CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS Contd/-1. GENERAL 1.1 The following special conditions shall be read in conjunction with General Conditions of Contracts IAFW-2249. Any provision in these special conditions, if at variance with provisions in the above mentioned documents shall take precedence there over. 2. SECURITY AND PASS ETC. 2.1 The work is to be carried out in unrestricted area/restricted area. 2.2 Contractor‟s attention is invited to condition 25 of IAFW-2249, he shall on demand by the Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge, as to the bonafide of such people. 2.3 The Engineer-in-Charge shall at his discretion have the right, to issue passes, as per rules and regulations of the installation/area in force to control the admission of the contractor, his agents, and employees and work people to the site of the work of any part thereof. Passes shall be returned at any time, on demand by Engineer-in-Charge or the authorities concerned and in all cases on completion of work. 2.4 The contractor, his agents, employees and work people shall observe all the rules promulgated by the authority controlling the installation/area in which work is to be carried out i.e. prohibition of smoking and lighting fire precautions, search of person on entry and exit, keeping to specific routes observing specified timings etc. Nothing extra shall be admissible for any man hours, etc, lost on this account. 3A. CONDITIONS OF WORKING IN RESTRICTED AREA 3A.1 VISIT TO SITE WITHIN THE RESTRICTED AREAS Permission to enter the restricted areas at the time of submission of tenders can be obtained through the Garrison Engineer. Tenders are advised to send prior intimation of their agents representatives etc, if any, date and time of their proposed visit so that necessary arrangements can be made by GE to secure admission. Whether a tenderer visits the site or not he shall be deemed to have full knowledge of the restrictions of entering into/exit from and working within the Restricted Area. 3A.2 ENTRY/ EXIT The contractor his agents, representatives, workmen etc. and his materials, carts, trucks or other means of transports etc., will be allowed to enter through and leave only from such gate or gates and at such times as the GE or authorities incharge of the of The Restricted Areas may at their sole discretion permit to be used. The contractor‟s authorised representative is required to be present at the place of entry and exit for the purpose of identifying his carts, truck etc. to the personal in charge of the security of Restricted Areas. 3A.3 IDENTITY OF WORKMEN 3A.3.1 Every workman shall be in possession of an identity card. The identity card will be issued after thorough investigation of the antecedents of the labours by the officer of the unit concerned in accordance with the standing rules and regulations of the unit. 3A.3.2 Contractor shall be responsible for the conduct and action of his workmen, agents or representatives.

Upload: others

Post on 21-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS

Contd/-…

1. GENERAL 1.1 The following special conditions shall be read in conjunction with General Conditions of

Contracts IAFW-2249. Any provision in these special conditions, if at variance with provisions in the above mentioned documents shall take precedence there over.

2. SECURITY AND PASS ETC. 2.1 The work is to be carried out in unrestricted area/restricted area. 2.2 Contractor‟s attention is invited to condition 25 of IAFW-2249, he shall on demand by the

Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge, as to the bonafide of such people.

2.3 The Engineer-in-Charge shall at his discretion have the right, to issue passes, as per rules and

regulations of the installation/area in force to control the admission of the contractor, his agents, and employees and work people to the site of the work of any part thereof. Passes shall be returned at any time, on demand by Engineer-in-Charge or the authorities concerned and in all cases on completion of work.

2.4 The contractor, his agents, employees and work people shall observe all the rules promulgated

by the authority controlling the installation/area in which work is to be carried out i.e. prohibition of smoking and lighting fire precautions, search of person on entry and exit, keeping to specific routes observing specified timings etc. Nothing extra shall be admissible for any man hours, etc, lost on this account.

3A. CONDITIONS OF WORKING IN RESTRICTED AREA

3A.1 VISIT TO SITE WITHIN THE RESTRICTED AREAS

Permission to enter the restricted areas at the time of submission of tenders can be obtained through the Garrison Engineer. Tenders are advised to send prior intimation of their agents representatives etc, if any, date and time of their proposed visit so that necessary arrangements can be made by GE to secure admission. Whether a tenderer visits the site or not he shall be deemed to have full knowledge of the restrictions of entering into/exit from and working within the Restricted Area.

3A.2 ENTRY/ EXIT

The contractor his agents, representatives, workmen etc. and his materials, carts, trucks or other means of transports etc., will be allowed to enter through and leave only from such gate or gates and at such times as the GE or authorities incharge of the of The Restricted Areas may at their sole discretion permit to be used. The contractor‟s authorised representative is required to be present at the place of entry and exit for the purpose of identifying his carts, truck etc. to the personal in charge of the security of Restricted Areas.

3A.3 IDENTITY OF WORKMEN

3A.3.1 Every workman shall be in possession of an identity card. The identity card will be issued after thorough investigation of the antecedents of the labours by the officer of the unit concerned in accordance with the standing rules and regulations of the unit.

3A.3.2 Contractor shall be responsible for the conduct and action of his workmen, agents or

representatives.

Page 2: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

3A.4 SEARCH

Thorough search of all persons and transport shall be carried out at each gate and for as many times as a gate used for entry or exit and may also be carried out at any time or any number of times at the work site within the Restricted area.

3A.5 FEMALE SEARCHERS

If the contractor desires to employ female labour on works to be carried out inside the area of factory, a depot, park etc. and a female searcher is not borne on the authorised strength of the factory, depot, park etc. at the time of submission of the tender, hi shall be deemed to have allowed in his tender for pay and allowances etc. for a female searcher (Class IV servant/ Gp “D” servant) calculated for the period female labour is employed by him inside that area. If more than one contractor employs female labour during any month and female searcher (s) has/have to be employed in addition to the authorised strength of the factory/ depot/ park etc. the salary and allowances paid to the additional female searcher (s) shall be distributed on an equitable basis between the contractors employing female labour taking into consideration the value and the period of completion of their contracts. TE GE‟s decision in regard to the amount recoverable on this account from any contractor shall be final and binding.

3. SECURITY OF CLASSIFIED DOCUMENTS 3.1 Contractor‟s special attention is drawn to condition 2 and 3 of General Conditions of the

Contracts IAFW-2249. The contractor shall not communicate any classified information regarding the works either to sub contractor or other without prior approval of the Engineer-in-charge. The contractor shall not make copies of the design/drawings and other documents furnished to him in respect of works and he shall return all documents on the completion of the works or on earlier determination of the contract. The contractor shall alongwith final bill attach receipt from the Engineer-in-charge in respect of his having returned the classified documents as per condition 3 of General Conditions of Contracts.

4. INSPECTION OF SITE 4.1 The contractor is advised to inspect the site of works with prior appointment with GE, who shall

give reasonable facilities for this purpose, to ascertain for himself the site/ground conditions access roads, approaches, availability of local material etc and all the necessary information which may affect works and prices under the contract. The contactor shall be deemed to have visited the site before submitting the tender irrespective of the fact whether or not he actually visits it.

5. MATERIAL AND SAMPLE 5.1 Materials listed in Appx „A‟ to special conditions will only be accepted if they bear ISI

certification marking. Material having only embossing of IS number can be rejected. Materials listed in Appx „A‟ will not be accepted even if they are conforming to relevant IS but not having IS marking. In case of deviation price adjustment @ 10% of the cost of article (on minus side only) shall be made for the articles/materials not having ISI marking. Materials listed in Appx „A‟, „B‟ land „C‟ to particular specification are the products which are manufactured by number of firms and are generally superior to certified products though they do not bear the ISI mark. Such materials shall be accepted if they are conforming to the relevant ISI. Materials provided by the contractor for incorporation in the work other than specified in Appx „A‟ shall unless otherwise specified in the particular specification, comply with the relevant Indian standard as specified in the MES SSR Part-I subsequently amended or revised, if available in the market, preference shall be given for ISI marked materials in such cases also. Materials required to be incorporated in the work to be procured by the contractor will be preferred in following order of preference:-

Page 3: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

(a) Materials with ISI marking

(b) Materials superior to ISI standards but not marked

(c) Materials conforming to relevant IS.

(d) Materials conforming to the samples kept in the GE‟s office.

5.2 The contractor shall produce samples of all materials, articles, fittings, accessories etc that he

proposes to use and get it approved in writing by the GE. The materials, articles etc as approved shall be labeled as such, and shall be signed by the Engineer-in-charge and the contractor‟s representative. These samples shall be kept in the custody of the Engineer-in-charge till satisfactory completion of the work.

5.3 The brands of all materials, articles, fittings etc approved together with names of the

manufactures and firms from which supplies have been arranged shall be recorded in the materials passing register.

5.4 The materials for which ISS do not exist or which are not specified in these particular

specifications shall conform to the samples kept in the GE‟s office. The tenderers are advised to inspect the samples which shall remain open for inspection with GE during working hours. The tenderer shall be deemed to have full knowledge of the samples whether he inspects them or not.

6. PROPRIETARY/BRANDED MATERIALS 6.1 The contractors will be required to submit purchase vouchers only in respect of items

for which payment in claimed is RAR as “Materials lying at Site”. Purchase vouchers in respect of balance items will not required to be submitted. However vouchers in respect of cement, steel, major E/M equipments like transformers, DG sets, pumps, motors, AC and lift equipments will be submitted invariably. The contractor shall obtain proprietary and branded materials form their authorised stockiest where such authorised stockiest have been appointed. These vouchers shall be endorsed dated and initialed by the Engineer-in-Charge giving the contract No. and name of work and a certified copy of each voucher signed both by Engineer-in-Charge and the contractor shall be kept on MES record.

6.2 Contractor‟s are permitted to purchase of cement and steel of approved manufacturers from

their local dealers is in case of all maintenance, special repairs, minor, revenue and low budgeted capital works having no structural work in the scope. Accordingly, Purchase Vouchers from local dealer shall suffice in these cases. Purchase Vouchers of bitumen should not be insisted upon when the contractor is purchasing the macadam from approved hot mix plant by CWE

7. RECORD OF CONSUMPTION OF CEMENT & STEEL 7.1 For the purpose of keeping a record of cement & steel issued/procured and consumed in works,

the contractor shall maintain a properly bound register in the form approved by the Engineer-in-Charge showing daily receipt of MES/procurement, quantity used in works and balance in hand. This register shall be signed daily by the Engineer-in-Charge and contractor‟s representative.

7.2 The register shall be kept at site in the safe custody of the contractor during progress of the work

and he shall on demand produce the same for verification of Inspecting Officer. On completion of work, the contractor shall deposit the cement register with the Engineer-in-Charge for record, and obtain a receipt thereof.

Page 4: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

7.3 The aforesaid provision will, however not absolve the contractor from returning over drawn cement, if any detected during course of examination of the final bill/ work.

8. ADMISSION TO SITE. 8.1 Delete the following from lines 5 to 9 of Sub Para 1 of condition 24 of IAFW-2249.

“In the event of areas of land …………………………………………………………… land allotted to him.” and insert as under :- “The contractor shall be allotted free of charge the area as approved by the GE for the purpose of execution of temporary workshop, stores etc.”

8.2 The area as occupied shall be vacated by the certified date of completion or earlier

determination/cancellation and site of work shall be clear as stipulated in condition 49 of IAFW-2249.

8.3 The persons who are directly employed by the contractor for the purpose of execution of work

shall only be allotted to stay and work in these areas. The contractor shall ensure that the outsiders who are not directly connected with the work do not stay in this area. The Engineer-in-charge shall exercise proper check for the same.

8.4 Contractor shall ensure proper sanitation of areas to the satisfaction of the Engineer-in-Charge. 9. WORKING HOURS 9.1 Reference condition 26 of IAFW-2249.Normal working hours of work for departmental staff are

from 0800 hours to 1700 hours on all days except on Sunday and other Gazetted holidays. However, the contractor may observe unrestricted hours of works for all the works to be executed in contractor‟s workshop. No work at site, other than the work to be executed in contractor‟s workshop shall be permitted to be executed out of the aforementioned normal working hours except with prior written permission of the GE. If such permission is given no liability in respect of any excess cost arising there for shall be accepted by the department.

10. ROYALTIES 10.1 Delete the existing condition 14 of IAFW-2249 and insert the following :- “No queries on defence land are available.” 11. MINIMUM WAGES PAYABLE TO LABOUR 11.1 Refer condition 58 of IAFW-2249. The contractor shall not pay wages lower than minimum

wages for labour fixed by the Govt of India/State Govt/Union Territory whichever is higher. 11.2 The fair wages referred to in condition 58 of IAFW-2249 will be deemed to be the same as the

minimum wages payable as referred above. 11.3 The contractor shall have no claim what so ever if on account of any local regulations or

otherwise he is required to pay wages in excess of the minimum wages shown in the schedule of minimum wages except that as provided for in condition 63 of IAFW-2249. Note :The minimum wages payable to labourers as listed in the Schedule of minimum wages shall be deemed to have been amended to conform with latest applicable minimum wages notified by the Govt of India under the minimum wages Act 1948 or the minimum wages as applicable (if any) fixed by the local state Govt (whichever is higher) which may have come into force on or before the date of receipt of tender.

12. EMPLOYMENT OF PERSONNEL 12.1 The contractor shall employ only Indian Nationals as his representative, servants and workmen

and verify their antecedents and locality before employing them for the work. He shall ensure

that no person of doubtful antecedents and nationality is, any way associated with the works. If for reasons of technical collaboration or other consideration, the employment of foreign national is unavoidable the contractor shall furnish the particulars to this effect to the Accepting Officer at the time of submission of tender. As a proof that the contractor has employed only Indian Nationals he shall render a certificate to the GE within one month from the date of acceptance of the tender to this effect. In case the GE desire, contractor will have the police verification done of the personnel employed by him. Contractor‟s attention is also drawn to condition 25 of IAFW-2249 in this connection.

12.2 The GE shall have full powers and

without giving any reason, to require the contractor immediately to cease to employ in connection with this contract, any agent, Servant or employee whose continued employment is in his opinion, undesirable. The contractor shall not be allowed any compensation on this account.

Page 5: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

13. PERIOD FOR KEEPING THE TENDER OPEN 13.1. The tender shall remain open for acceptance for a period of 60 days from the date specified for

its submission excluding the date of submission. 14. SIGNING OF CONTRACT DOCUMENTS 14.1 The person signing the tender on behalf of another or on behalf of a firm shall attach with the

tender a power of attorney duly executed in his favour by such other persons or by all the partners stating that he has authority to bind such other persons or the firm as the case may be in all matters pertaining to the contract including the arbitration clause.

15. OUT OF POCKET EXPENSES 15.1 No out of pocket expenses incurred by the tenderer in submitting this tender shall be reimbursed

whether his tender is accepted or not. 16. TIME AND PROGRESS CHART 16.1 The time and progress chart to be prepared as per condition 11 of IAFW-2249 (General

Conditions of Contracts) shall consist of detailed net work analysis and a time schedule. The critical path network will be drawn jointly by the GE and the contractor soon after acceptance of tender. The scheduling of the activities will be done by the GE and the contractor so as to finish the work within the stipulated time. On completion of the time schedule a firm calendar date Schedule will be submitted in four copies within two weeks from the date of handing over the site to the GE who will approve it after due scrutiny. Detailed net work analysis (CPM) is to be prepared in case works cost above Rs. 5.00 Lakhs, the normal time & progress chart shall be prepared for works below Rs. 5.00 lakhs.

16.2 During the currency of the work, contractor is expected to adhere to the time schedule and this

adherence will be part of the contractor‟s performance under the contract. During the execution of work contractor is expected to participate in the reviews and updating of the network under taken by the Engineer-in-charge. These reviews may be undertaken at the discretion of the GE either as periodical appraisal measure or when the quantum of work on the contract is subsequently changed through deviation order or amendments. Any revision of the schedule as a result of the reviews will be submitted by the contractor to the GE within a week, who approve it after due scrutiny. The contractor will adhere to the revised schedule thereafter. In case of contractor not agreeing to revised schedule the same will be referred to the Accepting officer whose decision will be final, conclusive and binding. GE‟s approval to the revised schedule resulting in a completion date beyond the stipulated date of completion shall not automatically amount to grant of extension of time. Extension of time shall be considered and decided by the appropriate authorities mentioned under condition 11 of IAFW-2249 and separately regulated.

16.3 Contractor is expected to mobilize and employ sufficient resources to achieve the detailed

Schedule within the broad frame work of the accepted methods of working and safety. 16.4 No additional payment shall be made to the contractor for any multiple shift work or other

incentive methods contemplated by him in his work schedule even though the time schedule is approved by the department.

17. CO-OPERATION WITH OTHER AGECIES 17.1 The contractor is required to work in close co-operation and he shall permit free access and

generally afford reasonable facilities to another agencies or departmental workmen, etc working in the same area, which may operate here-in-after and during currency of the contract.

18. CLEANING DOWN

18.1 The contractor shall clean all floors, remove cement/lime/paint drops on joinery, glass panes etc, touch up all painters works and carry out all other necessary items of work to make the premises clean and tidy before handing over the buildings.

Page 6: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

19. WATER (Refer Condition 31 of IAFW-2249) 19.1 Water will be supplied by MES from the points decided by Engineer-in-Charge at the time

of handing over the site at the recovery rate indicated on tender page. Contractor shall make necessary arrangement to draw & carry water from these points to the site of work and storing as required without any extra charge to Government.

. 19.2 The contractor shall be deemed to have ascertained the hours of availability of water before

submitting his tender. MES do not guarantee the output of water supply and no compensation shall be allowed for intermittent or failure or inadequate, water supply, if the water supply is not sufficient, contractor shall make his own arrangements to supplement the water supply at his own cost.

20. ELECTRIC SUPPLY 20.1 In case the contractor desires to buy electricity from MES it will be supplied at point(s) decided

by the Engineer-in-charge. 20.2 Electric supply shall be 415/230 Volts, 50 Cycles, three phase AC supply. 20.3 The contractor shall be charged the electric energy consumed at Rupees five and Paise sixty

four per unit (KWH) for lighting and power. 20.4 The above rates are all India Flat Rates. 20.5 Electricity shall be supplied from main switches, main switch and KWH meter to register the

power supplied will be provided and installed by MES. All other fittings, cable, switch, connections, etc for distribution and supply of electricity from main switch to work site shall be arranged by the contractor at his own according to Indian Electricity Rules and along the routes approved by the GE. The GE shall have free access to inspect all installation, connection, devices for consuming the electricity and if these are not found satisfactory the GE shall have the power to get these disconnected.

20.6 Supply of electricity shall be during the hours as decided by the GE. However, MES do not

guarantee the continuity of supply and no compensation shall accrue to the contractor for the supply becoming intermittent or if there is any breakdown for any reasons.

21. DAMAGE TO EXISTING WORK 21.1 Any damage done to the existing structures, roads, etc during the execution of work shall be

made good by the contractor at his own cost and the site of work left clean and tidy on completion. Rectification or reinstatement, making good etc shall conform to standard of materials and workmanship originally provided in the work and finished work shall match with existing work in all respects to the entire satisfaction of the Engineer-in-charge. In case of any dispute on this account, the matter shall be referred to the Accepting Officer whose decision in writing shall be final and binding.

