calculation - mwi
TRANSCRIPT
DATEENGINEERPROJECTREVISI
PROJECT NO :SIZE :OWNER :TYPE :CLASS :
Equipment Number =
• Length Overall ( L ) : 200 M• Length (96% of L) : 200 M• Breadth Moulded ( B ) : 9.2 M• Depth Moulded ( H ) : 1.8 M• Draft ( T ) : 1.10 M• Displacement : 2074.600 tons• Status :
A = area, in m2, in profile view of hull, within the Rule length of the vessel, and of superstructures and houses abovethe summer load waterline, which are within the Rule length of the vessel, and also having a breadth greaterthan B/4
b = breadth, in metres, of the widest superstructure or deckhouse on each tier
f = freeboard amidships, in metres, from the summer load waterline
h = the height, in metres, of each tier of superstructure ordeckhouse at side having a breadth of B/4 or greater.In calculation of h, sheer and trim are to be ignored.
Hence, B/4 = 2.30 mf = 1.80 - 1.10
= 0.70 m
Tier No. Breadth, b Height, h Area, bh1 Main Dk. To A Deck 9.20 0.70 6.4402 Forecastle Deck3 1st Deck4 Navigation Deck
∑bh = 6.440Profile Area
Item Length (m) Height (m) Area (m2)1 Main Dk. To A Deck 200.000 0.700 140.0002 Forecastle Deck3 1st Deck4 Navigation Deck
∑A = 140.000
Therefore, Equipment NumberΕΝ = (2074.60^2/3) + (2 x ((9.20 x 0.70) + 6.44)) + (140.00/10)
= 202.42
: 14-04-2014: Muji: 200m Barge: 0
Description
Description
Exceeding
(FOR INFORMATION ONLY)
LLYOD REGISTER
EQUIPMENT NUMBER CALCULATION
8245200 x 19.2 x 1.8m BargeNational Environment AgencyBARGE
EQUIPMENT NUMBER CALCULATION
( )10
23
2 AbhBf +Σ++∆
DATEENGINEERPROJECTREVISI
: 14-04-2014: Muji: 200m Barge: 0(FOR INFORMATION ONLY)
EQUIPMENT NUMBER CALCULATION
Table 13.7.2
Equipment Exceeding Not exceeding Numeral Number Mass in Kg Length (m) D1 D2 D3
150 175 107 2 480 275 22 19 19175 205 108 2 570 302.5 24 20.5 20.5205 240 109 3 660 302.5 26 22 20.5
* As stated in specification for U2 stud link cable according to class requirement plus 2mm.
Table 13.7.3Equipment
Numeral
150 175 107 180 100 3 120175 205 108 180 110 3 120205 240 109 180 130 4 120
Table 13.7.5
Grade MaterialU1 Mild Steel
Special qualitysteel(wrought)Special qualitysteel(cast)Extra qualitysteel
SUMMARYEquipment
Numeral Number Mass in Kg Length (m) D1 D2 D3
108 2 570 303 24 21 21
108 180 110 3 120 60
Towline Mooring line
Min. Length (m)
490 - 690
Tensile strength (N/mm2)
55
U2 (b)
202.42
690 min.
Equipment Number
202.42
Equipment NumberNumeral
Equipment
Min. breaking strength (KN)
Number
Stud link chain cables for bower achorsStockless Bower Anchor
U3
Min. Length
(m)
Min. Breaking strength (KN)
6065
U2 (a)
300 - 490
Mooring line
Exceeding Min. breaking strength (KN)
Min. Length (m)
490 - 690
Equipment Number
NumberMin.
