  • 8/17/2019 CABLE PULLING BKM 7101.docx

    1/5

    Method

    Statement

    TOTAL 5 PAGES

    (Including Cover)

    PROJECT NAME : Khabat Thermal Power Plant Units 1&2 Purpoe

    □For Information

     ☒ For Review

    □For Approval

    □For Construction

    □ As!uilt

    !OC"MENT NO" : KP##$$$C%12!1#1

    TITLE: 'etho( )tatement

    for  Cable Pullin*

    O#NER : 'inistr+ of ,lectricit+ -'.,/of  Kur(istan Re*ional0overnment

     A 11"#"2#1 For Review

    Re

    !ATE !ESCRIPTIONPREPARE C$EC%E RE&IE#E APPRO&E

    GAMA PO#ER S'STEMS ENG

    .wner 

    Mini+r, o- Elec+rici+, (MOE)o- %urdi+.n Region.l Govern/en+

    Contractor 

    POSCO ENGINEERING

    CONSTR"CTION CO* LT!*

    'ain )ubcontractor 

      GAMA PO#ER S'STEMSENGINEERING CONTRACTINGINC*

  • 8/17/2019 CABLE PULLING BKM 7101.docx

    2/5

    K3A!AT TPP U4IT) 1&2 !oc* No KP##$$$C%12!1#1

    Method

    Statement forRev* No*  A

    P.ge   2 of

    Contents

    1" PURP.),55555555555555555555555555555555"""

    2" )C.P,5555555555555555555555555555555555""

    6" R,)P.4)I!I7ITI,)55555555555555555555555555555

    8" PR.C,9UR,)55555555555555555555555555555"""""""

    " ACC,PTA4C, CRIT,RIA55555555555555555555555555

    :" R,F,R,4C,)5555555555555555555555555555555555

  • 8/17/2019 CABLE PULLING BKM 7101.docx

    3/5

    1" P"RPOSE

    This proce(ure outlines the metho(s to be followe( for the ,lectrical&Instrument Cable

    pullin* activit+"

    2" SCOPE

    This proce(ure is applicable to the K3A!AT Pro;ect"Also inclu(in* to the cable tra+

    installation accor(in* to the a*reement"

    6" RESPONSI0ILITIES

    Participate in an( provi(e input to )afet+ Tas< Anal+sis Ris< Re(uction Tal< -)TARRT/=>ob

    3a?ar( Anal+sis" Provi(e 3), covera*e for Commissionin* activities an( wal< (owns"

    Cable pullin* supervisor shall be ensurin* that wor< area facilities are safe prior to cablepullin* wor< activities"

    Personel Protection ,@uipment have to be use( b+ wor

  • 8/17/2019 CABLE PULLING BKM 7101.docx

    4/5

    8" PROCE!"RES

    The ven(orEs instruction manual ta

  • 8/17/2019 CABLE PULLING BKM 7101.docx

    5/5

    " ACCEPTANCE CRITERIA

    Installation of cable pullin* shall be within pro;ect (esi*n an( ven(or re@uirements an(

    no (ama*e"

    :" RE1ERENCES

    • ,lectrical )in*le7ine 9ia*rams"

    • ,lectrical )chematic 9ia*rams"

    • Cable Tra+ 7a+out

    • Cable 9rum )che(ule

    • en(orEs Instruction 'anual an( Associate( 9rawin*s"