c chan portfolio
DESCRIPTION
This is a brief work portfolio which showcase my ability in developing construction documents for an educational facilities (K-12 school) in Brooklyn.TRANSCRIPT
MATERIALS LEGEND
AMITY SCHOOL3867 SHORE PARKWAY, BROOKLYN, NY 11235
LEGEND &ZONING ANALYSIS
ABBREVIATIONS,GENERAL NOTES,
KEY PLAN
KNAPP ST
BRIGHAM ST
S
H
O
R
E
P
K
W
Y
VO
ORH
IES AVE
WEST WING
EAST WING
MA
IN
B
LD
BROOKLYN
3867 SHORE PARKWAYBROOKLYN, NY 11235
AMITY SCHOOL
BC 1704.19STRUCTURAL SAFETY - STRUCTURAL STABILITY
LIST OF SPECIAL INSPECTIONSBC 1704.15MECHANICAL SYSTEM
A LICENSED PROFESSIONAL ENGINEER ACCEPTABLE TO THE ARCHITECT OF RECORD SHALL BE RETAINED BY THE G.C. TO MAKE THEABOVE CONTROLLED INSPECTIONS. SUCH PE SHALL FILE WITH THE DEPT. OF BUILDINGS SIGNED COPIES OF ALL REQUIREDINSPECTION REPORT TOGETHER WITH SIGNED STATEMENTS STATING THE WORK COMPLIES WITH SECTION C26-106.3A CONTRACTORSHALL OBTAIN A CERTIFICATE OF OCCUPANCY UPON COMPLETION OF ALL WORK ACCORDING TO THIS PLAN AND BUILDINGCODE REQUIREMENTS.
ALL MATERIALS DESIGNED FOR " CONTROLLED INSPECTION " SHALL BE INSPECTED AND/OR TESTED TO VERIFY COMPLIANCE WITHALL REQUIREMENTS UNLESS OTHERWISE SPECIFICALLY PROVIDED BY CODE PROVISIONS. ALL REQUIRED INSPECTION & TESTS OFMATERIALS SHALL BE MADE & WITNESSED BY OR UNDER DIRECT SUPERVISION OF AN RA OR PE RETAINED BY/ OR ON HIS BEHALF OFTHE OWNER (THE CLIENT) / G.C.
BD NOTETHE FOLLOWING SCOPE OF WORK TO BE FILED UNDER SEPARATE APPLICATION: - SPRINKLER WORK - PUBLIC ASSEMBLY - FIRE ALARM - CURB CUT
BC 1704.25FIRESTOP, DRAFTSTOP AND FIREBLOCK
ENERGY NOTETHE BUILDING HAS BEEN DESIGN TO COMPLY WITH LL 17/95. IN ADDITION REFER TO S-600 FOR LATERAL FORCES
CRITERIA.
PROPOSED BUILDING
MAXIMUM FLOOR AREA RATIO
PERMITTED USE GROUPIN DISTRICT C2-1 USE GROUP 3 - SCHOOL (HIGH SCHOOL)
ZR 33-121 DISTRICT C2-1 IN R3-2, MAX F.A.R
MAX FLOOR AREA PERMITTED 85,600 x 1.60 = 136,960 SQ.FT
USE GROUP 3 - DORMITORY (HIGH SCHOOL)
FOR COMM. FACILITY USE = 1.60
FLOORUSESCOMMUNITY FACILITY
BASEMENT
TOTAL AREA
1ST FLOOR2ND FLOOR3RD FLOOR
8,800 SQ.FT
SCHOOL
FLOOR AREA: 136,960 SQ.FT > 52,675 SQ.FTTHEREFORE CONFORMING
DORMITORY
REQUIRED SETBACKS
REQUIRED ACCESSORY OFF-STREET
MINIMUM REQUIRED REAR YARDS
MINIMUM REQUIRED SIDE YARDS
ONE REAR YARD WITH A DEPTH OF NOT LESS THAN 20FEET SHALL BE PROVIDED.
