    TABLE OF CONTENTS

    1. GENERAL

    1.1 Scope of Work1.2 Standard, Codes, and Reference

    1.3 Basic Assumption

    251528192.doc 1/8

    CALCULATION NOTEASSESMENT TRANSMISSION TOWER

    B74, B75, & L56

    REV DATE PAGE DESCRIPTION PREP'D CHK'D AP COMP.A 2!1!21" #$#%#A& #SS'( A& $$ RW%

  • 8/10/2019 Calculation Note Assesment Transmission Tower B74, B75, & L56_Rev A

    2/8

    1.3.1 Basic )esi*n

    1.3.2 Soft+are

    1.3.3 &oad Comination

    1.3." &oad Case

    . RESULT

    !. CONCLUSION

    1. GENERAL

    1.1 S"#$% # W#(

    %-is cacuation note is prepared for re!anasis of %ransmission %o+er.

    1. S)*+*, C#%-, *+ R%%%+"%

    %-e isted eo+ documents are appicae standard, codes, and reference to e usedto support t-is cacuation 0

    ! American #nstitute of Stee Construction %-irteent- (dition A#SC 13t-!&R)

    251528192.doc 2/8

  • 8/10/2019 Calculation Note Assesment Transmission Tower B74, B75, & L56_Rev A

    3/8

    ! ASC( 4!5 Wind &oad

    ! S$# 3!1426!22 Seismic &oad

    1.! B*-" A--/0$)#+

    1.!.1 B*-" D%-+

    E2-)+ T#3%

    $o #tem )escription

    1 7ateria A36 and A542 r 6

    2 Beam Sie As per reference dra+in*

    3 Cae )iameter 0 21 mm, )ensit 0 1969 k*/km.

    " Conductor Wei*-t 0 66 k* assumption

    5 Basic Wind Speed " m/s ASC( 4!56 Seismic &oad :one 2 on ;ard Soi S$# 22

    T%0$#* T#3%

    $o #tem )escription

    1 7ateria SS"

    2 Beam Sie &45

  • 8/10/2019 Calculation Note Assesment Transmission Tower B74, B75, & L56_Rev A

    4/8

    1.!.4 L#* C*-%

    enera oad cases are 0

    1. )ead oad

    2. Wind oad

    3. (art-@uake oad

    7ain purpose t-is assessment is to kno+ stren*t- of to+er due to corrosion. We+i simuate transmission to+er +it- corrosion on to+er structure. Corrosion

    t-ickness +i use aera*e corrosion t-ickness as inspection to site is 1 mm.

    %-is is ecome main oad case e

  • 8/10/2019 Calculation Note Assesment Transmission Tower B74, B75, & L56_Rev A

    5/8

    As aoe data, t-e to+er stee structure is acceptae +it- corrosion 1 mm.

    251528192.doc 5/8

  • 8/10/2019 Calculation Note Assesment Transmission Tower B74, B75, & L56_Rev A

    6/8

    251528192.doc 6/8

  • 8/10/2019 Calculation Note Assesment Transmission Tower B74, B75, & L56_Rev A

    7/8

    !. CONCLUSION

    enera concusion for a to+ers B4", B45, and &56 as summar eo+0

    Corrosion of stee to+er +as predicted aera*e 1 mm.

    Arms of t-e to+er +-ic- support t-e cae -i*- ota*e are as critica condition due to

    corrosie assumed ad corroded on arms of to+er stee memer.

    >otentia stee t-ickness +i e reduced more t-an t-e assumed. #t +i cause

    decreasin* t-e inte*rit of t-e to+er structure.

    #f t-e to+er structure is on ad corroded, t-e to+er structure is predicted on fati*uecondition. %-e ifetime to+er structure is reduced.

    251528192.doc 4/8

  • 8/10/2019 Calculation Note Assesment Transmission Tower B74, B75, & L56_Rev A

    8/8

    &o+er and coumn to+er structure -ae sufficient stren*t- on a oad comination

    dead oad, +ind or seismic.

    #f t-e to+er structure is on ad corroded condition, t-e to+er structure s-a e

    repaced +it- ne+ one. %emporar support is needed especia on arms of t-e to+er

    structure to retain t-e structure due to decreasin* t-e inte*rit of structure.

    251528192.doc 8/8