cadiz valley water conservation, recovery & storage project

17
Cadiz Valley Water Conservation, Recovery & Storage Project July 2013

Upload: saskia

Post on 22-Feb-2016

22 views

Category:

Documents


0 download

DESCRIPTION

Cadiz Valley Water Conservation, Recovery & Storage Project. July 2013. Cadiz Inc. California company founded in 1983. Land and water rights at 3 locations in San Bernardino County. 20-year organic farming operation. Developing water s upply and groundwater storage projects. PIUTE. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Cadiz Valley Water Conservation, Recovery & Storage Project

Cadiz Valley Water Conservation, Recovery & Storage Project

July 2013

Page 2: Cadiz Valley Water Conservation, Recovery & Storage Project

2

aa

5

15 10

5

15

40

8

Los Angeles

San Diego

Las Vegas

Barstow

Fresno

Bakersfield

San Bernardino

SantaBarbara

Yuma

Kingman

Needles

Laughlin

El Centro

CADIZ

CRA

DANBY

PIUTE

Cadiz Inc.o California company

founded in 1983.

o Land and water rights at 3 locations in San Bernardino County.

o 20-year organic farming operation.

o Developing water supply and groundwater storage projects.

Page 3: Cadiz Valley Water Conservation, Recovery & Storage Project

3

o 1,300 sq. mile watershed -size of Rhode Island

o Approx. 20 million AF stored in the alluvial aquifers, comparable to Lake Mead

o Estimated average natural recharge 32,500 AF/year

o Cadiz-owned land at base of watershed.

The Cadiz Valley

Cadiz Dry

Lake

Bristol Dry Lake

5 Miles

a

BNSF

66

Fenner Valley

OrangeBlossomWash

GraniteMountains

ProvidenceMountains

New York Mountains

Page 4: Cadiz Valley Water Conservation, Recovery & Storage Project

4

Loss of Water at Dry Lakes

Dry Lake Crust Beneath Dry Lake Surface

Groundwater in the watershed currently flows to local dry lakes, where it is lost to evaporation.

Page 5: Cadiz Valley Water Conservation, Recovery & Storage Project

5

Cadiz Valley Propertyo 34,000 acres with 9,600 acres zoned for

permanent agricultural development.

o 1,600 Acres developed for ag:grapes, lemons and seasonal vegetables.

o Network of 8 large-scale production wells and 10 monitoring wells.

o 3,000 – 5,000 AF/year used for irrigation.

o Site of Cadiz Valley Water Conservation Project.

Page 6: Cadiz Valley Water Conservation, Recovery & Storage Project

6

Project Designo Intercept and

conserve groundwater before it reaches dry lakes.

o Put conserved water to beneficial use in So. California water system.

o Without intervention, billions of gallons of water lost

Page 7: Cadiz Valley Water Conservation, Recovery & Storage Project

7

Conservation & Recovery (CEQA Approved)

o Deliver average of 50,000 AF/year to water providers over 50-year project term, subject to management plan.

o Reliable supply for 100,000 families.

o Facilities –

20-32 wells and supporting wellfield manifold

Natural gas power source and ancillary facilities

43-mile buried pipeline to Colorado River Aqueduct within Arizona & California Railroad right-of-way.

Project Description – Phase 1

Page 8: Cadiz Valley Water Conservation, Recovery & Storage Project

8

Project Participants

o Six water providers with customers in LA, Orange, Riverside and San Bernardino Counties.

Santa Margarita Water District Three Valleys Municipal Water District Suburban Water Systems Golden State Water Company California Water Service Company Jurupa Community Services District

o Arizona & California Railroad will receive water and power for critical railroad purposes.

Page 9: Cadiz Valley Water Conservation, Recovery & Storage Project

9

Environmental Analysis and Approvals

o 2009 – 2011: Analysis of water and environmental resources conducted, CEQA review process led by SMWD.

o July 31, 2012: SMWD Board unanimously certified the Final EIR.

o October 1, 2012: San Bernardino County Supervisors approved Groundwater Management, Mitigation and Monitoring Plan and withdrawal of 50,000 AF/yr.

Page 10: Cadiz Valley Water Conservation, Recovery & Storage Project

10

o Over 40 monitoring features including – Measured water levels in private wells Air quality monitoring installations Subsidence monitoring devices

o Plan includes action triggers designed to identify potential impacts in advance and authorizes strict corrective actions.

o Regular monitoring reports prepared by technical experts

will be reviewed and posted online.

o Independent enforcement by San Bernardino County & Santa Margarita Water District.

Groundwater Management Plan

Page 11: Cadiz Valley Water Conservation, Recovery & Storage Project

11

o Subject to further permitting, import water when available for storage in the aquifer system at Project area ; return to agencies when needed in dry years.

o Facilities:

• Convert existing buried 30” pipeline from Cadiz to Barstow to water conveyance

• Recharge basins on Cadiz Property to accept storage water, and

• Pump station.

o Total storage capacity = 1 million acre-feet.

Phase 2 – Imported Water Storage

Page 12: Cadiz Valley Water Conservation, Recovery & Storage Project

12

Map – So Cal Water SystemPhase 1 & 2 would link Cadiz to main water transportation routes in California.

Page 13: Cadiz Valley Water Conservation, Recovery & Storage Project

13

o Capital Cost (approx.): Phase 1 Conservation and Recovery - $275 M. Phase 2 Imported Water Storage - $250 M.

o 18 months construction for Phase 1 could begin as early as next year.

o Economist John Husing estimated construction benefit for Phase 1 & 2: Total economic impact of

approx. $878M over 4 yrs. Create and support average

of 1,500 jobs/yr.

Economic Impact

Page 14: Cadiz Valley Water Conservation, Recovery & Storage Project

14

o Economic impact will benefit many sectors including: Construction (heavy, industrial) Construction Materials & Supplies Planning & Engineering Transportation

o Construction–related jobs to be across various specialties:

Construction Benefits

Well drillers, pipe-fitters & fabricators General facilities construction laborConstruction planners Legal, operations & project mgmt.

Materials supply purchase & delivery Transportation (trucking, rail) Surveyors, land management Engineers, science & technicalLand preparation (machinery) Hospitality, retail

Page 15: Cadiz Valley Water Conservation, Recovery & Storage Project

15

Local Support

• Building Industry Association of Southern California• Inland Empire Economic Partnership• The Morongo Basin Regional Economic Development Consortium• Adelanto Chamber of Commerce • Needles Chamber of Commerce• 29 Palms Chamber of Commerce• Rancho Cucamonga Chamber of Commerce• Fontana Chamber of Commerce• Redlands Chamber of Commerce• South Orange County Regional Chamber of Commerce• Orange County Taxpayers Association• San Bernardino Railroad Historical Society

Page 16: Cadiz Valley Water Conservation, Recovery & Storage Project

16

Timeline /Next Steps

2013

Resolve outstanding litigation, BLM.

Consider sales agreements with current option holders.

2014 Finalize agreements with Metropolitan Water District for

CRA tie-in and exchange terms.

Begin additional permitting for Phase 2. Project financing, final design and start construction of

Phase 1 facilities.

Page 17: Cadiz Valley Water Conservation, Recovery & Storage Project

For more information, visit www.cadizinc.com

email:[email protected]