Port of Darwin UpdatePort of Darwin Update
ByBy
Robert Ritchie, Chief Executive OfficerRobert Ritchie, Chief Executive OfficerMerrynMerryn Coleman, Human Resource ManagerColeman, Human Resource Manager
Darwin Port CorporationDarwin Port Corporation
2727thth February 2008February 2008
Port & ChannelPort & Channel
Assets and recent Assets and recent expansionexpansion
Why call Darwin for bulkWhy call Darwin for bulk
StaffStaff
•Darwin Port Corporation is a Government Business Division of the Northern Territory Government.
•Responsible for some 1000 sq Km.
Major cargo segmentsMajor cargo segments
Livestock tradeLivestock trade
Offshore oil and gas supportOffshore oil and gas support
Container & General cargoContainer & General cargo
Dry bulk imports and exportsDry bulk imports and exports
Petroleum & other bulk liquidPetroleum & other bulk liquid
Cruise & Naval vesselsCruise & Naval vessels
Assets we manageAssets we manage
Stokes Hill WharfStokes Hill Wharfharbour tour operatorsharbour tour operatorssmall food outletssmall food outletsrestaurantrestaurantfunction centrefunction centre
Fort HillFort Hilldefence and cruisedefence and cruisetug berthstug berths
Francis Bay MarinaFrancis Bay Marina
Fishermans WharfFishermans Wharf
East Arm facilitiesEast Arm facilities
ChannelChannel
PilotagePilotage Outer Outer 1.5 hours Charles Point Patches1.5 hours Charles Point PatchesInnerInner 45min45min
Tidal variations of up to 8.0mTidal variations of up to 8.0m
ChannelChannel DepthDepth Turning basin 12mTurning basin 12mCharles Point Patches 10.8mCharles Point Patches 10.8m
UKC UKC ChannelChannel 1.1 m 1.1 m East Arm East Arm 0.5 m while alongside0.5 m while alongside
Maximum size of vessel to call at East ArmMaximum size of vessel to call at East Arm
Panamax Panamax Length: 294.1Length: 294.1 metres metres Beam (width): 32.3Beam (width): 32.3 metres metres Draft: 12.0Draft: 12.0 metres in tropical fresh water metres in tropical fresh water Deadweight 60,000dwt Deadweight 60,000dwt –– 80,000dwt80,000dwt
Port & ChannelPort & Channel
Assets and recent Assets and recent expansionexpansion
Why call Darwin for bulk.Why call Darwin for bulk.
StaffStaff
Rail dumpRail dump
1300 tonnes per hour1300 tonnes per hour
Iron ore Iron ore 7 trains per week7 trains per weekManganeseManganese 4 trains per week4 trains per week
StockpileStockpile
Rail dump to stockpile conveyor (A$4.3m) designed for new clientsPotential for additional clients
Storage stockpile areaStorage stockpile area
56 hectares available56 hectares availablefor stockpile developmentfor stockpile development
Road dumpRoad dump
1500 tonnes per hourTriple side tippers from stockpileTruck every 3 minutes
East Arm East Arm –– New Bulk Handling SystemNew Bulk Handling System
Ship loader designed for Panamax vesselsShip loader designed for Panamax vessels
New Bulk Handling FacilityNew Bulk Handling FacilityNew Bulk Handling Facility
Capacity 3.5 - 4Mtpa
Commitments 1.9 Mta
6 shipments per month
Possible 4- 4.5 Mtpa
Liquids Berth 210mGeneral / Container Berth 145mBulk Loader Berth 280mRig Tender Berth 140m
East Arm BerthsEast Arm BerthsEast Arm Berths
12.2m
11.8m
12.5m
11.8m
East Arm has 775m of continuous quay line which is available to Port users on a common user basis. Development approvals in place allow for future extension of the quay line to 1500m
A$200 million spent on stages 1 & 2
Oxiana Stage 2
Shed 5
Shed 2Shed 4
- Relocate vehicle storage
- Relocate project hardstand
- Relocate common user container hardstand
- Relocate O&G hardstand
- Future hardstand reclamation and creation
required
Shed 6
Future possible developmentsFuture possible developmentsFuture possible developments
Overland conveyors from stockpile to ship loader
Reclamation of 2.8ha area behind ship loader
Upgrade to ship loader drive and belts
Reclamation of Pond F
Construction of 4000sqm cargo shed
Berth pocket dredging
Charles Point patches dredging
Reviews Under wayReviews Under wayReviews Under way
Review of Harbour Management and Pilotage
Development of Port Land Use Strategy - East Arm
Development of Scope for Port of Darwin Dredging Programme
Bulk Loader East Arm - Environmental Review
Port & ChannelPort & Channel
Assets and recent Assets and recent expansionexpansion
Why call Darwin for bulk.Why call Darwin for bulk.
