call us first! do not return to storeheartlandind.com/wp-content/uploads/2015/08/... · stratford...

76
STOP! STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: or email: customer [email protected] Our staff is ready to provide assistance. April through October M - F 8:00 AM to 7:00 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST 1-800-577-9663 16665

Upload: others

Post on 07-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

STOP!STOP!

Call Us First!DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll-free number:

or email:

[email protected]

Our staff is ready to provide assistance.

April through October M - F 8:00 AM to 7:00 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

1-800-577-9663

16665

Page 2: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

(This page intentionally left blank.)

Page 3: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

A Backyard Products Company

10/30/2012

KEEP THIS MANUAL FOR FUTURE REFERENCE

ACTUAL FLOOR SIZE IS 141 x 96" (358 x 244 cm) STRATFORD 12' x 8' (366 x 244 cm)

ASSEMBLY MANUAL

BEFORE YOU BEGIN

VALUE SERIES

16665

IMPORTANT!READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.

- CUSTOMER SERVICE -Call: 1-800-577-9663 email: [email protected]

• BUILDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and/ or requirements before building

. • ENGINEERED DRAWINGSContact our Customer Service Team if engineered drawings are needed to pull local permits.

• SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are

listed on page 4.

• CHECK ALL PARTSInventory all parts listed on pages 4 - 6. Contact our Customer Service Team if any parts are missing or damaged.

• ADDITIONAL MATERIALSYou will need additional materials to complete your shed. See page 3 for required and optional materials and quantities. .

Page 4: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

2

FINISH

BEGIN

� 3/8" Drill Bit

� Square

� Utility Knife

TOOLS

Safety! Always use approved safety glasses during assembly.

OptionalRequired

HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.

ORIENT LUMBER AND TRIM FOR BEST APPEARANCE

= Assistance Required; two or more people.

= Ensure squareness.

= Important required step or operation.

= Helpful assembly hint.

= Mark part with pencil.

= Beginning of steps for assembly or installation.

= You have fi nished the assembly or installation.

= Level

� Gloves

Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.

Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)

� Safety Glasses

� Tape Measure

� Paint Tools

� Ladder

� Caulk Gun

�Hammer

� Level

� Pencil

� Phillips Screwdriver

� Drill / Driver

� #2 Philips Drive Bit

� Tool Belt/ Nail Pouch

� Chalk Line

� Nail Gun

• gun nails

� Tin Snips (for drip edge)

or

� Shingle Blades

A B C

Page 5: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

3

FOUNDATION OR FLOOR MATERIALS

ADDITIONAL MATERIALS

DRIP EDGE ..................... 30 Feet #15 ROOFING FELT To cover 114 Sq. Ft. of roof area.

1" GALVANIZED ROOFING NAILS.........1/4 LbFor roofing felt.

x6

x20

2 x 4 x 8' (5 x 10 x 244 cm) Treated Lumber Cut to (5) 2 x 4 x 93" (5 x 10 x 236,2 cm) ea. 3" (7,6 cm) Hot Dipped Galvanized Nails

Optional 12" (30 cm) spacing

Standard 24" (60 cm) spacing

• This shed kit includes a complete wood fl oor frame system. It does not include floor panels.• It does not include ANY leveling materials.

• See the FLOOR LEVELING section on page 8 for recommended methods and suggested materials to properly level your fl oor, as this will vary depending on your specifi c site.

REINFORCED WOOD FLOOR FRAME (OPTIONAL)IMPORTANT! The included fl

fi c use you may want to construct a fl oor frame by adding additional fl

COMPLETING YOUR SHEDYou will need these additional materials:

OPTIONAL MATERIALS

3-TAB SHINGLES ............................ 5 Bundle s

PAINT FOR SIDING .......................... 2 GallonsUse 100% acrylic latex exterior paint. (2) coats r ecommended.

CAULK ................................................. 3 Tube sUse acrylic latex exterior caulk that is paintable.

s1" GALVANIZED ROOFING NAILS.... 2 LbFor shingles.

PAINT FOR TRIM .............................1 QuartUse 100% acrylic latex exterior paint.

WOOD GLUE ....................... Exterior Rated

FLOOR PANELS (NOT INCLUDED)

REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.

x2 x13/4 x 48 x 96"(1,9 x 122 x 244 cm)

3/4 x 45 x 96"(1,9 x 114 x 244 cm)

Floor Panels are3/4" (1,9 cm) thick

Page 6: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

4

RS RS

3/4"(19 mm)

1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm )

2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm )

2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm )

1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm )

x9x2

2 x 4 x 93" (5 x 10 x 236 cm)

2 x 4 x 48" (5 x 10 x 122 cm)

2 x 3 x 24-1/16" (5 x 7,6 x 61 cm)

2 x 3 x 7-7/8" (5 x 7,6 x 20 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)Gauge Block for 3/4" (19 mm)measurement

2 x 3 x 14-1/2" (5 x 7,6 x 36,8 cm)

2 x 3 x 66-1/2" (5 x 7,6 x 169 cm)

2 x 3 x 29-1/2" (5 x 10 x 75 cm)

2 x 3 x 32-1/2" (5 x 10 x 83 cm)

2 x 3 x 46-1/2" (5 x 7,6 x 118 cm)

2 x 3 x 94-1/2" (5 x 7,6 x 240 cm)

2 x 3 x 96" (5 x 7,6 x 244 cm)

2 x 3 x 13" (5 x 7,6 x 33 cm)

2 x 3 x 68" (5 x 7,6 x 173 cm)

FL

x2 x1x1

x1

x5x1 2 x 3 x 62-1/2" (5 x 7,6 x 158,8 cm)

x3

x3

x3x6x7

x5

x1

FN

GAADY

FZ

KK

KZ

2 x 3 x 22-1/2" (5 x 7,6 x 57 cm) x2 LV

2 x 3 x 21-1/2" (5 x 7,6 x 55)x2 LF

NF

PR

PT

RK

OT

2 x 4 x 65-5/8" (5 x 10 x 167 cm) Rafter

2 x 4 x 46-13/16" (5 x 10 x 119 cm) Rafter

ADNU

x5x5

8 x 24" (20 x 61 cm) Gusset

5/8 x 3 x 25" (1,6 x 7,6 x 63,5 cm)

5/8 x 3 x 8" (1,6 x 7,6 x 20 cm)

5/8 x 3 x 72-3/8" (1,6 x 7,6 x 184 cm)

2 x 3 x 70-1/2" (5 x 7,6 x 179 cm)

2 x 3 x 65" (5 x 7,6 x 165 cm)

x6x4x2

x2

x2

x2

KW

KV

ZZ

KX

KY

MM

NO

NR

NQ

3/8 x 5-3/8 x 5-1/2" (1 x 13,6 x 14 cm) 1 Left / 1 Rightx2

x2x2

2 x 3 x 46-7/8" (5 x 7 x 119 cm)

5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)

2 x 3 x 76-1/4" (5 x 7,6 x 194 cm)

x8

WOODSIZECONVERSIONCHARTNominalBoardSize ActualSize

PARTS IDENTIFICATION AND SIZESF

LOO

RR

AF

TE

RS

TR

IMW

ALL

S

Part identification is stamped on some parts.

• Check these locations for Part stamps

Treated lumber is stamped:

Treated lumber is stamped:

PARTS LISTINVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.

BJ

5/8 x 3 x 21-3/4" (1,6 x 7,6 x 55 cm)

x10

Page 7: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

5

x1x2 x2

x3 x1x2 x1 x1 x1 x1

7/16 x 18 x 96”(1,1 x 46 x 244 cm)

x17/16 x 18 x 48”(1,1 x 46 x 122 cm)

7/16 x 48 x 96"(1,1 x 122 x 244 cm)

7/16 x 47-7/8 x 48"(1,1 x 122 x 122 cm)

x1 x1 3/8 x 7-7/8 x 94-1/2" (0,9 x 20 x 240 cm)

3/8 x 48 x 72" (1 x 122 x 183 cm)

3/8 x 15-7/8 x 72" (1 x 40 x 183 cm)

3/8 x 7-7/8 x 46-1/2" (0,9 x 20 x 118 cm)

Roof Panels are7/16" (11 mm) thick

WALL PANEL & DOOR PARTS LIST

ROOF PANELS

Left Door Right Doorx1 x1

2 x 3 x 69" (5 x 7,6 x 175,3 cm)x2OO

5/8 x 3-7/8 x 96" (1,6 x 9,8 x 244 cm)x1

NOTES

Page 8: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

6

5/8 x 20 x 96"(1,6 x 51 x 244 cm)

7/16 x 11-3/4 x 96"(1,1 x 30 x 244 cm)

1 x 3 x 96"(2,5 x 7,6 x 244 cm)

Window

23-7/8 x 96"(61 x 244 cm) Peg Board

x1 x2

x1

x1

x1

x30

x74

x36

x2Boxes

x6Boxes

x112

x112

x25

x75

3" (7,6 cm)

3" (7,6 cm)

2" (5,0 cm)

2" (5,0 cm)

2" (5,0 cm)

1-1/4" (3,2 cm)

1-1/2" (3,8 cm)

1" (2,5 cm)

3/4" (19 mm)

SHELF & WINDOW PARTS LIST

FASTENERS / HARDWARE BAG (Shown actual size)

NAIL BOXES (Shown actual size)

DOOR HARDWARE (Not actual size)

BE

3/4" (19 mm) 3/4" (19 mm) 3/4" (19 mm)

64" Metal Threshold

Bagged seperately / special coating

x2

x8

x1 x1

x7 x11

Page 9: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

7

BUILDING ANATOMY

1. Sub-assembled doors with attached hinges.

2. 2x3 wall studs have been engineered to support roof load and to meet demanding wind loads.

