FONCODES / DEPI CALCULO DEL FLETE PROYECTO : AULAS DEL CEO TAPACOCHA OFICINA ZONAL : HUARAZ N. EXPEDIENTE : 1320060 1- DATOS GENERALES A-POR PESO MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTAL CEMENTO BL. 545.00 42.50 23,162.50 FIERRO, CLAV. ETC KG 3,392.17 1.00 3,392.17 MADERA P2 3,623.14 1.50 5,434.71 PERNOS UN 720.00 0.10 72.00 LADRILLO UN 6,421.59 1.20 7,705.91 YESO BL 12.00 25.00 300.00 PINTURA, IMPERM GAL 66.00 4.50 297.00 TRIPLAY KG 19.78 10.00 197.80 CALAMINA KG 146.84 10.00 1,468.40 OTROS KG 300.00 1.00 300.00 PESO TOTAL 42,330.49 B-POR VOLUMEN EN AGREGADOS Y MADERA DESCRIPC. UNIDAD AFECTOS IGV SIN IGV ARENA Y GRAVA M3 36.43 PIEDRA 1/2 M3 23.39 HORMIGÓN M3 41.33 MADERA P2 5.00 VOLUMEN TOTAL 101.16 CAPACIDAD DEL CAMION (M3) 6.00 NUMERO DE VIAJES 16.86 REDONDEO 16.86 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M. CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJES Tub de 3/4 5,040.00 U 0.00 0.00 0.00 . Tub, 1" 3,360.00 U 0.00 0.00 0.00 Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00 Tub 2:" 994.00 U 0.00 0.00 0.00 Tub, 3" 470.00 U 0.00 0.00 0.00 Tub 4": 259.00 U 0.00 0.00 0.00 Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00 Tub 8" U-PVC 65.00 U 0.00 0.00 0.00 Tub 10" U-PVC 50.00 U 0.00 0.00 0.00 Tub 8'; CSN 80.00 U 0.00 0.00 0.00 NUMERO TOTAL DE VIAJES REDONDEO TUBERIA EN VOLUMEN

Upload: ing-victor-herrera-timana

Post on 20-Jan-2016

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Calculo de Flete

FONCODES / DEPI

CALCULO DEL FLETE

PROYECTO : AULAS DEL CEO TAPACOCHAOFICINA ZONAL : HUARAZN. EXPEDIENTE : 1320060

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 545.00 42.50 23,162.50FIERRO, CLAV. ETC KG 3,392.17 1.00 3,392.17MADERA P2 3,623.14 1.50 5,434.71PERNOS UN 720.00 0.10 72.00LADRILLO UN 6,421.59 1.20 7,705.91YESO BL 12.00 25.00 300.00PINTURA, IMPERM GAL 66.00 4.50 297.00TRIPLAY KG 19.78 10.00 197.80CALAMINA KG 146.84 10.00 1,468.40OTROS KG 300.00 1.00 300.00

PESO TOTAL 42,330.49

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 36.43

PIEDRA 1/2 M3 23.39HORMIGÓN M3 41.33MADERA P2 5.00

VOLUMEN TOTAL 101.16CAPACIDAD DEL CAMION (M3) 6.00NUMERO DE VIAJES 16.86REDONDEO 16.86 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJESTub de 3/4 5,040.00 U 0.00 0.00 0.00

. Tub, 1" 3,360.00 U 0.00 0.00 0.00Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00Tub 2:" 994.00 U 0.00 0.00 0.00Tub, 3" 470.00 U 0.00 0.00 0.00Tub 4": 259.00 U 0.00 0.00 0.00Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00Tub 8" U-PVC 65.00 U 0.00 0.00 0.00Tub 10" U-PVC 50.00 U 0.00 0.00 0.00Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJESREDONDEOTUBERIA EN VOLUMEN

Page 2: Calculo de Flete

2- FLETE TERRESTRE

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 ) 6.00 CAPACIDAD DEL CAMION /M3 6.00COSTO POR VIAJE S/. 1,000.00 COSTO POR VIAJE S/. 660.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 14,000.00FLETE POR KG 0.10 110.00

AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO 4,233.05 FLETE POR VOLUMEN=No viajes*costo por viaje

FLETE POR VOLUMEN AGREGADOS 11,127.60TUBERIA

COSTO TOTAL FLETE TERR. 4,233.05 11,127.60

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viajeAcemila S/. 0.30

Peon S/. 0.00

Cantidad Unidades de Capacidad de Número de Flete no Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 2 80Peso total tubería desague CSN 2 80Peso total tubería desague PVC 2 80Numero bolsas de cemento 545.00 1 1 545.00 163.50Peso resto de materiales 19,167.99 1 50 383.36 115.01Agregados Total en Kilos 202,320.00 1 61.782 3,274.74 982.42Piedra zona aledaña 0.00 0.00COSTO TOTAL DEL FLETE EN ACEMILA S/. 1,260.93

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETEFLETE TERRESTRE 4,233.05 11,127.60FLETE FLUVIAL FLETE EN ACEMILA 1,260.93FLETES TOTALES S/. 4,233.05 12,388.53 16,621.58

Page 3: Calculo de Flete

FONCODES / DEPI

CALCULO DEL FLETE

PROYECTO : PRISE HUATASUBPROYECTO : RESERVORIO Y CANAL MANDAHUAZOFICINA ZONAL : HUARAZN. EXPEDIENTE : 1320050214

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 325.00 42.50 13,812.50FIERRO, CLAV. ETC KG 34.32 1.00 34.32MADERA P2 556.64 1.50 834.96ETERNIT UN 10.00CALAMINA UN 5.00YESO BL 20.00PINTURA, ASFALTO GAL 10.44 4.50 46.98TEJA KG 0.00 2.50 0.00OTROS KG 300.00 1.00 300.00

PESO TOTAL 15,028.76

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 0.24

PIEDRA M3 HORMIGÓN M3 52.19MADERA P2 P2 0.00

VOLUMEN TOTAL 52.43CAPACIDAD DEL CAMION (M3) 10.00NUMERO DE VIAJES 5.24REDONDEO 5.24 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJESTub de 3/4 5,040.00 U 0.00 0.00 0.00

. Tub, 1" 3,360.00 U 0.00 0.00 0.00Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00Tub 2:" 994.00 U 0.00 0.00 0.00Tub, 3" 470.00 U 0.00 0.00 0.00Tub 4": 259.00 U 0.00 0.00 0.00Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00Tub 8" U-PVC 65.00 U 0.00 0.00 0.00Tub 6'; CSN 160.00 U 0.00 0.00 0.00Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJESREDONDEOTUBERIA EN VOLUMEN

Page 4: Calculo de Flete

2- FLETE TERRESTREHUARAZ - HUATA CANTERA CARAZ O RANRAIRCA

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 ) 10.00 CAPACIDAD DEL CAMION /M3 10.00COSTO POR VIAJE S/. 800.00 COSTO POR VIAJE S/. 700.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 10,000.00FLETE POR KG 0.08 70.00

AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO 1,202.30 FLETE POR VOLUMEN=No viajes*costo por viajeFLETE POR VOLUMEN

AGREGADOS 3,668.00TUBERIA

COSTO TOTAL FLETE TERR. 1,202.30 3,668.00

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viajeAcemila S/. 0.00

Peon S/. 0.00

Cantidad Unidades de Capacidad de Número de Flete no Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 2 80Peso total tubería desague CSN 2 80Peso total tubería desague PVC 2 80Numero bolsas de cemento 325.00 1 1 325.00 0.00Peso resto de materiales 1,216.26 1 50 24.33 0.00Agregados Total en Kilos 104,860.00 1 40 2,621.50 0.00Piedra zona aledaña 0.00 0.00COSTO TOTAL DEL FLETE EN ACEMILA S/.

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETEFLETE TERRESTRE 1,202.30 3,668.00FLETE FLUVIAL FLETE EN ACEMILAFLETES TOTALES S/. 1,202.30 3,668.00 4,870.30

Page 5: Calculo de Flete

FONCODES / DEPI

CALCULO DEL FLETE

PROYECTO : PRISE HUATASUBPROYECTO : CANAL NAUYAOFICINA ZONAL : HUARAZN. EXPEDIENTE : 1320050214

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 321.00 42.50 13,642.50FIERRO, CLAV. ETC KG 42.71 1.00 42.71MADERA P2 803.11 1.50 1,204.67ETERNIT UN 10.00CALAMINA UN 5.00YESO BL 20.00PINTURA, ASFALTO GAL 14.19 4.50 63.86PENDOLA UND 20.00 0.70 14.00OTROS KG 300.00 1.00 300.00

PESO TOTAL 15,267.74

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 0.44

PIEDRA M3 HORMIGÓN M3 51.35MADERA P2 P2 0.00

VOLUMEN TOTAL 51.79CAPACIDAD DEL CAMION (M3) 10.00NUMERO DE VIAJES 5.18REDONDEO 5.18 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJESTub de 3/4 5,040.00 U 0.00 0.00 0.00

. Tub, 1" 3,360.00 U 0.00 0.00 0.00Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00Tub 2:" 994.00 U 0.00 0.00 0.00Tub, 3" 470.00 U 0.00 0.00 0.00Tub 4": 259.00 U 0.00 0.00 0.00Tub 6:" U-PVC 110.00 U 18.00 3.60 0.03Tub 8" U-PVC 65.00 U 0.00 0.00 0.00Tub 6'; CSN 160.00 U 0.00 0.00 0.00Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJES 0.03REDONDEO 0.00TUBERIA EN VOLUMEN 1

Page 6: Calculo de Flete

2- FLETE TERRESTREHUARAZ - HUATA CANTERA CARAZ O RANRAIRCA

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 ) 10.00 CAPACIDAD DEL CAMION /M3 10.00COSTO POR VIAJE S/. 800.00 COSTO POR VIAJE S/. 700.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 10,000.00FLETE POR KG 0.08 70.00

AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO 1,221.42 FLETE POR VOLUMEN=No viajes*costo por viajeFLETE POR VOLUMEN

AGREGADOS 3,626.00TUBERIA 0.00

COSTO TOTAL FLETE TERR. 1,221.42 3,626.00

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viajeAcemila S/. 1.00

Peon S/. 5.00

Cantidad Unidades de Capacidad de Número de Flete no Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 2 80Peso total tubería desague CSN 2 80Peso total tubería desague PVC 56 2 80 0.70 7.00Numero bolsas de cemento 321.00 1 1 321.00 321.00Peso resto de materiales 1,625.24 1 50 32.50 32.50Agregados Total en Kilos 103,580.00 1 40 2,589.50 2,589.50Piedra zona aledaña 0.00 0.00COSTO TOTAL DEL FLETE EN ACEMILA S/. 2,950.00

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETEFLETE TERRESTRE 1,221.42 3,626.00FLETE FLUVIAL FLETE EN ACEMILA 2,950.00FLETES TOTALES S/. 1,221.42 6,576.00 7,797.42

Page 7: Calculo de Flete

FONCODES / DEPI

CALCULO DEL FLETE

PROYECTO : PRISE HUATASUBPROYECTO : CANAL HUANQUEQUITAOFICINA ZONAL : HUARAZN. EXPEDIENTE : 1320050214

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 217.00 42.50 9,222.50FIERRO, CLAV. ETC KG 28.19 1.00 28.19MADERA P2 537.74 1.50 806.61ETERNIT UN 10.00CALAMINA UN 5.00YESO BL 20.00PINTURA, ASFALTO GAL 9.04 4.50 40.68PENDOLA UND 0.70OTROS KG 300.00 1.00 300.00

PESO TOTAL 10,397.98

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 0.59

PIEDRA M3 HORMIGÓN M3 34.28MADERA P2 P2 0.00

VOLUMEN TOTAL 34.87CAPACIDAD DEL CAMION (M3) 10.00NUMERO DE VIAJES 3.49REDONDEO 3.49 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJESTub de 3/4 5,040.00 U 0.00 0.00 0.00

. Tub, 1" 3,360.00 U 0.00 0.00 0.00Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00Tub 2:" 994.00 U 0.00 0.00 0.00Tub, 3" 470.00 U 0.00 0.00 0.00Tub 4": 259.00 U 0.00 0.00 0.00Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00Tub 8" U-PVC 65.00 U 0.00 0.00 0.00Tub 6'; CSN 160.00 U 0.00 0.00 0.00Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJESREDONDEOTUBERIA EN VOLUMEN

Page 8: Calculo de Flete

2- FLETE TERRESTREHUARAZ - HUATA CANTERA CARAZ O RANRAIRCA

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 ) 10.00 CAPACIDAD DEL CAMION /M3 10.00COSTO POR VIAJE S/. 800.00 COSTO POR VIAJE S/. 700.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 10,000.00FLETE POR KG 0.08 70.00

AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO 831.84 FLETE POR VOLUMEN=No viajes*costo por viajeFLETE POR VOLUMEN

AGREGADOS 2,443.00TUBERIA

COSTO TOTAL FLETE TERR. 831.84 2,443.00

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viajeAcemila S/. 1.50

Peon S/. 0.00

Cantidad Unidades de Capacidad de Número de Flete no Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 2 80Peso total tubería desague CSN 2 80Peso total tubería desague PVC 2 80Numero bolsas de cemento 217.00 1 1 217.00 325.50Peso resto de materiales 1,175.48 1 50 23.51 35.27Agregados Total en Kilos 69,740.00 1 40 1,743.50 2,615.25Piedra zona aledaña 0.00 0.00COSTO TOTAL DEL FLETE EN ACEMILA S/. 2,976.02

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETEFLETE TERRESTRE 831.84 2,443.00FLETE FLUVIAL FLETE EN ACEMILA 2,976.02FLETES TOTALES S/. 831.84 5,419.02 6,250.86

Page 9: Calculo de Flete

FONCODES / DEPI

CALCULO DEL FLETE

PROYECTO : PRISE HUATASUBPROYECTO : CANAL HUINCHUS URANOFICINA ZONAL : HUARAZN. EXPEDIENTE : 1320050214

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 262.00 42.50 11,135.00FIERRO, CLAV. ETC KG 35.13 1.00 35.13MADERA P2 661.04 1.50 991.56ETERNIT UN 10.00CALAMINA UN 5.00YESO BL 20.00PINTURA, ASFALTO GAL 11.53 4.50 51.89PENDOLA UND 0.70OTROS KG 300.00 1.00 300.00

PESO TOTAL 12,513.58

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 0.37

PIEDRA M3 HORMIGÓN M3 41.85MADERA P2 P2 0.00

VOLUMEN TOTAL 42.22CAPACIDAD DEL CAMION (M3) 10.00NUMERO DE VIAJES 4.22REDONDEO 4.22 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJESTub de 3/4 5,040.00 U 0.00 0.00 0.00

. Tub, 1" 3,360.00 U 0.00 0.00 0.00Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00Tub 2:" 994.00 U 0.00 0.00 0.00Tub, 3" 470.00 U 0.00 0.00 0.00Tub 4": 259.00 U 0.00 0.00 0.00Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00Tub 8" U-PVC 65.00 U 0.00 0.00 0.00Tub 6'; CSN 160.00 U 0.00 0.00 0.00Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJESREDONDEOTUBERIA EN VOLUMEN

Page 10: Calculo de Flete

2- FLETE TERRESTREHUARAZ - HUATA CANTERA CARAZ O RANRAIRCA

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 ) 10.00 CAPACIDAD DEL CAMION /M3 10.00COSTO POR VIAJE S/. 800.00 COSTO POR VIAJE S/. 700.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 10,000.00FLETE POR KG 0.08 70.00

AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO 1,001.09 FLETE POR VOLUMEN=No viajes*costo por viajeFLETE POR VOLUMEN

AGREGADOS 2,954.00TUBERIA

COSTO TOTAL FLETE TERR. 1,001.09 2,954.00

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viajeAcemila S/. 1.00

Peon S/. 0.00

Cantidad Unidades de Capacidad de Número de Flete no Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 2 80Peso total tubería desague CSN 2 80Peso total tubería desague PVC 2 80Numero bolsas de cemento 262.00 1 1 262.00 262.00Peso resto de materiales 1,378.58 1 50 27.57 27.57Agregados Total en Kilos 84,440.00 1 40 2,111.00 2,111.00Piedra zona aledaña 0.00 0.00COSTO TOTAL DEL FLETE EN ACEMILA S/. 2,400.57

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETEFLETE TERRESTRE 1,001.09 2,954.00FLETE FLUVIAL FLETE EN ACEMILA 2,400.57FLETES TOTALES S/. 1,001.09 5,354.57 6,355.66

Page 11: Calculo de Flete

FONCODES / DEPI

CALCULO DEL FLETE

PROYECTO : PRISE HUATASUBPROYECTO : RESERVORIO Y CANAL COTOPUÑINOFICINA ZONAL : HUARAZN. EXPEDIENTE : 1320050214

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 327.00 42.50 13,897.50FIERRO, CLAV. ETC KG 30.21 1.00 30.21MADERA P2 479.50 1.50 719.25ETERNIT UN 10.00CALAMINA UN 5.00YESO BL 20.00PINTURA, ASFALTO GAL 6.76 4.50 30.42PENDOLA UND 0.70OTROS KG 300.00 1.00 300.00

PESO TOTAL 14,977.38

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 0.18

PIEDRA M3 HORMIGÓN M3 52.47MADERA P2 P2 0.00

VOLUMEN TOTAL 52.65CAPACIDAD DEL CAMION (M3) 10.00NUMERO DE VIAJES 5.27REDONDEO 5.27 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJESTub de 3/4 5,040.00 U 0.00 0.00 0.00

. Tub, 1" 3,360.00 U 0.00 0.00 0.00Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00Tub 2:" 994.00 U 0.00 0.00 0.00Tub, 3" 470.00 U 0.00 0.00 0.00Tub 4": 259.00 U 0.00 0.00 0.00Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00Tub 8" U-PVC 65.00 U 0.00 0.00 0.00Tub 6'; CSN 160.00 U 0.00 0.00 0.00Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJESREDONDEOTUBERIA EN VOLUMEN

Page 12: Calculo de Flete

2- FLETE TERRESTREHUARAZ - HUATA CANTERA CARAZ O RANRAIRCA

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 ) 10.00 CAPACIDAD DEL CAMION /M3 10.00COSTO POR VIAJE S/. 600.00 COSTO POR VIAJE S/. 600.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 10,000.00FLETE POR KG 0.06 60.00

AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO 898.64 FLETE POR VOLUMEN=No viajes*costo por viajeFLETE POR VOLUMEN

AGREGADOS 3,162.00TUBERIA

COSTO TOTAL FLETE TERR. 898.64 3,162.00

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viajeAcemila S/. 0.00

Peon S/. 0.00

Cantidad Unidades de Capacidad de Número de Flete no Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 2 80Peso total tubería desague CSN 2 80Peso total tubería desague PVC 2 80Numero bolsas de cemento 327.00 1 1 327.00 0.00Peso resto de materiales 1,079.88 1 50 21.60 0.00Agregados Total en Kilos 105,300.00 1 40 2,632.50 0.00Piedra zona aledaña 0.00 0.00COSTO TOTAL DEL FLETE EN ACEMILA S/.

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETEFLETE TERRESTRE 898.64 3,162.00FLETE FLUVIAL FLETE EN ACEMILAFLETES TOTALES S/. 898.64 3,162.00 4,060.64

Page 13: Calculo de Flete

FONCODES / DEPI

CALCULO DEL FLETE

PROYECTO : PRISE HUATASUBPROYECTO : CANAL LUCMAOFICINA ZONAL : HUARAZN. EXPEDIENTE : 1320050214

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 208.00 42.50 8,840.00FIERRO, CLAV. ETC KG 23.76 1.00 23.76MADERA P2 443.52 1.50 665.28ETERNIT UN 10.00CALAMINA UN 5.00YESO BL 20.00PINTURA, ASFALTO GAL 9.36 4.50 42.12PENDOLA UND 0.70OTROS KG 300.00 1.00 300.00

PESO TOTAL 9,871.16

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 0.14

PIEDRA M3 HORMIGÓN M3 33.53MADERA P2 P2 0.00

VOLUMEN TOTAL 33.67CAPACIDAD DEL CAMION (M3) 10.00NUMERO DE VIAJES 3.37REDONDEO 3.37 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJESTub de 3/4 5,040.00 U 0.00 0.00 0.00

. Tub, 1" 3,360.00 U 0.00 0.00 0.00Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00Tub 2:" 994.00 U 0.00 0.00 0.00Tub, 3" 470.00 U 0.00 0.00 0.00Tub 4": 259.00 U 0.00 0.00 0.00Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00Tub 8" U-PVC 65.00 U 0.00 0.00 0.00Tub 6'; CSN 160.00 U 0.00 0.00 0.00Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJESREDONDEOTUBERIA EN VOLUMEN

Page 14: Calculo de Flete

2- FLETE TERRESTREHUARAZ - HUATA CANTERA CARAZ O RANRAIRCA

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 ) 10.00 CAPACIDAD DEL CAMION /M3 10.00COSTO POR VIAJE S/. 600.00 COSTO POR VIAJE S/. 500.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 10,000.00FLETE POR KG 0.06 50.00

AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO 592.27 FLETE POR VOLUMEN=No viajes*costo por viajeFLETE POR VOLUMEN

AGREGADOS 1,685.00TUBERIA

COSTO TOTAL FLETE TERR. 592.27 1,685.00

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viajeAcemila S/. 1.50

Peon S/. 0.00

Cantidad Unidades de Capacidad de Número de Flete no Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 2 80Peso total tubería desague CSN 2 80Peso total tubería desague PVC 2 80Numero bolsas de cemento 208.00 1 1 208.00 312.00Peso resto de materiales 1,031.16 1 50 20.62 30.93Agregados Total en Kilos 67,340.00 1 40 1,683.50 2,525.25Piedra zona aledaña 0.00 0.00COSTO TOTAL DEL FLETE EN ACEMILA S/. 2,868.18

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETEFLETE TERRESTRE 592.27 1,685.00FLETE FLUVIAL FLETE EN ACEMILA 2,868.18FLETES TOTALES S/. 592.27 4,553.18 5,145.45