ZR 33-431 C2-1 IN R6INITIAL SET BACK 20' ON NARROW AND 15' ON WIDE STREETMAX HEIGHT FRONT WALL: 60' FOR FOUR STORYSKY EXPOSURE: 2.7:1 ON NARROW AND 5.6:1 ON WIDE
ZR 25-31 IN DISTRICT R6:NONE REQUIRED: 22 PROVIDED
NO SIDE YARD IS REQUIRED. IF PROVIDED, IT SHALL BE ATLEAST 8 FEET WIDE
MAXIMUM HEIGHT OF WALLS AND
PARKING SPACES
ZR 32-10
ZR 33-10
ZR 33-25
ZR 33-26
ZR 33-40
ZR 25-30
LOT AREA: 85,600 SQ.FT(EXISTING BUILDING TO REMAIN)
15,045 SQ.FT8,115 SQ.FT
13,840 SQ.FT
7,235 SQ.FT
PARENT /GUEST ROOM
TOTAL
22,280 SQ.FT22,280 SQ.FT22,280 SQ.FT
8,115 SQ.FT
13,272 SQ.FT 3,216 SQ.FT5,792 SQ.FT
74,955 SQ.FT49,135 SQ.FT 19,875 SQ.FT5,945 SQ.FT
(EXISTING BUILDING TO REMAIN)
(FLOOR AREA WITHOUT BASEMENT = 52,675 SQ.FT)
USE GROUP 3 - PHILANTHROPIC INSTITUTION W/ SLEEPING ACCOMMODATION
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
FIRST FLOOR LIFE SAFETY PLAN3/32" = 1'-0"1
KEY PLAN
KNAPP ST
BRIGHAM ST
S
H
O
R
E
P
K
W
Y
VO
ORH
IES AVE
WEST WING
EAST WING
MA
IN
B
LD
BROOKLYN
3867 SHORE PARKWAYBROOKLYN, NY 11235
AMITY SCHOOL
LIFE SAFETY PLANFIRST FLOOR
UP
DN
DN
DN
UP
DN
UP
DN
DN
UP
DN
DN
DN
EGRESS CALCULATIONSOCCUPANCY LOAD
EGRESS CAPACITY
LIFE SAFETY LEGEND
EGRESS CAPACITY
GENERAL NOTES
OCCUPANCY GROUP
CONSTRUCTION TYPE
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
FIRST FLOOR PLAN3/32" = 1'-0"1
KEY PLAN
KNAPP ST
BRIGHAM ST
S
H
O
R
E
P
K
W
Y
VO
ORH
IES AVE
WEST WING
EAST WING
MA
IN
B
LD
BROOKLYN
3867 SHORE PARKWAYBROOKLYN, NY 11235
AMITY SCHOOL
CONSTRUCTION PLANFIRST FLOOR
UP
DN
DN
DN
UP
DN
UP
DN
DN
UP
DN
DN
DN
CONSTRUCTION GENERAL NOTES
CONSTRUCTION KEY NOTES
CONSTRUCTION LEGEND
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
FIRST FL REFLECTED CEILING PLAN3/32" = 1'-0"
KEY PLAN
KNAPP ST
BRIGHAM ST
S
H
O
R
E
P
K
W
Y
VO
ORH
IES AVE
WEST WING
EAST WING
MA
IN
B
LD
BROOKLYN
3867 SHORE PARKWAYBROOKLYN, NY 11235
AMITY SCHOOL1
REFLECTED CEILING PLANFIRST FLOOR
CEILING GENERAL NOTES
CEILING KEY NOTES
CEILING LEGEND
CEILING LEGEND CEILING LEGEND
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
EXIT STAIR A ENLARGED PLAN @ BASEMENT 1/4" = 1'-0"1
KEY PLAN
KNAPP ST
BRIGHAM ST
S
H
O
R
E
P
K
W
Y
VO
ORH
IES AVE
WEST WING
EAST WING
MA
IN
B
LD
BROOKLYN
3867 SHORE PARKWAYBROOKLYN, NY 11235
AMITY SCHOOL
EXIT STAIR A ENLARGED PLAN @ 1ST FLOOR1/4" = 1'-0"2
43
5
PROPOSED STAIR 4 SECTION1/4" = 1'-0"7 PROPOSED STAIR 4 SECTION
1/4" = 1'-0"8
TYPICAL HANDRAIL DETAIL1 1/2" = 1'-0"6 STAIR DETAIL
1 1/2" = 1'-0"9 STAIR DETAIL1 1/2" = 1'-0"10 STAIR DETAIL
1 1/2" = 1'-0"11
EXIT STAIR A ENLARGED PLAN @ 2ND FLOOR1/4" = 1'-0"
EXIT STAIR A ENLARGED PLAN @ 3RD FLOOR1/4" = 1'-0"
EXIT STAIR A ENLARGED PLAN @ ROOF1/4" = 1'-0"
STAIR SECTIONS &STAIR DETAILS
EXIT STAIRENLARGED PLAN,
UP
DN
UP
UP UP
DN
UP
DN
DN
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
GIRLS' TOILET 132 ENLARGED PLAN3/8" = 1'-0"1
KEY PLAN
KNAPP ST
BRIGHAM ST
S
H
O
R
E
P
K
W
Y
VO
ORH
IES AVE
WEST WING
EAST WING
MA
IN
B
LD
BROOKLYN
3867 SHORE PARKWAYBROOKLYN, NY 11235
AMITY SCHOOL
GIRLS' TOILET 132 / BOYS' TOILET 130 SIM.3/8" = 1'-0"2
A B
C D
MEN'S TOILET 134 ENLARGED PLAN3/8" = 1'-0"3 MEN'S TOILET 134/ WOMENS' TOILET 136 SIM.
3/8" = 1'-0"4
A B C D
MEN'S TOILET 134 ENLARGED PLAN3/8" = 1'-0"5 MEN'S TOILET 134/ WOMENS' TOILET 136 SIM.
3/8" = 1'-0"4
A B C D
INTERIOR ELEVATIONSTOILET ENLARGED PLANS &
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT