OUTLINE
\ Introduction
\ Wetland Models
\ Water Budget ModelâPrecipitation
âSurface Water Runoff
âGroundwater Inflow (Infiltration)
âEvapotranspiration
âGroundwater Outflow (Exfiltration)
âSurface Water Outflow
![Page 3: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/3.jpg)
Wetland Models
\ Novitzki (1979, 1989) outlined 5 basic sets ofhydrologic conditions that cause wetlands. Creating a wetland requires one toreplicate one of these sets of characteristics:
1. Surface water depression wetlands2. Ground water depression wetlands3. Surface water slope wetlands4. Ground water slope wetlands5. Extensive wetlands on flat plains
![Page 4: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/4.jpg)
Surface Water Depression
![Page 5: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/5.jpg)
Ground Water Depression
![Page 6: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/6.jpg)
Surface Water Slope
![Page 7: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/7.jpg)
Ground Water Slope
![Page 8: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/8.jpg)
Water Budget Model
\ Model of water depths and potential draw downfor proposed wetland constructionâMonthly estimates represented graphically
F Water Depths vs. Time
\ Reliable Water SourceâPredict water inflows and outflows
âAll units converted to water depth over wetlanddesign
âAll inputs conservatively estimated
âAll outputs generously estimated
![Page 9: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/9.jpg)
W a t e r B u d g e t - T y p i c a l Y e a r
-6.00
-4.00
-2.00
0.00
2.00
4.00
6.00
8.00
Oct. Nov. Dec. Jan. Feb. Mar. A p r . May June July A u g Sept.
Inch
es o
f W
ate
r
Initial Fill
In f i l t ra t ion
Runoff
Precip.
PET
Exf i l t ra t ion
O u t f l o w
Water
Elevation:
Graphical Water Budget
![Page 10: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/10.jpg)
Water Budget ComponentsMASS BALANCE
âINFLOWS - OUTFLOWS = ∆STORAGEF Inflows = Precipitation + Surface Water +
Groundwater Inflows
F Outflows = Evapotranspiration + Surface WaterOutflows + Groundwater Outflows
l all components measured in inches
l volumes divided by area of wetland to obtain depthof water in inches.
F ∆Storage = change in water level depth (inches)
InflowsOutflows
![Page 11: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/11.jpg)
Water Budget Components
âVariables:F Precipitation
l Actual Rainfall - Amount/Distribution
F Surface Water Runoff
F Groundwater Inflow (infiltration)l assume zero to be conservative
F Potential Evapotranspiration
F Groundwater Outflow (exfiltration)l soil permeability (k)
F Surface Water Outflow
F Change in Storage or water level
F Watershed Changes Overtime
![Page 12: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/12.jpg)
Water Budget Components
\ Input/OutputType Typical Data Sources
1. Precipitation Historical Rainfall2. Infiltration Site Measurements3. Direct Surface TR-554. Overbank Flooding TR-55, HEC-2, Stage5. Evapotranspiration Pan Data, Thornthwaite6. Exfiltration Soil Testing7. Spillway Outflow Weir Formula
![Page 13: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/13.jpg)
Typical Water Budget ModelS = P + RO - ET - GWO - SWO
Precipitation
\ Daily precipitation data obtained from nearestweather station - Historical RainfallâPrecipitation selected from wet, dry, and typical years
F Dulles or Washington National Airportsl http://205.156.54.206/er/lwx/iad/cliiad.htm
l http://tgsv5.nws.noaa.gov/er/lwx/dca/clidca.htm
F VA State Climatology Officel 804-924-0548 http://www.people.virginia.edu/~climate/
F National Climatic Data Centerl 804-924-0548 http://www.ncdc.noaa.gov/
![Page 14: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/14.jpg)
S = P + RO - ET - GWO - SWORunoff
âSurface Water RunoffF SCS Runoff Curve Number Method - TR-55
F Q = (P - Ia)2 / [(P - Ia) + S] Eq. 1l Q = runoff
l P = rainfall
l S = potential maximum retention after runoff begins
l Ia = initial abstraction
• units are inches
F Ia = 0.2S Eq. 2l surface depressions, interception, evaporation, and
infiltration
l minimum precipitation to cause runoff
![Page 15: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/15.jpg)
S = P + RO - ET - GWO - SWORunoff
âSubstituting Eq.2 into Eq.1 gives:
âQ = (P - 0.2S)2 / (P + 0.8S)F P = daily precipitation
F S = maximum retention potential
F S = (1000 / CN) - 10l related to soil and cover conditions of the watershed through
the CN
l determined by rainfall-runoff plots
F Influenced by:l rate of infiltration at soil surface
l rate of transmission in the soil profile
l water-storage capacity of the profile
![Page 16: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/16.jpg)
S = P + RO - ET - GWO - SWORunoff
\ CN = Curve Number - ranges from 0 - 100âhydrologic soil group (A - D) (Exhibit A-1)
F A (high infiltration) - D (low infiltration)
âcover type (Tables 2-2)F vegetation, bare soil, impervious surfaces, residential, etc.
âhydrologic condition (Tables 2-2)F poor, fair, and good
âantecedent moisture condition (AMC I - III)F based on 5 day rainfall totals
l I - dry periods
l II - average moisture periods
l III - wet periods
l Assume II
![Page 17: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/17.jpg)
S = P + RO - ET - GWO - SWORunoff
\ Calculate CNF 1. Delineate Watershed
F 2. Locate hydrologic soil groups (A - D) from Soil Survey.
F 3. Divide watershed into different cover types (woods,paved, etc) and conditions (good, fair, or poor).
F 4. Overlay watershed, soils, and cover type maps andcalculate area of each subgroup.
F 5. Determine CN for Each subgroup (Tables 2.2 a-d)
F 6. Calculate weighted CN (CNw)l CN x Area for each subgroupl CNw = CN x Area / ∑Areas
![Page 18: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/18.jpg)
S = P + RO - ET - GWO - SWORunoff
\ Calculate Runoff:F 1. Calculate S = (1000/CNw) - 10
F 2. Using Daily Precipitation Data (P) calculate:l Q = (P - 0.2S)2 / (P + 0.8S) (inches of runoff over watershed)
l Note that minimum size storm event that creates runoff = Pmin= 0.2S
F 3. Volume RO = Q x Net Contributing Watershed Area
F 4. Depth RO contributing to constructed wetland = VolumeRO / (Constructed Wetland Area + Existing Pond/WetlandArea)
F 5. Repeat steps 2 - 4 to for each daily storm event
F 6. Sum daily RO depths to determine RO depth for month.
![Page 19: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/19.jpg)
S = P + RO - ET - GWO - SWORunoff
âLimitationsF Ia = 0.2S = 20% of
maximum retention
F developed bymeans of rainfalland runoff data fromexperimental smallwatersheds (< 10acres).
F highly variableF Source:
F USDA, 1972. NationalEngineering Handbook,Section 4, Hydrology,Chapter 10. Estimation ofDirect Runoff From StormRainfall.
![Page 20: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/20.jpg)
S = P + RO - ET - GWO - SWORunoff
\ Limitationsâ CNs describe average conditions.
â Time is not a factor, therefore rainfall duration nor intensityare accounted for.
â Does not take into account runoff from snowmelt or rain onfrozen ground.
â CN is less accurate when runoff is < 0.5 inches.
â Applies only to direct subsurface runoff not subsurface flowor high groundwater levels that contribute to runoff.
â If CN < 40 use another method.
