cad-150 installation manual en - · pdf file5.3- ...installation steps 1 and 2 loops ... th...
TRANSCRIPT
![Page 1: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/1.jpg)
GB
GUIDE MANUAL
![Page 2: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/2.jpg)
3
GB
INDEX1- Introduction................................................................................................................5
.............................................................................................5
...............................................................................................6
4- The Control Pane .................................................................................................... 7l 4.1- The Control Panel 1 and 2 Loops ......................................................................... 7 4.2- The Control Panel 4 and 8 Loops...................................................................................9
5- Installation Guide................................................................................................... 10 5.1- Pre-Installation Checks ..................................................................................... 10
.................................................................................................. 11 5.3- Installation Steps 1 and 2 Loops ........................................................................ 12 5.4- Installation Steps 4 and 8 Loops..................................................................................18
............................................................................................ 24 1 and 2 Loops ................................................................. 24 4 and 8 Loops ..........................................................................43
.......................................................................................... 85 7.1- System Check ................................................................................................... 85
.................................................................................................. 85 7.3- System Test ...................................................................................................... 86
8- Maintenance .......................................................................................................... 92 8.1- User maintenance ............................................................................................. 92 8.2- Maintainer maintenance .................................................................................... 92
9- Features ............................................................................................................... 93
![Page 3: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/3.jpg)
5
GB
This manual contains instructions for installation, commissioning and maintenance of the range of analogue panels, and technical data.
The range of analogue panel consists of 2 models:
1 loop.2 loop.
detection system, such as businesses, schools, small and medium enterprises, etc.
detection and alarm systems listed in the standards EN54 Part 2 and 4.
guidelines of EN54 Part 14.
2- Pre-Installment Checks
One panel.
5x20 2A fuse for 1 and 2 loops.5x20 5A fuse for 4 and 8 loops.5X20 0.5A fuse.5X20 4A fuse.
Installation manual.User manual.Language labels according the control panel.
![Page 4: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/4.jpg)
6
GB
input / output modules. Devices can also be connected on one or more spurs off the closed loop.
Each loop of the system can be connected to up to 250 randomly routed sensor points, manual call points and input and / or output modules. The maximum loop length should
2
The system autosearches all of the points connected to the panel.
Record up to 4.000 events in the Event Log.
modules.
An auxiliary 24V DC output on the motherboard.
![Page 5: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/5.jpg)
7
GB
4- The Control Panel
4.1 The Control Panel 1 and 2 Loops A description of all equipment components and a description of indicators and control
1 LCD Display 132 Navigation controls 14 Output disablement LED3 Alarm zone LEDs 154 Fault-disablement-test-zone LEDs 16 Alarm LED5 17 Disablement LED6 18 Fault LED7 19 Test LED8 Reset control 20 Out of service LED9 2110 2211 Earth fault LED12 Delay ON LED
![Page 6: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/6.jpg)
8
GB
1. Loop One connector.2. 3. Fault and Alarm Connectors.4. 5. 6. Display contrast.7. 8. Auxiliary 24V output fuse.9. 10. 11. 12. Mains connector13. Mains fuse14.
![Page 7: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/7.jpg)
9
GB
4.2 The Control Panel 4 and 8 Loops
1 Display 11 Test LED2 12 Out of service LED3 134 145 15 Earth fault LED6 Reset Control 16 Delay ON LED7 Alarm LED 178 Alarm LED 18 Output disablement LED9 Disablement LED 1910 Fault LED 20
![Page 8: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/8.jpg)
10
GB
the instructions in this manual can cause damage to equipment.
connections.
![Page 9: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/9.jpg)
11
GB
Cable cutters or strippers.Voltmeter.
Programmer.
![Page 10: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/10.jpg)
12
GB
5.3.1 Removing the front cover
cover.
5.3.2 Panel location on the wall
are easily seen, and the cover can be easily removed. The panel must be located at a height of 1.5 m.
5.3.3 Fixing the panel to the wall
irreparable damage to the equipment.
![Page 11: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/11.jpg)
13
GB
5.3.5- Electrical wiring
devices such as sensors, manual call points etc. The panel must be connected via an 2 cable section. The voltage should be 230VAC.
communication bus lines. If the system can be affected by an electrical disturbance,
insert the cable glands.
It is advisable to use a shielded cable. Connect the cable shield to the corresponding
has an approved mains Earth.
and C.
![Page 12: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/12.jpg)
14
GB
5.3.6.1- Mains connection
coming loose in the case of sudden removal.
![Page 13: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/13.jpg)
15
GB
5.3.6.2- Battery connection
for the proper functioning of the panel.
The batteries are placed in the bottom of the box, vertically in the space provided.
5.3.7- Loop connection
The cable used must be at least 1.5 mm2, braided shield should be used to avoid
loop must be less than 44 Ohms, and the maximum capacity of the line should be less than 500 nF.
and R-, and the screen returns to terminal indicated as . It is essential to have a continuous screen on each loop.
![Page 14: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/14.jpg)
16
GB
5.3.8 Detectors connection
Heat ROR detector.Optical-Heat detector.Detector High ROR detector.
algorithmic analysis of signals received by the detectors. Each loop on the system can have up to 250 sensors connected. Analogue detectors should be routed prior
station Z-200, remember that there must be continuity of the cable screen on each loop connected.
A single monitored output module.A dual monitored output module.A conventional zone module.A dual conventional zone module.An analogue MCP.An analogue sounder.
230 Vac Relay Module.Isolator module.
![Page 15: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/15.jpg)
17
GB
source, located as close as possible to the module.
For more information see the installation manual of each module.
mA.
It is imperative that the sounders are polarized, or else it is necessary to insert a diode
resistor is required.
diode to prevent reverse current effect.
5.3.11 Relay connection
The panel has a fault relay and an alarm relay for outputs that act as an alarm or malfunction. The maximum relay contact current is 2A.
![Page 16: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/16.jpg)
18
GB
5.3.12 USB Connection
5.3.1 Removing the front cover
5.3.2 Panel location on the wall
are easily seen, and the cover can be easily removed. The panel must be located at a height of 1.5 m.
5.3.3 Fixing the panel to the wall
irreparable damage to the equipment.
![Page 17: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/17.jpg)
19
GB
5.3.5- Electrical wiring
devices such as sensors, manual call points etc. The panel must be connected via an 2 cable section. The voltage should be 230Vac.
communication bus lines. If the system can be affected by an electrical disturbance,
insert the cable glands.
It is advisable to use a shielded cable. Connect the cable shield to the corresponding
has an approved mains Earth.
and C.
![Page 18: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/18.jpg)
20
GB
5.3.6.1- Mains connection
coming loose in the case of sudden removal.
5.3.6.2- Battery connection
for the proper functioning of the panel.
The batteries are placed in the bottom of the box, vertically in the space provided.
![Page 19: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/19.jpg)
21
GB
5.3.7- Loop connection
The cable used must be at least 1.5 mm2, braided shield should be used to avoid
must be less than 44 ohms, and the maximum capacity of the line should be less than 500nF.
and R-, and the screen returns to terminal indicated as Earth. It is essential to have a continuous screen on each loop.
5.3.8 Detectors connection
Heat ROR detector.Optical-Heat detector.Detector High ROR detector.
algorithmic analysis of signals received by the detectors. Each loop on the system can have up to 250 sensors connected. Analogue detectors should be routed prior to
-tion Z-200, remember that there must be continuity of the cable screen on each loop connected.
![Page 20: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/20.jpg)
22
GBA single monitored output module.A dual monitored output module.A conventional zone module.A dual conventional zone module.An analogue MCP.An analogue sounder.
230 Vac Relay Module.Isolator module.
source, located as close as possible to the module.
For more information see the installation manual of each module.
mA.
It is imperative that the sounders are polarized, or else it is necessary to insert a diode
resistor is required.
![Page 21: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/21.jpg)
23
GB
diode to prevent reverse current effect.
5.3.11 Relay connection
The panel has a fault relay and an alarm relay for outputs that act as an alarm or malfunction. The maximum relay contact current is 2A.
5.3.12 USB Connection
![Page 22: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/22.jpg)
24
GB
After entering the access level 2 code, the installation engineer can access the
![Page 23: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/23.jpg)
25
GB
indicating all points that are connected to the loop. This report should be compared to the actual points installed to ensure that the devices are correctly detected and there are no connection errors.
and modules.
![Page 24: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/24.jpg)
26
GB
Pressing the Acceptthe points detected in the loop.
Pressing the Cancel
Pressing the Reportsfor the implementation of the system.
reports all addresses that have been found in the loop, indicating the type of point found at the address.
If there is no abbreviation under an address, it means that this address is free, and if you see XXX, it means there is more than one point that responds to that address.
![Page 25: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/25.jpg)
27
GB
end of the loop
found, and from the return connector on the loop 27 points have been found. This tells th point from the output connector and
To access the previous menu, press the Exit button.
options are available in the zone menu:
![Page 26: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/26.jpg)
28
GB
of the building covered by the zone.
given loop.