22. STANDARD OF WORKMANSHIP 22.1 To determine the acceptable standard of workmanship, the Engineer-in-Charge shall order the

contractor to construct/execute some portion of work in advance which shall be treated as “sample of work for entire work”

All work and service of the „sample work‟ such as brick work, RCC work, joinery, ceiling, plastering, flooring, plumbing, water supply and electrification with their fittings and fixtures, iron mongery finishes etc. Compete all as per drawings and specifications shall be got completed under the close supervision of the Engineer-in-Charge. It will be obligatory on the part of the

contractor to complete the sample of work as directed at least two-three stages ahead of the corresponding stages of other works.

Page 7: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

22.2 On approval of the states of construction/execution of sample of work the same shall be marked as guiding sample for the remaining construction.

23. STORAGE OF MATERIALS 23.1 The contractor shall not be provided with storage accommodation at the site. The contractor

shall make his own arrangement as per condition 10 of IAFW-2249 and as directed by Engineer-in-charge.

24. MATERIAL TESTING AND TESTING CHARGES

24.1 REFER CONDITION 10 OF IAFW-2249

24.2 All tests (as directed by the Engineer-in-Charge) shall be got carried out by the contractor form the laboratories/testing agencies as decided by the Engineer-in-Charge.

24.3 The cost of material, labour to be consumed in testing, transportation charges, testing

charges and the like shall be borne by the contractor.

24.4 The contractor may however get the materials tested from the Area Laboratories (Wherever available) for which the testing charges shall be recovered form the contractor‟s payment as per enumerated in ANNEXURE – I to Special Conditions.

24.5 The materials to be incorporated in the work shall be tested at a frequency as laid down in

Indian standard/IRC Standard/Standard as specified in the contract. The materials listed in Appendix „A‟ shall be tested as per the frequency indicated therein.

24.6 If facility for testing of building materials for any particular test is not available in the site/

zonal laboratory, the same will be got tested in National Test House/ SEMTWING/ Engineering College at discretion of Garrison Engineer, All expenses for testing shall be borne by the contractor.

24.7 Level of testing shown in legend as A, B & C are defined as under:- LEVEL „A‟

(a) Site lab (Level „A‟) shall be established by the contractor for contract sum of Rupees One Crores and above. However, for contract sum below Rupees One Crore, contractor may at his option, set up/establish site lab for carrying out various tests. (b) “Site Lab” means own site lab established by Contractor at the work site for such tests. This lab shall house all the facilities including T&P, machinery, equipment, manpower etc required for conducting tests. This lab shall be operative for entire duration of the contract till its completion. Tests shall be carried out in the presence of Engineer-in-charge. Random check of compliance of frequency of testing shall be done by the GE. (c) Records shall be maintained at work site. These test results shall be signed by his authorised representative and aforesaid departmental official. (d ) Within 15 days of placement of Work Order No 1 site lab shall be established and fact shall be reported by the Contractor to GE in writing who will verify the fact and satisfy himself regarding the facilities provided. Thereafter GE shall issue a certificate to this effect in writing listing out equipment particulars etc of material test. Only after issue of this certificate by GE, tests shall be carried out and materials so approved shall be incorporated in the work. (e) Manpower, materials and infrastructure like electricity, water etc required for conducting these tests shall be provided by the Contractor.

Page 8: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

(f) Remedial measure, if any, required achieve/obtain desired results for each test shall be taken promptly by Contractor. Lump sum is deemed to included for this eventuality and nothing extra shall be payable to the contractor. No extension of time shall be admissible on this account.

(g) Tenderer is deemed to cater for above provisions in his quoted rates.

(h) In case during any point of time contractor fails to adhere to the laid down frequency of the tests for any reasons whatsoever which in the absolute opinion of GE are beyond the control of the Contractor, he shall get the tests done from any other lab whose name shall be approved by GE in writing. The testing charges payable to such lab shall be paid by the Contractor. No extension of time shall be admissible on this account. (j) However, in case GE in his absolute opinion considers that Contractor is purposely not adhering to the laid down frequencies of tests, he shall reserve the right to deduct penal recovery which shall be double the rates of test indicated in Appendix ‟A‟. However, besides effecting penal recovery for non-compliance of contractual testing frequency for adhering the quality control norms, simultaneously GE will get tests done from any source and necessary testing charges paid by the GE shall be debited to the running payments. GE‟s decision shall be final and binding in such cases. Testing charges for level „A‟ indicated in Appendix „A‟ are applicable only for the purpose of penal recovery as elaborated above. LEVEL „B‟ (a) “Zonal Lab” means lab of CE Lucknow Zone, Lucknow. (b) The tests shall be conducted as per frequencies laid down for these tests in this labs for which Contractor shall provide all requisite facilities like sample, cubes materials etc. transportation to those labs for testing purpose. It will be Contractor‟s responsibility to adhere to the laid down frequency of testing. Test results shall be sent by lab to the GE whose copies can be made by Contractor at his own expense. Testing charges for the tests so conducted shall be recovered at the rates indicated in Appendix „A‟ from the running payments. The Contractor„s quoted rates shall be deemed to include for above provision.

(c) Provision of para (b) above of Level „A‟ shall be applicable to level „B‟ also. LEVEL „C‟

(a) Level „C‟ lab stands for National Test House/SEMT Wing Pune located in CME Pune 31/Local Engineering College. (b) Test provision contained in para (b) of level „B‟ above shall be applicable here except that contractor shall make necessary arrangement for transportation etc, to hand over the samples to these labs. Test results shall be forwarded to GE by these labs directly. The testing charges payable to these labs for conducting these tests shall be borne by the contractor and his quoted lump sum is deemed to include this provision.

(c) In case the contractor has not set up the site laboratory and the tests are carried out in

Zonal or any other laboratory, the recovery shall be made at the applicable rates indicated Annexure „I‟

(d) In case non availability of testing facilities in MES lab. The tests shall be conducted in any

outside approved labs. Testing charges of materials/ cubes carried out in approved laboratory shall be as per actual and shall be directly born by the contractor.

Page 9: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

25. OUTPUT OF ROAD ROLLER (Refer Condition 15 of IAFW-2249)

25.1. A logbook for each road roller shall be maintained by contractor for recording hours of working of the road roller. Entries in the logbook shall be signed by the Contractor or his authorised representative and by the Engineer-in-charge.

25.2 To ensure proper consolidation, road roller must work for at least the number of day assessed,

on the basis of output given here-in-after. If the road roller has not worked for the number of day so assessed, recovery shall be effected from the Contractor for the number of days failing short of the days assessed on the basis of output stipulated. The recovery shall be affected at the rate of Rs.960.00 per day.

25.3 Output of 8 to 10 tonne ROAD ROLLER per day of Eight hours.

(a)Consolidation of formation surfaces/sub grade. =1850 Sqm. (b)Consolidation of stone soling 20cm thick (Spread thickness) =590 Sqm

(c)-do- but 15 Cm thick -do- = 800 Sqm (d)Consolidation of water bound macadam (Stone metal) 10 cm = 186 Sqm compacted thickness including spreading and consolidation with binding materials (e)-do- but 7.5 cms compacted thickness = 248 Sqm (f) Consolidation of 2.5 cm thick pre-mixed carpet incl seal coat = 600 Sqm (g)Consolidation of moorum = 1865 Sqm 25.4 The above provisions shall not however, absolve the contractor of his responsibility of properly consolidating surfaces required under the provisions of the contract.

26. RECORD OF MATERIALS :- 26.1 The quality of materials such as paints, water proofing compound, chemicals for ant-termite termite treatment and the like as directed by the Engineer-in-Charge (the quantity of which cannot be checked after incorporation in the works), shall be recorded in measurement Books and signed by the contractor and the Engineer-in-Charge as a check to ensure that the required quantity has been brought to site for incorporation in the work. 26.2 Materials brought to site shall be stored as directed by the Engineer-in-Charge and those already recorded in measurement book shall be suitable marked for identification. 26.3 The contractor shall, on demand produce to the GE, original receipted vouchers/invoices in respect of the supplies. The vouchers/invoices shall be defaced and stamped by Engineer-in-Charge indicating contract number, name of the work, under his dated signature. The contractor shall ensure that the materials are brought to site, in original sealed containers/packing, bearing manufacturer‟s marking except in the case of requirement of material (s) being less than smallest packing. 26.4 Contractor shall produce vouchers/invoices from the manufacturers and/or their authorized agents for the full quantity of the following materials, as applicable as a pre-requisite before submitting claims for payment for advances on account of work done and/or materials collected in accordance with condition 64 of General conditions of contracts IAFW-2249. (a) Water proofing compound (b) Chemicals for Anti-termite Treatment (c) Paints, Distempers and Snowcem (d) Cast iron pipes and fittings (e) Sanitary fittings (f) Factory made door shutters (g) Steel windows/ventilators (h) Floor/wall tiles (i) Iron mongry (j) Tar felt/bituminous products

(k) Electric and water supply fittings/fixtures where names of manufactures/brands and specified or approved.

(l) Cable/wires. (m) Particulars of plants/equipments, their

make. manufacturers Model Number, if any, Registration number if any, capacity year of manufacture and year of purchase etc.

(n) Total No. (Quantity) no site of work. (o) Location, indicating No (Quantity) at each location on the site of work. (p) Purchase value on date of purchase.

For the purpose of this condition, plant/equipment shall include vehicles ie. trucks and Lorries but neither their workman‟s tools not any manually operated tools/equipment shall be given. The Engineer-in-Charge shall record the particular supplies by the works diary and send the return to the GE for record in his office.

27. RELEASE OF ADDITIONAL SECURITY DEPOSIT : 27.1 Reference conditions 22 and 68 of IAFW – 2249. 27.2 The contractor, in case he has to deposit additional security for the contract, is advised to deposit the additional security in two equal parts so as to facilitate its release in accordance with condition 68 of IAFW – 2249. 28. ADVANCE ON ACCOUNT 28.1 Reference conditions 22,64 and 68 of IAFW – 2249.

Page 10: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

27. RETENTION MONEY/COMPENSATION FOR DELAY Refer Condition 50 of IAFW 2249 of General Condition of Contracts for compensation for delay. For the purpose of calculating retention money under condition 64 of IAFW 2249, and under condition 50 of IAFW 2249, the value of contract as revised by above mentioned price variation under modified condition 63 of IAFW 2249 shall be taken into account. 28. Damage to Existing Works :- Any damage done to the existing structure during the execution of works shall be made good by the contractor at his own cost and the site of works left clean and tidy on completion. Rectification or reinstatement making good etc shall concern to the standard of materials originally used shall work and finished work shall match with existing work in a respect to the entire satisfaction of the GE. In case of any dispute on this account, the matter shall be referred to the CWE whose decision in writing shall be final and binding. 29. Condition for working in unrestricted Area :- The work lies in unrestricted area. However, the contract his agents, servants, work people and vehicles may pass through the unit lines in which case the Engineer-in-Charge shall at his discretion has the right to issue passes control the admission to the site of work or any part thereof. The contract shall on demand by the Engineer-in-Charge submit a list of personnel, etc concerned and shall satisfy the Engineer-in-Charge as to the bonfires of such people. Passes shall be returned at any time on demand by the Engineering- Charge in any case on completion of work. The contractor and his work people shall observe a rule promulgated from the authority controlling for which the work is to be carried out each publication of smoking, lighting and fire precaution, restricted hours of working etc. Any person found violating the securing rules aid down by the authority shall be immediately auth for the area without assigning any reasons what-so-ever and the contractor shall have no claim on this account. Notice admissible for any man hours lost on his account. 30. Special condition for conciliation Scope of Conciliation. The scope of conciliation shall be restricted to the following types of disputes with financial limit as indicated therein :- (a) Disputes relating to levy of compensation for delay in completion-actual amount of

compensation.

(b) Disputes relating to technical examination of works.

(c) Disputes relating to interpretation of the provisions of the contract with reference to their

application to parties.

(d) Disputes relating to non-return of Schedule „B‟ stores over issued to contractor.

(e) Any other dispute having fair chances of being resolved by conciliation and considered fit to be

referred to conciliation by the parties. For item (b), (c), (d) and (e) each as stated above the

financial limit shall be Rupees to lakhs or one percent of the contract amount which is less.

31. Commencement of conciliation Proceedings 31.1 The party initiating conciliation shall send to the other party a written invitation to conciliate, briefly identifying the subject of the dispute. Conciliation proceedings shall commence when the other party accepts in writing the invitation to conciliate. If the other party rejects the invitation, there will be no conciliation proceedings. If the party initiation conciliation does not receive a reply within 30 days from the date on which the sends or within such other periods of time as specified in the invitation, he may

elect to treat this as a rejection of the invitation to conciliate and if he so elects, shall inform in writing the other party accordingly.

