c43 west basin reservoir...package 2 –irrigation ps s-476 (3) 65 cfs vertical line electric driven...

31
C43 WEST BASIN STORAGE RESERVOIR PACKAGE 4 - CIVIL WORKS INDUSTRY DAY MAY 7 2018

Upload: others

Post on 30-Nov-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

C43 WEST BASIN

STORAGE RESERVOIR

PACKAGE 4 - CIVIL WORKS

INDUSTRY DAYMAY 7 2018

Page 2: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

SFWMD – Who We Are

Oldest and largest of the state’s five regional water management districts

• 16 counties; 7.9 million residents

• Regional responsibilities

• Water Quality

• Flood Control

• Natural Systems

• Water Supply

Page 3: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

SFWMD – Who We Are

Created in 1949 as local sponsorfor Federal C&SF System

Expanded responsibilities in1972

Today’s system consists of 2,100miles of canals and 2,000 milesof levees/berms and more than600 water control structures, 625culverts and 71 pump stations

Currently engaged in restorationof Everglades ecosystem

Page 4: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Project Team

Janet Starnes – Project Manager

Joe Albers, P.E. – Engineering PM

Tom McKernan – Construction Manager

Bonnie Cantrell – Procurement

Partner – US Army Corps of Engineers

Page 5: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Solicitation Process

Two Step Process

Request for Statement of Qualifications (SOQ)

Request For Bids

Requirements will be listed in SOQ

Must use District Forms that are included

Site Visits

Questions must be submitted to Bonnie Cantrell in writing, [email protected] or fax (561) 682-5319

Page 6: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

C43 Reservoir

Purpose

Project will improve timing, quality and quantity of water deliveries to the Caloosahatchee Estuary

Capture excess basin runoff and Lake Okeechobee releases

Provide dry season flows to restore salinity levels

Reduce wet season flows

C-43 West

Storage

Reservoir

Page 7: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Project Site

Page 8: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

C43 Existing Conditions

Page 9: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Existing Water ManagementT

ow

nsend C

anal

Duda NE Rim Ditch

LPDD1 LPDD2 LPDD3

Header Canal

Inverted Siphon

Roberts Canal

Page 10: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Project Delivery Plan

4 Construction Contract Packages2 Prep Packages

Page 11: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Package 1 – Preload & Demolition

Construct earthen Preload Mounds at 7 locations.

~285,000 CY ea. (2M CY Total)

Demolition of all agricultural facilities including small irrigation pump stations (excluding LPDD1, 2 and 3).

NTP – Nov 2015

COMPLETED - August 2017

S-473S-474

S-475S-472

Embankment

S-470S-471

SFWMD

Trailer Compound

Page 12: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Package 1 – Preload & Demolition

S-473 Preload Mound Looking West

Page 13: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Package 2 – Irrigation PS S-476

(3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total)

Power will be dropped from adjacent FPL Feeder Line along Townsend Canal

Replaces need for Header Canal to provide irrigation water to the east.

NTP - June 2016

Final Completion – August 2018

S-476

SFWMD

Trailer Compound

Header CanalLPDD

PS#1

LPDD

PS#2

Perimeter Canal

Page 14: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Package 2 – Irrigation PS S-476

Setting Pumps

Page 15: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Package 3 – Inflow Pump Sta S-470

(4) 375 CFS Vertical Mixed-Flow Electric Driven Pumps (1,500 CFS Total) @ 1,250 HP

300’ Microwave Tower & Control Bldg

SR-80 Bridge Armoring

Townsend Canal Improvements

Relocation of S-470 Preload Mound

Design TDH – 42’

NTP – March 2018

Final Completion – May 2022

S-470

SFWMD

Trailer Compound

Page 16: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Pump Station and Discharge

Package 3 – Inflow Pump Sta S-470

Discharge

PipeFormed

Suction

Intake

Saxophone

Discharge

Structure

Mixed Flow Pump

Pump StationElectric Motor

Gear Drive

Package 3 Package 4

Page 17: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Site Clearing

Areas 1 & 2 (Interior Cells) - Grubbing and Burning of all Trees (Cabbage Palm, Oak, Pine, Eucalyptus, & Cypress).

