  • 8/8/2019 Calculate Mfpi

    1/21

    CONSUM ER PRODUCTS PROCESSIN G

    DA I RY PROCESSI N G

    OI L M I L L I N G

    M EAT & POU LT RY PROCESSI N G

    GUAIDELINES FOR

    M IN ISTRY OF FOOD PROCESSING INDUSTRI ESMIN ISTRY OF FOOD P ROCESSING IN DUSTRI ES

    CALCULATION OF GRANT

    Important parameters forImportant parameters forscrutinizationscrutinization of the proposalof the proposal

    Ineligible proposals.Ineligible proposals.

    Eligibility of Plant & MachineriesEligibility of Plant & Machineries

    Eligibility of Technical Civil Work.Eligibility of Technical Civil Work.

    http://calculation.xls/http://calculation.xls/
  • 8/8/2019 Calculate Mfpi

    2/21

    THE PROPOSALS HAVE TO BE SCRUTINIZED ONFOLLOWING PARAMETERS

    FOR DAIRY

    FOR MEAT & POULTRY FOR CONSUMER PRODUCTS

    FOR OIL MILLING

    CLICK HERE

    CLICK HERE

    CLICK HERE

    CLICK HERE

    Main Page

  • 8/8/2019 Calculate Mfpi

    3/21

    THE PROPOSALS OF MILK PROCESSING

    THE PROP OSAL HAVE TO BE SCRUTI NI SED ON FOLLOW I NGIMPORTANT P ARAM ETERS

    1.CAPACITY OF THE PLANT (Processing capacity LPD)

    2. CAPACITY OF PLANT & MACHINARY PROPOSED TO BE

    INSTALLED

    3. REQUIRMENT OF PLANT & MACHINARY IN RESPECT OF THEMILK PRODUCTS PROPOSED TO MANUFACTURE.

    5. RAW MATERIAL AVAILABILITY IN THE AREA OF PROPOSEDPROJECT.

    6. DETAILS OF MARKETING ARRANGEMENTS PROPOSED FORMARKETING OF PROCESSED PRODUCTS.

    BACK

    Main Page

  • 8/8/2019 Calculate Mfpi

    4/21

    THE PROPOSALS OF MEAT PROCESSING

    THE PROP OSAL HAVE TO BE SCRUTI NI SED ON FOLLOW I NGIMPORTANT P ARAM ETERS

    1.CAPACITY OF THE PLANT (Processing capacity MT/DAY)

    2. CAPACITY OF PLANT & MACHINARY PROPOSED TO BEINSTALLED

    3. REQUIRMENT OF PLANT & MACHINARY IN RESPECT OF THEMEAT & MEAT PRODUCTS PROPOSED TO PROCESS.

    5. RAW MATERIAL AVAILABILITY IN THE AREA OF PROPOSEDPROJECT. (Procurement of Raw meat must be from approved slaughterhouses)

    6. DETAILS OF MARKETING ARRANGEMENTS PROPOSED FORMARKETING OF PROCESSED PRODUCTS.

    BACK

    Main Page

  • 8/8/2019 Calculate Mfpi

    5/21

    THE PROPOSALS OF CONSUMER PRODUCTS

    THE PROP OSAL HAVE TO BE SCRUTI NI SED ON FOLLOW I NGIMPORTANT P ARAM ETERS

    1.CAPACITY OF THE PLANT (Processing capacity MT/DAY OR No. /day)

    2. CAPACITY OF PLANT & MACHINARY PROPOSED TO BEINSTALLED

    3. REQUIRMENT OF PLANT & MACHINARY IN RESPECT OF THECONSUMER PRODUCTS.

    5. RAW MATERIAL AVAILABILITY IN THE AREA OF PROPOSEDPROJECT.

    6. DETAILS OF MARKETING ARRANGEMENTS PROPOSED FOR

    MARKETING OF CONSUMER PRODUCT.

    BACK

    Main Page

  • 8/8/2019 Calculate Mfpi

    6/21

    THE PROPOSALS OF OIL MILLING

    THE PROP OSAL HAVE TO BE SCRUTI NI SED ON FOLLOW I NGIMPORTANT P ARAM ETERS

    1.CAPACITY OF THE PLANT (Processing capacity MT/DAY)

    2. CAPACITY OF PLANT & MACHINARY PROPOSED TO BEINSTALLED

    3. REQUIRMENT OF PLANT & MACHINARY IN RESPECT OF THEOIL MILLING.

    5. RAW MATERIAL AVAILABILITY IN THE AREA OF PROPOSEDPROJECT. (Procurement of Raw seeds must be from farmers/ Mandi)

    6. DETAILS OF MARKETING ARRANGEMENTS PROPOSED FORMARKETING OF EADIBLE OIL.

    BACK

    Main Page

  • 8/8/2019 Calculate Mfpi

    7/21

    INELIGIBLE PROPOSALS

    FOR DAIRY

    FOR MEAT & POULTRY FOR CONSUMER PRODUCTS

    FOR OIL MILLING

    CLICK HERE

    CLICK HERE

    CLICK HERE

    CLICK HERE

    Main Page

    BACK

  • 8/8/2019 Calculate Mfpi

    8/21

    I neligible proposals - DAI RY

    Proposals for installation of Bulk M ilk Coolers at variousmilk collection points.Proposals for pasteurization and packing of raw milk alone. (Proposals of pasteurization of milk along w ithvalue added products should be considered for grant inaid)Proposals for expansion/ modernization of the same unitfor w hich MFPI grant has already been availed for settingup in the same location or activity.Proposals w ho made application for grant in aid aftercomm encement of comm ercial production.

    Proposals w ho have already availed grant in aid TW Otimes including its sister concern from M FPI .

    BACK

    Main Page

  • 8/8/2019 Calculate Mfpi

    9/21

    I neligible proposals - MEAT

    Proposals for expansion/ modernization of the same unitfor w hich MFPI grant has already been availed for settingup in the same location or activity.

    Proposals w ho made application for grant in aid aftercomm encement of comm ercial production.Proposals w ho have already availed grant in aid TW Otimes including its sister concern from M FPI .Proposals of Poultry farm, Goat farms , Proposals of Retail m eat selling counters etc.

    BACK

    Main Page

  • 8/8/2019 Calculate Mfpi

    10/21

    I neligible proposals - CONSUMER

    Proposals for Setting up/ expansion/ modernization of the unit for w hich MFPI grant has already been availedfor setting up in the same location or activity.Proposals w ho made application for grant in aid after

    comm encement of comm ercial production.Proposals w ho have already availed grant in aid TW Otimes including its sister concern from M FPI .IN CASE OF BHAGAR PR OCESSING ONLY ONE GRAN T ISELIGIBLE.

    BACK

    Main Page

  • 8/8/2019 Calculate Mfpi

    11/21

    I nel igible proposals OI L MI LLI NG

    Proposals for Setting up/ expansion/ modernization of the unit for w hich MFPI grant has already been availedfor setting up in the same location or activity.Proposals w ho made application for grant in aid aftercomm encement of comm ercial production.Proposals w ho have already availed grant in aid ONEtimes including its sister concern from M FPI .

    Proposals for Vanaspati ghee (Vegetable ghee I.e. inSolid form).

    BACK

    Main Page

  • 8/8/2019 Calculate Mfpi

    12/21

    ELIGIBILITY OF PLANT & MACHINARIES

    FOR DAIRY

    FOR MEAT & POULTRY FOR CONSUMER PRODUCTS

    FOR OIL MILLING

    CLICK HERE

    CLICK HERE

    CLICK HERE

    CLICK HERE

    Main Page

    BACK

  • 8/8/2019 Calculate Mfpi

    13/21

    ELIGI BILI TY OF PLANT & MACHINAR IES IN MI LK PR OCESSINGUNITS.

    Eligibility of P/M in milk processing project is to be workedout on the basis of milk products proposed to bemanufactured.

    For example if company proposes to process Cream, Butter,Ghee, Paneer etc. the l ist of plant & machineries must have

    Cream separator, Butter churner, Multipurpose vat, GheeBoiler, Ghee Clarifier, Ghee settling tank, Coagulation vat,Paneer press, Paneer hooves, packing M/ c etc.In case of I ce cream processing, continuous freezer must beinstalled.

    Inel ig ib le P lant / Machiner ies Computers, A/ C, officefurniture,Close circuit cameras, Milk tankers, Milk cans,Erection and commissioning charges,Transportation charges,Technical consultancy fees, vehicles, fire equipments, fuels,consumables, second hand/ old machines/ refurbishedmachineries, Electrical fixtures not mounted on machines orprocessing area etc.

    BACK

  • 8/8/2019 Calculate Mfpi

    14/21

    ELIGI BI LITY OF PLANT & MACHIN ARI ES IN M EAT PR OCESSINGUNITS.

    Eligibility of P/ M in meat & M eat processing project is to beworked out on the basis of meat products proposed to bemanufactured.

    For example if company proposes to process Poultry meatproducts etc. the li st of plan t & machiner ies must have

    proper slaughter equipments, Freezing facility, Renderingplant, ETP, packing M/ c etc.In case of raw meat/ beef processing, carcass splittingequipments, fat trim ming kn ives, meat mincer, grinder,packing machine etc. must be installed.Inel ig ib le P lant/ Machiner ies Computers, A/ C, officefurniture,Close circuit cameras, Transport vehicle , Erectionand commissioning charges,Transportation charges, Technical consul tancy fees, Refer Van , fire equipm ents, fuels,

    consumables, second hand/ old machines/ refurbishedmachineries, Electrical fixtures not mounted on machines orprocessing area etc.

    BACK

  • 8/8/2019 Calculate Mfpi

    15/21

    ELIGI BI LITY OF PLANT & MACHINAR IES IN CONSUM ER PRODUCTS.

    Eligibility of P/M in Consumer products projects is to beworked out on the basis of final products proposed to bemanufactured.

    For example if company proposes to process Bakery items likeBread, Buns etc, the l ist of plant & machineries must have

    Flour sifter, Dough K neader, Dough Divider, Dough Rounder,M oulding M/ c, Conveyer, Oven, Slicer, Packaging M/ c etc.In case of Biscuits, machineries are same but their specifications

    are different suitable for Biscuit s. Oven is a critical Machine .

    Inel ig ib le P lant / Machiner ies Computers, A/ C, officefurniture,Close circuit cameras, Transport vehicle/ Delivery

    Van , Erection and commissioning charges,Transportationcharges, Technical consultancy fees, fire equipments, fuels,

    consumables, second hand/ old machines/ refurbishedmachineries, Electrical fixtures not mounted on machines orprocessing area etc.

    BACK

  • 8/8/2019 Calculate Mfpi

    16/21

    ELIGI BI LITY OF PLANT & MACHINAR IES IN OIL M ILLIN G UNI TS.

    Eligibility of P/ M in oil milling projects is to be worked out onthe basis of Expeller, Solvant Extraction plant and Edible oilrefinery plant proposed to be Established.

    For example if company proposes to Establ ish SolventExtract ion plant , the l ist of plant & machineries must haveRotary seal, Dessolvantizer,Evaporators, Toaster, Meal discharge rodler etc.

    Inel igible P lant/ Machiner ies Computers, A/ C, officefurniture,Close circuit cameras, Transport vehicle , Erectionand commissioning charges,Transportation charges, Technical consultancy fees, fire equipm ents, fuels,consumables, second hand/ old machines/ refurbishedmachineries, Electrical fixtures not mounted on machines orprocessing area etc.

    BACK

  • 8/8/2019 Calculate Mfpi

    17/21

    ELIGIBILITY OF TECHNICAL CIVIL WORK

    FOR DAIRY

    FOR MEAT & POULTRY FOR CONSUMER PRODUCTS

    FOR OIL MILLING

    CLICK HERE

    CLICK HERE

    CLICK HERE

    CLICK HERE

    Main Page

    BACK

  • 8/8/2019 Calculate Mfpi

    18/21

    ELIGI BILI TY OF TECHNI CAL CIVIL WORK IN M ILK PR OCESSING

    UNITS.

    Eligible technical civil w ork w ill be the civil w ork m eantfor operational requirements.

    such as Raw milk reception dock, Raw Milk processingsection, Value added products processing section,Packing area, Cold storage, finished product store,Dispatch dock ,laboratory etc.

    Ineligible civil w ork Administrative office, staff room s, w orkers change room s, Toilets, sanitationrooms, Security/ guard room, compound w alls,approach roads etc.

    BACK

  • 8/8/2019 Calculate Mfpi

    19/21

    ELIGI BI LITY OF TECHNICAL CIVI L WORK IN M EAT PR OCESSING

    UNITS.

    Eligible technical civil w ork w ill be the civil w ork m eantfor operational requirements.

    such as Raw Meat recept ion dock, Meat processingsection, Value added products processing section,cooking area, Packing area, Cold storage, blast freezerroom, finished product store, Dispatch dock,laboratoryetc.

    Ineligible civi l w ork Administrative off ice, s taff rooms, workers change rooms, Toilets, sanitationrooms, Security/ guard room, compound walls,approach roads etc.

    BACK

  • 8/8/2019 Calculate Mfpi

    20/21

  • 8/8/2019 Calculate Mfpi

    21/21

    ELIGI BI LITY OF TECHNI CAL CIVIL WORK IN OIL MI LLING

    UNITS.

    Eligible technical civil w ork w ill be the civil w ork m eantfor operational requirements.

    such as Processing hal l, Raw/ Finished materialgodow ns, Heax ane tank s, Packing area, laboratory , oilstorage tanks etc.

    Ineligible civi l w ork Administrative off ice, s taff rooms, workers change rooms, Toilets, sanitationrooms, Security/ guard room, compound walls,approach roads etc.

    BACK