Page 11: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

31.2 Number of conciliators : There will be sole conciliator. 31..3 Appointment Conciliator: All disputes brought out in Para 29.1.2 (a) to (e) above shall be referred to the sole conciliator viz serving officer not below the rank of Superintending Engineer/ Superintending Engineer (QS&C) having degree in Engineering or equivalent or having passed final/direct final examination of Sub division II of Institution of Surveyors (India) to be appointed by the Chief Engineer Lucknow, Zone or in his absence officiating Chief Engineer.

31.4 Status of Effect of Settlement Agreement: The settlement agreement signed by the parties as a result of conciliation proceedings shall have the same statues and effect as it is an arbitral award on agreed terms. 32. RE-IMBURSEMENT/REFUND ON VARIATION IN “TAXES DIRECTLY RELATED TO

CONTRACT VALUE”

(a) The rates quoted by the Contractor shall be deemed to be inclusive of all taxes / cesses viz GST duties Royalties, Octroi & other levies payable under the respective Status. No reimbursement/refund for variation in rates of taxes, duties, Royalties, Octroi & other levies and/or imposition/abolition of any new/existing taxes/cesses, duties, Royalties, Octroi & other levies shall be made except as provided in Sub Para (b) here-in-below.

(b) The taxes/cesses which are levied by Govt at certain percentage rates of contract Sum/Amount shall be termed as “taxes directly related to Contract Value” such as GST, Labour Welfare Cess/ Tax and like as applicable but excluding income Tax. The tendered rates shall be deemed to be inclusive of all “taxes directly related to Contract value” with existing percentage rates as prevailing on last due date for receipt of tenders. Any increase in percentage rates of taxes directly related to Contract value” with reference to prevailing rates on last due date for receipt of tenders shall be reimbursement to the Contractor and any decrease in percentage rates of “taxes directly related to Contract value” with reference to prevailing rates on last due date for receipt of tenders shall be refunded by the Contractor to the Govt/deducted by the Govt from any payments due to the Contractor. Similarly imposition of any new “taxes directly related to Contract value” after the last due date for receipt of tenders shall be reimbursement to the Contractor and abolition of any “taxes directly related to Contract value” prevailing on last due date for receipt of tenders shall be refunded by the Contractor to the Govt/deducted by the Govt from the payments due to the Contractor.

(c) The contractor shall, within a reasonable time of his becoming aware of variation in percentage rates and/or imposition of any further “taxes directly related to Contract value”, give written notice thereof to the GE stating that the same is given pursuant to this Special Condition, together with all information relating there to which he may be in a position to supply. The Contractor shall submit the other documentary proof/information as the GE may require.

(d) The Contractor shall, for the purpose of this condition keep such books of account and other documents as are necessary and shall allow inspection of the same by a duly authorised representative of Govt and shall further at the request of the GE furnish, verified in such a manner as the GE may require, any documents so kept and such other information as the GE may require.

(e) Reimbursement for increase in percentage rates/imposition of “taxes directly related to Contract value” shall be made only if the Contractor necessarily and properly pays additional “taxes directly related to Contract value” to the Govt without getting the same adjusted against

any other tax liability or without getting the same refunded from the concerned Govt Authority and submits documentary proof for the same as the GE may require.

Page 12: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

(f) The work of pipe line, conduit or plant for the following falls under exemption list of Service Tax as under:-

(a) Water Supply

(b) Water Treatment

(c) Sewage Treatment or Disposal

33. Materials and samples :- Materials provided by the contractor for incorporation in the work shall unless otherwise specified in the particular specification comply with the requirements of the relevant Indian standards (IS of the year of publication/edition) as specified in the Schedule Part-I. The contractor may, however at his own discretion provide and incorporate in the works, such materials complying with the requirement of any corresponding, subsequently amended or revised edition of IS without any adjustment in the contract sum. The contractor shall produce samples of all materials, fittings accessories etc. that he proposes to use and get them approved in writing by the Garrison Engineer through Engineer-in-Charge. The materials, articles etc approved shall be singed by the Engineer-in-Charge and the contractor‟s representative. These samples shall be kept in the custody of the Engineer-in-Charge. The brands of all materials, articles, fittings etc, approved together with the names of the manufacturers and firms from which supplies have been arranged shall be recorded in the materials passing register. The materials for which ISS do not exist or which are specified in the particular specification to conform to the samples kept in the GE‟s office, shall comply with the requirement of these samples. The contractors are advised to inspect the samples, which shall remain open for inspection with GE during working hours. The contractor shall be deemed to have full knowledge of the samples whether he inspects them or not. 34 WORK ON HOLIDAYS The contractor shall not carryout any work on Gazetted holidays, weekly holidays and other non working days except when he is specially authorised in writing to do so by the GE may at his sole discretion, declare any day as holiday or non-working day without assigning any reason for such declaration.

35. ACCESS TO RESTRICTED AREA AFTER COMPLETION OF WORKS After the works are completed and surplus stores etc. removed, the contractor, his agents‟ representatives or workmen etc. may not be allowed to have access to the restricted area except for attending any rectification of defects pointed out to him by the GE.

36. FIRE PRECAUTIONS

36.1 The contractor, his agents, representatives, workmen etc. shall strictly observe the orders pertaining to fire precautions prevailing within the Restricted Area. 36.2 Motor transport vehicles, if any, allowed by authorities to enter the restricted area must be fitted

with serviceable fire extinguishers. 37. MATERIALS IN MATRIC SIZES 37.1 If materials (other than those issued under schedule „B‟) are not available in matric sizes as

shown on drawings, the contractor shall provide materials in equivalent in sizes which should not be less than the matric sizes dimensions under any circumstances at no extra cost to the Government.

38. UNIT RATES IN SCH „A‟

48.1 Rate quoted shall be deemed to include for any minor details of construction which are obviously and fairly intended and which may not have been referred to in these documents but are essential to the work.

48.2 In case of difference of opinion as to

whether or not a certain item of work constitutes minor details of constructions included in the contractor‟s price the decision of the Accepting Officer shall be final and binding.