â Safety Factor - The opposite of Typical Civil EngineeringSF’s
![Page 21: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/21.jpg)
Sunrise Valley Nature Park Runoff ComparisonReston, VA
0
2
4
6
8
10
12
14
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Inch
es o
f W
ate
r
SCS TR-55 Measured Inflow
âAMC IIF Source:
F Wetland Studies and Solutions, Inc., 1998. Evaluation of a FlexibleFabric/Bentonite Pond Liner through The Analysis of a Water Budget for aConstructed Pond/Wetland System for Walt Disney Imagineering.
![Page 22: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/22.jpg)
S = P + RO - ET - GWO - SWOPotential Evapotranspiration (ET)
\ Thornthwaite ET methodF empirical equation
F mean monthly temperature (T) degrees Celsius
F ET = 1.6(10T/I)a
F I = heat index = ∑ (T/5)1.514 (sum 12 months)
F a = 0.49239 + 0.01792 (I) - 7.71x10-5 (I2) + 6.75x10-7 (I3)
\ orâObtain ET values from nearest weather station
âPercentage of Pan Evaporation
âWeighing Lysimeter
![Page 23: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/23.jpg)
S = P + RO - ET - GWO - SWOGroundwater Outflow (exfiltration)
\ Darcy’s Equation q = -k dh/dlâq = groundwater seepage rate (cm/day)
âk = hydraulic conductivity of soil
âdh/dl = vertical hydraulic gradient, assume = 1
\ Laboratory testing for Kâcollect soil samples for testing
\ Estimate K based on soil textureâSand = >1x10-3 cm/sec (>0.002 ft/min)
âSilt = 1x10-3 to 1x10-5 cm/sec (0.002 to 2x10-5 ft/min)
âClay = < 1x10-6 cm/sec (<2x10-6 ft/min)
![Page 24: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/24.jpg)
S = P + RO - ET - GWO - SWOSurface water Outflow
\ Outflow ControlâExcess Runoff is your Safety Factor
âAlways provide a way to spill excess water and adjustwater levels
âControlled with berms, dikes, dams, spillways, andweirs
![Page 25: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/25.jpg)
Water Level = Initial Fill + P + RO -ET - GWO - SWO
Water budget model components and water level prediction for pond/wetland system.
1995/96 Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug Sept. Year
INPUT:
Initial Fill 2.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.28
Infiltration 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Runoff 3.79 1.18 0.06 1.16 0.17 0.37 0.47 0.57 0.79 1.21 2.05 6.35 18.18
Precipitation 6.51 4.75 2.05 5.61 2.62 3.52 3.69 7.07 4.88 5.89 4.16 7.73 58.48
OUTPUT:
PET -2.23 -0.39 -0.03 0.00 -0.10 -0.46 -2.16 -3.06 -5.36 -5.28 -4.90 -3.67 -27.65
Exfiltration -0.10 -0.10 -0.10 -0.10 -0.10 -0.10 -0.10 -0.10 -0.10 -0.10 -0.10 -0.10 -1.22
Outflow -0.38 -5.44 -1.98 -6.66 -2.59 -3.33 -1.90 -4.48 -0.20 -1.71 -1.20 -10.28 -40.13
Water Level * 9.85 9.85 9.85 9.85 9.85 9.85 9.85 9.85 9.85 9.85 9.85 9.85
* expressed in depth (inches) over baseline elevation which is approximately the average distance from weir invert
to average elevation of soil substrate in wetland.
![Page 26: CALCULATING A WETLAND WATER BUDGETirrigationtoolbox.com/ReferenceDocuments/BasicWaterManagement/f64... · Wetland Models \ Novitzki (1979, 1989) outlined 5 basic sets of hydrologic](https://reader031.vdocuments.us/reader031/viewer/2022021900/5b6074b37f8b9a48438b5887/html5/thumbnails/26.jpg)
Graphical Water Budget
Constructed We tla nd Mitiga tion Site
Oct. 1995- Sept. 1996
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug Sept.
Inc
he
s o
f W
ate
r
Initial Fill
Inf iltration
Runof f
Precip.
PET
Exf iltration
Outf low
WaterElevation: