cad models for mpgd chambers
DESCRIPTION
Antonio Conde, PH-CMX. CAD MODELS FOR MPGD CHAMBERS. POINTS. 1 DIMENSIONAL & GEOMETRICAL CHANGES. 2 SINGLE CHAMBERS INSTALLED. 3 DOUBLE CHAMBERS. 4 INSTALATION PROCEDURE. 5 PATCH PANEL SCKETCH. 1 DIMENSIONAL & GEOMETRICAL CHANGES. THICKNES REDUCED 1 mm - PowerPoint PPT PresentationTRANSCRIPT
II MPGD WORKSHOP 1
CAD MODELS FOR MPGD CHAMBERS
24/06/2011
Antonio Conde, PH-CMX
II MPGD WORKSHOP 2
1 DIMENSIONAL & GEOMETRICAL CHANGES
2 SINGLE CHAMBERS INSTALLED
3 DOUBLE CHAMBERS
4 INSTALATION PROCEDURE
5 PATCH PANEL SCKETCH
POINTS
24/06/2011
II MPGD WORKSHOP 3
1 DIMENSIONAL & GEOMETRICAL CHANGES
24/06/2011
II MPGD WORKSHOP 4
24/06/2011
THICKNES REDUCED 1 mmIN THESE TWO SPACERS
II MPGD WORKSHOP 5
24/06/2011
CHIMNEY WILL BE CONICAL IN STEAD OF PARALELL AS HERE
THE HEIGHT WILL BE REDUCED
8 mm. (enough for services)
13mm. (15 before)
II MPGD WORKSHOP 6
24/06/2011
24 CONNECTORS NOW (8 BEFORE) NEEDS CONICAL CHIMNEY
II MPGD WORKSHOP 7
24/06/2011
OLD PARALELL CHIMNEY
NEW CONICAL CHIMNEY (24 connectors)
II MPGD WORKSHOP 8
24/06/2011
GOOD GAP BETWEEN TWO CHIMNEYS (NO CLASHES)
II MPGD WORKSHOP 9
2 SINGLE CHAMBERS INSTALLED
24/06/2011
II MPGD WORKSHOP 10
24/06/2011
RADIAL RAILS
9° ROTATED RAILS
9°
SET OF CHAMBERS MOUNTED ON THE BACK FLANGE
II MPGD WORKSHOP 11
24/06/2011
INSERTION WINDOWS IN THE BRACKETS OF THE BACK FLANGE
II MPGD WORKSHOP 12
3 DOUBLE CHAMBERS (S.C.)
24/06/2011
II MPGD WORKSHOP 13
24/06/2011
VERY COMPACT CHAMBERS NOW
II MPGD WORKSHOP 14
24/06/2011
-GAP BETWEEN CHAMBERS: 1mm- STACKED CHAMBERS TOTAL HEIGHT: 98mm
II MPGD WORKSHOP 15
24/06/2011
GAP BETWEEN BACK FLANGE & MUON CHAMBERS: 100mm
II MPGD WORKSHOP 16
24/06/2011
TWO TYPES OF PIVOTS & ANGLES BUT ONLY 1 ONE TYPE OF CHAMBER FOR ALL SC
both SC match well
(2 or 3 empty protos should be made theninsered in all the positions, the next opening of the detector put in the schedule??)
II MPGD WORKSHOP 17
4 INSTALATION PROCEDURE (same for single chamber or SC)
24/06/2011
II MPGD WORKSHOP 18
4 INSTALATION PROCEDURE4.a FIRST SC
24/06/2011
II MPGD WORKSHOP 19
24/06/2011
FIRST SC TO ENTER
II MPGD WORKSHOP 20
24/06/2011
FIRST SC ENTERING
II MPGD WORKSHOP 21
24/06/2011
FIRST SC ENTERED TO PIVOT STOP
II MPGD WORKSHOP 22
24/06/2011
FIRST SC ROTATED TO ITS FINAL POSITION
II MPGD WORKSHOP 23
4 INSTALATION PROCEDURE4.b SECOND SC
24/06/2011
II MPGD WORKSHOP 24
24/06/2011
SECOND SC TO ENTER
II MPGD WORKSHOP 25
24/06/2011
SECOND SC ENTERING
II MPGD WORKSHOP 26
24/06/2011
SECOND SC IN ITS FINAL POSITION
II MPGD WORKSHOP 27
24/06/2011
THE TWO TYPES OF SC MATCHING IN PLACE
II MPGD WORKSHOP 28
4 INSTALATION PROCEDURE4.c THIRD SC
24/06/2011
II MPGD WORKSHOP 29
24/06/2011
THIRD SC ENTERING
II MPGD WORKSHOP 30
24/06/2011
4°
NEEDS TO BE ROTATED 4° TO AVOID CLASH
II MPGD WORKSHOP 31
24/06/2011
WHEN ROTATED 4°, THE SC ENTERS WELL (same as RPC’s)
II MPGD WORKSHOP 32
24/06/2011
THIRD SC IN ITS FINAL POSITION
II MPGD WORKSHOP 33
4 INSTALATION PROCEDURE4.d FOURTH SC
24/06/2011
II MPGD WORKSHOP 34
24/06/2011
FOURTH SC TO ENTER
II MPGD WORKSHOP 35
24/06/2011
FOURTH SC ENTERING
II MPGD WORKSHOP 36
24/06/2011
FOURTH SC IN ITS FINAL POSITION
II MPGD WORKSHOP 37
5 PATCH PANEL SCKETCH
24/06/2011
II MPGD WORKSHOP 38
24/06/2011
PATCH PANELS(their surface cover the two openings of the chimneys for each SC)
II MPGD WORKSHOP 39
24/06/2011
25 mm. length, SPACERS
II MPGD WORKSHOP 40
ENTRETIENS AVEC JOSÉ SALICIO, CHEFS DE GROUPE, PERSONNEL DEPT. ITTHANK YOU FOR YOUR ATTENTION !!
REMARKS / QUESTIONS ?
24/06/2011
Antonio Conde, PH-CMX