california high speed rail authority - b alternative 1, 3, 5 · 2020-04-02 · 5 r r Æ fresno to...

1
UPRR UPRR Æ FRESNO TO BAKERSFIELD Ä 65 LOCALLY GENERATED ALTERNATIVE F STREET STATION Fresno - Bakersfield Section B ! ALTERNATIVE 1, 3, 5 EDISON BAKERSFIELD Ä 204 Æ Ä 119 Æ CCNM DESIGN OPTION REFINED CCNM DESIGN OPTION ALTERNATIVE 2 Ä 58 Æ KEENE Ä 223 Æ ARVIN TEHACHAPI 184 Ä Æ 202 Ä Æ 99 Ä Æ ALTERNATIVE 1, 2, 5 ALTERNATIVE 3 MOJAVE ALTERNATIVE 1, 2, 3 ROSAMOND KERN COUNTY LOS ANGELES COUNTY N § ¨ ¦ 5 Ä Æ 138 Ä Æ 14 ° 0 3.5 7 14 Miles LANCASTER LEGEND ! ( Underground ALTERNATIVE 5 Surface PALMDALE Elevated PALMDALE STATION B ! Other HSR Sections ! ( Lancaster North MOWF Palmdale - Burbank Section ! Avenue M LMF ( LE: Y:\HSR_BP\GIS\MXDs\Summary\ProjectDescription\BP_NatGeo_AllAlts_withRCCNM.mxd (1/31/2020) High Desert Corridor ! B Proposed Station Metrolink/UPRR PRELIMINARY DRAFT/SUBJECT TO CHANGE - HSR ALIGNMENT IS NOT DETERMINED SOURCE: National Geographic/Esri (2015); CHSRA (4/2016, 6/2016, 8/2018, 11/2019) FI

Upload: others

Post on 20-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: California High Speed Rail Authority - B ALTERNATIVE 1, 3, 5 · 2020-04-02 · 5 r r Æ fresno to bakersfield Ä 65 locally generated alternative f street station fresno - bakersfield

UPRR

UPRR

Æ FRESNO TO BAKERSFIELD

Ä65 LOCALLY GENERATED ALTERNATIVE F STREET STATION Fresno - Bakersfield

Section

B! ALTERNATIVE 1, 3, 5 EDISON

BAKERSFIELD

Ä204ÆÄ119Æ CCNM DESIGN OPTION

REFINED CCNM DESIGN OPTION ALTERNATIVE 2

Ä58ÆKEENE Ä223Æ

ARVIN

TEHACHAPI 184 ÄÆ 202 ÄÆ

99 ÄÆ

ALTERNATIVE 1, 2, 5 ALTERNATIVE 3 MOJAVE

ALTERNATIVE 1, 2, 3

ROSAMOND

KERN COUNTY

LOS ANGELES COUNTY

N §̈¦5

ÄÆ138 ÄÆ14

° 0 3.5 7 14 Miles LANCASTER

LEGEND !(

Underground ALTERNATIVE 5 Surface PALMDALE Elevated PALMDALE STATION B! Other HSR Sections

!( Lancaster North MOWF Palmdale - Burbank Section

! Avenue M LMF (

LE: Y

:\HSR

_BP\G

IS\MX

Ds\Su

mmary

\Proje

ctDes

cripti

on\BP

_NatG

eo_A

llAlts

_with

RCCN

M.mx

d (1/3

1/202

0)

High Desert Corridor !B Proposed Station Metrolink/UPRR

PRELIMINARY DRAFT/SUBJECT TO CHANGE - HSR ALIGNMENT IS NOT DETERMINED SOURCE: National Geographic/Esri (2015); CHSRA (4/2016, 6/2016, 8/2018, 11/2019)

FI