StaffStaff
-
Prominent HillCopper / Gold
Olympic DamCopper / Gold /
Uranium
Leigh CreekCoal Beverley
Uranium
ChallengerGold
Ambrosia Mineral Sands
JacinthMineral Sands
RelianceZinc
Goulds DamUranium Portia
Gold
Middleback RangeIron Ore
AngasZinc
ADELAIDE
ALICE SPRINGS
TENNANTCREEK
KATHERINE
DARWINRanger / Jabiluka
UraniumUnion Reefs
Gold
GoveBauxite/Alumina
Northern LimeLime
MerlinDiamonds
McArthur RiverLead/Zinc/Silver
Edna BerylGold
Bootu CreekManganese
GroundrushGold
TanamiOperations
Gold
Peko Project Gold
Harts RangeMineral Sands
Melville Island
Bathurst Island
BatchelorManganese
Browns OxideCobalt/Nickel
Mud TankVarriculite
Palm ValleyGas
MereenieGas and Oil
Railw
ay
WonarahPhosphate
Rai
lway
TunkilliaGold Kalkaroo
Copper / gold
HoneymoonUranium
White DamGold
MindarieMineral
Sands
KanmantooCopper / Gold
0 200 km
Operating mine
Mineral project
Legend
Frances CreekIron Ore
PhillipsonCoal
ArckinragaCoal
BigrlyiUranium
Nolans BorePhosphate
MolyhilTungsten
Rai
lway
TARCOOLA
Mt Porter Gold
RustlersRoostGold
Maud Creek Gold
Redbank Copper
Century Zinc
MT ISAChariotGold
WerregoGold
Juno Gold
Lucy Creek Uranium
YalyirimbaUranium
White Range Gold
Claude Hills Coal
WingellinaCoal
Peculiar KnobIron Ore
Mt Fitton
Hatches CreekTungsten, Gold
and Copper
Oberon Gold
Supply ChainSupply Chain
2200km28hrs
1) Direct rail link from Adelaide to Darwin Port
2) Catchment cargo either side of rail.
2) Current clients
Territory Resources Frances CreekOM Manganese Bootu CreekOxiana Prominent Hill
3) Infrastructure is built and operating
800km11 hrs
190km3hrs
??
Discharge Discharge PortPort
Load PortLoad Port DistanceDistancenautical milesnautical miles
Time round Time round voyage invoyage indays days
(1)(1)
Additional Additional days from days from DarwinDarwin
Additional charter hire @ US$ Additional charter hire @ US$ 96,000 per day96,000 per day
Shanghai Darwin 5530 18
Townsville 7444 24 6 US$576,000
Adelaide 10664 34 14 US$1,344,000
Vessel voyage charter cost comparisonVessel voyage charter cost comparisonVessel voyage charter cost comparison
Supply ChainSupply Chain
Assumptions•Round voyage Shanghai / Australia load port•Voyage at 13 knots•Vessel charter hire at US$96,000•Load 67,000 tonne
Port & ChannelPort & Channel
Assets and recent Assets and recent expansionexpansion
Why call Darwin for bulk.Why call Darwin for bulk.
Staff Staff …… over to over to MerrynMerryn
Identified HR IssuesIdentified HR IssuesIdentified HR Issues
Leadership•Industry Growth will require a different leader
Ageing Workforce•52% age 55 (and Over) in 5 years
Low turnover• average length of service is 11.1 years
Hard to recruit roles•Electricians, Marine Pilots, Attraction and retention issues
Future Labour Market•Future generations will not be attracted to the traditional roles at the Port
Recruitment Recruitment Recruitment
Security RolesCapture market as they receive their licence
ElectriciansNon traditional methods – word of mouth
Marine Pilots e457 Visas
Ageing Workforce vs Low Turnover
Future Generations and Port Roles
People ProgramsPeople ProgramsPeople Programs
Workforce Plan•Ageing Workforce•New infrastructure•24/7 operation•Future Labour Market
Succession Planning Program•Critical Roles •Career Management•Knowledge Management
Performance Management Program•Doing the right things, right
Leadership Program•Develop leaders and change agents
Industrial Relations Reform•Terms and conditions of employment
Reward and Recognition Program•Develop Reward Programs to support the desired culture
Thank you.