calendar of activity - ksr

25
CALENDAR OF ACTIVITY AS OF APRIL 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20. HO 21. HO/SPV 22. LBT/SAUG 23. MWV 24. MPV/ELG3 25. HO Orientation Weekly TOE Meeting 26 27. HO/SPV 28. HO/STV 29. HO/2C 30. PKSV 1 2 KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR. Technical Operations Engineer Director Process Integration and QM, FOPM Process Integration and QM, FOPM Orientation and Site Inspection Validation of EE Roooms @ LBT4 & Audio System @ SAUG1 BTO Activity: perimenter fence & landscape BTO Activity for Podium Parking @ MPV, Site and Telco Room Inspection @ ELG3 delivery of materials, observation report for SPV Observation report for STV Meeting, Initial Inspection Validation Of Basement 1&2 Parking Area

Upload: kenneth

Post on 27-Jan-2016

220 views

Category:

Documents


3 download

DESCRIPTION

calendar

TRANSCRIPT

Page 1: Calendar of Activity - KSR

CALENDAR OF ACTIVITY AS OF APRIL 2015

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2 3 4

5 6 7 8 9 10 11

12 13 14 15 16 17 18

19 20. HO 21. HO/SPV 23. MWV 25. HOOrientation

26 27. HO/SPV 28. HO/STV 29. HO/2C 30. PKSV 1 2

KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director

Process Integration and QM, FOPM Process Integration and QM, FOPM

22. LBT/SAUG

24. MPV/ELG3

Orientation and Site Inspection

Validation of EE Roooms @ LBT4 & Audio System @ SAUG1

BTO Activity: perimenter fence & landscape

BTO Activity for Podium Parking @ MPV, Site and Telco Room Inspection @ ELG3

Weekly TOE Meeting

delivery of materials, observation report for SPV

Observation report for STV

Meeting, Initial Inspection

Validation Of Basement 1&2 Parking Area

Page 2: Calendar of Activity - KSR

CALENDAR OF ACTIVITY AS OF MAY 2015

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2. HO

3 4. PTV 5. SPV 6. SPV 7. STV 8. HO 9. HO

PIQM Meeting

10 11. 2 CEN 12. PTV1 13. PKSV 14. RRN 15. HO 16. HO

PIQM Meeting

17 18. SER 19. MSER 20. 8FTR 21. MAKATI 22. MHH 23. PTV 2

Closure w/ KSP Closure w/ KSP Inspection ALL Inspection ALL

24 25. MAKATI 26. STV 27. ECQCE 28. ECQCE 29. HO 30. HO

Closure w/ JBB Closure w/ JBB

31 1 2 3 4 5 6

KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director

Holiday (Labor Day)

Weekly TOE Meeting, DTR

Validation of BTO

Observation Report w/ KSP

Initial Inspection (Parking area), Observation Report w/ KSP

Inspection report, Observation Report w/ KSP

Weekly TOE Meeting

Site Inspection w/ KSP

Inspection w/ JBB & KSP

Close out w/ KSP

Close out w/ KSP

Weekly TOE Meeting, DTR

Closure w/ KSP & FLA

Closure w/ KSP & FLA

Closure w/ JBB & KSP

Orientation of equipment w/ JBB

Finalization of presentation for FDV

WEekly TOE Meeting, Presentation to FDV

Page 3: Calendar of Activity - KSR

Process Integration and QM, FOPM Process Integration and QM, FOPM

Page 4: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF JUNE 2015Sunday Monday Tuesday Wednesday Thursday

31 2. HO 4. 2CEN

BTO MONITORING REPORTS & DTR

7 8. STV 9. MPV 10. 2CC 11. HO

REST DAY Temporary P. E.

