeputy District Director -
Construction
Caltrans District 4
Alameda 28 $325,370Contra Costa 10 $87,881Marin 11 $92,566Napa 7 $9,637Santa Clara 30 $125,833San Francisco 6 $1,706,620San Mateo 22 $423,026Solano 15 $64,835Sonoma 11 $79,799Var 2 $4,422
Total: 142 $2,919,989
Fiscal Year 2005 - 2006 Construction Workload ($1000s)
Caltrans District 4
North Counties Upcoming Projects
80
12
101
101
29
37
1
Son 101 HOV SR 12 – Steele Ln
SON 101 Steele Ln IC
Mrn 101 HOV Central San Rafael 580
Mrn 580 RSR - Polyester Deck Overlay
Napa 29 - St Helena Roadway Rehabilitation
Mrn 101 Blithedale Off-Ramp
Napa 121 – Replace Tulucay Bridge
Caltrans District 4
Richmond San Rafael Bridge Polyester Deck Overlay
041521 Complete Bridge Deck Overlay, Deck joint
Cost: $18.6 M Adv: Dec. 2005
Caltrans District 4
Marin 101 HOV Gap Closure Central San Rafael
226151 Mrn 101 HOV Widening Central San Rafael
Cost $42.5 M Adv: Oct. 2005
Caltrans District 4
East Blithedale Off Ramp
N
131
101
2937U1 Mrn 101 E. Blithedale Off Ramp
Cost $5.8 M Adv: Feb. 2006
Caltrans District 4
Napa 29 St. Helena Roadway Rehabilitation
128471 Napa 29 Pavement Rehabilitation
Cost: $4.7 M Adv: Sept. 2005
Rehabilitate Roadway :• Curve Improvements• Super elevation Correction• Shoulder Widening• Drainage Modification• Digout and AC Overlay
N
29
St Helena
128
128
29
Project Limit – York Creek Bridge
Project Limit – Bale Lane
Caltrans District 4
Sonoma 101 HOV Widening Route 12 - Steele Lane
245411 Son 101 HOV Route 12 to Steele Lane
Cost: $52.1 M Adv: Sept. 2005
12
N
Route 12 / 101 I/C Ramp Modification
College Ave. Bridge Replacement and I/C Modification
6th Street New Undercrossing 4th Street Bridge
Widening Santa Rosa Creek
Replace Bridge
Soundwall
Route 101 Widening Bicentennial Way -
Earle Street OC
Auxiliary Lane - Steele Lane -
College Avenue
101
101
12
Santa Rosa
Caltrans District 4
Sonoma 101 HOV Widening Steele Lane IC
263901 Son 101 HOV Steele Lane I/C
Cost: $12.4 M Adv: Sept. 2005
Route 101 Widening Cleveland -
Edwards Avenue
Steele Lane Bridge Widening
Steele Lane NB On Ramp Metering
Steele Lane Off Ramp Relocation
Soundwall
101
101
N
Santa Rosa
N
Caltrans District 4
San Francisco, San Mateo and Santa Clara Counties Projects
280
80
92
1
101
82
84
87
101
680
Devil’s Slide Tunnels
SCl 680 Median Barrier
SM 101 Auxiliary Lane
SCl 101 Grind PCC Pavement
SF 101 Presidio Viaduct
SF 80 SFOBB Resurface Upper & Lower Deck
Caltrans District 4
0105U1 – Overlay SFOBB Upper/Lower Deck
0105U4 SFOBB Resurface Upper
and Lower Deck Cost: $25.0 Million Adv: 8/29/05
Resurface SFOBB :• ¾” Polyester Deck Overlay• Grind ¾” Existing Epoxy Asphalt• Lower Deck - Replace 9
Expansion Joints
Project Limits – YBI
N
80
80
Project Limits – SFO SFOBB Anchorage
Caltrans District 4
SF 101 - Presidio Viaduct Rehabilitation and Repaint
449404 Rehab and Paint Presidio Viaduct
Cost: $19.6 Million Adv: Dec. 2005
Caltrans District 4
SM 101 Auxiliary Lanes
Auxiliary Lanes :• NB and SB Auxiliary Lanes• Reconstruct Peninsula OC• Monte Diablo Ped. Bike OC• Soundwall and Retaining Wall• Drainage Improvements