Page 13: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

39 All the workers deployed by contractors or sub contractors are enrolled as members of provident fund and should be given the Universal Account Number (UAN) 40 While clearing the bills of such contractor, certificate be obtained that all workers employing directly or indirectly by him are registered for EPF and the due contribution have been credited into their account.

41. APPLICABILITY OF EMPLOYEES PROVIDENT FUND

41.1 Employees Provident Funds and Miscellaneous Provisions Act - 1952 is applicable to contractor

for this contract. The contractor and their sub contractors shall be in possession of Provident Fund Code Number. All the workers deployed in the work by the contractor and sub contractor shall be enrolled as members of Provident Fund and shall be give the Universal Account Number (UAN).

41.2 The contractor shall submit a certificate stating that all workers employed by him or his

subcontractors in the work are registered for EPF and their due contributions have been credited into their account. This certificate duly signed by the contractor shall form part of RARs and FB.

SIGNATURE OF THE CONTRACTOR FOR ACCEPTING OFFICER

DATED : 2018

Page 14: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

APPENDIX „A‟ LIST OF CERTIFIED PRODUCTS TO BE INCORPORATED IN WORKS

Sl No

Material

1. Concrete (a) Internal water proofing compounds(IS : 2645) (b) Plywood for concrete shuttering work(IS-4990)

2. Joinery Wooden Flush Door Shutters, solid core type(IS-2202)

3. Builders Hardware (a) Steel shutter hinges(IS:1341) (b) Non-ferrous Butt Hinges(IS : 205) (c) Ferrous Tower Bolts (IS:204) (d) Non-ferrous Tower Bolts (IS: 204 ) (e) Door Handles (non-ferrous )(IS:208) (f) Parliament Hinges(Ferrous)(IS:362) (g) Hydraulically Operated Door Closures(IS:3564) h) Continuous Piano Hinges(IS:3818) (j) Non-ferrous Metal sliding door Bolts (IS:2681) (k) Tee and Strap Hinges (IS:206) (l) Mild steel sliding door Bolts (IS:281)

4. Steel And Iron Work (a) Steel doors, windows and ventilators(IS: 1038)

5. Roof Covering Bitumen Felts for water proofing and damp proofing (IS-1322)

6. Ceiling and Lining (a) Plywood for General Purposes(IS- 303) (Second revision) (b) Block boards(IS : 1659) (c)Veneered decorative plywood(IS : 1328) (Second revision ) (d) Marine plywood (IS : 710) (e) Fiber Hard board(IS : 1658)

7 Flooring (a) White Portland cement(IS : 8042) (b) Cement concrete flooring(IS : 1237)

8 WATER SUPPLY, PLUMBING, DRAINS AND SANITARY APPLIANCES (a) Concrete pipes with or without reinforcement (IS: 458) (b) Salt glazed stoneware pipes and fittings (IS: 651) (c) Flushing cisterns for water closets and urinals other than plastic (IS: 774) (d) Cast copper alloys screw down bib taps and stop valves (IS: 781) (e) Galvanised mild steel tubes (IS: 1239) (f) Galvanised mild steel tube fittings (IS: 1239) (g) Sand cast irons spigot and socket soil waste and ventilating pipes and fittings (IS: 1729) (h) Ball valves (Horizontal plunger type ) including floats for water supply purposes (IS: 1703) (j) Cast iron manhole covers and frames (IS: 1726) (k) AC presser pipes (IS: 1592) (l) Automatic flushing cisterns (IS: 2326) (m) Vitreous china sanitary appliances (i) Wash down water closets (IS: 2556 Part II) (ii) Squatting pans (IS: 2556 Part III) (iii) Wash basins (IS: 2556 Part IV) (iv) Laboratory Sinks (IS: 2556 Part V) (v) Urinals Bowl type (IS: 2556 Part VI Section I) (vi) Half Round Channels (IS: 2556 Part VII)

Page 15: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No. SPECIAL CONDITIONS (Contd/...)

Contd/-…

APPENDIX „A‟ (Contd…) (vii) Syphonic wash down water closets (IS: 2556 Part VIII)

(viii) Foot rests (IS: 2556 Part X) (n) Plastic WC seats and covers (IS: 2546) (o) Vertically cast iron pressure pipes for water and sewage (IS: 1531) (p) Pillar tap (IS: 1793) (q) Centrifugally cast (Spun) iron pressure pipes for water gas and sewage (IS: 1536) (r) Centrifugally cast (CI spigot and socket soil waste and ventilating pipes, fittings and

accessories)(IS: 3989) (s) Rubber sealing rings for gas main water mains and sewers (IS: 5382) (t) Cast iron fittings for pressure pipes for water mains and sewers (IS: 1538)

9. Electrical Works

(a)Ceiling Rose (IS:371) (b)Tumbler switches (IS:3854) (c)Socket outlet 3 pin plug and socket (IS:1293) (d)Switch fuses (main & switch) (IS:1064 Part-I&II) (e)Rigid steel conduit (IS:1063) (f)Rigid Non-Metallic conduit (IS:2509) (g)Single core cable polyethylene insulated and PVC sheathed cable(IS:1596) (h)Starter for tube light (IS:2215) (i)Fluorescent lamps (IS: 2418 Part I&II) (j)Aluminium stranded conductor (IS: 398 Part I & II) (k)Switchgears (IS:2208) (l)HRC cartridge fuse links upto 650 volts (IS:9224 Part II) (m)Porcelain Insulators for overhead power lines (IS:731) (n)MCB (IS:8828)

SIGNATURE OF THE CONTRACTOR FOR ACCEPTING OFFICER DATED 2018

APPENDIX „A‟ TO SPECIAL

Page 16: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No.

Contd/-…

APPENDIX „A‟ TO SPECIAL CONDITIONS MATERIAL AND TESTS (REVISED)

Sl. No

Material

Tests Method of Testing Frequency of tests Level of tests

Rate Remarks

1 2 3 4 5 6 7 8

1. Brick 1. Compressive Strengt

h 2. Water Absorption.

3. Efflorescence

IS-3495 (Part-I)

-do-

-do-

As per IS-5454 as given under :- A

A

A

180.00

150.00

180.00

Checks for visual and Dimensional characteristics shall also be carried out. As per IS-5454. Legend. A – Site Lab. B – Zonal Lab. C – National Test

House/SEMT WING/

Engineering College

Lot Size Sample Size

Permissible Nos of defective Bricks

1001 to 10000

50 0

10001 to

35000 100 0

35001 to 50000

151 01

2. Coarse Aggregate

1. Sieve Analysis. 2. Flakiness Index.

3. Estimation of

deleterious materials

4. Organic Impurities 5. Moisture Content.

6. Specific Gravity.

IS-2386 (Part-I)

-do-

-do-

-do-

IS-2386 (Part-II)

-do-

One test for every 15 cum of aggregate or part there of brought to site. -do-

One test for every 100 cum of aggregate or part thereof.