Length (m)
Stud link chain cables for bower achorsStockless Bower Anchor
Min. Breaking strength (KN)
Not exceeding
Equipment Number Tow line
DATE :
ENGINEER :
PROJECT :
REVISI :
Nominal
Diameter D D1 H H1 t t1 t2 h1 e b h2 l 1 r
200 216.3 270 378 300 10 8 9 70 8 500 0 0 0
Nominal
Diameter B L h t3 l R Rib
200 290 860 85 8 160 25 8 x 70
Nominal
Diameter f1 f2 f3 f4 f5
200 4 3 6 6 8
Hemp Synthetic
No. 2 No. 4 No. 5 No. 6 Rope Fibre Rope
(6x12) (6x24) (6x30) (6x37)
200 14 12.5 12.5 12.5 36 26
Appli. Rope (KN)
79.5 78
POST
Diameter
NominalDiameter of Applicable Rope (Reference)
Wire Rope
Mass (KG)
BOLLARD DETAIL'SJ.I.S. STANDARD
22-10-2010
Muji
NBT 030
BEDPLATE
BEDPLATE Reference Cal. Max. Break. Load
0
DIMENSION
Client : PT. Top Great Engineering & MarineProject : SFP I, II,III,IV,V & VI Subject : Anchor paternAuthor : MujiDate : 4/15/2014Revision : 0
Notes : all are linear horizontal meters
Start time Stop timeAnchor location Bollard locations Ligne length Bollard locations Ligne length
Anchor n° x y x1 y1 L1 x2 y2 L2(m) (m) (m) (m) (m) (m) (m) (m)
1 15.9 25 15.9 9.6 15 21 10 162 55.95 25 56.0 9.6 15 61 10 163 96 25 96.0 9.6 15 101 10 164 136.1 25 136.1 9.6 15 141 10 165 176.2 25 176.2 9.6 15 181 10 16678
85.4 20.425
-100
0
100
0 100 200 300
y (m
) fr
om p
ipel
ine
tow
ard
sout
h
x (m) from stren 1 toward west
Anchor patern for bad weather
anchors
Barge 1
Barge 2
Lignes 1
Lignes 2
Barge
Lignes
Start Actual StopLength (m) 0 0 5% 0 0% 5
Actual without loadAnchor location Fearlead locations Ligne length Line tension Cable length Axis tension Yaw tension
Anchor n° x y x2 y2 horizontal T -horizontal l. T T(m) (m) (m) (m) (m) (kN) (m) (kN) (kN)
1 15.875 25 16 10 15.40 60 1.32 0 602 55.95 25 56 10 15.40 60 1.32 0 603 96 25 96 10 15.40 60 1.32 0 604 136.1 25 136 10 15.40 60 1.32 0 605 176.2 25 176 10 15.40 60 1.32 0 60678
P/L tension (kN) : -300Total (kN) = -300 300
Yaw : -0.307 m (y direction)
Actual with loadsAnchor location Fearlead locations Ligne length Line tension Cable length Rised length Line tension Axis tension Yaw tension
Anchor n° x y x2 y2 L dL -horizontal l. L T T T(m) (m) (m) (m) (m) (m) (m) (m) (kN) (kN) (kN)
1 15.875 25 16 10 15.09 -0.31 1.01 271 102 0 1022 55.95 25 56 10 15.09 -0.31 1.01 271 102 0 1023 96 25 96 10 15.09 -0.31 1.01 271 102 0 1024 136.1 25 136 10 15.09 -0.31 1.01 271 102 0 1025 176.2 25 176 10 15.09 -0.31 1.01 271 102 0 102678
P/L tension (kN) : -300Total (kN) = -300 511
Total anchor line tension against yaw direction = 511 kNTotal environmental load as per DNV CN 30.5 = 565 kNError on the transversal force equilibre = 53 kN
present Line tension presentAnchor n° SWL T SWL / T
(kN) (kN) (%)1 131 102 1.3 Using Mooring Riope diameter 28mm2 131 102 1.3 Using Mooring Riope diameter 28mm3 131 102 1.3 Using Mooring Riope diameter 28mm4 131 102 1.3 Using Mooring Riope diameter 28mm5 131 102 1.3 Using Mooring Riope diameter 28mm6 1 0 0%7 1 0 0%8 3 0 0%
Client : PT. Top Great Engineering & MarineProject : SFP I, II,III,IV,V & VI Subject : Anchor paternAuthor : MujiDate : 4/15/2014Revision : 0
Notes : Input data in bold.Environmental load calculation as per DNV classification notes No 30.5The wind and current dirrection are supposed to be normal to the barge length.