![Page 27: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/27.jpg)
29
GB
6.1.3.1 Edit Point
In the Edit Point menu, the name of points can be provided, and a zone can be assigned. The mode of the point is also displayed, i.e. enabled or disabled.
analogue value of the point being displayed.
![Page 28: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/28.jpg)
30
GB
6.1.3.2 Address programming
6.1.3.3 Toggling LED
light until either another address is chosen or the Exit option is selected.
Cause and effect actions are created from this menu.
![Page 29: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/29.jpg)
31
GB
6.1.4.1 New Actions (Action Creation)
An action is the cause and effect generated by an event in the building protected by
points connected to the panel.
“Point” as the Input in Action number 0001.
![Page 30: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/30.jpg)
32
GB
General alarm.MCP Alarm.Detector Alarm.Multi Point Alarm.
Pressing the More button changes the type of alarm that is generated by the panel.
General Alarm.Multi Point Alarm.
![Page 31: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/31.jpg)
33
GB
The actions on the points may be of ON or OFF, i.e. activate the output point such as
Pressing the More button changes the type of output that can be activated or de-
Outputs ONOutputs OFF.
Relays ON.Relays OFF.
![Page 32: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/32.jpg)
34
GB
Pressing the More button changes the type of loop output that is activated or de-
Outputs ON.Outputs OFF.
Relays ON.Relays OFF.
Pressing the More button changes the type of output that is activated on the entire
Outputs ON.Outputs OFF.
Relays ON.
![Page 33: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/33.jpg)
35
GB
Relays OFF.
is displayed in the top right of the LCD. All actions are started simultaneously so be
6.1.4.2 Modify Actions
of programmed actions is 3.Press the Input button to modify the Input.Press the Output button to modify the Output.Press the Erase button to cancel the displayed action.
leave the sub-menu.
6.1.5 Event Log
Alternatively you can list all events.
![Page 34: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/34.jpg)
36
GB
As a last option in this menu, the Erase option. This deletes all events from Event Log. This process is recommended to be used after commissioning the installation, so that
6.1.6.1 Installation name
In this submenu the installation engineer can enter the name of the facility, the company responsible for maintaining the facility and a help line.
facility.
and its phone number.
In the General menu you can enter the installation name, choose the menu language,
![Page 35: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/35.jpg)
37
GB
The system can operate in different languages to suit local requirements. The available
installation engineer.
menu.
![Page 36: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/36.jpg)
38
GB
Press Exit to exit the application.
search.
![Page 37: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/37.jpg)
39
GBcontroller node.
controller node.
![Page 38: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/38.jpg)
40
GB 6.1.7.2 Network Filter
DIRECCION:
![Page 39: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/39.jpg)
41
GB
- Possible number of nodes from 01 to 32.
![Page 40: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/40.jpg)
42
GB
6.1.8.2 Print LOG
FROM: - Day. Range from 01 to 31. - Month. Range from 01 to 31.
6.1.9 Day and time
Use this submenu to change the date and time displayed on the panel.
![Page 41: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/41.jpg)
43
GB
After entering the access level 2 code, the installation engineer can access the
![Page 42: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/42.jpg)
44
GB
![Page 43: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/43.jpg)
45
GB
indicating all points that are connected to the loop. This report should be compared to the actual points installed to ensure that the devices are correctly detected and there are no connection errors.
![Page 44: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/44.jpg)
46
GB
and modules.
elementos encontrados en el lazo.
reports all addresses that have been found in the loop, indicating the type of point found at the address and the status.
Again the and
If there is no abbreviation under an address, it means that this address is free, and if you see XXX, it means there is more than one point that responds to that address.
points detected in the loop.
![Page 45: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/45.jpg)
47
GB
![Page 46: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/46.jpg)
48
GB
found, and from the return connector on the loop 27 points have been found. This tells
To access the previous menu, press the Exit button.
options are available in the zone menu:
![Page 47: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/47.jpg)
49
GB
the area of the building covered by the zone.
![Page 48: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/48.jpg)
50
GB
sounders in this mode.
given loop.
loop.
![Page 49: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/49.jpg)
51
GB
![Page 50: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/50.jpg)
52
GB
given loop.
enable mode, disable mode or test mode.
![Page 51: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/51.jpg)
53
GB
in this mode.
After 20 minutes under the test mode selection, if the system detects that there has
test mode.
![Page 52: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/52.jpg)
54
GB
In the Edit Point menu, the name of points can be provided, and a zone can be as-signed. The mode of the point is also displayed, i.e. enabled or disabled. Also turn on the led.
![Page 53: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/53.jpg)
55
GB
In the Edit Point menu, the name of points can be provided, and a zone can be as-signed. The mode of the point is also displayed, i.e. enabled or disabled.
The device type is available in the display. AV is the analogue value of the point being displayed.
![Page 54: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/54.jpg)
56
GB the loop.
![Page 55: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/55.jpg)
57
GB
to use this function.
displayed.
![Page 56: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/56.jpg)
58
GB
type, the text of the point, the zone and the zone text for the selected device.
A summary of the number of devices enabled and disabled.
disable addresses of each loop.
in the loop.
![Page 57: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/57.jpg)
59
GB
![Page 58: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/58.jpg)
60
GB
-
mode.
light until either another address is chosen or the Exit option is selected.
![Page 59: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/59.jpg)
61
GB
-
Cause and effect actions are created from this menu.
![Page 60: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/60.jpg)
62
GB
Press the Erase button to cancel the displayed action.
6.2.4.1 New Actions (Action Creation)
An action is the cause and effect generated by an event in the building protected by
points connected to the panel.
![Page 61: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/61.jpg)
63
GB-mediate actions in case of false alarms.
action can be done by an input from a Panel, Loop, Zone or Point Input.
General Alarm.Multiple Point Alarm.Multiple Zone Alarm.
General Alarm.
General Alarm.MCP Alarm.Detector Alarm.Multiple Alarm.
types:
Alarm.
![Page 62: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/62.jpg)
64
GB
activate. The action can be done by an output from a Panel, Loop, Zone or Point Input.
Enable outputs.Disable outputs.Enable sounders.Disable sounders.Enable relays.Disable relays.
Enable outputs.Disable outputs.Enable sounders.Disable sounders.Enable relays.Disable relays.
Enable outputs.Disable outputs.Enable sounders.Disable sounders.Enable relays.Disable relays.
After selecting the loop and the address point
Enable.Disable.
![Page 63: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/63.jpg)
65
GB
Alternatively you can list all events.
As a last option in this menu, the Erase option. This deletes all events from Event Log. This process is recommended to be used after commissioning the installation, so that
![Page 64: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/64.jpg)
66
GB
In this submenu the installation engineer can enter the name of the facility, the com-pany responsible for maintaining the facility and a help line.
In the General menu you can enter the installation name, choose the menu language,
![Page 65: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/65.jpg)
67
GB
facility.
and its phone number.
The system can operate in different languages to suit local requirements. The available
![Page 66: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/66.jpg)
68
GB
The system can operate in different languages to suit local requirements. The available
![Page 67: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/67.jpg)
69
GB
installation engineer.
![Page 68: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/68.jpg)
70
GB
the loops.
![Page 69: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/69.jpg)
71
GB
![Page 70: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/70.jpg)
72
GB
Press Exit to exit the application.
![Page 71: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/71.jpg)
73
GB
the Loop.
the Loop.
![Page 72: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/72.jpg)
74
GB
version.
-
![Page 73: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/73.jpg)
75
GB
![Page 74: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/74.jpg)
76
GB
controller node.
panel.
![Page 75: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/75.jpg)
77
GB
- Possible number of nodes from 01 to 32.
![Page 76: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/76.jpg)
78
GB
installed in the panel.
![Page 77: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/77.jpg)
79
GB
![Page 78: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/78.jpg)
80
GB
![Page 79: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/79.jpg)
81
GB
6.2.8.2 Print LO
FROM: - Day. Range from 01 to 31. - Month. Range from 01 to 31.
![Page 80: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/80.jpg)
82
GB
Use this submenu to change the date and time displayed on the panel.
![Page 81: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/81.jpg)
83
GB
![Page 82: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/82.jpg)
84
GB
Here are the steps for a basic installation.
Date and Time Settings. To set the date and time on the panel see section 6.1.7
Name the installation. To enter the name of the installation, and the maintenance company & phone number see section 6.1.6.1 of this manual.
Set a loop.
to be structured according to installation requirements. To create and assign zones see section 6.1.2 of this manual.
and zone. The points can be disabled if necessary. To name and assign the points see section 6.1.3 of this manual.
Set actions.
delay in seconds, to avoid false alarms in case of immediate actions. To access the
protect the installation.
![Page 83: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/83.jpg)
85
GB Use the tester to verify continuity of the line. Verify that the circuits connected to zone
EOL resistors.
have a voltage greater than 24V.
is:
Connect the batteries.
also see the sounder delay LED on.
If you notice any indication other than those described above, the origin of the problem
![Page 84: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/84.jpg)
86
GB
relay operates and the fault is indicated on the LEDs and LCD.
7.4- How to solve common problems
it is important to solve the problem, since it can affect communications. If an Earth fault
Verify that the fault is not caused by the panel itself, by disconnecting all circuits connected to the panel.