One test per source of supply. Regularly as required. One test for each source of supply.Regularly as required.

A A A

C

A

B

120.00

90.00

120.00

120.00

120.00

120.00

3. Fine Aggregate

1. Sieve Analysis. 2. Test for clay, silt and Impurities. 3. Specific Gravity. 4. Organic impurities. 5. Moisture Content.

IS-2386 (Part-I)

-do-

-do- -do- -do-

(Part–II)

One test for every 15 cum of FA or part thereof when brought to site. -do-

One test for each source of supply. One test for each source of supply. Regularly as required subject to 2 tests per day when being used.

A

A B C A

180.00

90.00

180.00 180.00

180.00

Page 17: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No.

Contd/-…

APPENDIX „A‟ TO SPECIAL CONDITIONS (CONTD…)

MATERIAL AND TESTS (REVISED) (Contd…….)

1 2 3 4 5 6 7 8

4. Cement (When Contractor Supply)

1. Setting Time 2. Soundness

3. Compressive Strength

4.Fineness

IS-4031-63 (Part-I) Reaffirmed 1980

-do-

-do-

-do-

Once for each consignment or as and when required.

- do-

-do-

-do-

A

A A A

180.00

120.00

120.00

120.00

5. Structural concrete 1. Slump Test or compacting factor test or VEE-BEE test.

2. Compressive strength.

IS-1199

IS-516

The mini frequency of sampling of concrete of each grade shall be as under.

A

A

180.00

120.00

(1) Random samples shall be carried out or cover mixing units.

(2) Refer IS-456-2000 for frequency of sampling.

Qty of Conc

work (M3)

Nos of in the sample

1 –5 1

6 –15 2

15 –30 3

31 –50 4

51 & above 4+1 for each addl 50 Cum of part there of

6. Cement: Flooring Tiles/Terrazzo Tiles.

1. Water Absorption 2. Wet Transverse strength 3.Resistence

IS1237-1980

(Appx D) -do- -do-

6 tiles out of 18

-do- -do-

B

B C

180.00

144.00 540.00

Samples: 18 tiles from each source of supply selected at Random.

7. Burnt clay roofing tiles (Hand made) IS-2690 (Pt-II) Length 150 mm to 250 mm width 100 mm to 250 mm thickness 35 mm to 50 mm

1. Water absorption. 2. Compressive strength.

IS-3495 (Part-II)

-do- (Part-I)

6 tiles out of 12

-do-

B

A

216.00

180.00

Samples: 12 Tiles from each source of supply selected at Random.

.

Page 18: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA NO. GE/E/ALD / OF 2018-19 Page No.

Contd/-…

APPENDIX „A‟ TO SPECIAL CONDITIONS (CONTD…)

MATERIAL AND TESTS (REVISED) (Contd…….)

1 2 3 4 5 6 7 8

8. Manglore

pattern

roofing tiles

1. Water absorption.

2. Breaking Load.

IS-654

-do-

6 tiles out of 32

-do-

B

B

180.00

180.00

Samples. 32 tiles from

each consignment of 3000

tiles or part thereof. These

tiles shall be checked for

dimensions and weight.

9. Timber 1. Specific gravity

& weight

2. Moisture content

IS-1708-

1960

-do-

Minimum 3 samples from a lot of 4 cum or

250 pieces of seasoned timber.

B

A

120.00

120.00

10. Welding

of steel

work

Visual inspection test. IS-822-1970

Clause 7.1

100% by visual inspection.

Work

site

360.00 Specialised tests, their

method and frequency to be

decided on consideration of

their importance by the

Accepting Officer. 11. Timber

paneled &

glazed/gauge

d

door/window

shutters(inclu

ding factory

made shutter

)

(a) Dimensions,

size workmanship &

finish.

(b) Strength test.

1. Sampling

2. Impact Indention

3. Shock resistance

4. Edge Loading

IS-1003-1977

(Part-I)

IS-13034-

1990

Frequency of sampling from each lot shall be as under :-

Lot Size Sample Size 26 to 50

5 51 to 100

8 101 to 150

13 151 to 300

20 301 to 500

32 501 to 1000

50 1001 & above

80 From each lot 5% of the factory made

shutters shall be tested for strength tests.

A

Man

u-

factu

rer

180.00

12. Ply Wood

(IS-303-

1989)

(a) Moisture content ISA-1734-1983

[Part – I]

Six test pieces cut from each of the

boards selected as per table-I shall be

subjected to tests.

B 240.00 SAMPLING shall be as

per IS-7635- 1975 Table –2 (b) Water Resistance ISA-1734-1983

[Part –6]

C 60.00

Page 19: CA NO. GE/E/ALD/ OF 2018-19 Page No. SPECIAL CONDITIONS · Engineer-in-charge submit a list of his agents, employees and work people concerned and shall satisfy the Engineer-in-charge,

CA No. : GE/E/ALD/ OF 2018-19 PAGE No .

Contd/-…

APPENDIX „A‟ TO SPECIAL CONDITIONS (CONTD…)

MATERIAL AND TESTS (REVISED) (Contd…….)

1 2 3 4 5 6 7 8 9

13 Particle Board (Medium density)

IS-3087-2005

(a)

(b)

Density

Moisture content

(Part-I)

(Part-I)

Three test specimens from each sample (Size 150 mm x 75 mm).

Three test specimens from each sample (Size 150 mm x 75 mm).

C

A&B

60.00

60.00

Sampling shall be as per IS-3087-83 Clause 2 with moisture meter.

(c) Water absorption (Part-16) Three test specimens from each sample

(Size 300 mm x 300 mm).

A 60.00

(d) Swelling due to

Surface absorption (Part-17) Three test specimens from each

sample (Size 125 mm x 100 mm). A 60.00

(e) Swelling in water. (Part-17) Three test specimens from each sample (Size 200 mm x 100 mm).

A 60.00

(f) Modulus of rupture (Part-4) Three test specimens as per IS-2380-1977

B 90.00

(g) Screw with drawal strength

(Part-14) Three test specimens as per IS-2380-1977

C 120.00