14 15. PKSV 16. VLR/SCI 17. HO 18. HO

REST DAY BTO of FDAS Activity reports SEMINAR @ 9AM

21 22. ELG3 23. 150NB 24. 2CEN 25. MWV

REST DAY Set-up proper

28 29. 2CEN 30. N150 1 2

REST DAY

KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director

Process Integration and QM, FOPM Process Integration and QM, FOPM

1. PKSV/PTV1

3. PTV1/PTV2

Validation of 1st Bto

BTO OF MAIN LOBBY, ADMIN, MAILBOX, COMMON TOILET, SEC ROOM @ 2PM

BTO CATV System 9AM, BTO FDAS System 1:30 PM

Validation of first BTO

Delivery of items for MWV, 2CEN & ELG3

SAUG BTO monitoring, Set-up proper

BTO of Hallways & Lift Lobbies @ 9;30am

Validation of BTO @ 2CEN, BTO of AUX room @ PTV1

Initial Inspection for 2CEN

BTO of Hallways and Lift lobbies, 3F, 9:30am, revalidation of hallways and lift lobbies, 5F, 1:30pm

Page 5: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF JUNE 2015Friday Saturday

6. HO

12 13. HO

HOLIDAY TOE MEETING

20. PKSV

26. N150 27. HO

Activity reports

3 4

FERNANDO D. VALDEZ JR. Director

Process Integration and QM, FOPM

5. N150/PKSV

Validation @ N150, BTO SEP

@ PKSV

19. 2CEN/SCI HUB/ELGBTO of Arcade & Sidewalks @ 2CEN 10AM, Pull out of furniture accessories @ SCIENCE HUB, ELG3 change items

Pull-out and Delivery of items for ELG3, 2CEN and MWV

Validation of hallways and lift lobbies

Page 6: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF JULY 2015Sunday Monday Tuesday Wednesday Thursday Friday Saturday

28 29 30 1. 150NB 2. HO 3. STV 4. HO

DTR and Reports Reports

5 6. HO 7. MWV/PSV 8.150NB/STV 9. HO 10. PKSV 11. HO

REST DAY No Schedule yet Seminar Reports

12 13. HO 14. PTV1/PSV 15. 2CEN 16. 2CEN 17 18

REST DAY HOLIDAY LEAVE

19 20 22. SPV 23. 2CEN 25. HO

REST DAY ABSENT BTO of Intercom Reports

26 27. HO/ICITE 28. HO/ICITE 29. HO/ICITE 30. PASEO 31. 1800 1

REST DAY Site Inspection Hauling of Racks

KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.

Validation of VEP, FDAS and CCTV

BTO of Intercom,

BTO in MWV, Validation of FDAS, PSV

Validation of 3F hallways 150NB, Validation of intercom STV

Validation of FDAS, Basement 1 and Hallways

Validation of Cluster A, B & D Aux room @ PTV1, Validation of Cluster A & B Hallways and Lift Lobbies @ PSV

BTO of A/C Equipment

BTO of Passenger Elevator 2 & 3, Machine Room

21. N150/MWV

24. UPTP/HO

Revalidation of 3F & 5F Hallways and Lift Lobbies @ N150, Coordination for Admin Layout for MWV

Validation of A/C Equipment and Passenger Elevator 2 & 3

BTO of EE room, Water meter room and janitor room @ UPTP, Otis Elevator Seminar

Hauling of Doors and Troffer Lights

Hauling of Office Documents from Paseo to 1800

Cleaning of Proposed Storage

Page 7: Calendar of Activity - KSR

Technical Operations Engineer Director

Process Integration and QM, FOPM Process Integration and QM, FOPM

Page 8: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF AUGUST 2015Sunday Monday Tuesday Wednesday Thursday

2 3. PASEO 4. PASEO 5. PASEO

9 10 11. HO 12. SPV 13. HO/1800

Sick Leave Reports

16 17. HO/2CC 18. HO/2CC 19. HO/ICITE

23 24. HO/2CC 25. HO/2CC 26. HO 27. HO

30 31

Holiday

6. HO/2CC/ PASEO

Site Supervision, cleaning of Paseo Penthouse Office

Site Supervision, Inventory of items, pull out of items to be use for OSG penthouse

Site Supervision, Pull out of items from Paseo to 1800

Validation of Function room @ 2CC, assemble of office @ OSG Penthouse for parking

BTO of Genset System and EE Room, Dahlia

Cleaning and Hauling of item from ICITE to 1800 and from Paseo to 1800

20. 150NB/ PTV2

DTR, Revalidation of AC Equipment

DTR, Reports, Fire Detection and Alarm System; 7th-15th Floor, Videophone; 7th-15th Floor

Site Supervision w/ Jolly

BTO of Transfer pump (reschedule) for 150NB, Coordination for Admin Layout for PTV2

Site Inspection w/ 2CC P.E.

Fire Detection and Alarm System; 7th-15th Floor, Videophone; 7th-15th Floor (reschedule)

Page 9: Calendar of Activity - KSR

KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director

Process Integration and QM, FOPM Process Integration and QM, FOPM

Page 10: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF AUGUST 2015Friday Saturday

1. PASEO

7. 1800 8. PASEO

Fixing of Storage

14. 2CC 15. 150NB

Revalidation of AC Equipment

21 22

Holiday ABSENT

28. 2CC 29. HO

Securing of permits, Hauling of Documents from Paseo to 1800

Hauling of office documents and other items

BTO of Transfer pump for wing A, Coordination for BTO Monitoring

Generator Set, Fuel Storage Tank, Fuel Pumps and Pipes, ELVSAd and MCB1, Genset Room, Water Distribution System @ 1:30 PM, Transfer Pumps and Controllers, Booster Pumps and Controllers, Cistern Tank, Overhead Tank, Transfer Pump Room, Sump Pumps and Controllers

Page 11: Calendar of Activity - KSR

FERNANDO D. VALDEZ JR. Director

Process Integration and QM, FOPM

Page 12: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF SEPTEMBER 2015Sunday Monday Tuesday Wednesday Thursday

1. PTV1/PTV2 2. HO 3. 2CC

DTR, Reports

6 7. HO 8. 150NB 9. HO 10. 2CC

BTO of Fire Exit No. 3 BTO of Podium 1

13 14. HO/SPV 15. 150NB 16. UPTP1

20 21. PTV2 22. 150NB 23. SPV 24. UPTP1

27 28. HO 29. 150NB 30. HO

PIM Meeting

KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director

Process Integration and QM, FOPM Process Integration and QM, FOPM

BTO of CCTV System @ PTV1, Coordination for Admin Layout @ PTV2

Coordination Meeting

17. 2CC/PTV1

Validation of Genset

Toilet and Kitchen Exhaust Fans incl Controllers, Building Signage, Jockey Pumps, Fire Pumps and Controllers, Fire Pump Room and Fire Tank, Validation of Fire exit 3

BTO of EE Rooms and Redundant Rooms, MT/FT & Lift lobby (Rescheduled)

Validation of Podium 1, Revalidation of CCTV & Aux Room

Inspection on Deffective pump on cluster C, (to get service report for the said pump) 8:30AM - 5:30PM

Validation of Hallways and lift lobbies @ PTV2 9:30 - 11:30AM, Validation of KEF and TEF incl Controllers, JP, FP and Controllers, FP Room and Fire Tank, Revalidation of FE 3 @ 150 NB 1:30 - 5:00PM

BTO of EE Rooms (dahlia) 9:30AM - 11:30AM, revalidation of Genset 1:30PM - 5:00PM

Validation of EE Rooms and Redundant Rooms (10F, 11F, 12F, 14F) 9:30AM - 11:30AM, MT/FT & Lift lobby (6F, 7F, 8F, 9F) 1:30PM - 5:00PM

BTO of Sump pump and Sewage pump @ Wing A 9:30-11:30 AM, Validation of Fire Protection system, KEF & TEF 1:30 - 5:00 PM

Page 13: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF SEPTEMBER 2015Friday Saturday

4. 2CC/PTV1 5.HO

11. UPTP/PTV1 12. HO

18. PKSV/PTV2 19. HO

25 26. HO

Holiday PIM Meeting

FERNANDO D. VALDEZ JR. Director

Process Integration and QM, FOPM

Validation of Generator system @ 2CC, Validation of CCTV System @ PTV1

PIM Monthly Meeting

EE Rooms, EE Rooms Redundant (10F, 11F, 12F & 14F), MT/FT, Lift Lobbies (6F, 7F, 8F & 9F) @ UPTP, Revalidation of CCTV System, Revalidation of AUX Room CL A, B & D @ PTV1

Validation of Basement 2 Parking 9:30AM - 11:30AM @ PKSV, Validation of Machine room, PE1 & PE2 and BTO of hallways and lift lobby 1:30PM - 5:00PM @ PTV2

Page 14: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF OCTOBER 2015Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1. HO/2CC 2. HO/2CC 3. 150NB

DTR, Monitoring of TCC

4 5. HO/SPV 6. 150NB 7. HO/2CC 8. UPTP1/VLR 9. PTV2 10. 150NB

Rest day

11 12. HO/2CEN 13. 8FTR 14. HO/2CEN 15. VLR 16. VLR 17. HO

Rest day DTR, Reports

18 19. HO/2CC 20. 150NB 21. SPV 22. 8FTR/2CC 23. VLR 24. SPV

Rest day

25 26. HO 27. 2CC 28. SPV 29. 2CC 30. 150NB 31. SPV

Rest day PIM Meeting

KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director

Inspection of SOR together with CMT and 2CC PE, Assist PE about site concerns on CMT

BTO Filing and monitoring 8:30AM - 12:30PM

BTO transmittal 8:30AM - 12:00PM @ HO, Coordination with PE and PA for the SPV Coordination meeting 1:00PM - 5:30PM

Validation of Sump pump and Sewage pump @ Wing A 9:30-11:30 AM, Revalidation of, KEF & TEF 1:30 - 5:00 PM

BTO transmittal, Assist PE about site concerns on CMT

BTO of Air Conditioning System, 6/F - 14/F, 9:00 AM - 11:30 AM @ UPTP1, BTO of PE 2, Fans and Blowers, 1:00 PM - 5:00 PM @ VLR

BTO of Roofdeck and FE 3, 9:30 AM - 11:30 PM, PE 1&2, Machine Room and Elevator Pit @ Cluster B, 2:00 PM - 5:00 PM

BTO of Roofdeck for Wing A & B, 9:30 AM - 12:00 NN

BTO transmittal, Monitoring of 2CEN

BTO of Parking Area, 9:30 AM - 11:30 AM, Mechanical System @ Parking

Megaworld QC Orientation on repairs, Monitoring of 2CEN

BTO of Transfer Pumps; Tower D, Overhead Water Tank; Tower D, Fire Protection System – High Zone; Tower D, Turbo Fans – Basement 1, Machine Room; Tower B, Male/Female Toilet; Tower C/D, 9:30AM - 5:00 PM

BTO of Videophone for VEN D, 9:30 AM - 11:30 AM, Videophone for VEN C, 1:30 PM - 5:00 PM

PIM Meeting, Coordination Meeting @ 2CC

BTO of Basement Parking and Lift Lobby - Wing A, Service Corridor for Fire Exit 1, Transfer Fans and Controllers, 9:30AM - 5:00PM

BTO of Podium Parking 3 & 4; Tower 5 & 6, 9:30AM - 11:30AM, Validation of Genset, 1:30PM - 5:00PM

Validation of Parking Area and Mechanical System @ Parking, 9:30AM - 11:30AM, BTO of Fire exit, 2:00PM - 5:00PM

Validation of PE 2, Fans and Blowers, Transfer Pumps; Overhead Water Tank; Fire Protection System; Turbo Fans; MT/FT; 9:30AM - 5:00 PM

Coordination meeting

BTO of Combined EE/Aux Room- 7F to 15th Floor, Seismic Accelerograph System

Validation of Genset and Fire Exit, 9:30AM - 11:30AM, Validation of Podium Parking 3 & 4; Tower 5 & 6, 1:30PM - 5:00PM

Validation of Fire exit, podium 1, Coordination meeting

Validation of Basement Parking and Lift Lobby - Wing A, Service Corridor for Fire Exit 1, Transfer Fans and Controllers, roofdeck, KEF, TEF, 9:30AM - 5:00PM

