cal med innov - sepisolar.com · hiq acspl-40 480 vac, 40 a nema 4, ul listed l2 n g l1 l1 l2 g l1...
TRANSCRIPT
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
T1.0
2013 CA. ELECTRICAL CODE: § 110, 240, 250, 690, 7052013 CA BUILDING CODE: § 1507.17, 1509.7, 3111
2013 CA FIRE CODE: § 605.11UNDERWRITERS LABORATORIES (UL) STANDARDS
OSHA 29 CFR 1910.269
THIS ROOF MOUNTED PHOTOVOLTAIC (PV) SYSTEM IS TO BE INSTALLED AT THE OFFICE BUILDING IN CITY, CALIFORNIA.THE ENERGY PRODUCED BY THE PV SYSTEM SHALL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ON-SITE ELECTRICAL EQUIPMENT VIA
A BACK-FED BREAKER IN THE MAIN SERVICE PANEL. THIS PROJECT INCLUDES STORAGE BATTERIES.
PARCEL MAP1
VICINITY MAP3
AERIAL MAP2
PROJECT DESCRIPTION
SHEET INDEXT1.0 COVERA1.0 SITE PLANA1.1 PV LAYOUTA1.2 BALLAST LAYOUTA2.0 MOUNTING & RACKING METHODA3.0 MISC. DETAILSE1.0 PV ELECTRICAL DIAGRAME1.1 BATTERY ELECTRICAL DIAGRAME2.0 SAFETY PLACARDSD1.0 EQUIPMENT DATA SHEETS 1D1.1 EQUIPMENT DATA SHEETS 2
GOVERNING CODES
OCCUPANCY CATEGORY: IIDESIGN WIND SPEED: 110 MPH
EXPOSURE CATEGORY: CGROUND SNOW LOAD: 0 PSF
SITE SPECIFICATIONS
(225) PV MODULES (TOTAL: 4833 SQ. FT.)(8) 8.0 kW PV INVERTERS
(1) AVALON BATTERY IV SYSTEM(2) AC DISCONNECTS, 480 VAC, NEMA 3R
(1) LOAD CENTER, 480 VAC, NEMA 3R
SCOPE OF WORK CONSTRUCTION NOTES
PROJECT LOCATION
1.) CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TOINITIATING CONSTRUCTION.
2.) CONTRACTOR SHALL REVIEW ALL MANUFACTURER INSTALLATIONDOCUMENTS PRIOR TO INITIATING CONSTRUCTION.
3.) ALL EQUIPMENT SHALL BE LISTED BY U.L. (OR EQUAL) AND LISTEDFOR ITS SPECIFIC APPLICATION.
4.) ALL EQUIPMENT SHALL BE RATED FOR THE ENVIRONMENT INWHICH IT IS INSTALLED.
5.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THEMANUFACTURER'S INSTALLATION INSTRUCTIONS.
6.) ACCESS TO ELECTRICAL COMPONENTS OVER 150 VOLTS TOGROUND SHALL BE RESTRICTED TO QUALIFIED PERSONNEL.
7.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 VOLTSAND 90°C WET ENVIRONMENT, UNLESS OTHERWISE NOTED.
8.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITSARE NOT SPECIFIED, CONTRACTOR SHALL SIZE THEM ACCORDING TO
APPLICABLE CODES.9.) PV MODULE FRAMES SHALL BE BONDED TO RACKING RAIL ORBARE COPPER G.E.C. PER THE MODULE MANUFACTURER'S LISTED
INSTRUCTION SHEET.10.) PV MODULE RACKING RAIL SHALL BE BONDED TO BARE COPPER
G.E.C. VIA WEEB LUG, ILSCO GBL-4DBT LAY-IN LUG, OR EQUIVLENTLISTED LUG.
11.) GROUNDING ELECTRODE CONDUCTOR (G.E.C.) SHALL BECONTINUOUS AND/OR IRREVERSIBLY SPLICED/WELDED.
12.) ALL JUNCTION BOXES, COMBINER BOXES, AND DISCONNECTSSHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.