3. Sidewall top and bottom plates tie wall studs together and provide nailing support for top and bottom edge of siding.

4. Rafters line up over wall studs to effectively transfer roof load to the floor and eliminate need for double top plate. Oversized wood gussets at peak provide a strong connection for rafter halves.

5. Treated siding overhangs the wall framing and floor to keep the elements out.

6. Collar tie and over-door header maintains door frame integrity. 7. Corner studs & end rafters are positioned to the outside of the siding where they serve the dual purpose of framing and trim.

8. The EZ Frame design transfers the roof load to the front and back walls allowing for reduced framing at the side walls.

9. Includes treated floor frame.

This building has been designed using our patented EZ Frame construction method. EZ Frame is a unique construction method which has been engineered to use fewer framing members. This reduces assembly time and cost by as much as 30% compared to conventional construction methods. EZ Frame patent no. 5,666,766

All of our buildings have been engineered to withstand demanding wind and snow loads. If you live in an area with extreme wind/snow load requirement, contact

us and we can assist with engineering to meet your local codes.

1

2

3

4

5

6

7

8

9

9

7

3

2

6

85

4

1

Page 10: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

8

FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below.

Leveling materials are not included in this kit.

PREFERRED METHOD - 4x4 TREATED RUNNERS

Measurementstocentersof4x4's.

• 3" Screws angled into 4x4.

• (2) at each point frame• and 4x4 touch.

12"(30,5 cm)

12"(30,5 cm)

• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.

LEVELINGMETHODS

• If you are building your shed on a concrete foundation see the following page.

CONCRETE

MATERIALREQUIRED

x2 4" x 4" x 12' (10 x 10 x 366 cm)Treated Lumber

FastenersforFrameto4"x4".(3" Screws shown as one option.) Minimum (28) 3" screws / exterior grade.

Useonlywoodtreatedforgroundcontactandfastenersapprovedforusewithtreatedwood.

Alwayssupportframeseams.

Levelinghigherthan16"notrecommended.

LEVELINGMATERIALSGravel

2x4 Treated Lumber

Solid Masonry Blocks in 1", 2", 4" or 8" thickness

Asphalt Shingles

8" Block

4" BlockGravelGravel

Do not exceed 16".

4x4 Runner

Shingle

ShingleMaximum between leveling

material locations.48"

12"

2x4 Treated Lumber

2" Block

Level

12"

Page 11: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

9

A

B C

4"(10 cm)

3-1/2"(8,9 cm)

DOOR

2" x 4" x 12' (5 x 10 x 366 cm)

2" x 4" x 8' (5 x 10 x 244 cm)

Caulk

Requires:

x2

x2

x1

MUST be treated lumber.

MUST be treated lumber.

96" (244 cm)141" x 96" (358 x 244 cm) 89" (226 cm)12'x 8' (366 x 244 cm) 141" (358 cm)

AActual Size B CBuilding Size

CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor frame. If you choose to install your kit

on a concrete slab refer to the diagram below.

• A treated 2 x 4" (5 x 10 cm) sill plate is required when installing your shed on concrete. Hint: Use treated lumber in your kit or purchase full length treated lumber. • Use a high quality exterior grade caulk beneath all sill plates. • Fasten 2 x 4" (5 x 10 cm) sill plates to slab using approved concrete anchors (fasteners not included). • Check local code for concrete foundation requirements.

NOTES

Treated Sill Plate

Caulk between sill plate and concrete.

Allow new concrete slabs to cure for at least seven (7) days.

Page 12: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

10

93"(236 cm)

96"(244 cm)

141”(358 cm)

117”(297 cm)

93”(236 cm)

93”(236 cm)

70-1/2”(179 cm)

48”(122 cm)

24”(61 cm

48”(122 cm)

93”(236 cm)

OffsetSeam

OffsetSeam

x323" (7,6 cm)

x9

x2

2 x 4 x 93" (5 x 10 x 236 cm)

2 x 4 x 48" (5 x 10 x 122 cm)

PARTSREQUIRED:

FINISH

3 You have fi nished your Floor Frame.

Use two 3" nails at each mark.

Orient parts as shown on fl at surface. Measure and mark.

Somemeasurementsnottypical24"spacing

Centeronmarks

FLOOR FRAME

Flush

Flush

Look for StampTREATED

2

BEGIN

HINT:Foreasiernailingstandonframe.

Page 13: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

11

First,secureatendswithonefastener.

Second,secureatendswithonefastener.

170-9/16"(433,3 cm)

170-9/16"(433,3 cm)

Fig.A

FINISH

5

LEVEL AND SQUARE FLOOR FRAMEBefore attaching fl oor decking, it is important to level and square the fl oor frame.

A level and square fl oor frame is required to correctly construct your shed.

BEGIN

2

3

4

1

Use level and check the frame is level before applying fl oor panels.

Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 170-9/16" (433,3 cm).

When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig.A).

Once the fl oor frame is level and square fasten the frame to the x4 runners at each point the frame contacts the 4x4 runners.

See page 8 for the preferred fl oor leveling method.

Page 14: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

12

48"(122 cm)

141"(358 cm)

6"(15 cm)

PARTS REQUIRED:

x1

x55

3/4 x 48 x 96"(1,9 x 122 x 244 cm)

Grid lines up

12" (30 cm)

2" (5 cm)

Flush

Flush

Flush

(2) Nails

(2) Nails

FLOOR PANELS (NOT INCLUDED)

3/4" (1,9 cm)

170-9/16" (433,3 cm)

170-9/16" (433,3 cm)

Attach the 3/4 x 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner flush to the floor frame (Fig A). Secure panel with two 2" nails in the corners.

Move to the opposite side. Using the long edge of the panel as a lever, move thepanel side-to-side until the top corner is flush to the floor frame (Fig. B).Secure panel with two 2" nails in the corners.

2

BEGIN¸11

3

4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.

Ensure your floor frame is square by installing one paneland squaring frame.

Fig. A

Fig. B

Fig. C

Check the floor frame is square by measuring diagonally across the frame corners. If the measurements are the same your floor frame is square. The measurement will be approximately 170-9/16" (433,3 cm) (Fig. C).

Floor Panels not includedSee page 3 for panel sizes

and quantities.

Page 15: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

13

45"(114 cm)

48"(122 cm)

141"(358 cm)

6"(15 cm)

12"(30) cm

PARTS REQUIRED:

x1 3/4 x 45 x 96"(1,9 x 114 x 244 cm)

FINISH7 You have fi nished attaching your fl oor panels.

Continue installing panels with rough side up (painted grid lines).

Use grid lines on panel for 2" nails 6" apart on edges, and 12" apart inside panels.

5

76

x1 3/4 x 48 x 96"(1,9 x 122 x 244 cm)

Grid lines up

x1102" (5 cm)

FLOOR PANELS (NOT INCLUDED)

Flush

FlushFlush

45" Panel

Page 16: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

14

DOOR

Backwall

FrontwallSidewall

SideWall

Checkthefloorframeislevelafterinstallingfloorpanels.Re-levelifneeded.

•Thefloorshouldbeusedasalevelworksurfaceforwallconstruction.

• Organizeyourwallsectionsduringsub-assembly toavoidover-handlingofthewalls.HINT:

IMPORTANT!

Page 17: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

15

PARTSREQUIRED:

x12 x 3 x 76-1/4" (5 x 7,6 x 194 cm)

x1

MM

Flush

Primedsidedown

Fig.B

Fig.A

6"(15 cm)

2-1/2"(6,4 cm)

76-1/4"(194 cm)

76-1/4"(194 cm)

Checkforcorrectpanelshape.

2

3

Edges of panel should be flush to MM.

Use 1-1/4" (3,2 cm) screws spaced 6" (15 cm) apart as shown.

BEGIN

1̧ Orient parts on the flat on floor as shown(Fig.A,B).

Panel should be primed side down(Fig.B).

x131-1/4" (3,2 cm)

LEFT WALL

MM

Page 18: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

16

LEFT WALL

x1

Checkforcorrectpanelshape.

x121-1/4" (3,2 cm)

PARTSREQUIRED:

x1

5

4

6

Edges of panel should be fl ush to NO.

Use 1-1/4" (3,2 cm) screws spaced 6" (15 cm) apart as shown.

Orient parts on the fl at on fl oor as shown(Fig.A,B).

Panel should be primed side down(Fig.B).

Flush

6"(15 cm)

NO70-1/2"

(179 cm)

2 x 3 x 70-1/2" (5 x 7,6 x 179 cm)NO

FINISH

7 You have fi nished building your two Left Wall Assemblies.

Primedsidedown Fig.B

2-1/2"(6,4 cm)

Fig.A

70-1/2"(179 cm)

Page 19: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

17

1"(2,5 cm)

2-1/2"(5,4 cm)

33-1/2"(85 cm)

1-1/4"(3,2 cm)

33-1/2"(85 cm)

2-1/2" (6,4 cm)

Flush

Flush12"

(30 cm)

6"(15 cm)

KZ

PT

PTtemporarysupport

RKtemporarysupport

x121-1/2" (3,8 cm)

PARTSREQUIRED:

3

2

4

Nail KZ first, 1" (2,5 cm) from panel bottom.

Use 1-1/2" (3,8 cm) nails only 6" (15 cm) apart.

Place PT flush to KZ and edge of panel. Hold the 33-1/2" (85 cm) measurement and nail with 1-1/2" (3,8 cm) 12" (30 cm) apart.

Orient KZ and PT on flat on floor as shown.

Place panel on KZ and PTwith primed side up.

Primedsideup

Useonly1-1/2"(3,8cm)longnails

x1

x1x2

LEFTWALLREARASSEMBLY

2 x 3 x 32-1/2" (5 x 10 x 83 cm)

2 x 3 x 96" (5 x 7,6 x 244 cm)

KZ

PT

2 x 3 x 13" (5 x 7,6 x 33 cm) x1 RK

BEGIN

LEFT WALL

Donotnailingroove.

Page 20: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

18

58-1/4"(148 cm)

S

5/8"(16 mm)

2-1/2"(6,4 cm) Use

as spacer

Use Gauge Bloc kas spacer 3/4"

(19 mm)

Flush

58-1/4"(148 cm)

21-1/2"(54,6 cm)

29-1/2"(75 cm)

Flush

1-1/4"(3,2 cm)

2-1/2"(6,4 cm)

1-1/4"(3,2 cm)

12"(30 cm)

6"(15 cm)

BJ

Flush

LF

PT

RKtemporarysupport

x171-1/2" (3,8 cm)

PARTSREQUIRED:

7

5

6

8

9

Use 1-1/2" (3,8 cm) nails only 6" (15 cm) apart.

Place PT flush toLF and panel edge. Hold the 58-1/4" (148 cm) measurement and nail with 1-1/2" (3,8 cm) nails 12" (30 cm) apart.

Place the 5/8" (16mm) spacer on PT.

Place BJ flush to spacer and nail.

Place 3/4" gauge block on PT.

Place LF flush on gauge block and nail.

Useonly1-1/2"(3,8cm)longnails

x12 x 3 x 96" (5 x 7,6 x 244 cm)

PT

2 x 3 x 29-1/2" (5 x 10 x 75 cm) BJx1

2 x 3 x 21-1/2" (5 x 7,6 x 55)x1 LF

5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)3/4"GAUGE

BLOCKTEMPORARYSPACERx1

LEFT WALL

Donotnailingroove.

Page 21: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

19

1"(2,5 cm)

33-1/2"(85 cm)

58-1/4"(148 cm)

1"(2,5 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm) Flush

Flush

2-3/4"(7 cm)

2-3/4"(7 cm)

1"(2,5 cm)

2-1/2"(6,4 cm)

x331-1/2" (3,8 cm)

PARTSREQUIRED:

11

12

10

Nail using 1-1/2" (3,8 cm) nails 6" (15 cm) apart on edges, and 12" apart inside panel.

Nail RK using three 1-1/2" (3,8 cm) nails (Fig.A).

Place panel onto frame primed side up.

You have fi nished your left wall. Proceed to build your right wall.

FINISH

13

LEFTWALLFRONTASSEMBLY

x1

Primedsideup

RK

Fig.A RK

2 x 3 x 13" (5 x 7,6 x 33 cm) x2 RK

LEFT WALL

Donotnailingroove.

Useonly1-1/2"(3,8cm)longnails

Page 22: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

20

Checkforcorrectpanelshape.

PARTSREQUIRED:

x12 x 3 x 76-1/4" (5 x 7,6 x 194 cm)

x1

2

3

Edges of panel should be flush to MM.

Use 1-1/4" (3,2 cm) screws spaced 6" (15 cm) apart as shown.

BEGIN

1̧ Orient parts on the flat on floor as shown(Fig.A,B).

Panel should be primed side down(Fig.B).

x131-1/4" (3,2 cm)

Flush

6"(15 cm)

MM76-1/4"

(194 cm)

Primedsidedown

Fig.B

RIGHT WALL

2-1/2"(6,4 cm)

Fig.A

76-1/4"(194 cm)

MM

Page 23: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

21

Primedsidedown

Fig.B

x1

x121-1/4" (3,2 cm)

PARTSREQUIRED:

x1

5

4

6

Edges of panel should be fl ush to NO.

Use 1-1/4" (3,2 cm) screws spaced 6" (15 cm) apart as shown.

Orient parts on the fl at on fl oor as shown (Fig.A,B).

Panel should be primed side down(Fig.B).

2 x 3 x 70-1/2" (5 x 7,6 x 179 cm)NO

FINISH

7 You have fi nished building your two right wall assemblies.

Checkforcorrectpanelshape.

Flush

6"(15 cm)

NO70-1/2"

(179 cm)

RIGHT WALL

2-1/2"(6,4 cm)

Fig.A

70-1/2"(179 cm)

Page 24: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

22

1"(2,5 cm)

33-1/2"(85 cm)

1-1/4"(3,2 cm)

2-1/2"(6,4 cm)

33-1/2"(85 cm)

2-1/2" (6,4 cm)

Flush

Flush12"

(30 cm)

6"(15 cm)

KZ

PT

PTtemporarysupport

RKtemporarysupport

x121-1/2" (3,8 cm)

PARTSREQUIRED:

3

2

4

Nail KZ first, 1" (2,5 cm) from panel bottom.

Use 1-1/2" (3,8 cm) nails 6" (15 cm) apart.

Place PT flush to KZ and edge of panel. Hold the 33-1/2" (85 cm) measurement and nail with 1-1/2" (3,8 cm) 12" (30 cm) apart.

Orient KZ and PT on the flat on floor as shown.

Place panel on KZ and PT with primed side up.

Primedsideup

x1

x1x2

RIGHTWALLREARASSEMBLY

2 x 3 x 32-1/2" (5 x 10 x 83 cm)

2 x 3 x 96" (5 x 7,6 x 244 cm)

KZ

PT

2 x 3 x 13" (5 x 7,6 x 33 cm) x1 RK

BEGIN

Useonly1-1/2"(3,8cm)longnails

RIGHT WALL

Donotnailingroove.

Page 25: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

23

33-1/2"(85 cm)

S

5/8"(16 mm) Use

as spacer

Flush

32-1/2"(82,5 cm)

Flush

1-1/4"(3,2 cm)

2-1/2"(6,4 cm)

21-1/2"(54,6 cm)

1-1/4"(3,2 cm)

2-1/2"(6,4 cm)

6"(15 cm)

LF

KZ

PT

RKtemporarysupport

x101-1/2" (3,8 cm)

PARTSREQUIRED:

7

5

6 Place the 5/8" (16 mm) spacer on KZ

Place LF flush to spacer and nail with 1-1/2" (3,8 cm) nails 6" (15 cm) apart.

Place KZ flush on PT and nail with 1-1/2" (3,8 cm) nails 6" (15 cm) apart.

x1

2 x 3 x 21-1/2" (5 x 7,6 x 55)x1 LF

5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)x1

2 x 3 x 32-1/2" (5 x 10 x 83 cm)KZ

RIGHT WALL

Useonly1-1/2"(3,8cm)longnails

Donotnailingroove.

TEMPORARYSPACER

Page 26: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

24

1"(2,5 cm)

33-1/2"(85 cm)

1"(2,5 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm) Flush

Flush

2-3/4"(7 cm)

2-3/4"(7 cm)

12"(30 cm)

6"(15 cm)

x281-1/2" (3,8 cm)

PARTSREQUIRED:

RIGHTWALLFRONTASSEMBLY

x1

Primedsideup

RK Fig.A

2 x 3 x 13" (5 x 7,6 x 33 cm) x2 RK

RIGHT WALL

9

1010

8

Nail using 1-1/2" (3,8 cm) nails 6" (15 cm) apart on edges, and 12" apart inside panel.

Nail RK using three 1-1/2" (3,8 cm) nails (Fig.A).

Place panel onto frame primed side up.

You have fi nished your right wall.FINISH

11

Donotnailingroove.

Useonly1-1/2"(3,8cm)longnails

RK

1"(2,5 cm)

2-1/2"(6,4 cm)

Page 27: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

25

141"(358 cm)

118-1/2"(301 cm)

94-1/2"(240 cm)

94-1/2"(240 cm)

70-1/2"(179 cm)

46-1/2"(118 cm)

22-1/2"(57 cm)

66-1/2"(169 cm)

94-1/2" 46-1/2"(240 cm) (118 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

PARTSREQUIRED:x5

x2

x2

x243" (7,6 cm)2 x 3 x 66-1/2" (5 x 7,6 x 169 cm)

2 x 3 x 46-1/2" (5 x 7,6 x 118 cm)

2 x 3 x 94-1/2" (5 x 7,6 x 240 cm)

FZ

NF

PR

2 Attach with 3" (7,6 cm) nails, two at each connection.

BEGIN

1̧ Orient parts on edge on floor as shown. Measure and mark.

PROFFSETSEAM

OFFSETSEAM

FZx5

PR

NF

NF

Centeron marks

BACK WALL

HINT:Foreasiernailingstandonframe.

Page 28: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

26

48"(122 cm)

3/4"(1,9 cm)

1-1/2"(3,8 cm)

3/4"(1,9 cm)

12"(30) cm

6"(15 cm)

Forsquareness,maintain3/4"and1-1/2"measurementalongpaneledges.

4

5

3

PARTSREQUIRED:

x1

x342" (5 cm)

3/8 x 48 x 72"(1 x 122 x 183 cm)

BEGINHERE

HINT:UseRKas1-1/2"gauge

2 x 3 x 13" (5 x 7,6 x 33 cm) as spacerx1 RK3/4"GAUGE

BLOCK

Therewillbeanoverhangattopandbottom

BACK WALL

Donotnailingroove.

Primedsideup

Fig.B

Fig.A

1-1/2" (3,8 cm)

1-1/2" (3,8 cm)

3/4" (1,9 cm)

3/4" (1,9 cm)

2Nails

2Nails

SQUAREEDGE

3/4"GAUGEBLOCK

Place the 48x72" panel onto wall frame with primed side up as shown. Note the lip and square edges.

Use the gauge block to mark the 3/4" measurement on the wall stud. Use RK as a 1-1/2" gauge block at top. Secure panel with two 2" nails in the corners (Fig.A).

Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

Ensureyourwallframeissquarebyinstallingonepanelandsquaringframe.

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig.B).

Page 29: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

27

1-1/2"(3,8 cm)

3/4"(19 mm)

48"(122 cm)

12"(30 cm)

6"(15 cm)

Flush

1-1/2"(3,8 cm)

48"(122 cm)

12"(30 cm)

6"(15 cm)

Flush

PARTSREQUIRED:

x2

x1922" (5 cm)

3/8 x 48 x 72" (1 x 122 x 183 cm)

2 x 3 x 13" (5 x 7,6 x 33 cm) as spacerx1 RK

HINT:UseRKas1-1/2"gauge

HINT:UseRKas1-1/2"gauge

3/4"GAUGEBLOCK

Therewillbeasideoverhang

attopandbottom

BACK WALL

LIPEDGE

SQUAREEDGE

LIPEDGE

Place center 48" panel on frame as shown with primed side facing up.NOTETHESQUAREANDLIPEDGES.

Nail using 2" nails 6" apart on edges and 12" apart inside panel.

6

Donotnailingroove.

Place end 48" panel on frame as shown with primed side facing up.NOTETHESQUAREANDLIPEDGES.

Nail using 2" nails 6" apart on edges and 12" apart inside panel.

7

You have fi nished building your back wall.FINISH

8

Primedsideup

Primedsideup

Forsquarenessmaintainflushand1-1/2"measurementalongpaneledges.

Forsquarenessmaintainflushand1-1/2"measurementalongpaneledges.

Page 30: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

28

22-1/2"(57 cm)

13-3/4"(35 cm)

46-1/2"(118 cm)

94-1/2"(240 cm)

61-3/4"(157 cm)

64"(162,5 cm)

68"(172,7 cm)

65-1/2"(166,3 cm)

Dimensions are to center of studs

Maintain dimension between studs

62-1/2"(158,8 cm)

14-1/2"(36,8 cm)

Flush

Flush

PARTSREQUIRED:x1

x1

x4

x1

x1

x183" (7,6 cm)

2 x 3 x 46-1/2" (5 x 7,6 x 118 cm)

2 x 3 x 94-1/2" (5 x 7,6 x 240 cm)

NF

PR

2 Nail using two 3" (7,6 cm) nails at each connection.

BEGIN

1̧ Orient parts on edge on floor as shown. Measure and mark.

2 x 3 x 14-1/2" (5 x 7,6 x 36,8 cm) FL

2 x 3 x 62-1/2" (5 x 7,6 x 158,8 cm)FN

2 x 3 x 68" (5 x 7,6 x 173 cm) OT

PRNF

FN FL

OTx4

FRONT WALL

HINT:Foreasiernailingstandonframe.

Page 31: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

29

Flush

94-1/2"(240 cm)

46-1/2"(118 cm)

7-7/8"(20 cm)

2-1/2"(6,4 cm)

2-1/2"(6,4 cm)

Flush

7-7/8"(20 cm)

PARTSREQUIRED: x4

OVERHANG PANELS

2 x 3 x 7-7/8" (5 x 7,6 x 20 cm) x2

x1

x1

3/8 x 7-7/8 x 94-1/2" (0,9 x 20 x 240 cm)

3/8 x 7-7/8 x 46-1/2" (0,9 x 20 x 118 cm)

Orient two overhang panels with the primed side up.

Attach panels flush to 2 x 3 x 7-7/8" (5 x 7,6 x 20 cm) using two 1-1/4" (3,2 cm) screws as shown.

4

3

Primedsideup

1-1/4" (3,2 cm)

Page 32: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

30

PARTSREQUIRED:

6

5

Screw into top plate using (14) 1-1/4"(3,2 cm) screws.

You have fi nished attaching your overhang.

Place overhang on wall panel, fl ush to back side and ends.

Place overhang fl ush to 2 x 3" (Fig.A.)

Keep overhang fl ush to 2 x 3" (Fig.B.)

Makesureoverhangsareflushto2x3"theentirelength

SeamFlush

x1

x1

Overhang

Overhang

Flush

DOOROPENING

Fig.AFig.B

FINISH

7

Flush

Flush

Approximately 10" (25,4 cm)

Approximately 9" (22,9 cm)

94-1/2"(240 cm)

46-1/2"(118,1 cm)

Two screws near seams

FRONT WALL

x161-1/4" (3,2 cm)

DOOROPENING

Page 33: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

31

3/4"(1,9 cm)

6" (15 cm)

Flush

48"(122 cm)

3/4"(1,9 cm)

12"(30 cm)

PARTSREQUIRED:

x1

x342" (5 cm)

FRONT WALL

Forsquareness,maintainflushand3/4"measurementalongpaneledges.

BEGINHERE

3/4"GAUGEBLOCK

3/4"GAUGEBLOCK

Therewillbeanoverhang

attopandbottom

Flushpanelunderoverhang

Fig.A.

2

3

1Donotnailingroove.

Primedsideup

Place the panel onto wall frame flush under overhang with primed side up as shown (Fig.A).

Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig.B).

Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

Ensureyourwallframeissquarebyinstallingonepanelandsquaringframe.

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud (Fig.C). Secure corner with two 2" nails.

Fig.C

Fig.B

3/4" (1,9 cm)

3/4" (1,9 cm)

2Nails

Flush

2Nails

Page 34: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

32

6"(15 cm)

64"(163 cm)

Flush

PT

Flush

3"(7,6 cm) Screws

Use one (1) PT across door openingto maintain 64" dimension

PARTSREQUIRED:

x2

x1

x49

x22" (5 cm)

3" (7,6 cm)

FRONT WALL

FINISH

7 You have fi nished attaching your front wall panels. Proceed to erect your walls.

Use PT as a brace to maintain 64" (163 cm) opening. Use two 3" screws to attach.

Continue installing panels primed side up fl ush under overhang (Fig.A).Note 1/4" (6,4 mm) offset on right panel.

Use 2" nails 6" apart on edges, and 12" apart inside panel.