Assist PA on CMT Concerns

Page 15: Calendar of Activity - KSR

Process Integration and QM, FOPM Process Integration and QM, FOPM

Page 16: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF NOVEMBER 2015Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2 3 4. HO/PTV2 5. 150NB/PTV2 6. HO/2CC 7. ICITE

Rest Day LEAVE ABSENT Family Fun Day

8 9. HO 10. 150NB/PTV2 11. VLR 12. 2CC/PTV2 13. PKSV 14. HO

Rest Day PIM Meeting PIM Monthly Meeting

15 16. HO 18 19 20. PTV2 21. HO

Rest Day DTR, Reports HOLIDAY HOLIDAY PIM Meeting

22 23. HO 24. SPV 25. HO 26. 8FTR/VLR 27. VLR/HO 28. 150NB

Rest Day BTO Activity report PIM Meeting

29 30

Rest Day HOLIDAY

KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Site Operations Engineer Director

DTR and Reports @ HO, Validation of hallways and lift lobbies and Fire exit 2 @ PTV2, 2:00PM - 5:00PM

BTO of Diesel Generator Set, MDP/ATS/ GCB, Genset Room @ 150NB, 9:30AM – 11:30AM, BTO of Diesel Generator Set, MDP,ATS & GCB, Genset Room, Exhaust Fan and Sump Pumps @ PTV2, 2:00PM - 5:30PM (BTO of Genset System cancelled due to non attendance of technician/facilitator, reschedule on tuesday, 11/10/15)

BTO of Hallways and Lift Lobbies – 8F to 12F, 10:00AM – 11:30AM, Jockey Pumps and Controller – High Zone and Low Zone, Fire Tank and Fire Pump Room, 2:00PM - 5:00PM

Validation of Genset Room, BTO of GenSet, MDP/ATS/GCB @ 150NB, 9:30AM - 11:30PM, Validation of Genset Room, Sump Pump and Exhaust Fan, BTO of GenSet, MDP, ATS & GCB @ PTV2, 1:30PM - 5:00PM

BTO of VENA – FDAS – PH and B1, VENB – FDAS – 26F to 30F, VP System – 22nd to 26F, VENC/D – FDAS – 9F to 15F, EE/Aux Room – 9F to 15F, 9:30AM - 5:00PM

Validation of Combined EE/Aux Room- 7F to 15th Floor, Seismic Accelerograph System 9:30AM - 11:30AM @ 2CC, BTO of Basement Parking CL A, Outdoor Fitness Station, Playground and Jogging Path 1:30PM - 5:00PM @ PTV2

BTO of Fire Protection and Piping Works – Basement 2,

17. VLR/150NB/PTV2Validation of Fans and Blowers, Water Distribution; Fire Pro System; Turbo Fans; 9:30AM - 11:30AM @ VLR, Validation of GenSet, MDP/ATS/GCB @ 150NB and PTV2, 1:30PM - 5:00PM

Validation of Fitness Station, Jogging Path, playground, Genset room, Exhaust fan for genset, 9:30AM - 11:30AM, BTO of Hallways and Lift Lobbies 10F & 7F CL A 1:30PM - 5:00PM

Validation of EE rooms and Genset, Follow up of construction update, assist PA on CMT Concerns @ 8:30AM - 5:30PM

8FTR @ 9:00 AM - HelipadVENB @ 10:30 AM - Auxiliary/EE Rooms - 22nd to 26th FloorVENC @ 1:30 PM - Videophone System - 9th to 15th Floor

VEND @ 9:30 AM - 11:30 AM, BTO of Videophone System - 9th to 15th Floor, PIM Meeting with JRS @ HO

Validation of TEF & KEF, Basement Parking and Roofdeck @ 9:00AM - 12:00 NN

Page 17: Calendar of Activity - KSR

Process Integration and QM, FOPM Process Integration and QM, FOPM

Page 18: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF DECEMBER 2015Sunday Monday Tuesday