WIND LOAD CALCULATION Usual Principia Principia Principia Stop Crane boom Abandon Abandon Maximummass density of air 1.225 kg/m3 C1 C2 C3 S laying down + 1 tug (before) (after) (summer)gravitational acceleration : 9.81 m/s² Wind speed (m/s) 6.1 15.4 15.4 12 10.5 10.5 20.5 20.5 26air kinematic viscosity 1.46E-05 m²/s Wind speed (kts) 12 30 30 23 20 20 40 40 51
Basic wind pressure (N/m²) 23 145 145 88 68 68 257 257 414Three dimentional bodies placed on a horizontal surface Wind Wind Wind Wind Wind Wind Wind Wind Wind
item height width length shape coef. area force force force force force force force force force(m) (m) (m) (m²) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
hull 0.70 19.20 200.00 1.20 140.00 3.829 24.404 24.404 14.818 11.345 11.345 43.244 43.244 69.560Truck 3.6 3.4 12 1.20 43.20 1.181 7.530 7.530 4.572 3.501 3.501 13.344 13.344 21.464
Cylinder Wind Wind Wind Wind Wind Wind Wind Wind Winditem Diameter length shape coef. area force force force force force force force force force
(m) (m) (m²) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
Pipe 0.09 120.00 1.20 10.68 0.292 1.862 1.862 1.130 0.865 0.865 3.299 3.299 5.306Pipe 0.09 122.5 1.20 10.90 0.298 1.900 1.900 1.154 0.883 0.883 3.368 3.368 5.417
0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.0000.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.0000.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.0000.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Other shape Wind Wind Wind Wind Wind Wind Wind Wind Winditem Diameter Shape length shape coef. area force force force force force force force force force
(m) (m) (m²) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
Outriger mast 0.32 H 25.00 1.90 8.00 0.346 2.208 2.208 1.341 1.026 1.026 3.913 3.913 6.294Davits frame 0.25 H 16.72 1.90 4.18 0.181 1.154 1.154 0.700 0.536 0.536 2.044 2.044 3.288
Total wind force (kN) = 6 39 39 24 18 18 69 69 111Total wind force (metric tons) = 1 4 4 2 2 2 7 7 11
CURRENT LOAD CALCULATION
Mass density of water 1025 kg/m3 Usual Principia Principia Principia Stop Crane boom Abandon Abandon Maximumgravitational acceleration : 9.81 m/s² C1 C2 C3 S laying down + 1 tug (before) (after) (summer)
Current speed (kts) 2.43 3.3 3.3 3.3 3 3 3 3 3Current speed (m/s) 1.25 1.70 1.70 1.70 1.54 1.54 1.54 1.54 1.54
Three dimentional bodies placed on a horizontal surface Drag Drag Drag Drag Drag Drag Drag Drag Dragitem height width length shape coef. area force force force force force force force force force
(m) (m) (m) (m²) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
hull 0.70 19.20 200.00 1.20 140.00 135 248 248 248 205 205 205 205 205Cargo barge hull 4.70 2.00 10.00 1.20 47.00 45
Cylinder Drag Drag Drag Drag Drag Drag Drag Drag Dragitem Diameter length shape coef. area force force force force force force force force force
(m) (m) (m²) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
Pipe 0.77 40.00 1.20 30.80 30 55 55 55 45 45 45Stinger tube 1 0.00 0 0 0 0 0 0 0 0 0Stinger tube 1 0.00 0 0 0 0 0 0 0 0 0
Total current drag force (kN) = 209 303 303 303 250 250 250 205 205Total current drag force (tons) = 21 31 31 31 26 26 26 21 21
WAVE AVERAGE LOAD CALCULATION (100% dam) Usual Principia Principia Principia Stop Crane boom Abandon Abandon MaximumMass density of water 1025 kg/m3 C1 C2 C3 S laying down + 1 tug (before) (after) (summer)Gravitational acceleration : 9.81 m/s² Swell height (m) 0.5 2 2 1.5 1 1 1 1 1.2Correction coefficient : 9.5 Swell incidence (°) 90 90 90 90 90 90 90 90 90Wall Wave Wave Wave Wave Wave Wave Wave Wave Wave
item height length force force force force force force force force force(m) (m) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
hull 1.80 200.00 26 423 423 238 106 106 106 106 152