4

76

5

2 x 3 x 96" (5 x 7,6 x 244 cm)

PT

3/8 x 15-7/8 x 72" (1 x 40 x 183 cm)

Therewillbeanoverhang

attopandbottom

Flushpanelsunderoverhang

Fig.A

LIPEDGE1/4"

(6 mm)

10 to12"

SQUAREEDGE

1/4"(6 mm)

Donotnailingroove.

Primedsideup

Page 35: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

33

PARTSREQUIRED:

x1

x6

x4

3" (7,6 cm)

3" (7,6 cm)

LEFT WALL INSTALLATION

2 x 3 x 96" (5 x 7,6 x 244 cm) PT

3" Nails(7,6 cm)

(2)3" Screws(7,6 cm)

6"(15 cm)

2" Nails(5 cm)

x18

LEFT

RK

PT

Fig.A

Fig.B

Angletohitfloorframe.

Nail2"nailsfirst.

2" (5 cm)

Attach RK, using three 3" (7,6 cm) nails as shown. Angle nails to hit fl oor frame (Fig.A).

First, nail lower edge of panel to fl oor frame using 2" nails 6" apart Angle nail to hit fl oor frame (Fig.A).

3

Secure back wall uprights to fl oor using two 3" screws (Fig.B).

4

5

You have fi nished standing your left wall.

FINISH

6

Center left wall assembly on the 96" (244 cm) fl oor dimension.

Use PT as a temporary brace. Secure with two 3" screws.

2

BEGIN

1

Donotnailingroove.

(2) 3" Screws(7,6 cm)

96"(244 cm)

Page 36: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

34

CENTER

PARTSREQUIRED:

x12

x2

BACK WALL INSTALLATION

x39

3" (7,6 cm)

3" (7,6 cm)

2" (5 cm)

FINISH

4

Nail down the bottom plate using two 3" nails between the wall studs.

Screw through the backwall trim into the top and bottom plates using one 3" screw (Fig.D,E).

Stand Back Wall Assembly on Floor. 1-1/2"(3,8cm)Paneloverhangisattop.

It is important to secure the Back Wall in the following order.

Nail the lower back wall corner to the side wall trim with one 2" (5 cm) nail (Fig.A).

Center back wall on fl oor, side-to-side.

Be sure the measurement between the panel edge and the trim is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig.B).

Nail along the panel edge into the trim using 2" nails spaced 6" apart.

Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit fl oor frame (Fig.C).

You have fi nished standing your Back Wall. Proceed to stand the Right Wall.

1

2

3

BEGIN¸

2"(5cm)Nail

1-1/2"(3,8cm)

2"(5cm)Nail

3"(7,6cm)Screw

6"(15 cm)

6"(15 cm)

3" (7,6 cm)nails

TrimPanel

Fig.A

Trim

Fig.C

Fig.B

Fig.D

Fig.E

SameMeasurement

3"(7,6cm)Screw

Trim

Page 37: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

35

6"(15 cm)

PARTSREQUIRED:

x6

x4

RIGHT WALL INSTALLATION

x31

3" (7,6 cm)

3" (7,6 cm)

2" (5 cm)

FINISH

4

Nail down RKusing three 3" nails on each as shown and secure center wall frame using two 3" screws (Fig.D).

Screw through the right wall trim into the top and bottom plates using 3" screws (Fig.E,F).

Stand right wall assembly on fl oor. It is important to secure the right wall in the following order.

Nail the lower back wall corner to the right wall trim. Secure with one 2" (5 cm) nail (Fig.A).

Center right wall on fl oor, side-to-side.

Be sure the measurement between the panel edge and the trim is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig.B).

Nail along the panel edge into the trim using 2" nails spaced 6" apart.

Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit fl oor frame (Fig.C).

You have fi nished standing your right wall. Proceed to stand the front Wall.

1

2

3

BEGIN¸

2"(5cm)Nail

Fig.A

Trim

CENTER

2"(5cm)Nail

3"(7,6cm)Screw

Trim Fig.B

Fig.E

Fig.F

SameMeasurement

6"(15 cm)

3" (7,6 cm)nails

BackPanel

Fig.C

Fig.D RK

(2)3"(7,6cm)

Screws

3"(7,6cm)Screw

Trim

Page 38: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

36

6"(15 cm)

6"(15 cm)

64"(162,6 cm)

Nail down the bottom plate using two 3" nails between the wall studs. (Fig.D). Screw through the front wall trim into the top and bottom plates using one 3" screw (Fig.E,F).

Repeat process to secure the left side of the front wall.

You have finished standing your front wall.4

x8 x4

x41

6"(15cm)

2"(5cm)Nail

Fig.B

Trim

Fig.A

CENTER

2"(5cm)Nail

TrimFig.C

Fig.D

SameMeasurement

2"(5cm)Nail

3"(7,6cm)Screw

PanelFig.E

3"(7,6cm)Screw

3"(7,6cm)Nails

Fig.F

Center front wall on floor side-to-side.

Check the 64" door opening is held before nailing. Nail the front wall flush to the floor using 2" nails 6" apart. Angle nails to hit floor frame (Fig.A).

Nail the lower side wall corner to the side wall trim with one 2" nail (Fig.B).

1

2

BEGIN

2" (5 cm) x26

3" (7,6 cm) 3" (7,6 cm)

FRONT WALL INSTALLATION

Be sure the measurement between the panel edge and the trim is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig.C).

Nail along the panel edge into the trim using 2" nails spaced 6" apart.

3

Stand front wall on floor. It is important to secure the front wall in the following order.

Page 39: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

37

Flush toopening1-1/2"

(3,8 cm)

PARTSREQUIRED: x8

LV

3" (7,6 cm)

FRONT WALL

2 x 3 x 22-1/2" (5 x 7,6 x 57 cm) x2 LV

3" (7,6 cm) nails(2) at each connection

On inside of front wall attach LV flush to window opening using 3" (7,6 cm) nails as shown.

5

Page 40: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

38

PARTSREQUIRED: x4

FRONT WALL

3" (7,6 cm)

2 x 3 x 13" (5 x 7,6 x 33 cm)

2 x 3 x 68" (5 x 7,6 x 173 cm)

x1

x1

RK

OT

Angle 3"(7,6 cm)screw

Two 3"(7,6 cm) screw

Remove

OT

RK

Fig.A

Assemble RK to OT with one 3" (7,6 cm) screw (Fig.A).

Use OT and RK as a temporary brace to support top plate.Screw securely in place.

Remove temporary support in door opening.

One 3"(7,6 cm)screw

1-1/2"(3,8 cm)

6

7

FINISH

8

Page 41: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

39

x23" (7,6 cm)

x3

x1 3/8 x 5-3/8 x 5-1/2" (1 x 13,6 x 14 cm)

2 x 3 x 13" (5 x 7,6 x 33 cm) RK

101-3/8"(257,5 cm)

Importantmeasurement

DOOR

RAFTER JIG

FINISH

4

Make a rafter jig to make sure all rafters are assembled the same.

Measure from corner of backwall and RK (already installed) as shown.

Secure RK on the fl at square to back wall at measurement usingtwo 3" (7,6 cm) screws.

Attach a second RK on edge and 3/8" thick angle trim piece as shown (Fig.A).

You have fi nished building your rafter jig.

Requiredbecauserafterisunevenatbottom

2

3

BEGIN

PARTSREQUIRED:

RK

End Cap3/8 x 5-3/8 x 5-1/2"(1 x 13,6 x 14 cm)

3" (7,6 cm) screwmust drive in all the way

2-1/2"(6,4 cm)

RK

Fig.A

RK

Page 42: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

40

101-3/8”257,5 cm

NU

GLUE

2 x 4 x 65-5/8" (5 x 10 x 167 cm) Rafter

2 x 4 x 46-13/16" (5 x 10 x 119 cm) Rafter

ADx5

x10

x5

8 x 24" (20 x 61 cm) Gusset2" (5 cm)

x120

Shortedgetometalplateside

Shortedgetothisside

Endstouch

FINISH

6

You will assemble (5) rafters. Place rafter parts on Jig as shown.

You have fi nished building your rafters.

BEGIN

PARTSREQUIRED:

NU

NU

GussetAD

AD

RAFTERS

Apply glue to rafters where the gusset will fi t. Note short side of gusset. (Fig.A)2

Ends of rafters must touch together at the peak. Nail gusset to rafters using twelve 2" nails in pattern shown.

3

Flip over rafter assembly and repeat STEPS2-3 to attach second gusset to other side.4

Repeat STEPS1-4 to build FOUR additional rafter assemblies.5

Fig.A1/4" Gap(6 mm)

Page 43: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

41

Flush

Flush Flush

Flush

PARTSREQUIRED:

TRIM CAPS

x2

Attach primed side out and fl ush with soffi t, using two 1-1/4" (3,2 cm) screws on both sides, as shown.