1. PTV2/150NB

6 7. HO/2CC 8. HO/2CC

Monitoring of Property

13 14. 2CC 15. PTV1/PTV2

20 21. MHH 22. PTV1/PTV2

27 28 29

LEAVE LEAVE

KENNETH S. RAYMUNDOTechnical Operations Engineer

Process Integration and QM, FOPM

Validation of Genset & Genset Room, Exhaust fan, Playground, Basement 1 and CL A hallways @ PTV2, 9:00AM - 11:30AM, Validation of Genset & Genset Room @150NB, 1:30PM - 5:00PM

BTO of Fire Pumps and Controllers; Low Zone and High Zone, 1:30PM

Validation of Fire Pumps and Controllers; Low Zone and High Zone, 1:30PM

PTV1 @ 9:30 AM, BTO of TF at B1 & B2 ParkingPTV2 @ 10:30 AM, BTO of WDS – CL A, Transfer Pump, Booster Pump and Controller, Bladder Tank and Elevated Water Tank, @ 1:30 PM, BTO of FE 1 – CL A, FE 2 – CL B, Hallways and Lift Lobbies – CL A; 8F to 9F

BTO of CATV, CCTV and Intercom @ 9:30AM - 5:00PM

PTV1 @ 9:30 AM, Validation of TF at B1 & B2 ParkingPTV2 @ 10:30 AM, Validation of WDS – CL A, Validation of Transfer Pump, Booster Pump and Controller, Bladder Tank and Elevated Water Tank, @ 1:30 PM, FE 1 – CL A, FE 2 – CL B, Hallways and Lift Lobbies – CL A; 8F to 9F

Page 19: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF DECEMBER 2015Wednesday Thursday Friday

2. HO 3. HO/2CC 4. 150NB/PTV2

Reports, DTR Monitoring of property

9. SPV 10. MEGATENT 11. 2CC

HO Performer Preparation

16. SPV/331 AJI 17. PTV2 18. 2CC

23. PTV2 24 25

HOLIDAY HOLIDAY

30 31

HOLIDAY HOLIDAY

FERNANDO D. VALDEZ JR. Director

Process Integration and QM, FOPM

150NB @ 9:30 AM BTO of Machine Deck, PTV2 @ 2:00 PM BTO of Hallways and Lift Lobbies – 5F to 2F, Cluster B

Validation of EE Rooms, Fire Exit, Machine Room, BTO of Podium parking 3 & 4, 8:30 AM - 5:30 PM

9:30 AM, BTO of Supply and Exhaust Fans, Transfer Fans and Controllers – B3,4 & 5, BTO of Basement Parking – B3, 4 & 5 @ 1:30 PM

9:30 AM, BTO of Hallways and Lift Lobbies – GF to 20F, Validation of Podium Parking 3 & 4, 331AJI @ 2:00 PM, BTO of Passenger Elevator No. 1 & 2

Validation of Hallways and Lift Lobbies – CL A; 8F to 9F, 10F & 7F, Basement 1 CL A Parking

9:30 AM, Validation of Supply and Exhaust Fans, Transfer Fans and Controllers – B3,4 & 5, Validation of Basement Parking – B3, 4 & 5 @ 1:30 PM

Meralco Power Up, Site Inspection Report

Page 20: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF DECEMBER 2015Saturday

5. HO

12. HO

19. HO

26

LEAVE

Page 21: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF JANUARY 2015Sunday Monday Tuesday

3 4 5

10 11 12

17 18 19

24/31 25 26

KENNETH S. RAYMUNDOTechnical Operations Engineer

Process Integration and QM, FOPM

Page 22: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF JANUARY 2015Wednesday Thursday Friday

1

HOLIDAY

6 7 8

13 14 15

20 21 22

27 28 29

FERNANDO D. VALDEZ JR. Director

Process Integration and QM, FOPM

Page 23: Calendar of Activity - KSR

CALENDAR OF ACTIVITY FOR THE MONTH OF JANUARY 2015Saturday

2

HOLIDAY

9

16

23

30