Total average wave force (kN) = 26 423 423 238 106 106 106 106 152Total average wave force (tons) = 3 43 43 24 11 11 11 11 16
TUG THRUST Usual Principia Principia Principia Stop Crane boom Abandon Abandon MaximumC1 C2 C3 S laying down + 1 tug (before) (after) (summer)
Main tug Engine power (BHP) : 3500 3500 3500Bollard pull at zero speed (kN) : 300 300 300
Correction factor for manual remote control : 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70Correction factor for inflow velocity (**) : 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Thrust (kN) = 0 0 0 0 0 0 178.5 178.5 178.5AHT Engine power (BHP) : 1500 1500 1500 1500
Bollard pull (kN) : 100 100 100 100Correction factor for inflow velocity (**) : 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Correction factor for manual remote control : 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70Thrust (kN) = 0 0 0 0 0 59.5 59.5 59.5 59.5
Total tug force (kN) = 0 0 0 0 0 59.5 238 238 238
TOTAL ENVIRONMENTAL LOADS Usual Principia Principia Principia Stop Crane boom Abandon Abandon MaximumC1 C2 C3 S laying down + 1 tug (before) (after) (summer)
Data sumary Wind (knots) : 12 30 30 23 20 20 40 40 51Current (knots) : 2.4 3.3 3.3 3.3 3.0 3.0 3.0 3.0 3.0
Wave (m) : 0.5 2.0 2.0 1.5 1.0 1.0 1.0 1.0 1.2Loads Wind load (kN) : 6 39 39 24 18 18 69 69 111
Current load (kN) : 209 303 303 303 250 250 250 205 205Wave load (kN) : 26 423 423 238 106 106 106 106 152
Total Total environmental loads (kN) = 242 765 765 565 374 374 425 380 469Total environmental loads (m tons) = 25 78 78 58 38 38 43 39 48
LOAD PER ANCHOR LINE Usual Principia Principia Principia Stop Crane boom Abandon Abandon MaximumC1 C2 C3 S laying down + 1 tug (before) (after) (summer)
Total environmental loads (kN) = 242 765 765 565 374 374 425 380 469Tug thrust (kN) = 0 0 0 0 0 59.5 238 238 238
Total environmental loads - tug thrust (kN) = 242 765 765 565 374 315 187 142 231Number of holding anchor line : #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Load per anchor line (kN) = #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!Anchor line Safe Working Load (kN) : 442 442 442 442 442 442 442 442 442
Safety coef. (*) = #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Notes :* Safety factor as per API RP 2SK (2cd edition 1996) :
Quasi-static Total dynamicload load
Permanent mooring :intact load condition 1.8 1.5damaged load condition 1.2 1.0
Temporaty mooringintact load condition 1.0 0.8 Principia = 1.67 0.60damaged load condition Not required Not required
As per the Vryhof Anchor manual (2000), the factor of safety used by the major classification socieies are generally similar to those givenin API RP 2SK.Safety factor for Vertical Loads Anchors are higher than the above.
** Correction factor for inflow velocity as par API RP 2SK (effective date : March 1 1997)Inflow velocity in knots :
Propeler type : 1 2 3 4Open propeler 0.95 0.90 0.85 0.80Nozzled propeler 0.94 0.88 0.82 0.76
PT. Marcapada Waruna Indonesia
Project: SFP I, II,III,IV,V & VI Subject: Spud DesignDate: 4/15/2014Rev. 0
input data =boldF METHODE : BROMS 1964
ELoad data :
Load : 153 kN FLoad height : 4 m E
Pile data :Above ground pile length : 0 m
L Under ground pile length : 14 m LPile external diameter : 0.914 m D 36" SCH 30
L/D ratio : 15.32 L/DWall thicness : 15.88 mm th
Yield strength : 235 Mpa
D Soil data :Submerged density = 3.7 kN/m3 gamma'Internal drag angle : 5 ° Fi
1.2 KpResults : bearing capacity : 3 time passive soil load (RANKINE)
Ultimate lateral resistance = 309.3 kN Hu= 31,531 kg
Pile loading ratio = 49% =F/HuMax moment depth = 5.03 m f
Maximum bending moment = 1125.6 kN/m MmaxPile inertia = 0.0023194 m4 I
Maximum stress = 222 Mpa SMYS 1.1 %
-15
-14
-13
-12
-11
-10
-9
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
-0.5 0.5
Load
Momentmax
Pile
Pileinside
Page 1