2-5/8 x 5-3/8 x 5-1/2" (6,6 x 13,6 x 14 cm) 1 Left / 1 Right

x41-1/4" (3,2 cm)

You have fi nished your trim caps.

LEFTSIDE RIGHTSIDE

Install with primed side facing out

FINISH

2

BEGIN

Page 44: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

42

Install the back trim first, flush to back panel, trim, and panel edge as shown.

Secure using eight 1-1/4" (3,2 cm) screws 9" apart from inside shed.2

2 x 3 x 65" (5 x 7,6 x 165 cm)NRx2

Flush

Flush on trim

Flush to panel

NR

Flush to panel edge

PARTS REQUIRED: x161-1/4" (3,2 cm)

Flush

TRIM

BEGIN¸1

9" (22,9 cm)approximately

Page 45: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

43

Install the front trim, fl ush to peak and panel edge as shown.

Secure using six 1-1/4" (3,2 cm) screws from inside shed.

Repeat Steps for opposite Side Wall.

4

3

5

NQx22 x 3 x 46-7/8" (5 x 7 x 119 cm)

Flush to panel

Flush

NQ

Flush to peak

PARTS REQUIRED: x121-1/4" (3,2 cm)

TRIM

FINISH

6 You have fi nished attaching your Trim. Proceed to installing your Rafters.

9" (22,9 cm)approximately

Page 46: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

44

22-1/2"(57 cm)

24"(61 cm)

24"(61 cm)

24"(61 cm)

24"(61 cm)

22-1/2"(57 cm)

Dimensions are to center of rafters

Dimensions are from inside of panel

Flus h

DOOR

PARTSREQUIRED:

3" (7,6 cm)x20

FINISH

7

Mark top of wall frames to measurement shown.

Hold rafter end fl ush to back wall and overhang. Secure from under overhang using two 2" (5 cm) screw. (Fig.A)

Locate Rafter centered on marks.

Secure opposite end through panel into rafter end using one 2" (5 cm) screw (Fig.B)

Screw rafters at each end using two 3" (7,6 cm) screws as shown. (Fig.B,C)

Repeat steps to attach 5 rafters.

At each end(2) 3" (7,6 cm) screws

angle into 2 x 3"

2"(5 cm) Screw

Two 2"(5 cm)Screws

Fig.A

Fig.C Fig.B

You have attached your rafters. Proceed to attaching your soffi t trim.

3

2

4

5

6

BEGIN

ROOF

x15 2" (5 cm)

Page 47: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

45

72-3/8"(184 cm)

PARTSREQUIRED:2" (5 cm)

x16

5/8 x 3 x 72-3/8" (1,6 x 7,6 x 184 cm)

x2 KY

FINISH

3

2

Orient parts as shown and attach to ends of rafters, using two 2" (5 cm) fi nish nails (Fig.A).

You have fi nished your soffi t trim.

Trim is fl ush at ends to sidewall trim.

BEGIN

Flush

Fig.A

TRIM

KYFlushtotrimatends

Page 48: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

46

PARTSREQUIRED:2" (5 cm)

x22

x15/8 x 3-7/8 x 96" (1,6 x 9,8 x 244 cm)

FINISH

4

Position support fl ush with bottom edge of top plate and side wall panel and attach with 2" (5 cm) nails as shown.

Remove temporary brace after support is installed.

Use exterior-rated wood glue behind support. Apply to top plate and end of rafter

You have fi nished your door frame support.

2

3

BEGIN

Dooropening

RemoveAfter door

Frame supportIs attached

Flush

Glue

FlushFlush

DOOR SUPPORT

6"(15,2 cm)

Page 49: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

47

1/4"(6 mm)

20"(51 cm)

PARTSREQUIRED:2" (5 cm)

x10

5/8 x 20 x 96" (1,6 x 51 x 244 cm)

2 x 3 x 96" (5 x 7,6 x 244 cm)

x1

x1 PT

FINISH

3

Attach with 2" (5 cm) nails as shown.

Position bench top to PT fl ush at ends and maintaining 1/4" (6 mm) overhang, as shown (Fig.A).

You have fi nished building your workbench top.

2

BEGIN

PT

Fig.A

2x3temporarysupport

Flush at ends

5/8"(15,9 mm)

Flushatends

10-1/2"Approximately

WORKBENCH

2-1/2"(6,4 cm)

Page 50: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

48

1/4"(6 mm)

11-3/4"(30 cm)

PARTSREQUIRED:2" (5 cm)

x10

2 x 3 x 96" (5 x 7,6 x 244 cm)

x2

x27/16 x 11-3/4 x 96" (1,1 x 30 x 244 cm)

PT

Fig.A

Flush at ends

Flushatends

FINISH

3

Attach with 2" (5 cm) nails as shown. Repeat steps to build second shelf.

You will build two shelves. Position shelf to PT fl ush at ends and maintaining 1/4" (6 mm) overhang, as shown (Fig.A).

You have fi nished building your shelves.

2

BEGIN

SHELVES

7/16"(11,1 mm)

2-1/2"(6,4 cm)

PT

10-1/2"Approximately

Page 51: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

49

Fig.A

PARTSREQUIRED:3/4" (19 mm)

x13

1 x 3 x 96" (2,5 x 7,6 x 244 cm)

x1

x1

23-7/8 x 96" (61 x 244 cm) Peg Board

Flushatends

Flushatends

Flush

FINISH

3

Attach with 3/4" (19 mm) screws as shown.

Roughsideup

Roughsideup

Position pegboard to 1 x 3" fl ush at ends and edge, as shown (Fig.A).

You have fi nished building your pegboard.

2

BEGIN

PEGBOARD

8"Approximately

Page 52: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

50

20"(51 cm)

PARTSREQUIRED:

Place workbench into gap in side wall upright. Nail using 2" (5 cm) nails, as shown.

Level and attach KK to upright and workbench, using four 3" (,6 cm) screws as shown (Fig.A).

You will secure your workbench ends later. Proceed to attach your pegboard.

2

3" (7,6 cm)

x10

x1

x1

x4

2 x 3 x 24-1/16" (5 x 7,6 x 61 cm)KK

2" (5 cm)

BEGIN

Window

FINISH

3

Workbench2" (5 cm)

Nails

WORKBENCH

3" (7,6 cm)screws

KK

Fig.A

20"(51 cm)

10-1/2"Approximately

Angle top screwto hit KK

Page 53: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

51

2-1/2"(6,4 cm)

PARTSREQUIRED:

Attach RK at back corner of workbench into outside trim, using 3" (7,6 cm) screws, as shown.

Attach pegboard at top using (13) 1" (25 mm) screws as shown.

Place pegboard onto workbench with 1 x 3 Trim to bottom, facing out.

Anchor bottom of pegboard, using one 2" (5 cm) screw at center, and 3" (7,6 cm) screws at lower corners.

You have fi nished your pegboard. Proceed to attach your shelf .

3

2

4

3" (7,6 cm)x4

x2

x1

x13

x12" (5 cm)

BEGIN

Window

Flush

Window

2 x 3 x 13" (5 x 7,6 x 33 cm) RK 1" (25 mm)

3" (7,6 cm)

FINISH

5

2" (5 cm)Screw

1 x 3Trim to bottom

(13) 1" (2,5 cm)Screws across top

3" (7,6 cm)Screws

8"Approximately

RK

PEGBOARD

Page 54: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

52

11-3/4"(30 cm)

Window

Shelf

PARTSREQUIRED: x102" (5 cm)

You will screw the ends of workbench and shelf from outside of shed.2

BEGIN

1̧ Place shelf into gap in side wall upright. Attach using 2" (5 cm) nails, as shown.

x1

11-3/4"(30 cm)

10-1/2"Approximately

SHELVES

Page 55: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

53

59"(150 cm)

1"(2,5 cm)

12-5/8"(32 cm)

Measure fromcorner trim

Outside bottom ofwall panel

20-7/8"(53 cm)

34-1/4"(87 cm)

1"(2,5 cm)

3" (7,6 cm)Nail

PARTSREQUIRED: x83" (7,6 cm)

Measure and mark outside nail locations for workbench and shelf on back wallas shown.

Nail through marks on wall panel into ends of workbench and shelf supports. Repeat procedure at opposite ends of shelf and workbench.

Assistance may be required to hold shelf and workbench level.4

3

FINISH

5

SHELVES

Page 56: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

54

11-3/4"(30 cm)

PARTSREQUIRED: x6

x4

x2

1-1/4" (3,2 cm)

3" (7,6 cm)

3" (7,6 cm)

FINISH

4

2

3

BEGIN

Place shelf into gap in side wall upright. Attach using 1-1/4" (3,2 cm) screws from underneath, as shown.

From outside shed, nail through the wall panel into end of shelf using two 3" (7,6 cm) nails.

You have fi nished installing your shelf. Proceed to building your roof.

Install RK fl ush against top plate and outer wall panel. Attach using 3" (7,6 cm) screws, as shown (Fig.A).

Install RK in corner fl ush against top plate and outer wall panel.

RK

Fig.A

(3)1-1/4" screw

(3,2 cm)

(3)1-1/4" screw

(3,2 cm)

3" (7,6 cm) nails

Shelf

Gap

x1 2 x 3 x 13" (5 x 7,6 x 33 cm) RK

x1

11-3/4"(30 cm)

Youaneasilylocatenailslookingoverwall.

3" (7,6 cm)Screws

SHELVES

Page 57: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

55

ROOF PANELS

48"(122 cm)

PARTSREQUIRED: x42" (5 cm)

x1

2

3

BEGIN

3/4"GAUGEBLOCK

7/16 x 48 x 96"(1,1 x 122 x 244 cm)

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is flush to the peak (Fig.C) and there is 3/8" measurement to the gable trim (Fig.D). You may need to move your sidewall to get the 3/8" measurement. Secure panel with two 2" nails in the corners.

You must square the roof by attaching one panel fist. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”.

Roofpanelsmaycauseseriousinjuryuntilsecurelyfastened.

Attach the 48x96" panel with the rough side up (painted-grid lines side) with a 3/4" measurement on the rafter (FigA) and the panel flush at the peak (Fig.B). Secure panel with two 2" nails in the corners.

3/8"(9,5 mm)

GableTrim

Fig.D

Fig.C

TwoNails

3/4" (1,9 cm)

Fig.A

GaugeBlock

Flushatpeak

Flushatpeak

Fig.B

Page 58: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

56

22-1/2"(57 cm)

24"(61 cm)

24"(61 cm)

24"(61 cm)

24"(61 cm)

22-1/2"(57 cm)

3/8"(9,5 mm)

3/8"(9,5 mm)

12"(30,5 cm)

6"(15 cm)

PARTSREQUIRED:

x2

7/16 x 47-7/8 x 48"(1,1 x 122 x 122 cm)

x1082" (5 cm)

3/4"GAUGEBLOCK

x1

7/16 x 48 x 96"(1,1 x 122 x 244 cm)

Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig.E). Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig.E). Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel. Attach 47-7/8x48" roof panel flush to first panel, flush at peak and with the 3/8" measurement on trim (Fig.F,G).

4

Move to the opposite side of the roof and repeat this process installing a 48 x 96” and 47-7/8 x 48” panel.

Note the panels edges are offset from the first panels installed.

Make sure panels are flush at the peak (FigH) and there is a 3/8” measurement at the gable trims (Fig.J).

Nail the roof panel using 2” nails 6” apart on edges and 12” apart inside panel.

5

GableTrim

NOTE: Measurements from inside of panels

Fig.F

Fig.H

Fig.J

Fig.G

Fig.E

2"NailsFlushatpeak

Flushatpeak

Flush

96"

48"

ROOF PANELS

Page 59: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

57

3/8"(9,5 mm)

3/8"(9,5 mm)

3/4"(19 mm)

PARTSREQUIRED:

x1

x1

7/16 x 18 x 96” (1,1 x 46 x 244 cm)

7/16 x 18 x 48" (1,1 x 46 x 122 cm)

x282" (5 cm)

3/4"GAUGEBLOCK

Attach 18x96" panel as shown fl ush to panels and 3/4" on rafter (Fig.A) and with 3/8" at the gable trim (Fig.B). Attach 18x48" roof panel fl ush to panels and with the 3/8" measurement on trim (Fig.B) and with 3/8" at the gable trim (Fig.C).

Nail the roof panels using 2" nails 6" apart on edges and 12" apart inside panel.

6

FINISH

7 You have fi nished installing your roof panels.

Fig.A

Fig.C

Fig.B

Flush

Flush

96"

48"

Flush

ROOF PANELS

Page 60: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

58

2 x 3 x 68" (5 x 7,6 x 173 cm) OT

2 x 3 x 69" (5 x 7,6 x 175,3 cm)

x1

x1

OO

OO

OT

Makesurespacerisattached.

Tightenscrewssecurely.

OFFSET

3"(7,6cm)screws

Bottomedgesflush

3/8"(1 cm)3/8"

(1 cm)

3/8"(1 cm)

3/8"(1 cm)

OFFSET

GREEN RED

Orient parts as shown on flat surface. 3/8"offsetistotop.Lookforred(right)andgreen(left)onhingeboard.

PARTSREQUIRED:

x1x1Left Door Right Door

BEGIN

1̧1

DOORS

3" (5 cm) x8

2 Attach temporary supports OO and OT with 3" screws in middle and at ends. Tighten securely.

HINT:Lookfor3/8"SPACER

attachedtodoors.

Page 61: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

59

PARTSREQUIRED: x133" (7,6 cm)

OO2 x 3 x 69" (5 x 7,6 x 175,3 cm)

OO

72"fromoverhang

OO

Fig.A

Center doors on mark as shown (Fig.B).4

Checkhingeboardisflushunderoverhang(Fig.C).

Remove temporary supports and check doors open properly.6

FINISH

7 You have fi nished installing your doors.

Screw hinge boards into wall supports and fl oor using ten 3" screws as shown. Makesurescrewsgointoframingandfloor (Fig.D,E).

5

3"(7,6cm)Screwsintothewall

supportandfloorframe.

Fig.B

Center3/8"measurementonmark.

Fig.D

Fig.C

3/8"(1 cm)

Fig.E

Angle3"(7,6cm)Screw

Flush

Attach temporary support OO as a ledger board for doors to rest on, using three 3" screws. Measure 72" down from underside of overhang (Fig.A).

Locate center of door opening and mark.

72"(182,9cm)frombottomofoverhangtotopofledgerboard

x1

3

DOORS

Page 62: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

60

CENTER CENTER

3/4" (1,9 cm)

Remove 3/8" spacers from doors.

Reinforce the door trim using 3/4" screws through door panel into trim (Fig.A).Locate screws as shown (Fig.B). Use two screws at seams.

Fig.B

Screwintoframing.

TwoScrews

DoorTrim

HingeBoard

Fig.A

DoorPanel

You have fi nished securing your door trim. FINISH

4

BEGIN

2

1

DOOR

PARTSREQUIRED: x42

Center metal threshold between doors and secure using eleven 3/4" special coating screws into fl oor as shown (Fig,C).

3

Fig.C

x11Bagged separately/special coating64" Metal Threshold

x1

(11)Specialcoatingscrews

Page 63: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

61

OO

Screws2"

(5cm)

x14

1"(2,5 cm)

OFFSETScrews

2"(5cm)

1"(2,5 cm)

OFFSET

Secure OO using seven 3" screws through outside trim into OO (Fig.B)2

Fig.A Fig.B Fig.C

CenterOOindooropening.

11" (28 cm)Approximately

PARTSREQUIRED:

2 x 3 x 69" (5 x 7,6 x 175 cm)x2

x142" (5 cm)

DOOR WEATHERSTRIP

OO

You have fi nished installing your door weatherstrips.

BEGIN

With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig.A). OO will offset the left door 1" OUT past the door trim 1" (Fig.B).

1

FINISH

5

On right door center OO vertically in door opening (Fig.A). OO will offset the right door 1" IN from the door trim (Fig.C).

3

Secure OO using seven 3" screws through outside trim into OO (Fig.C).4

Page 64: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

62

PARTSREQUIRED:

DOOR HARDWARE

x2

3/4" (1,9 cm) x8

35-1/2"(90 cm)

Installonrightdoor.

x1

3/4" (1,9 cm) x7

Fig.B

3/4"(1,9cm)Screwx7

3/8" (9 mm) Drill Bit

OO

OO

Fig.A

Fig.B

FlushonOO.

FlushonOO

Drill3/8"holein-linewithbolt.

Drill3/8"holein-linewithbolt.

LEFTDOOR

BEGIN

With door closed mark hole locations for bolts to extend into.

HINT: Extend bolts to leave marks in wood. Tap bolts with hammer. Drill 3/8" holes deep enough for each bolt to slide into.

3

2

Mount one barrel bolt fl ush at top of OO on left door using 3/4" screws as shown (FigA).

Mount the second barrel bolt fl ush at bottom of OO on left door using 3/4" screws as shown (FigB).

1

HINT: With door closed extend bolt and tap with hammer to leave a mark in wood for drilling.

Secure hasp and latch as shown using 3/4" screws. You have fi nished mounting your door hardware.

FINISH

4

Page 65: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

63

LevelFlush

Flush

Glue

Rafter centeredover door opening.

Glue

ROOF

PARTSREQUIRED: x63" (7,6 cm)

x12 x 3 x 68" (5 x 7,6 x 173 cm)

OT

FINISH

3

2

BEGIN

1̧ Position and level OT on rafter that is centered over door opening.

Glue OT and attach with 3" (7,6 cm) nails as shown.

You have fi nished your roof. Proceed to attaching your doors.

OT

Page 66: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

64

1/4"(6,4 mm)

3-1/2"(8,9 cm)

3-1/2"(8,9 cm)

1" (25 mm)

PARTSREQUIRED:

FINISH

4

BEGIN

1̧ Position parts primed side-down on fl oor, as shown. You will build two shutters the same.

You have fi nished building your window shutters. Proceed to install your window.

Installwithprimedsidefacingdown

5/8 x 3 x 25" (1,6 x 7,6 x 63,5 cm)

5/8 x 3 x 8" (1,6 x 7,6 x 20 cm)

x6x4

KW

KV

KVx2KWx3

Flush

Flushbothsides

Flushbothsides

2

3

Attach using 1" (25 mm) screws as shown.

Repeat steps to build your second shutter.

Primedsidedown

WINDOW SHUTTERS

x12

Page 67: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

65

CENTER

CENTER

CENTER

CENTER

WINDOW SHUTTERS

1-1/4" (3,2 cm)

PARTSREQUIRED:

BEGIN

1̧ Seal windowwith high-quality exterior-grade caulk.

2

3

Attach window using four 1-1/4" (3,2 cm) screws as shown.

Mark center of window frame as shown.

Window23-3/4" x 16-1/2"(63 x 42 cm)

x1x4

HINT: Caulk behind frame near edge before installing.

Page 68: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

66

KX

KX

WINDOW SHUTTERS

3/4" (19 mm)

CENTER

Flush Flush

Flush

2" Finish nails

2" Finish nailsinto wall frame

3/4" Screws from inside

Flush

Mark

Mark

FINISH

7

PARTSREQUIRED:

Locate one shutter centered on marks as shown.

x6

x20

5

6

4

First, attach shutter using a 2" fi nish nail at "dot". Nail into wall frame inside.

Then, from INSIDE of the shed, use three 3/4" screws to secure the shutter indicated at "X".

Repeat steps to attach shutter on opposite side.

Locate KX centered on mark and fl ush to shutters as shown. Attach using 2" fi nish nails. Nail into window frame inside.

You have fi nished installing your window and shutters.

2" (5 cm)

5/8 x 3 x 21-3/4" (1,6 x 7,6 x 55 cm)x2 KX

x2

8-3/8"(21,3 cm)

8-3/8"(21,3 cm)

12-1/2"(31,8 cm)

12-1/2"(31,8 cm)

Page 69: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

67

DOOR TRIM

PARTSREQUIRED:

5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)x8

x163/4" (19 mm)

BEGIN

1̧ Position parts on lower pane of Door Panel, as shown.

2 Attach each using two 3/4" (19 mm) screws as shown.

Page 70: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

68

• Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place.

OK to overlap at ridge.3"OVERLAP

Flush

Flush

PARTSREQUIRED:

• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.

• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges

Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)

PAINT & CAULK- NOT INCLUDED -

ROOF FELT- NOT INCLUDED -

DRIP EDGE- NOT INCLUDED -

Snip bottom side of drip edge andbend over to other side of roof.

(Follow directions provided by manufacturer.)

• Install drip edge over roof felt on gable side and under roof felt on eave side (Fig.A).• Do not use nails on side of drip edge that hangs over side of building. • Only nail top of drip edge as shown.

Edgeflushtotrim.

Fig.A

Dripedge Dripedge

Rooffelt

Page 71: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

69

•Followdirectionsprovidedbymanufacturerandtheseinstructions.

SHINGLES - NOT INCLUDED -

Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle. Starterrowmustbestraightandlevelallthewayacrosswithloweredgeofroofdeck.NOTE: If you have installed drip edge install shingles flush to drip edge.

BEGIN

1

TABSUP

Shingleoverlapsroofdecking.

1"(2,5cm)overhangpastroofdeck.

1"(2,5cm)overhangorflushwithdripedge.

(4)Nails

BACKOFSHED

FRONTOFSHED

NEVERDRIVEFASTENERSINTOORABOVESEALINGSTRIPS.

Familiarizeyourselfwitha3-TabShingle.

SHINGLE NAIL PATTERN

1"(2,5 cm)

NAILS

Sealing Strip 1"(2,5 cm)

1/2"(1,3 cm)

Full Rain Slot

Half A Rain Slot

NotchNotch

Page 72: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

70

SHINGLES continued...

Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge.22

FRONTOFSHED

BACKOFSHED

Notch-or-

DripEdge

Notch

RoofDeck

1"(2,5 cm)

Flush with starter row.

Flush with starter row.

Continue installing rows of shingles by staggering at front.

4

Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row.

3

1"(2,5 cm)

1"(2,5 cm)

BACKOFSHED

FRONTOFSHED

FRONTOFSHED

Flushwithrainslots. Flushwithrainslots.

Notch

Notch

Page 73: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

71

You have fi nished shingling your roof. Proceed to capping the ridge.FINISH

9

Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife.

Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge.

Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.

Using your shingle hooked blade carefully cut shingles along chalk line.

5

6

7

8

SHINGLEScontinued...

•Ifmorethan5"torainslotyoumustinstallanotherrowofshingles.

5"(12,7 cm)or less.

5"(12,7 cm) MAX.

Topofrainslot.

CutOff.CUT

Page 74: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

72

SHINGLES - RIDGE CAP

• You will finish off the top of the roof with a ridge cap made from shingles.

Note: • You will need about 29-31 cut pieces.

Cut shingles into THREE pieces. Hint: Use cut-off pieces first.

Scoreshingle,thensnap-offangledcut.

Install first ridge cap flush to shingles at front, as shown.

Install second ridge cap 5" back, as shown.

2

BEGIN

1

2" (5 cm)

2" (5 cm)

2" (5 cm)

2" (5 cm)

2" (5 cm)

2" (5 cm

Topofslot.WeatherSeal

Flush

(1)Nailpersidethroughweatherseal.

(1)Nailpersidethroughweatherseal.

5" 12,7 cm

FRONTOFSHED

Flush

29to31Pieces

3

Page 75: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

73

SHINGLES - RIDGE CAPcontinued...

Continue installing ridge cap to back of roof.

Make sure there is 4" between the shingle-color and edge of shingles.

When you have 4" minimum of shingle color cut one piece to cap your roof.

Install fl ush to shingles.

4

5

6

7

(2)Nailsperside.

You have fi nished your ridge cap.FINISH

8

Cutattopofrainslot.

Flushtoshingles

Trimcapoffflushtoshingles

Cap

4"(10 cm)

Page 76: Call Us First! DO NOT RETURN TO STOREheartlandind.com/wp-content/uploads/2015/08/... · STRATFORD 12' x 8' (366 x 244 cm) ASSEMBLY MANUAL BEFORE YOU BEGIN VALUE SERIES 16665 ... To

74

WARRANTYBackyard Storage Solutions, LLC warrants the following:1. Every product is warranted from defects in workmanship and manufacturing for one year.2. All hardware and metal components are warranted for two years.3. Trim is warranted for 10 years.4. Waferboard siding and sheathing is warranted for two years.5. SmartSide™ siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings.6. Timber series buildings’ siding and trim are warranted for 10 years.7. Solar Shed windows are warranted for 1 year.8. Cedar lumber is warranted for 15 years.9. Cedar doors and Cedar Garden Center are warranted for 10 years.10. Metal roof is warranted for 25 years.

Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC paythe cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on anaffected part, it will be prorated from the date of purchase.

CONDITIONSThe warranty is effective only when:1. The unit has been erected in accordance with the assembly instructions.2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.3. The failure occurs when the unit is owned by the original purchaser.4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and notification

of the failure in writing within the warranty period specified above.5. Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification

to inspect and verify the failure prior to commencement of any repair work.

REQUIREMENTSStorage Buildings & Pla yhouse sTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly;

above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of SmartSide™ andwaferboard siding to include all exterior walls and all sides and all edges of doors.

Gazebos, Pergolas & Timber BuildingsTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of theexposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative, an exterior oil-basedsemi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as neededthereafter to maintain your warranty.

Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. Theminimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the groundwhen building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard

events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (whichleads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred

to construct your unit. This warranty gives you certain specific rights that vary from state to state.

CLAIM PROCEDURETo make a claim under this warranty, you can either call 1-888-827-9056 or prepare a letter. Please have ready the information below whenyou call or include the information when writing:1. The model and size of the product.2. A list of the part(s) for which the claim is made.3. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice.4. Run code, as listed on the yellow warranty card enclosed in the product package.

Mail the above information to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162

Limited ConditionalWarranty *

*WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.IMPORTANT: This is y our warranty cer tificate.Please complete and mail your warranty card to pr operl y validate y our warranty .

Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by

eventually

caulk