13.) ROOF ACCESS POINTS SHALL BE AT A STRONG POINT ON THEBUILDING AND NOT REQUIRE THE PLACEMENT OF LADDERS OVER
EXTERIOR WALL OPENINGS.14.) WORKING SPACE AROUND ELECTRIAL EQUPMENT SHALL COMPLY
WITH NEC 110.26
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
A1.0
32'
180°
N
PV A
ZIM
UTH
10° TILT TYP.
MAIN SERVICE PANEL
PARKING LOT
PV LOAD CENTER
PARKING LOT
PARKIN
G L
OT
PARKING LOT
ADJACENT BUILDING
TOW
NE C
ENTE
R D
RIV
E
SYMBOL NAME DESCRIPTION
ROOFTOP
PV MOD.
FIRE
SETBACK
CA FIRE REQUIRED PATHWAYS
4' TYP.
LOCATION OF ROOFTOP PV MODULE
ROOF
OBSTR.
LOCATION OF ROOFTOP HVAC,
SKYLIGHTS, ETC.
76'-6"
200'
165'
11'
24'
25'
19'-6"
FLAT ROOF (1/4:12)
3' P
ARAPET W
ALL
3' PARAPET WALL
7' PARAPET W
ALL
5' PARAPET W
ALL
6' PARAPET WALL
7' PARAPET W
ALL 7' PARAPET WALL
NOTE: WHERE PARAPET WALL IS LESS THAN 42" HIGH, INSTALL GUARD RAILS PER CBC 1013.6
NOTE: WHERE CLEARANCE AROUND SKYLIGHTS IS LESS THAN 48" WIDTH, INSTALL GUARD RAILS
7'-6"
3'
3'-6"
3'3'-6"
3'-6"
7'-6"
4'
2'-6"
4'
4'
2'-6"
4'-6"
2'-6"
3'3'-6"
3'-6"
7'4'-6"
3'
3'-6"
4'-6"
8'
4'
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
A1.1
180°
N
PV A
ZIM
UTH
1.1 (14)
12 ft6 ft 24 ft
SCALE: 1" = 12'
4.2 (14)
STRING LEGEND:
1.2 (12)
INVERTER ID #
STRING ID #
STRING LENGTH
1.2 (12)
4.1 (14)
2.1 (14)
2.2 (12)
3.2 (12) 3.1 (14)
5.2 (14)
5.1 (15)
6.1 (16) 6.2 (13)
7.1 (16)
7.2 (15)
8.2 (15)
8.1 (15)
INVERTER #1
INVERTER #2 &
SPLICE BOX #2
INVERTER #3
INVERTER #4 &
SPLICE BOX #3
INVERTER #5INVERTER #6
INVERTER #7 &
SPLICE BOX #4
INVERTER #8
3/4" EMT
3/4" EMT ON ROOFTOP TYP.
MAIN SERVICE
PANEL
AC DISCONNECT
BATTERY
UNIT (QTY. 3)
BATTERY
INVERTER
PV LOAD CENTER
PV METER
AC DISCONNECT
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
A1.2
LAYOUT
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
A2.0
MOUNTING DETAILMOUNTING METHOD4
SCALE: 1" = 4"SCALE: 1" = 8"
8 in4 in 16 in 4 in2 in 8 in
5
MOUNTING PLAN VIEW1
SCALE: 1" = 18"
18 in9 in 36 inMOUNTING ISO VIEW
3SCALE: 1" = 18"
18 in9 in 36 in
BALLAST BLOCK DETAIL2
SCALE: N/A
4-
5-
2 BLOCK 3 BLOCKS 4 BLOCKS 5 BLOCKS1 BLOCK
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
A3.0
CONDUIT ROOF MOUNTING3
SCALE: NTS
3 1/2" MIN.
INVERTER & SPLICEBOX MOUNTING
1SCALE: NTS
CONDUIT WALL MOUNTING2
SCALE: NTS
ROOF SLOPE
DRAINAGE PLAN4
SCALE: 1" = 20'
20 ft10 ft 40 ft
NROOF SLOPE = 1/4:12 TYP.
INTERSECTION OF RIDGELINES
REPRESENTS 0'-0"
ELEVATIONS OF SCUPPERS AND
DRAINS LABELED ON LAYOUT AS
RELATIVE TO RIDGELINE HEIGHT
0'-0"
SCUPPER
TYP.
DRAIN TYP.
ROOF MATERIAL:
ROLL-OUT COMP.
165'
76'-6"
200'
-1'-8"
-1'-8"-1'-8"
-2'-5"
-0'-10"-0'-10"
-0'-5"
-0'-5"
NOTE: MODULES RAISED
MIN. 2" ABOVE ROOF
TO ALLOW DRAINAGE;
ONLY BALLAST TRAYS
WILL IMPEDE FLOW
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
E1.0
ON ROOFTOP BLDG EXTERIOR WALL
MPPT 'A'
G
L1
L2
N
G
AC1
L3
MPPT 'B'
HIQ TRUESTRING TS480-8K
OUTPUT: 8.0 kW, 480 VAC, 9.6 A
98.0% CEC-WEIGHTED EFFICIENCY
NEMA 6, UL LISTED, INTERNAL GFDI & AFCI
UNGROUNDED, TRANSFORMERLESS
(N) INVERTER (QTY 8)
MPPT 'A'
G
L1
L2
N
G
L3
MPPT 'B'
MPPT 'A'
G
L1
L2
N
G
L3
MPPT 'B'
MPPT 'A'
G
L1
L2
N
G
AC1
L3
MPPT 'B'
L2
L3
N
G
G
L1
L1
L2
N
G
L3
L1
L2
N
G
L3
L1
L2
N
G
L3
AC4
(N) AC SPLICE BOXHIQ ACSPL-40
480 VAC, 40 A
NEMA 4, UL LISTED
MPPT 'A'
G
L1
L2
N
G
AC1
L3
MPPT 'B'
MPPT 'A'
G
L1
L2
N
G
AC1
L3
MPPT 'B'
L2
L3
N
G
N
G
L1
15 AL1
L2
N
G
L3
25 AL1
L2
N
G
L3
MPPT 'A'
G
L1
L2
N
G
L3
MPPT 'B'
MPPT 'A'
G
L1
L2
N
G
L3
MPPT 'B'
40 AL1
L2
N
G
L3
AC5GGG
1221
GGG
1421
DC1STRING 1.2STRING 1.1
GGG
1221
GGG
1421
DC1
GGG
1221
GGG
1421
DC1
STRING 2.2STRING 2.1
STRING 3.2STRING 3.1
GGG
1421
GGG
1421
DC1STRING 4.2STRING 4.1
GGG
1421
GGG
1521
DC1STRING 5.2STRING 5.1
GGG
1321
GGG
1621
DC1STRING 6.2STRING 6.1
GGG
1521
GGG
1621
DC1STRING 7.2STRING 7.1
GGG
1521
GGG
1521
DC1STRING 8.2STRING 8.1
(N) PV LOAD CENTERSQ D NF418L1
W/ MH26WP ENCLOSURE
480 VAC, 3-PH, 125 A
NEMA 3R, UL LISTED
(E) BI-DIRECTIONAL
UTILITY METER
3-PHASE, 4-WIRE
277/480 VAC WYE
L2 L3 N
TO UTILITY GRID
(E) MAIN SERVICE DISCONNECT
800 A, 480 V, 3-P
(E) BUS BARS: 800 A
L1
(N) RELAY CT (1 PER PHASE)
(N) DEMAND CT (1 PER PHASE)
FROM BATTERY SYSTEM
SEE E1.1 FOR DETAILS
FROM BATT. PROTECTION RELAY
FROM DEMAND MONITOR
(N) BATTERY INVERTER
INTERCONNECTION BREAKER
EATON GHC3060
60 A, 480 V, 3-P
INSTALLED PER NEC 705.12(D)(7)
(N) AC SPLICE BOXHIQ ACSPL-40
480 VAC, 40 A
NEMA 4, UL LISTED
L2
L3
N
G
G
L1
L1
L2
N
G
L3
L1
L2
N
G
L3
AC3
AC1
AC1
AC1
(N) AC SPLICE BOXHIQ ACSPL-40
480 VAC, 40 A
NEMA 4, UL LISTED
L2
L3
N
G
G
L1
L1
L2
N
G
L3
L1
L2
N
G
L3
AC3
AC1
AC1
25 AL1
L2
N
G
L3
G G
(N) JUNCTION BOXNEMA 4X, UL LISTED
AC2
L1
L2
N
L3
L1
L2
N
L3
(N) AC DISCONNECTSQ D HU363NRB
600 VAC, 100 A
NEMA 3R, UL LISTED
L1
L2
N
G
L1
L2
N
G
L3 L3
#1
#2
#3
#4
#5
#6
#7
#8
AC5
HI-Q MONITORING
GATEWAY
L1
LAN ETHERNET CABLE
TO ROUTER
G
L1
N
G
N
15 A
SEE SPLICE BOX WIRE DIAGRAM ON D1.0
FOR AC COMBINATION CONFIGURATION DETAIL
(E) MAIN SWITCHBOARD
3-PHASE, 4-WIRE
277/480 VAC WYE
(E) GROUNDING
ELECTRODE SYSTEM
L1
L2
N G
800 A
L3
L1
L2
100 A
L3
L1
L2
60 A
L3
(N) PV BREAKER
100 A, 480 V, 3-P
INSTALLED PER
NEC 705.12(D)(7)
(N) PV METER480 VAC, 100 A
NEMA 3R, UL LISTED
L1
L2
N
G
L1
L2
N
G
L3 L3
AC5
(N) AC DISCONNECTSQ D HU363NRB
600 VAC, 100 A
NEMA 3R, UL LISTED
L1
L2
N
G
L1
L2
N
G
L3 L3
AC5
MATERIALTEMP.
RATING
TRADE
SIZE
MAX
CURRENT
690.8(A)(1)
xIs c
(Amps)x
# OF
PARALLEL
STRINGS
= x125% PER
690.8(B)(2)(a)= <
DC1 PV STRING INVERTER COPPER 90°C AWG #10 40 Amps 1.25 x 9.44 x 1 = 11.8 Amps x 1.25 = 14.8 Amps 14.8 Amps < 40.0 Amps
TAGCIRCUIT
ORIGIN
CONDUCTOR SPECIFICATIONS
AMPACITY @
30°C PER
310.15(B)(16)
MAX
CURRENT PER
690.8(A)(1)
MAX
CURRENT PER
690.8(B)(2)(a )
MAX
CURRENT PER
690.8(B)(2)(a)
REQUIRED CONDUCTOR AMPACITY
CONDUCTOR
AMPACITY
AMPACITY CHECK #1CIRCUIT
DESTINATION
Model Number:
Power Rating: 8.00 kW AC
Nominal Voltage: 480 Volts AC
Max Output Current: 9.6 Amps
CEC Weighted Efficiency: 98.0%
Maximum DC Voltage: 1000
DC Start Voltage: 200
Max. MPPT Voltage: 850 Max Current MPPT A: 15.0
MPPT Quantity: 2 Max Current MPPT B: 15.0
Inverter Quantity: 8 Max Current MPPT C: N/A
HIQ SOLAR TRUESTRING TS480-8K
Inverter #1 - #8 Specifications
Inv #1 Inv #2 Inv #3 Inv #4 Inv #5 Inv #6 Inv #7 Inv #8
8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
8.45 8.45 8.45 9.10 9.43 9.43 10.08 9.75
1.06 1.06 1.06 1.14 1.18 1.18 1.26 1.22
26 26 26 28 29 29 31 30
String Qty: 1 1 1 1 1 1 1 1
String Length: 14 14 14 14 15 16 16 15
Max Open Ci rcui t Vol tage 699 699 699 699 749 799 799 749
Operating Vol tage: 505 505 505 505 541 577 577 541
Max Short Ci rcui t Current 11.8 11.8 11.8 11.8 11.8 11.8 11.8 11.8
Operating Current: 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9
String Qty: 1 1 1 1 1 1 1 1
String Length: 12 12 12 14 14 13 15 15
Max Open Ci rcui t Vol tage 599 599 599 699 699 649 749 749
Operating Vol tage: 433 433 433 505 505 469 541 541
Max Short Ci rcui t Current 11.8 11.8 11.8 11.8 11.8 11.8 11.8 11.8
Operating Current: 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9
Inverter I.D. #
Inverter AC Power (kW):
PV Power (kWstc):
Inverter DC:AC Ratio
Module Total Qty:
MP
PT
"A
"M
PP
T "
B"
System: 73.13 kWstc, 64 kW AC
Total PV Module Qty: 225
Array Configuration Model Number:
Weight: 52.9 lbs
Dimensions: (in)
Power @ STC: 325 Watts
Voc: 46.4 Volts DC
Vmp: 36.7 Volts DC
Isc: 9.44 Amps
Imp: 8.85 Amps
Voc Temp Coeff: -0.29 %/°C
Max DC Voltage: 1,000 Volts DC
78.5 x 39.4 x 1.38
HANWHA Q CELLS Q.PLUS-G4 325
PV Module Specifications
Local Record Low Temp: °C Data Source:
0.29%/°C x 26°C + 1 = 1.075 x 46.4 x 16 = 798.9 Volts DC1.075
1 =
Voc
Correction
Factor
Voc
Correction
Factor
x Voc x
Max # of
Modules in
Series
=
Termperature
Corrected Open
Circuit Voltage
Voc Temp
Coefficientx
25°C -
Record
Low Temp.
+
-1
PV System Maximum Voltage Calculation per NEC 690.7(A)
ONTARIO
NOMINAL SYSTEM VOLTAGE: 480 Volts AC
MAX CURRENT PER 690.8(A): 77 Amps
MAX CURRENT PER 690.8(B): 96 Amps
PV AC System Summary
NOMINAL SYSTEM VOLTAGE: 480 Volts AC
MAX CURRENT: 141 Amps
Total AC System Summary
CONDUCTOR SPECIFICATIONS
MATERIALTEMP.
RATING
TRADE
SIZE
INVERTER
OUTPUT
CURRENT
x# OF
INVERTERS= x
125% PER
690.8
(B)(2)(a )
= <
AC1 INVERTER JBOX/PVLC COPPER 75°C AWG #12 25 Amps 9.6 x 1 = 9.6 Amps x 1.25 = 12.0 Amps 12.0 Amps < 25 Amps
AC2 JUNCTION BOX PV LOAD CENTER COPPER 75°C AWG #10 35 Amps 9.6 x 1 = 9.6 Amps x 1.25 = 12.0 Amps 12.0 Amps < 35 Amps
AC3 SPLICE BOX PV LOAD CENTER COPPER 75°C AWG #8 50 Amps 9.6 x 2 = 19.2 Amps x 1.25 = 24.0 Amps 24.0 Amps < 50 Amps
AC4 SPLICE BOX PV LOAD CENTER COPPER 75°C AWG #8 50 Amps 9.6 x 3 = 28.8 Amps x 1.25 = 36.0 Amps 36.0 Amps < 50 Amps
AC5 PV LOAD CENTER PV BREAKER COPPER 75°C AWG #1/0 150 Amps = 108.8 Amps x 1.25 = 136.0 Amps 136.0 Amps < 150 Amps
AMPACITY CHECK #1
MAX
CURRENT PER
690.8(B)(2)(a )
MAX
CURRENT PER
690.8(B)(2)(a )
CONDUCTOR
AMPACITY
REQUIRED CONDUCTOR AMPACITY
MAX
CURRENT PER
690.8(A)(3)
CIRCUIT
ORIGIN
CIRCUIT
DESTINATIONAMPACITY @
30°C PER
310.15(B)(16)
TAG
(9.6 x 8) + 32
CONDUIT FILL DERATING VOLTAGE DROP
CIRCUIT ENVIRONMENT
TEMP. ADDER
PER
310.15(B)(3)(c)
EXPECTED
OPERATING
TEMP (°C)
AMPACITY
CORRECTION
310.15(B)(2)(a)
# OF
UNGROUNDED
CONDUCTORS
AMPACITY
CORRECTION
310.15(B)(3)(a )
CONDUCTOR
AMPACITYx
TEMP
DERATEx
CONDUIT
FILL
DERATE
= <VOLTAGE
DROP
ROOFTOP, IN CONDUIT (3.5in) 17 48 0.82 3 1.00 25 x 0.82 x 1.00 = 20.5 Amps 9.6 Amps < 20.5 Amps 10 ft 0.07%
ROOFTOP, IN CONDUIT (3.5in) 17 48 0.82 3 1.00 35 x 0.82 x 1.00 = 28.7 Amps 9.6 Amps < 28.7 Amps 60 ft 0.25%
ROOFTOP, IN CONDUIT (3.5in) 17 48 0.82 3 1.00 50 x 0.82 x 1.00 = 41 Amps 19.2 Amps < 41.0 Amps 100 ft 0.54%
ROOFTOP, IN CONDUIT (3.5in) 17 48 0.82 3 1.00 50 x 0.82 x 1.00 = 41 Amps 28.8 Amps < 41.0 Amps 175 ft 1.42%
EXTERIOR BLDG. WALL (+15°C) N/A 46 0.82 3 1.00 150 x 0.82 x 1.00 = 123 Amps 108.8 Amps < 123.0 Amps 100 ft 0.51%
EST.
ONE-WAY
DISTANCE
DERATED
CORRECTED
AMPACITY
MAX
CURRENT
690.8(B)(2)(b)
DERATED
CONDUCTOR
AMPACITY
AMPACITY CHECK #2CONDUCTOR TEMPERATURE DERATING CORRECTED AMPACITY CALCULATION
WIRE AND CONDUIT SCHEDULE
TAGCONDUIT
SIZE
CONDUIT
TYPE
EST.
DIST.
DC1 2/STRING AWG #10 1000V PV-WIRE 1 AWG #6 BARE CU N/A N/A 5
PHASE CONDUCTOR
QTY, SIZE AND TYPE
PER CONDUIT
GROUND CONDUCTOR
QTY, SIZE AND TYPE
PER CONDUIT
AC1 4 AWG #12 THWN-2 1 AWG #8 THWN-2 3/4" EMT 10
AC2 4 AWG #10 THWN-2 1 AWG #8 THWN-2 3/4" EMT 60
AC3 4 AWG #8 THWN-2 1 AWG #8 THWN-2 3/4" EMT 100
AC4 4 AWG #8 THWN-2 1 AWG #8 THWN-2 3/4" EMT 175
AC5 4 AWG #1/0 THWN-2 1 AWG #6 THWN-2 2" EMT 100
CONDUIT FILL DERATING VOLTAGE DROP
CIRCUIT ENVIRONMENT
LOCAL 2%
AVG. HIGH
TEMP (°C)
HEIGHT
ABOVE
ROOF (in)
TEMP. ADDER
PER
310.15(B)(3)(c)
OPERATING
TEMP (°C)
AMPACITY
CORRECTION
310.15(B)(2)(a)
# OF
UNGROUNDED
CONDUCTORS
AMPACITY
CORRECTION
310.15(B)(3)(a)
AMPACITY xTEMP
DERATEx
CONDUIT
FILL
DERATE
= <VOLTAGE
DROP
ROOFTOP, FREE AIR 31 3.5 17 48 0.82 N/A 1.00 40 x 0.82 x 1.00 = 32.8 Amps 11.8 Amps < 32.8 Amps 5 ft 0.03%
CONDUCTOR TEMPERATURE DERATING CORRECTED AMPACITY CALCULATION
DERATED
CONDUCTOR
AMPACITY
MAX
CURRENT PER
690.8(B)(2)(b)
DERATED
CORRECTED
AMPACITY
EST.
ONE-WAY
DISTANCE
AMPACITY CHECK #2
- =
120% Rule Calculation per NEC 705.12(D)(2)
Mai n Busbar Rating: 800 Amps
Amps
Backfeed Breaker Rating: 100 + 60 Amps
Mai n Service Breaker Rating: 800
BUSBAR x 120% - MAIN BREAKER =MAX BACKFEED
BREAKER
960 800 160
= EQUIP. GROUNDING CONDUCTOR = CIRCUIT CONDUCTOR L1 L2 N G= = = =LINE 1 (BROWN) LINE 2 (ORANGE) NEUTRAL (WHITE) GROUND (GREEN) = =POSITIVE (RED) NEGATIVE (BLACK)=FUSE = CIRCUIT BREAKER = =NEW EQUIP. EXISTING EQUIP.(E)(N) L3 = LINE 3 (YELLOW)
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
E1.1
(E) MAIN SWITCHBOARD
3-PHASE, 4-WIRE
277/480 VAC WYE
(E) BI-DIRECTIONAL
UTILITY METER
3-PHASE, 4-WIRE
277/480 VAC WYE
L2 L3 N
(E) GROUNDING
ELECTRODE SYSTEM
L1
L2
TO UTILITY GRID
N G
800 A
L1
L3
(N) BOS
CTL1
L2
L3
AVALON BATTERY V2 SYSTEM
G
25 KWh AC, 30 KW AC PEAK
48 V DC, 375 A DC MAX DISCHARGE
480 VAC, 3-PHASE, 60 Hz
36 A AC CONTINUOUS, 45 A AC PEAK
L1
L2
100 A
L3
(N) BATTERY INVERTER
L1
L2
G
L3
L1
L2
G
L3
(N) BATTERY
BANK
10 A
(N) BATTERY
BANK
AC1
L1L1
(N) CONTACTOR
L1
L2L2
L3L3
G
(N) PROTECTION
RELAY
CT
G
G
(N) BATTERY
BANK
IDEAL POWER PCS
(N) INVERTER UNIT
(N) BATTERY (QTY. 3)
(2) AWG #4/0 CU MIN.
PER BATTERY
(E) MAIN SERVICE DISCONNECT
800 A, 480 V, 3-P
(E) BUS BARS: 800 A
(N) RELAY CT (1 PER PHASE)
(N) DEMAND CT (1 PER PHASE)
L1
L2
60 A
L3
FROM PV SYSTEM
SEE E1.0 FOR DETAILS
(N) BATTERY INVERTER
INTERCONNECTION BREAKER
EATON GHC3060
60 A, 480 V, 3-P
INSTALLED PER NEC 705.12(D)(7)
(N) PV BREAKER
100 A, 480 V, 3-P
INSTALLED PER
NEC 705.12(D)(7)
WIRE AND CONDUIT SCHEDULE
TAGCONDUIT
SIZE
CONDUIT
TYPE
EST.
DIST.
PHASE CONDUCTOR
QTY, SIZE, & TYPE
PER CONDUIT
GROUND CONDCUTOR
QTY, SIZE & TYPE
PER CONDUIT
CIRCUIT ENVIRONMENT
LOCAL 2%
AVG. HIGH
TEMP (°C)
OPERATING
TEMP (°C)
AMPACITY
CORRECTION
310.15(B)(2)(a )
# OF
UNGROUNDED
CONDUCTORS
AMPACITY
CORRECTION
310.15(B)(3)(a )
CONDUCTOR
AMPACITYx
TEMP
DERATEx
CONDUIT
FILL
DERATE
= <VOLTAGE
DROP
EXTERIOR BLDG. WALL (+15°C) 31 46 0.75 3 1.00 65 x 0.75 x 1.00 = 48.8 Amps 45.0 Amps < 48.8 Amps 10 ft 0.08%
CONDUIT FILL DERATING CORRECTED AMPACITY CALCULATION AMPACITY CHECK #2
DERATED
CONDUCTOR
AMPACITY
CONDUCTOR TEMPERATURE DERATING VOLTAGE DROP
DERATED
CONDUCTOR
AMPACITY
MAX
CURRENT PER
690.8(B)(2)(b)
EST.
ONE-WAY
DISTANCE
AC1 3 AWG #6 THWN-2 1 AWG #8 THWN-2 3/4" EMT 10
CONDUCTOR SPECIFICATIONS
MATERIALTEMP.
RATING
TRADE
SIZE
INVERTER
OUTPUT
CURRENT
x# OF
INVERTERS= x
125% PER
680.8(B)(2)(a )= <
AC1 BATTERY BANK MAIN PANEL COPPER 75°C AWG #6 65 Amps 45.0 x 1 = 45.0 Amps x 1 = 45.0 Amps 45.0 Amps < 65 Amps
MAX CURRENT
PER
690.8(A)(3)
MAX CURRENT
PER
690.8(B)(2)(a )
CONDUCTOR
AMPACITY
CIRCUIT
ORIGIN
AMPACITY CHECK #1REQUIRED CONDUCTOR AMPACITY
TAGCIRCUIT
DESTINATIONAMPACITY @
30°C PER
310.15(B)(16)
MAX CURRENT
PER
690.8(B)(2)(a )
= EQUIP. GROUNDING CONDUCTOR = CIRCUIT CONDUCTOR L1 L2 N G= = = =LINE 1 (BROWN) LINE 2 (ORANGE) NEUTRAL (WHITE) GROUND (GREEN) = =POSITIVE (RED) NEGATIVE (BLACK)=FUSE = CIRCUIT BREAKER = =NEW EQUIP. EXISTING EQUIP.(E)(N) L3 = LINE 3 (YELLOW)
RICHARD DOBBINS
DESCRIPTION DATE REV
Sheet Title:
Sheet Size:
Sheet Number:
Project:
Engineering Approval:
REVISIONS
Project Details:
DESIGN & DRAFTING BY:
Reviewed & Approved by:
JH
Contractor:
73.125 kWstc, 64.00 kW AC
ARCH C - 24" x 18"
E2.0
GRID TIED PHOTOVOLTAIC POWER SOURCE
OPERATING CURRENT: 8.9 AOPERATING VOLTAGE: 577 V
MAX SYSTEM VOLTAGE: 799 VMAX SYSTEM CURRENT: 11.8 A
MAX INVERTER OUTPUT:8 kW, 9.6 A, 480 VAC
WARNING
ELECTRIC SHOCK HAZARD.
DO NOT TOUCH
TERMINALS. TERMINALS ON
BOTH THE LINE AND LOAD
SIDES MAY BE ENERGIZED
IN THE OPEN POSITION.
THIS ELECTRIC SERVICE IS
ALSO SERVED BY A
PHOTOVOLTAIC SYSTEM
WARNING
INVERTER OUTPUT
CONNECTION. DO NOT
RELOCATE THIS
OVERCURRENT DEVICEPHOTOVOLTAIC POWER SOURCE SOLAR AC DISCONNECT
PHOTOVOLTAIC SYSTEM
DISCONNECT
AC CURRENT: 96 A
VOLTAGE: 480 VACSOLAR DC DISCONNECT
WARNING
IF A GROUND FAULT IS
INDICATED, THE NORMALLY
GROUNDED CONDUCTORS
MAY BE ENERGIZED AND
UNGROUNDED.
WARNING
ELECTRIC SHOCK HAZARD.
THE DC CONDUCTORS OF
THE PV SYSTEM ARE
UNGROUNDED AND MAY BE
ENERGIZED.
PHOTOVOLTAIC SYSTEM
DISCONNECT
AC CURRENT: 45 A
VOLTAGE: 480 VAC
PHOTOVOLTAIC SYSTEM
DISCONNECT
AC CURRENT: 141 A
VOLTAGE: 480 VAC
SIGNAGE REQUIREMENTS1.) RED BACKGROUND
2.) WHITE LETTERING3.) MIN. 3/8" LETTER HEIGHT4.) ALL CAPITAL LETTERS
5.) ARIAL OR SIMILAR FONT6.) WEATHER RESISTANT
MATERIAL, PER UL 969
REQ'D BY: NEC 690.171
APPLY TO:DISCONNECTSPV LOAD CENTERSCOMBINER BOXES
REQ'D BY: NEC 705.12(D)(4)3
APPLY TO:MAIN SERVICE PANEL
REQ'D BY: NEC 705.12(D)(7)4
APPLY TO:PV SYSTEM BREAKER
REQ'D BY: NEC 690.31(E)(3)2
APPLY TO:EXPOSED RACEWAYS, CABLE TRAYSCOVERS OR ENCLOSURES OF JUNCTION BOXESCONDUIT BODY W/ AVAILABLE CONDUIT OPENING
5
REQ'D BY: NEC 690.549
APPLY TO:PV SYSTEM DISCONNECT
REQ'D BY: NEC 690.538
APPLY TO:INVERTERS
REQ'D BY: NEC 690.13(B)6
APPLY TO:PV SYSTEM DC DISCONNECTS
REQ'D BY: NEC 690.5(C)7
APPLY TO:INVERTER
REQ'D BY: NEC 690.14(C)(2)
APPLY TO:PV SYSTEM AC DISCONNECTS
REQ'D BY: NEC 690.35(F)12
APPLY TO:JUNCTION BOXES, COMBINER BOXESDC DISCONNECTS, INVERTERS
REQ'D BY: NEC 690.5410
APPLY TO:BATTERY SYSTEM DISCONNECT
REQ'D BY: NEC 690.5411
APPLY TO:BACKFEED BREAKER