Once the circuit that causes the Earth fault is ascertained, disconnect the return loop,
connected. Continue this process until the exact location of the Earth fault is found.
Removal of any point of the loop.
![Page 85: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/85.jpg)
87
GB
should be 32V.
return the same loop. Are there cross the system from both the output and input from only communicate to the nearest crossing insulators.
Disconnect half of the loop.
problems disappear, this means that the communication problem interference is in the other half of the installation. If problem persists this means that the
problem. Once you reach the area, the normal solution is to remove from the loop
Once solved the problem, reconnect the loop in all its entirety and carry out another
During the installation of the system, it can fail because of the same address at different points of the loop.
![Page 86: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/86.jpg)
88
GB
Press the Reports button to go to the next screen:
found in the loop indicating the type of the point at the address.
If there is not any abbreviation under an address, it means that this address is free, and if you see XXX, it means there is more than one point that responds to that address.
address of 6 has accidentally been given an address of 9.
During the installation of the system, it can fail because of the same address at different points of the loop.
![Page 87: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/87.jpg)
89
GB
Press the Reports button to go to the next screen:
![Page 88: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/88.jpg)
90
GB
found in the loop indicating the type of the point at the address.
If there is not any abbreviation under an address, it means that this address is free, and if you see XXX, it means there is more than one point that responds to that address.
address of 6 has accidentally been given an address of 9.
![Page 89: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/89.jpg)
91
GB
dealer.
7.4.6 Password incorrect
and installers, respectively. If you forget the code, contact your dealer.
![Page 90: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/90.jpg)
92
GB
8- Maintenance
recommendations found in this section.
8.1- User maintenance
or manual call point. A different area should be tested every month. Any anomaly
action as soon as possible.
8.2- Maintainer maintenance
The company in charge of maintenance of the facility shall test every six months as
»actions. » Examine the battery connections and load voltage. » » Visually inspect the equipment to detect any increase in moisture or any other deterioration. »alter the normal operation of the facility
» The company responsible for maintenance of the facility must demonstrate annually that:
» Put the panel on test mode, and verify that all sensors and call points operate
» Inspect all connections to the panel and its attachments to verify that there has been no deterioration. » Examine the state of the batteries and replace if necessary. »
![Page 91: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/91.jpg)
93
GB
439 mm x 268 mm x 112 mm
Material
4 and 8
460 mm x 360mm x 120 mm
460 mm x 450 mm x 120 mm
460 mm x 450 mm x 200
Material
Relative Humidity Maximum 95% dry
IP Rating IP30
Class type
Maximum points per loop 250 points
Loop voltage Min 25 Vdc Max 32 Vdc
Loop maximum output current 225 mA
Maximum loop length
Maximum loop capacitance 500 nF2
Maximum loop resistance 44 Ohms
Características salida de relé de alarma
Relé libre de tensión 1 relé con contactos C, NA, NC
Potencia máxima de conmutación 2A a 30 Vdc
Características salida del relé de avería
Relé libre de tensión 1 relé con contactos C, NA, NC
Potencia de máxima de conmutación 24 a 30 Vdc
Energizado
![Page 92: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/92.jpg)
94
GB
Number of monitored sounder outputs 2
Quiescent output voltage
Min 18 Vdc Max 29 Vdc
Maximum output current 400 mA per sounder output2
End of line resistor
Output voltage Min 18Vdc Max 29 Vdc
Maximum output current 400 mA2
Protecting fuses 24V aux
Mains voltage
Output voltage Max 29 Vdc
Protecting fuse
Maximum output current 2A
Output voltage 27,6 Vdc at 20ºC
Temperature compensation 3 mV/ºC x C
Maximum load current 350 mA
Rimax resistance 2.3 Ohms
Recommended battery NP7-12
Minimum battery voltage 21.0V
Maximum battery voltage 28,7V
Imax per panel 1,65A
![Page 93: CAD-150 Installation Manual EN - · PDF file5.3- ...Installation Steps 1 and 2 Loops ... Th vol ag hould b 230VAC. ... CAD-150_Installation_Manual_EN.pdf](https://reader031.vdocuments.us/reader031/viewer/2022022503/5ab07d157f8b9a284c8b5366/html5/thumbnails/93.jpg)
95
GB
Output voltage 27,6 Vdc at 20ºC
Temperature compensation 3 mV/ºC x C
Maximum load current 1200 mA
Rimax resistance 2.3 Ohms
Recommended battery NP7-12 NP24-12 Plus version
Minimum battery voltage 21.0V
Maximum battery voltage 28,7V
Imax per panel 1,65A
User level code 1111
Installator level code 2222