ICC Background The ICC is a multi-modal east-west highway that connects I-270/I-370 and I-95/US 1 corridors within central and eastern Montgomery County and northwestern Prince George's County The new east-west highway will cover approximately 18.8 miles, and will include the construction of numerous new highway interchanges and bridges. The ICC will be a state-of-the-art, toll operated, multi- modal roadway with limited points of access. The ICC project team consists of US Department of Transportation, Maryland Department of Transportation, and the Maryland Transportation Authority.TRANSCRIPT
![Page 1: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/1.jpg)
Intercounty Connect Project
By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven
![Page 2: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/2.jpg)
Responsibility Matrix
![Page 3: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/3.jpg)
ICC BackgroundThe ICC is a multi-modal east-west highway that
connects I-270/I-370 and I-95/US 1 corridors within central and eastern Montgomery County and northwestern Prince George's County
The new east-west highway will cover approximately 18.8 miles, and will include the construction of numerous new highway interchanges and bridges.
The ICC will be a state-of-the-art, toll operated, multi-modal roadway with limited points of access.
The ICC project team consists of US Department of Transportation, Maryland Department of Transportation, and the Maryland Transportation Authority.
![Page 4: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/4.jpg)
ICC’s PurposeIncrease community mobility and safetyFacilitate the movement of goods and people to
and from economic centersProvide cost-effective transportation infrastructure
to serve existing and future development patterns reflecting local land use planning objectives
Help restore the natural, human and cultural environments from past development impacts in the project area
Advance homeland security by providing additional mobility
![Page 5: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/5.jpg)
ICC ContractsThe ICC was split into 5 contracts consisting of
contract A to contract E.The 5 contracts include 8 full interchanges, 1 partial
interchange (entrance only), and 1 intersection.The sequence of construction will be Contract A – C –
B – D/EContract A, started construction in 2007 and Contract
B and C followed after. As of November 2011, Contracts A-C opened to traffic.
Contract D/E of the ICC is expected to begin construction mid 2012 and is expected to be complete by late 2013/early 2014.
![Page 6: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/6.jpg)
![Page 7: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/7.jpg)
![Page 8: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/8.jpg)
![Page 9: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/9.jpg)
![Page 10: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/10.jpg)
Contract Overview
![Page 11: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/11.jpg)
ICC Operations and TollingThe ICC is Maryland’s first
all-electronic, variably priced toll facility (no toll booths)
Toll prices are increased during peak periods and lower during off-peak periods
For user’s without E-Zpass a photo of vehicle's license plate will be taken and a statement will be mailed to the registered owner's address for the amount of the toll plus a service charge
![Page 12: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/12.jpg)
ICC Timeline
![Page 13: By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven](https://reader035.vdocuments.us/reader035/viewer/2022081512/5a4d1b7b7f8b9ab0599b9036/html5/thumbnails/13.jpg)
Take Away PointsProject Purpose
Create a multi-modal east-west highway that limits access and accommodates the movement of passengers and goods
Generate tax revenue through tollsAdvance homeland security by providing
additional mobility