Project Limits – Millbrae Avenue
Project Limits – E 3rd Avenue
N
82
280101
101
101
82
264201 SM 101 Auxiliary Lanes 3rd Ave – Millbrae Ave.
Cost: $74.2 M Adv: June. 2006
Caltrans District 4
Devil’s Slide Tunnels and Approach Roads
1123U1 Devil Slide – Construct Tunnels
Cost: $225.0 Million Adv: Apr. 2006
North PortalBridge
South Portal
South Rock Cut
New RoadwayTunnels
Operation Maintenance
Center
N
Caltrans District 4
0C890 SCL 101 Grind PCC Pavement
0C8901 SCl 101 Grind PCC Pavement
Cost: $19.9 M Adv: 8/15/05
Grind PCC Pavement :• Grind PCC Pavement• Slab Replacement• AC Overlay Mainline & Ramps• Fog Seal Shoulders
Project Limits – San Mateo County
Line
Project Limits – Quadalupe
River Bridge
N
87
280880
82
680
880
101
101
101
101
82
237
237
Caltrans District 4
SCl 680 Upgrade Median Barrier
270511 SCl 680 Upgrade Median Barrier
Cost: $13.7 M Adv: Sept. 2005
Upgrade Median Barrier :• Replace MBGR w/ Concrete
Barriers• Minor Drainage Modifications
Project Limits – Alameda County
Line
Project Limits – I 280 / 101 IC
N
87
680
880
232
880
680
680
280
101
101
Caltrans District 4
Contra Costa County Upcoming projects
80
4
680
24
Richmond San Rafael Bridge
Benicia Martinez Bridge
Antioch Bridge
Carquinez Bridge
CC 680 Auxiliary Lanes
CC 80 Westbound HOV Lanes
Caltrans District 4
I 80 WB HOV Extension CC4 - Cummings Skyway
I 80 Widening
I/C Modification
I/C Modification
Auxiliary Lanes
I/C Modification
80
80
4
263701 CC 80 Extend WB HOV SR4 - Cummings
Cost: $19 M Adv: Oct. 2005
Caltrans District 4
Construct Auxiliary Lanes Diablo Road - Bollinger Canyon Road
228551 CC 680 Construct Auxiliary Lanes
Cost: $15.2 M Adv: Nov. 2005
Construct Auxiliary Lanes:• NB And SB Auxiliary Lanes• Relocate Existing Soundwalls • Widening Laurel Drive UC • Retaining Walls
N
Project Limits – Bollinger Canyon Rd.
Project Limits – Diablo Road.
Project Limits – Sycamore Valley Rd.
Project Limits – Crow Canyon Rd.
680
680
Caltrans District 4
Alameda County Upcoming Projects
Dumbarton Bridge
San Mateo Hayward Bridge
SF Oakland
Bay Bridge
880
580
680
92 238
80
84
5th Avenue IC Retrofit
High Street IC RetrofitI 238/580 Widening and Rehabilitation
MacArthur Blvd. On Ramp
Distribution Struct. Retrofit
SR 84 Pigeon Pass Realignment
I 580 PCC Pavement Rehab.
Caltrans District 4
Ala I 80 / 580 / 880 Distribution Structure Retrofit - Utility Corridor
143554 Retrofit I 80/580/880 Distribution Structure
Cost: $13.2 M Adv: Dec. 2005
Caltrans District 4
1706U4 Ala 880 – 5th Avenue Interchange Retrofit
Cost:$102 Million Adv: Aug. 2006
Alameda 880 - 5th Avenue Interchange Retrofit
Replace Existing Structure:• Maintain Existing Capacity• Raise Profile of New Structure• Auxiliary Lane, from Oak St. Off Ramp• Standard Shoulders• Bike and Pedestrian Lane• Lake Merritt Channel
Project Limits – Oak Street
Project Limits – 10th Avenue
N
Caltrans District 4
Alameda 880 - High Street Interchange Retrofit
165424 Ala 880 – High Street Interchange Retrofit
Cost:$60.7 Million Adv: Sept. 2006
Replace Existing Structure:• Maintain Existing Capacity• Reconfigure SR 77 / 42 Ave./880 IC-
Partial diamond w/ at grade intersection• Reconstruct Frontage Road: - Oakport Street - E. Eight Street• Standard Shoulders• Bike and Pedestrian Lane
Project Limits - Fruitvale Avenue
Project Limits- .9 km S. of High Street
N
Caltrans District 4
I-238 Widening and Rehabilitation I-238/580 IC to I-
238/880 IC
249041 I-238 Widening and Rehabilitation
Cost: $82.4 M Adv: Jan. 2006
Widening and Rehabilitation:• Widen I-238 from 4 to 6 Lanes• Rehabilitate I-238 with LLP • SB I-880 Aux. Lane from I238/880 IC
to A Street Off Ramp• Widen NB I-880 to I-238 to 2-Lanes• Widen NB I-238 to I-880 to 2 Lanes
N
Project Limits – A Street
880
880
238
Project Limits – I-238/880 IC
Project Limits – I-238/580 IC
238580
Caltrans District 4
PCC Pavement Rehabilitation Hacienda Drive - I 238
284311 Ala 580 PCC Pavement Rehab
Cost: $28 M Adv: 8/8/05
Project Limits – Hacienda Dr.Project Limits –
I - 238
Upgrade Existing Pavement :• Replace Cracked Slabs• Grind All Lanes• Repair Shoulders• Replace Approach Slab• AC Overlay Ramps• Rehab Bridge Decks• Install Bridge Rails
580
680
238880
580
N
Caltrans District 4
State Route 84 Realignment Pigeon Pass
172401 Ala 84 Roadway Realignment
Cost: $21.3 M Adv: Aug. 2006
Project Location
Livermore
Dublin
Pleasanton
580680
84
680
680
84
238
580
N
Roadway Realignment :• Improve Horizontal / Vertical
Alignment• Median Buffer • Current Design Standard• Standard Outside Shoulder• Guardrail• Steep Terrain• Environmental Sensitive Habitat
Caltrans District 4
Networking
Network session