Area 3 (Reservoir Perimeter & Separator Dam Footprint – 2000’ wide) – Clearing & Grubbing & Mechanical Mowing & Burning of all Woody Vegetation.

NTP – October 2017

Final Completion – June 2019

Page 18: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Site Clearing

Page 19: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Access Roads

Construction of approximately 16 Miles of Shell Rock Rd.

Installation of approximately 2,500 LF of culverts

Design and installation of road crossing over the Roberts/Banana Branch Canal

Removal of existing culverts and temporary canal plugs

Installation of speed limit & street signs

NTP – April 2018

Final Completion – February 2019

Page 20: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Threatened and Endangered Species

Multiple T&E Species on project site

Training required for all workers

Protection strongly enforced

Strict reporting requirements

Page 21: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Package 4 – Civil Works

2-Cell Reservoir

~ 10,000 Acres

170,000 ac-ft of storage

Dam height 27 ft – 38 ft

~19 Miles of Dam Embankment

~14.7 Miles of Perimeter Canal

Soil Bentonite Seepage Barrier

Soil Cement Lining

Seepage Management System

Pressure Relief System

Page 22: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Package 4 – Civil Works (cont.)

14 Water Control Structures

Discharge Piping for S-470 Pump Station

Recreation Features

Townsend Canal Improvements

Local & Site Access Bridges

Currently at Intermediate Design Review Stage

NTP – March 2019

Page 23: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Perimeter Canal• Varies 50’ to 140’ top width

• Varying bottom width

• Varying bottom elevation

• Length: 14.7 Miles

• Excavation Volume: 2.8 M CY

Earth Dam • Dam Height: 27 - 37.5 Feet

• Length: 16.3 Miles (excludes Separator Dam)

• Crest Width: 14 feet

• Water Depth: 15 - 25 Feet

• Embankment Volume: 14.5 M CY

• Soil Bentonite Wall: 4.8 M SF

• Seeding: 590 AC

• Soil Cement: 582 K CY

Perimeter Canal

ReservoirToe

Road

Shallow

Interceptor

Swale Chimney Drain

Perimeter Access

Road/Corridor

Soil Cement Protection

Existing Ground

Project Boundary

Existing Limestone Layer Existing Clay Layer Drainage Blanket

with Toe Drain

Extended to Ditch

Soil Bentonite Wall

Culvert

Toe Ditch

Package 4 - Dam and Canal Typical Section

Page 24: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Typical Dam Sectional Details

Page 25: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Water Control Structures

25

S477

S478

S479

S480S481

A/B/C

S475

S473S474S482S471S483

Perimeter Canal Water Supply &

Stormwater Structures

Reservoir Operations Structures

Ungated Structures

S472

Page 26: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Perimeter Canal – Stormwater

S478

Fixed Weir

S481C

Dual Leaf Weir

Page 27: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Perimeter Canal – Water Supply

S476

195 CFS

TW 23’

S477

HW23’

TW 19’

S479

125 CFS

TW 25’

S480

ManualS481B

HW 18.75’

TW 16’

Page 28: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Completed Project Components

Page 29: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Funding

Project will be funded by annual State of Florida legislative appropriations

Corps will credit up to 50% of cost to District applicable to other projects.

Page 30: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

What’s Next

Site Visit – May 8, 2018

Issue RFQ – target mid-May 2018

RFQ Responses due – target early July 2018

Approval of Prequalified list – target tentative August 2018

Page 31: C43 WEST BASIN RESERVOIR...Package 2 –Irrigation PS S-476 (3) 65 CFS Vertical Line Electric Driven Pumps (195 CFS Total) Power will be dropped from adjacent FPL Feeder Line along

Questions